INDOT contract B-42436-A bid tabulation

BRIDGE REPLACEMENT. Let by Indiana DOT on December 10, 2025, Carroll, LaPorte. 7 bids received; low bid $4,187,900 by Milestone Contractors LP.

Owner
Indiana DOT
Letting
10 DEC 2025
Pay items
114
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Milestone Contractors LP$4,187,900Low
2His Constructors Inc$4,234,197+1.0%
3Beaty Construction Inc$4,592,586+10%
4E & B Paving LLC$4,763,548+14%
5Dunnet Bay Construction Company$4,783,156+14%
6Icc Group Inc$4,967,000+19%
7Rieth-Riley Construction Co., Inc.$5,062,473+21%
INDOT contract B-42436-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Milestone Contractors LP2. His Constructors Inc3. Beaty Construction Inc4. E & B Paving LLC5. Dunnet Bay Construction Company6. Icc Group Inc
0001Construction engineering (105-06845)LS1$18,100$43,205$19,700$90,000$250,000$19,700
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$190,000$211,710$230,000$238,000$253,000$235,000
0010Tree, 6 in., remove (201-02245)EACH90$110.00$110.00$110.00$110.00$66.00$110.00
0011Tree, 10 in., remove (201-02250)EACH45$160.00$160.00$160.00$160.00$110.00$160.00
0012Tree, 18 in., remove (201-02255)EACH53$270.00$270.00$270.00$270.00$235.00$270.00
0013Tree, 30 in., remove (201-02260)EACH22$890.00$890.45$890.45$890.45$550.00$890.45
0014Tree, 48 in., remove (201-02265)EACH12$1,800.00$1,800.00$1,800.00$1,800.00$750.00$1,800.00
0015Tree, 60 in., remove (201-02270)EACH1$4,000.00$4,000.00$4,000.00$4,000.00$1,000.00$4,000.00
0016Clearing right-of-way (201-52370)LS1$38,000$84,684$91,500$95,200$95,802$1,200.00
0017Pavement removal (202-02240)SYS1,213$1.00$34.00$22.00$20.00$1.00$27.00
0018Present structure, remove, structure no. 1 (202-51330)LS1$375,000$360,000$585,000$729,654$500,000$375,000
0019Excavation, common (203-02000)CYS2,785$35.00$26.00$30.00$98.00$30.00$39.00
0020Borrow (203-02070)CYS1,207$0.01$30.00$40.00$0.01$65.00$80.00
0021Stormwater management budget (205-12108)DOL53,828$1.00$1.00$1.00$1.00$1.00$1.00
0022Stormwater management implementation (205-12616)LS1$20,000$4,000.00$25,000$90,000$20,000$11,700
0023SWQCP preparation (205-12618)LS1$7,500.00$3,500.00$3,800.00$3,200.00$5,000.00$3,200.00
0024Excavation, foundation, unclassified (206-51230)CYS255$20.00$55.00$80.00$90.00$66.00$60.00
0025Cofferdam (206-51235)LS1$75,000$75,000$219,500$65,000$1.00$222,324
0026Subgrade treatment, type III (207-08266)SYS997$15.00$2.00$12.00$12.00$12.00$10.00
0027Subgrade treatment, type IC (207-09935)SYS2,073$30.00$42.00$42.00$58.00$37.00$28.00
0028Aggregate for end bent backfill (211-06467)CYS52$175.00$79.00$215.00$120.00$250.00$120.00
0029Structure backfill, type 2 (211-09265)CYS254$175.00$106.00$355.00$100.00$100.00$110.00
0030Geogrid, type IB (214-11796)SYS2,073$1.50$2.00$2.50$2.00$2.00$2.00
0031Geotextile for pavement, type 2B (214-12239)SYS602$4.00$5.00$4.50$5.00$4.50$7.00
0032Compacted aggregate, no. 2 (301-12231)CYS54$80.00$82.00$135.00$120.00$129.00$78.75
0033Compacted aggregate, no. 53 (301-12234)CYS134$100.00$90.00$115.00$80.00$104.00$100.00
0034Subbase for PCCP (302-06464)CYS81$150.00$160.00$185.00$100.00$1.00$120.00
0035Compacted aggregate, for trails (303-000164)TON104$50.00$64.00$60.00$90.00$56.00$69.00
0036Compacted aggregate, no. 73 (303-07449)TON225$70.00$41.00$70.00$37.80$63.00$59.00
0037Milling, transition (306-08043)SYS1,172$8.00$7.00$10.00$10.00$8.50$6.00
0038QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005)TON248$145.00$145.00$168.00$167.00$145.00$145.00
0039QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041)TON284$130.00$130.00$118.00$145.00$130.00$130.00
