INDOT contract B-42436-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on December 10, 2025, Carroll, LaPorte. 7 bids received; low bid $4,187,900 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 114
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $4,187,900 | Low |
| 2 | His Constructors Inc | $4,234,197 | +1.0% |
| 3 | Beaty Construction Inc | $4,592,586 | +10% |
| 4 | E & B Paving LLC | $4,763,548 | +14% |
| 5 | Dunnet Bay Construction Company | $4,783,156 | +14% |
| 6 | Icc Group Inc | $4,967,000 | +19% |
| 7 | Rieth-Riley Construction Co., Inc. | $5,062,473 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. His Constructors Inc | 3. Beaty Construction Inc | 4. E & B Paving LLC | 5. Dunnet Bay Construction Company | 6. Icc Group Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $18,100 | $43,205 | $19,700 | $90,000 | $250,000 | $19,700 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $190,000 | $211,710 | $230,000 | $238,000 | $253,000 | $235,000 |
| 0010 | Tree, 6 in., remove (201-02245) | EACH | 90 | $110.00 | $110.00 | $110.00 | $110.00 | $66.00 | $110.00 |
| 0011 | Tree, 10 in., remove (201-02250) | EACH | 45 | $160.00 | $160.00 | $160.00 | $160.00 | $110.00 | $160.00 |
| 0012 | Tree, 18 in., remove (201-02255) | EACH | 53 | $270.00 | $270.00 | $270.00 | $270.00 | $235.00 | $270.00 |
| 0013 | Tree, 30 in., remove (201-02260) | EACH | 22 | $890.00 | $890.45 | $890.45 | $890.45 | $550.00 | $890.45 |
| 0014 | Tree, 48 in., remove (201-02265) | EACH | 12 | $1,800.00 | $1,800.00 | $1,800.00 | $1,800.00 | $750.00 | $1,800.00 |
| 0015 | Tree, 60 in., remove (201-02270) | EACH | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $1,000.00 | $4,000.00 |
| 0016 | Clearing right-of-way (201-52370) | LS | 1 | $38,000 | $84,684 | $91,500 | $95,200 | $95,802 | $1,200.00 |
| 0017 | Pavement removal (202-02240) | SYS | 1,213 | $1.00 | $34.00 | $22.00 | $20.00 | $1.00 | $27.00 |
| 0018 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $375,000 | $360,000 | $585,000 | $729,654 | $500,000 | $375,000 |
| 0019 | Excavation, common (203-02000) | CYS | 2,785 | $35.00 | $26.00 | $30.00 | $98.00 | $30.00 | $39.00 |
| 0020 | Borrow (203-02070) | CYS | 1,207 | $0.01 | $30.00 | $40.00 | $0.01 | $65.00 | $80.00 |
| 0021 | Stormwater management budget (205-12108) | DOL | 53,828 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0022 | Stormwater management implementation (205-12616) | LS | 1 | $20,000 | $4,000.00 | $25,000 | $90,000 | $20,000 | $11,700 |
| 0023 | SWQCP preparation (205-12618) | LS | 1 | $7,500.00 | $3,500.00 | $3,800.00 | $3,200.00 | $5,000.00 | $3,200.00 |
| 0024 | Excavation, foundation, unclassified (206-51230) | CYS | 255 | $20.00 | $55.00 | $80.00 | $90.00 | $66.00 | $60.00 |
| 0025 | Cofferdam (206-51235) | LS | 1 | $75,000 | $75,000 | $219,500 | $65,000 | $1.00 | $222,324 |
| 0026 | Subgrade treatment, type III (207-08266) | SYS | 997 | $15.00 | $2.00 | $12.00 | $12.00 | $12.00 | $10.00 |
| 0027 | Subgrade treatment, type IC (207-09935) | SYS | 2,073 | $30.00 | $42.00 | $42.00 | $58.00 | $37.00 | $28.00 |
| 0028 | Aggregate for end bent backfill (211-06467) | CYS | 52 | $175.00 | $79.00 | $215.00 | $120.00 | $250.00 | $120.00 |
| 0029 | Structure backfill, type 2 (211-09265) | CYS | 254 | $175.00 | $106.00 | $355.00 | $100.00 | $100.00 | $110.00 |
| 0030 | Geogrid, type IB (214-11796) | SYS | 2,073 | $1.50 | $2.00 | $2.50 | $2.00 | $2.00 | $2.00 |
| 0031 | Geotextile for pavement, type 2B (214-12239) | SYS | 602 | $4.00 | $5.00 | $4.50 | $5.00 | $4.50 | $7.00 |
| 0032 | Compacted aggregate, no. 2 (301-12231) | CYS | 54 | $80.00 | $82.00 | $135.00 | $120.00 | $129.00 | $78.75 |
| 0033 | Compacted aggregate, no. 53 (301-12234) | CYS | 134 | $100.00 | $90.00 | $115.00 | $80.00 | $104.00 | $100.00 |
| 0034 | Subbase for PCCP (302-06464) | CYS | 81 | $150.00 | $160.00 | $185.00 | $100.00 | $1.00 | $120.00 |
| 0035 | Compacted aggregate, for trails (303-000164) | TON | 104 | $50.00 | $64.00 | $60.00 | $90.00 | $56.00 | $69.00 |
| 0036 | Compacted aggregate, no. 73 (303-07449) | TON | 225 | $70.00 | $41.00 | $70.00 | $37.80 | $63.00 | $59.00 |
| 0037 | Milling, transition (306-08043) | SYS | 1,172 | $8.00 | $7.00 | $10.00 | $10.00 | $8.50 | $6.00 |
| 0038 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 248 | $145.00 | $145.00 | $168.00 | $167.00 | $145.00 | $145.00 |
| 0039 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 284 | $130.00 | $130.00 | $118.00 | $145.00 | $130.00 | $130.00 |
| 0040 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 923 | $80.00 | $80.00 | $118.00 | $114.00 | $80.00 | $80.00 |
| 0041 | Joint adhesive (401-11526) | LFT | 3,394 | $0.50 | $0.50 | $1.00 | $0.50 | $0.50 | $0.50 |
| 0042 | Asphalt for tack coat (406-05520) | TON | 3 | $100.00 | $100.00 | $1.00 | $600.00 | $100.00 | $100.00 |
| 0043 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $1,000.00 | $1,000.00 | $1,500.00 | $2,000.00 | $1,000.00 | $1,000.00 |
| 0044 | Guardrail transition, type TGB (601-01522) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0045 | Guardrail terminal system, W-beam, curved, type 1 (601-01700) | EACH | 1 | $2,900.00 | $2,900.00 | $2,800.00 | $2,800.00 | $2,800.00 | $2,800.00 |
| 0046 | Guardrail, remove (601-02241) | LFT | 971 | $2.00 | $2.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 0047 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 575 | $23.00 | $23.00 | $22.00 | $22.00 | $22.00 | $22.00 |
| 0048 | Guardrail transition, MGS without curb (601-12292) | EACH | 3 | $3,090.00 | $3,090.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 0049 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $2,900.00 | $2,900.00 | $2,450.00 | $2,450.00 | $2,450.00 | $2,450.00 |
| 0050 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 68.75 | $28.00 | $28.00 | $24.00 | $24.00 | $24.00 | $24.00 |
| 0051 | Barrier delineator (602-06729) | EACH | 14 | $25.00 | $13.19 | $30.00 | $20.00 | $50.00 | $25.00 |
| 0052 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 268 | $125.00 | $175.00 | $155.00 | $150.00 | $230.00 | $185.20 |
| 0053 | Right-of-way marker (615-06490) | EACH | 12 | $145.00 | $145.00 | $175.00 | $175.00 | $175.00 | $175.00 |
| 0054 | Monument, type B (615-06505) | EACH | 2 | $950.00 | $950.00 | $1,600.00 | $1,600.00 | $1,600.00 | $1,600.00 |
| 0055 | Riprap, class 2 (616-05689) | TON | 1,369 | $110.00 | $117.00 | $115.00 | $85.00 | $143.00 | $125.00 |
| 0056 | Riprap, revetment (616-06405) | TON | 95 | $75.00 | $99.00 | $65.00 | $80.00 | $135.00 | $85.00 |
| 0057 | Geotextile for riprap, type 1A (616-12246) | SYS | 1,218 | $1.25 | $3.00 | $2.00 | $4.00 | $3.00 | $4.50 |
| 0058 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $400.00 | $400.00 | $400.00 | $400.00 | $400.00 | $400.00 |
| 0059 | Mulched seeding, type R (621-06559) | SYS | 2,008 | $2.00 | $2.08 | $2.08 | $2.08 | $2.08 | $2.08 |
| 0060 | Sodding (621-06574) | SYS | 49 | $35.50 | $35.50 | $35.50 | $35.50 | $35.50 | $36.50 |
| 0061 | Seed mixture, floodplain (621-12612) | LBS | 18 | $337.00 | $337.00 | $337.00 | $337.00 | $337.00 | $337.00 |
| 0062 | Field office, type C (628-09403) | MOS | 12 | $4,000.00 | $2,684.00 | $3,600.00 | $3,000.00 | $3,000.00 | $3,250.00 |
| 0063 | Topsoil processing and distribution (629-000149) | SYS | 6,361 | $5.75 | $22.00 | $10.00 | $2.00 | $5.70 | $9.45 |
| 0064 | Topsoil amendment budget (629-000150) | DOL | 12,721 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0065 | Cored hole in rock, diameter 24 in. (701-02938) | LFT | 70 | $850.00 | $846.00 | $1,205.00 | $500.00 | $1,745.00 | $345.00 |
| 0066 | Dynamic pile load test (701-06011) | EACH | 2 | $4,000.00 | $5,500.00 | $6,800.00 | $5,000.00 | $25,000 | $1,790.00 |
| 0067 | Test pile, indicator, production (701-09558) | LFT | 89 | $50.00 | $119.00 | $40.00 | $120.00 | $150.00 | $215.00 |
| 0068 | Test pile, dynamic, restrike (701-09559) | EACH | 2 | $4,000.00 | $2,500.00 | $7,000.00 | $1,500.00 | $8,000.00 | $1,800.00 |
| 0069 | Test pile, indicator, restrike (701-09560) | EACH | 2 | $4,000.00 | $2,500.00 | $1,700.00 | $2,000.00 | $20,000 | $1,800.00 |
| 0070 | Pile shoe, HP 12 X 53 (701-09739) | EACH | 14 | $135.00 | $150.00 | $125.00 | $300.00 | $125.00 | $175.00 |
| 0071 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 414 | $170.00 | $60.00 | $75.00 | $115.00 | $67.00 | $95.00 |
| 0072 | Concrete, C, substructure (702-92857) | CYS | 107 | $1,800.00 | $1,450.00 | $1,500.00 | $1,800.00 | $2,300.00 | $1,900.00 |
| 0073 | Reinforcing bars (703-06028) | LBS | 23,517 | $1.50 | $1.70 | $1.25 | $1.25 | $1.28 | $1.40 |
| 0074 | Reinforcing bars, epoxy coated (703-06029) | LBS | 134,704 | $1.60 | $1.75 | $1.35 | $1.45 | $1.25 | $1.50 |
| 0075 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 50 | $33.00 | $50.00 | $45.00 | $30.00 | $41.00 | $55.00 |
| 0076 | Concrete, C, superstructure (704-51002) | CYS | 315.20 | $1,100.00 | $1,250.00 | $900.00 | $1,800.00 | $1,695.00 | $1,040.00 |
| 0077 | Concrete bridge railing transition, type TPF-1 (706-06351) | EACH | 2 | $9,000.00 | $9,000.00 | $4,000.00 | $9,000.00 | $4,000.00 | $9,000.00 |
| 0078 | Reinforced concrete moment slab, 13 in. (706-08498) | SYS | 48 | $350.00 | $250.00 | $400.00 | $125.00 | $340.00 | $400.00 |
| 0079 | Railing, concrete type FC (706-09960) | LFT | 471 | $89.00 | $89.00 | $75.00 | $89.00 | $118.00 | $89.00 |
| 0080 | Railing, concrete type PF-1 (706-09962) | LFT | 194 | $130.00 | $130.00 | $110.00 | $130.00 | $118.00 | $130.00 |
| 0081 | Railing, steel type PF-1 (706-11404) | LFT | 203 | $105.00 | $113.35 | $125.00 | $87.50 | $87.50 | $98.30 |
| 0082 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,500.00 | $2,500.00 | $1,250.00 | $2,500.00 | $4,000.00 | $2,500.00 |
| 0083 | Structural member, concrete, bulb-T beam, 36 in. X 49 in. (707-09865) | LFT | 963 | $600.00 | $675.00 | $612.00 | $450.00 | $502.00 | $900.00 |
| 0084 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $500.00 | $5,000.00 | $1.00 | $1.00 | $1.00 | $8,000.00 |
| 0085 | Waterproofing membrane, type 2 (714-000086) | SFT | 2,530 | $3.00 | $5.00 | $4.00 | $2.00 | $8.00 | $2.31 |
| 0086 | Structure, reinforced concrete, box sections, 16 FT X 11 FT (714-11162) | LFT | 58 | $6,100.00 | $5,300.00 | $5,000.00 | $1,600.00 | $4,300.00 | $9,725.00 |
| 0087 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 164 | $19.00 | $18.00 | $5.00 | $10.00 | $37.00 | $27.00 |
| 0088 | Geotextile for underdrains, type 2B (718-12308) | SYS | 118 | $8.00 | $9.00 | $8.50 | $5.00 | $12.00 | $10.00 |
| 0089 | Longitudinal grooving (722-12732) | SYS | 984 | $3.50 | $3.50 | $8.00 | $7.50 | $5.80 | $3.50 |
| 0090 | Bearing assembly, elastomeric (726-92406) | EACH | 20 | $1,500.00 | $1,600.00 | $1,300.00 | $1,500.00 | $3,200.00 | $2,410.00 |
| 0091 | Drilled shaft, exploratory core (728-11672) | LFT | 396 | $175.00 | $76.00 | $165.00 | $150.00 | $121.21 | $75.75 |
| 0092 | Drilled shaft, permanent casing (728-11673) | LFT | 196 | $350.00 | $230.00 | $230.00 | $229.59 | $217.00 | $315.00 |
| 0093 | Drilled shaft, diameter 36 in. (728-11713) | LFT | 196 | $600.00 | $280.00 | $500.00 | $600.00 | $950.00 | $1,220.00 |
| 0094 | Drilled shaft, diameter 30 in. (728-12209) | LFT | 80 | $1,500.00 | $1,053.00 | $1,000.00 | $1,000.00 | $666.00 | $1,365.00 |
| 0095 | Road closure sign assembly (801-04308) | EACH | 5 | $243.00 | $325.00 | $243.00 | $243.00 | $325.00 | $325.00 |
| 0096 | Temporary transverse pavement marking, removable, 6 in. (801-06217) | LFT | 52 | $2.00 | $2.75 | $1.93 | $1.93 | $2.75 | $2.75 |
| 0097 | Detour route marker assembly (801-06625) | EACH | 30 | $143.00 | $115.00 | $143.00 | $143.00 | $115.00 | $115.00 |
| 0098 | Construction sign, type A (801-06640) | EACH | 18 | $197.00 | $185.00 | $197.00 | $197.00 | $185.00 | $185.00 |
| 0099 | Construction sign, type B (801-06645) | EACH | 16 | $105.00 | $125.00 | $105.00 | $105.00 | $125.00 | $125.00 |
| 0100 | Maintaining traffic (801-06775) | LS | 1 | $50,000 | $10,000 | $55,000 | $160,000 | $25,000 | $2,643.00 |
| 0101 | Barricade, type III-A (801-07118) | LFT | 80 | $15.00 | $16.00 | $14.43 | $14.43 | $16.00 | $16.00 |
| 0102 | Barricade, type III-B (801-07119) | LFT | 160 | $15.00 | $16.00 | $14.43 | $14.43 | $16.00 | $16.00 |
| 0103 | Portable changeable message sign (801-11642) | EACH | 2 | $2,500.00 | $4,800.00 | $2,488.00 | $2,488.00 | $4,800.00 | $4,800.00 |
| 0104 | Temporary pedestrian channelizer (801-12862) | LFT | 1,286 | $16.00 | $15.00 | $25.72 | $10.00 | $15.00 | $15.00 |
| 0105 | Reference post (802-04893) | EACH | 4 | $294.00 | $294.00 | $217.00 | $217.00 | $217.00 | $217.00 |
| 0106 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 16 | $39.00 | $39.00 | $28.00 | $28.00 | $28.00 | $28.00 |
| 0107 | Sign, sheet, and supports, remove (802-07059) | EACH | 1 | $100.00 | $100.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 0108 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 6 | $33.00 | $33.00 | $34.00 | $34.00 | $34.00 | $34.00 |
| 0109 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,978 | $0.80 | $0.80 | $0.77 | $0.77 | $0.80 | $0.80 |
| 0110 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 915 | $0.80 | $0.80 | $0.77 | $0.77 | $0.80 | $0.80 |
| 0111 | Grooving for pavement markings (808-12032) | LFT | 2,425 | $0.80 | $0.55 | $0.76 | $0.76 | $0.55 | $0.55 |
| 0112 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 248 | $1.00 | $1.20 | $0.99 | $0.99 | $1.20 | $1.20 |
| 0113 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 13 | $20.00 | $65.00 | $50.00 | $8.00 | $230.68 | $65.00 |
| 0114 | Snowplowable raised pavement marker (808-75998) | EACH | 9 | $170.00 | $50.00 | $168.00 | $168.00 | $50.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.