0040QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON923$80.00$80.00$118.00$114.00$80.00$80.00
0041Joint adhesive (401-11526)LFT3,394$0.50$0.50$1.00$0.50$0.50$0.50
0042Asphalt for tack coat (406-05520)TON3$100.00$100.00$1.00$600.00$100.00$100.00
0043Cracks in asphalt pavement, fill (408-12028)TON1$1,000.00$1,000.00$1,500.00$2,000.00$1,000.00$1,000.00
0044Guardrail transition, type TGB (601-01522)EACH1$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00
0045Guardrail terminal system, W-beam, curved, type 1 (601-01700)EACH1$2,900.00$2,900.00$2,800.00$2,800.00$2,800.00$2,800.00
0046Guardrail, remove (601-02241)LFT971$2.00$2.00$4.00$4.00$4.00$4.00
0047Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT575$23.00$23.00$22.00$22.00$22.00$22.00
0048Guardrail transition, MGS without curb (601-12292)EACH3$3,090.00$3,090.00$3,500.00$3,500.00$3,500.00$3,500.00
0049Guardrail end treatment, type OS (601-94689)EACH3$2,900.00$2,900.00$2,450.00$2,450.00$2,450.00$2,450.00
0050Guardrail, W-beam, 6 FT 3 in. spacing (601-99105)LFT68.75$28.00$28.00$24.00$24.00$24.00$24.00
0051Barrier delineator (602-06729)EACH14$25.00$13.19$30.00$20.00$50.00$25.00
0052Reinforced concrete bridge approach, 12 in. (609-06259)SYS268$125.00$175.00$155.00$150.00$230.00$185.20
0053Right-of-way marker (615-06490)EACH12$145.00$145.00$175.00$175.00$175.00$175.00
0054Monument, type B (615-06505)EACH2$950.00$950.00$1,600.00$1,600.00$1,600.00$1,600.00
0055Riprap, class 2 (616-05689)TON1,369$110.00$117.00$115.00$85.00$143.00$125.00
0056Riprap, revetment (616-06405)TON95$75.00$99.00$65.00$80.00$135.00$85.00
0057Geotextile for riprap, type 1A (616-12246)SYS1,218$1.25$3.00$2.00$4.00$3.00$4.50
0058Mobilization and demobilization for seeding (621-01004)EACH2$400.00$400.00$400.00$400.00$400.00$400.00
0059Mulched seeding, type R (621-06559)SYS2,008$2.00$2.08$2.08$2.08$2.08$2.08
0060Sodding (621-06574)SYS49$35.50$35.50$35.50$35.50$35.50$36.50
0061Seed mixture, floodplain (621-12612)LBS18$337.00$337.00$337.00$337.00$337.00$337.00
0062Field office, type C (628-09403)MOS12$4,000.00$2,684.00$3,600.00$3,000.00$3,000.00$3,250.00
0063Topsoil processing and distribution (629-000149)SYS6,361$5.75$22.00$10.00$2.00$5.70$9.45
0064Topsoil amendment budget (629-000150)DOL12,721$1.00$1.00$1.00$1.00$1.00$1.00
0065Cored hole in rock, diameter 24 in. (701-02938)LFT70$850.00$846.00$1,205.00$500.00$1,745.00$345.00
0066Dynamic pile load test (701-06011)EACH2$4,000.00$5,500.00$6,800.00$5,000.00$25,000$1,790.00
0067Test pile, indicator, production (701-09558)LFT89$50.00$119.00$40.00$120.00$150.00$215.00
0068Test pile, dynamic, restrike (701-09559)EACH2$4,000.00$2,500.00$7,000.00$1,500.00$8,000.00$1,800.00
0069Test pile, indicator, restrike (701-09560)EACH2$4,000.00$2,500.00$1,700.00$2,000.00$20,000$1,800.00
0070Pile shoe, HP 12 X 53 (701-09739)EACH14$135.00$150.00$125.00$300.00$125.00$175.00
0071Pile, steel H, HP 12 X 53 (701-51195)LFT414$170.00$60.00$75.00$115.00$67.00$95.00
0072Concrete, C, substructure (702-92857)CYS107$1,800.00$1,450.00$1,500.00$1,800.00$2,300.00$1,900.00
0073Reinforcing bars (703-06028)LBS23,517$1.50$1.70$1.25$1.25$1.28$1.40
0074Reinforcing bars, epoxy coated (703-06029)LBS134,704$1.60$1.75$1.35$1.45$1.25$1.50
0075Threaded tie bar assembly, epoxy coated (703-97936)EACH50$33.00$50.00$45.00$30.00$41.00$55.00
0076Concrete, C, superstructure (704-51002)CYS315.20$1,100.00$1,250.00$900.00$1,800.00$1,695.00$1,040.00
0077Concrete bridge railing transition, type TPF-1 (706-06351)EACH2$9,000.00$9,000.00$4,000.00$9,000.00$4,000.00$9,000.00
0078Reinforced concrete moment slab, 13 in. (706-08498)SYS48$350.00$250.00$400.00$125.00$340.00$400.00
0079Railing, concrete type FC (706-09960)LFT471$89.00$89.00$75.00$89.00$118.00$89.00
0080Railing, concrete type PF-1 (706-09962)LFT194$130.00$130.00$110.00$130.00$118.00$130.00
0081Railing, steel type PF-1 (706-11404)LFT203$105.00$113.35$125.00$87.50$87.50$98.30
0082Concrete bridge railing transition, type TFC (706-11620)EACH4$2,500.00$2,500.00$1,250.00$2,500.00$4,000.00$2,500.00
0083Structural member, concrete, bulb-T beam, 36 in. X 49 in. (707-09865)LFT963$600.00$675.00$612.00$450.00$502.00$900.00
0084Surface seal , bridge no. 1 (709-51821)LS1$500.00$5,000.00$1.00$1.00$1.00$8,000.00
0085Waterproofing membrane, type 2 (714-000086)SFT2,530$3.00$5.00$4.00$2.00$8.00$2.31
0086Structure, reinforced concrete, box sections, 16 FT X 11 FT (714-11162)LFT58$6,100.00$5,300.00$5,000.00$1,600.00$4,300.00$9,725.00
0087Pipe, end bent drain, diameter 6 in. (715-05407)LFT164$19.00$18.00$5.00$10.00$37.00$27.00
0088Geotextile for underdrains, type 2B (718-12308)SYS118$8.00$9.00$8.50$5.00$12.00$10.00
0089Longitudinal grooving (722-12732)SYS984$3.50$3.50$8.00$7.50$5.80$3.50
0090Bearing assembly, elastomeric (726-92406)EACH20$1,500.00$1,600.00$1,300.00$1,500.00$3,200.00$2,410.00
0091Drilled shaft, exploratory core (728-11672)LFT396$175.00$76.00$165.00$150.00$121.21$75.75
0092Drilled shaft, permanent casing (728-11673)LFT196$350.00$230.00$230.00$229.59$217.00$315.00
0093Drilled shaft, diameter 36 in. (728-11713)LFT196$600.00$280.00$500.00$600.00$950.00$1,220.00
0094Drilled shaft, diameter 30 in. (728-12209)LFT80$1,500.00$1,053.00$1,000.00$1,000.00$666.00$1,365.00
0095Road closure sign assembly (801-04308)EACH5$243.00$325.00$243.00$243.00$325.00$325.00
0096Temporary transverse pavement marking, removable, 6 in. (801-06217)LFT52$2.00$2.75$1.93$1.93$2.75$2.75
0097Detour route marker assembly (801-06625)EACH30$143.00$115.00$143.00$143.00$115.00$115.00
0098Construction sign, type A (801-06640)EACH18$197.00$185.00$197.00$197.00$185.00$185.00
0099Construction sign, type B (801-06645)EACH16$105.00$125.00$105.00$105.00$125.00$125.00
0100Maintaining traffic (801-06775)LS1$50,000$10,000$55,000$160,000$25,000$2,643.00
0101Barricade, type III-A (801-07118)LFT80$15.00$16.00$14.43$14.43$16.00$16.00
0102Barricade, type III-B (801-07119)LFT160$15.00$16.00$14.43$14.43$16.00$16.00
0103Portable changeable message sign (801-11642)EACH2$2,500.00$4,800.00$2,488.00$2,488.00$4,800.00$4,800.00
0104Temporary pedestrian channelizer (801-12862)LFT1,286$16.00$15.00$25.72$10.00$15.00$15.00
0105Reference post (802-04893)EACH4$294.00$294.00$217.00$217.00$217.00$217.00
0106Sign post, square, type 2, reinforced anchor base (802-05702)LFT16$39.00$39.00$28.00$28.00$28.00$28.00
0107Sign, sheet, and supports, remove (802-07059)EACH1$100.00$100.00$65.00$65.00$65.00$65.00
0108Sign, sheet, with legend, 0.100 in. thickness (802-09840)SFT6$33.00$33.00$34.00$34.00$34.00$34.00
0109Line, multi-component, solid, white, 6 in. (808-10049)LFT1,978$0.80$0.80$0.77$0.77$0.80$0.80
0110Line, multi-component, solid, yellow, 6 in. (808-10057)LFT915$0.80$0.80$0.77$0.77$0.80$0.80
0111Grooving for pavement markings (808-12032)LFT2,425$0.80$0.55$0.76$0.76$0.55$0.55
0112Line, multi-component, broken, yellow, 6 in. (808-12841)LFT248$1.00$1.20$0.99$0.99$1.20$1.20
0113Snowplowable raised pavement marker, remove (808-75996)EACH13$20.00$65.00$50.00$8.00$230.68$65.00
0114Snowplowable raised pavement marker (808-75998)EACH9$170.00$50.00$168.00$168.00$50.00$50.00
INDOT contract B-42436-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy