INDOT contract B-43780-A bid tabulation

BRIDGE DECK OVERLAY. Let by Indiana DOT on September 10, 2025, Morgan, Seymour. 8 bids received; low bid $3,467,142 by Superior Construction Co Inc.

Owner
Indiana DOT
Letting
10 SEP 2025
Pay items
122
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Superior Construction Co Inc$3,467,142Low
2Beaty Construction Inc$3,664,707+6.0%
3Pontem Contractors Inc$4,029,084+16%
4Force Construction Co Inc$4,160,532+20%
5Milestone Contractors LP$4,334,500+25%
6E & B Paving LLC$4,394,800+27%
7William Charles Construction Company$4,434,000+28%
8Ragle, Inc.$4,566,498+32%
INDOT contract B-43780-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Superior Construction Co Inc2. Beaty Construction Inc3. Pontem Contractors Inc4. Force Construction Co Inc5. Milestone Contractors LP6. E & B Paving LLC
0001Construction engineering (105-06845)LS1$25,000$9,800.00$20,000$20,470$9,800.00$10,166
0002Inspection hole, deeper than 3 FT (107-09358)EACH2$400.00$2,000.00$1,080.77$1,158.00$1,500.00$3,300.00
0003Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, PCCP (109-08441)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0010Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0011Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0012Mobilization and demobilization (110-01001)LS1$172,000$183,000$201,000$208,000$215,979$217,500
0013Clearing right-of-way (201-52370)LS1$16,000$18,000$20,100$49,650$21,500$21,750
0014Debris, remove, structure no. 2 (201-90788)LS1$15,000$33,600$15,000$6,171.00$47,352$36,000
0015Pavement removal (202-02240)SYS1,446$30.00$29.00$25.84$28.00$72.61$35.00
0016Present structure, remove portions, structure no. 1 (202-51328)LS1$149,385$100,000$86,000$66,270$76,675$150,000
0017Present structure, remove portions, structure no. 2 (202-51328)LS1$60,000$20,000$58,809$6,020.00$41,920$75,000
0018Excavation, common (203-02000)CYS871$36.00$60.00$77.27$64.00$57.27$74.00
0019Stormwater management budget (205-12108)DOL14,800$1.00$1.00$1.00$1.00$1.00$1.00
0020Stormwater management implementation (205-12616)LS1$15,000$9,500.00$50,012$13,200$13,222$41,000
0021SWQCP preparation (205-12618)LS1$1,500.00$2,000.00$7,140.65$3,600.00$2,250.00$3,150.00
0022Excavation, foundation, unclassified (206-51230)CYS18$117.00$260.00$124.76$120.00$393.83$500.00
0023Cofferdam (206-51235)LS1$25,000$90,000$73,136$145,940$40,500$50,000
0024Subgrade treatment, type II (207-08264)SYS1,368$25.00$27.50$31.20$28.00$29.89$30.00
0025Subgrade treatment, type IC (207-09935)SYS1,880$35.00$41.00$39.02$43.00$55.35$75.00
0026B borrow (211-02050)CYS8$140.00$153.00$184.94$235.00$120.06$92.00
0027Aggregate for end bent backfill (211-06467)CYS18$162.00$280.00$197.99$200.00$100.51$300.00
0028Structure backfill, type 2 (211-09265)CYS16$57.00$121.00$93.67$191.00$80.41$132.00
0029Geogrid, type IB (214-11796)SYS1,368$3.00$2.00$6.12$3.90$4.17$2.00
0030Geotextile for pavement, type 2B (214-12239)SYS2,139$4.00$3.50$5.47$5.10$5.71$5.00
0031Subbase for PCCP (302-06464)CYS519$88.00$107.00$128.08$106.00$117.78$120.00
0032QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009)TON113$161.00$161.00$172.27$166.00$192.00$220.00
0033QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045)TON189$118.00$118.00$126.26$121.00$124.00$160.00
0034QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048)TON752$83.00$83.00$88.81$85.00$118.00$125.00
0035Asphalt for tack coat (406-05521)SYS4,101$1.00$1.00$1.07$1.00$0.15$0.25
0037Retrofitted tie bars (503-03489)EACH92$44.00$29.00$32.97$71.00$81.51$10.00
0038D-1 contraction joint (503-05240)LFT76$55.00$25.00$36.84$101.00$107.31$35.00
0039Jointed reinforced concrete pavement, 12 in. (503-12476)SYS338$175.00$233.00$251.02$237.00$252.71$195.00
0040Terminal joint, type PCCP (503-12478)LFT76$182.00$350.00$298.88$389.00$617.50$200.00
0041Expansion joint with load transfer (503-12479)LFT76$42.00$80.00$45.23$66.00$79.75$36.00
0042Terminal joint, retrofit polymer modified asphalt (503-12480)SFT192$58.00$138.00$124.06$127.00$115.94$94.00
0043Cracks in PCCP, rout and seal (507-07482)LFT48$15.00$40.00$16.05$15.00$15.00$40.00
0044Guardrail transition, type TGB , modified (601-01522)EACH8$1,975.00$1,975.00$3,183.25$3,060.00$1,975.00$3,560.00
0045Guardrail, reset (601-06035)LFT830$19.00$19.00$9.63$9.30$19.00$15.00
0046Guardrail end treatment, type MS (601-94690)EACH1$6,480.00$6,480.00$5,885.00$5,657.00$6,480.00$5,771.00
0047Guardrail, W-beam, 6 FT 3 in. spacing (601-99105)LFT25$30.00$30.00$25.68$25.00$30.00$40.00
0048Barrier delineator (602-06729)EACH60$32.00$30.00$32.10$36.00$30.00$20.00
0049Curb, concrete, type B (605-06121)LFT830$13.61$20.00$41.80$35.00$66.69$83.00
0050Milled PCCP corrugations, conventional (606-11064)LFT800$3.00$5.00$3.21$3.10$2.93$11.00
0051Milled HMA corrugations, conventional (606-12399)LFT1,230$2.25$6.00$2.41$2.30$2.23$7.50
0052Reinforced concrete bridge approach, 12 in. (609-06259)SYS377$150.00$147.00$230.77$261.00$247.34$300.00
0053Riprap, class 1 (616-05688)TON1,376$100.00$122.00$94.13$116.00$137.95$105.00
0054Riprap, class 2 (616-05689)TON1,500$95.00$97.00$94.13$116.00$135.57$105.00
0055Riprap, grouted, 24 in. (616-11928)SYS1,376$30.00$30.00$182.67$54.00$116.70$20.00
0056Geotextile for riprap, type 1A (616-12246)SYS2,912$3.00$2.50$4.54$4.00$4.43$2.00
0057Clean steel bridge, QP-1, bridge no. 1 (619-11051)LS1$120,000$120,000$128,400$123,420$120,000$150,000
0058Clean steel bridge, QP-2, bridge no. 2 (619-11052)LS1$170,000$170,000$181,900$174,850$170,000$200,000
0059Disposal of cleaning waste, hazardous, bridge no. 2 (619-12459)LS1$2,000.00$2,000.00$2,140.00$2,057.00$2,000.00$2,000.00
0060Disposal of cleaning waste, non-hazardous, bridge no. 1 (619-12460)LS1$2,000.00$2,000.00$2,140.00$2,057.00$2,000.00$2,000.00
0061Coat steel bridge, bridge no. 1 (619-51859)LS1$65,000$65,000$69,550$66,850$65,000$75,000
0062Coat steel bridge, bridge no. 2 (619-51859)LS1$79,000$79,000$84,530$81,250$79,000$95,000
0063Clean and coat bearing assemblies, bridge no. 1 (619-95315)LS1$1,000.00$1,000.00$1,070.00$1,029.00$1,000.00$5,000.00
0064Clean and coat bearing assemblies, bridge no. 2 (619-95315)LS1$1,000.00$1,000.00$1,070.00$1,029.00$1,000.00$5,000.00
0065Mobilization and demobilization for seeding (621-01004)EACH2$200.00$200.00$1,070.00$206.00$200.00$200.00
0066Seed mixture, floodplain (621-12612)LBS67$125.00$125.00$214.00$129.00$125.00$125.00
0067Field office, type C (628-09403)MOS18$2,800.00$3,500.00$3,093.93$3,116.00$4,200.00$3,000.00
0068Computer system equipment (628-11976)EACH2$500.00$1,000.00$1,155.38$623.00$1,790.00$825.00
0069Temporary shoring (702-04325)LS1$15,000$28,000$19,526$28,750$7,400.00$15,000
0070Field drilled hole in concrete (702-51863)EACH112$0.01$30.00$18.10$52.00$29.70$30.00
0071Reinforcing bars, epoxy coated (703-06029)LBS30,542$1.50$1.60$1.64$1.70$2.28$1.25
0072Threaded tie bar assembly, epoxy coated (703-97936)EACH282$37.00$38.00$44.98$42.00$52.62$40.00
0073Concrete, C, superstructure (704-51002)CYS30$2,500.00$2,200.00$2,048.49$2,916.00$4,590.29$1,200.00
0074Railing, concrete type FC , modified (706-09960)LFT29$400.00$235.00$270.11$467.00$942.40$350.00
0075Concrete bridge railing transition, type TFC (706-11620)EACH8$3,500.00$3,170.00$5,066.20$6,260.00$6,476.55$2,800.00
0076Surface seal , bridge no. 1 (709-51821)LS1$8,979.37$9,600.00$9,607.93$9,236.00$8,979.37$12,000
0077Surface seal , bridge no. 2 (709-51821)LS1$9,000.82$9,700.00$9,630.88$9,258.00$9,000.82$12,000
0078Surface seal , bridge no. 3 (709-51821)LS1$7,748.86$5,900.00$8,291.28$7,970.00$7,748.86$12,000
0079Surface seal , bridge no. 4 (709-51821)LS1$7,748.86$5,900.00$8,291.28$7,970.00$7,748.86$12,000
0080Drilled hole (711-51864)EACH30$115.00$96.67$44.14$99.00$96.67$100.00
0081Jacking and supporting beams , bridge no. 1 (711-51877)LS1$75,000$40,000$9,484.60$9,848.00$10,295$30,000
0082Pipe, type 4, circular, diameter 6 in. (715-05048)LFT800$11.00$13.00$29.10$17.00$24.09$27.00
0083Pipe, underdrain outlet, diameter 6 in. (715-05053)LFT216$22.00$30.00$43.01$20.00$31.01$49.00
0084Pipe, end bent drain, diameter 6 in. (715-05407)LFT105$9.00$10.00$19.23$43.00$9.86$25.00
0085Outlet protector, type 2 (718-06529)EACH4$2,600.00$1,100.00$235.32$1,783.00$2,797.00$1,375.00
0086Geotextile for underdrains, type 1B (718-12306)SYS638$5.50$2.30$4.25$6.40$5.05$4.75
0087Aggregate for underdrains (718-52610)CYS88$78.00$63.00$82.93$85.00$80.41$130.00
0088Bridge deck overlay, rigid (722-000134)SYS3,550$85.00$85.00$87.14$96.00$98.00$92.00
0089Hydrodemolition (722-01066)SYS3,488$60.00$65.00$72.24$57.00$61.00$84.00
0090Bridge deck overlay budget (722-12380)DOL75,600$1.00$1.00$1.00$1.00$1.00$1.00
0091Bridge deck, remove concrete surface (722-12464)SYS3,488$10.00$10.00$6.59$7.10$8.74$16.00
0092Longitudinal grooving (722-12732)SYS3,906$3.50$4.00$10.10$4.00$3.50$5.00
0093Bridge deck patching, full depth (722-51401)SFT200$7.50$142.00$41.96$92.00$48.50$60.00
0094Bridge deck patching, partial depth (722-51852)SFT504$2.50$3.00$2.68$31.00$2.50$3.00
0095Overlay dam (722-51874)SFT351$43.00$33.00$60.15$42.00$36.67$80.00
0096Bridge expansion joint, type SS (724-12771)LFT81$700.00$325.00$478.41$412.00$696.73$480.00
0097Bearing assembly, elastomeric (726-92406)EACH5$1,850.00$2,500.00$1,808.20$2,150.00$2,417.55$5,000.00
0098Warranted polymer overlay, bridge deck (738-12855)SYS1,122$58.13$40.00$62.20$66.00$58.13$45.00
0099Temporary pavement marking, removable, 6 in. (801-06209)LFT17,857$1.65$1.65$2.03$2.00$1.65$1.65
0100Temporary pavement marking, removable, 8 in. (801-06469)LFT2,576$2.55$2.55$3.76$3.20$2.55$2.55
0101Construction sign, type A (801-06640)EACH95$150.00$150.00$204.37$154.00$150.00$150.00
0102Flashing arrow sign (801-06710)DAY508$15.55$15.55$20.33$16.00$15.55$15.55
0103Maintaining traffic (801-06775)LS1$100,000$123,500$80,507$301,680$56,617$170,000
0104Energy absorbing terminal, CZ, TL-2 (801-07023)EACH2$6,575.00$6,575.00$6,259.50$6,017.00$6,575.00$9,000.00
0105Energy absorbing terminal, CZ, TL-3 (801-07024)EACH2$7,845.00$7,845.00$7,864.50$7,560.00$7,845.00$9,500.00
0106Barricade, type III-A (801-07118)LFT60$15.00$15.00$14.98$15.00$15.00$15.00
0107Temporary traffic barrier, type 2 (801-08401)LFT2,706$25.00$52.00$27.19$48.00$56.06$45.00
0108Temporary traffic barrier, anchored, type 2 (801-08508)LFT520$52.00$30.00$50.11$63.00$63.02$46.00
0109Portable changeable message sign (801-11642)EACH8$5,000.00$5,000.00$5,442.02$5,143.00$5,000.00$5,000.00
0110Temporary worksite speed limit sign assembly, continuous (801-12883)EACH16$555.00$555.00$311.37$571.00$555.00$555.00
0111Sign post, square, type 1, unreinforced anchor base (802-05704)LFT10$19.00$19.00$40.66$39.00$19.00$43.00
0112Sign, sheet, and supports, remove (802-07059)EACH1$55.00$55.00$107.00$103.00$55.00$210.00
0113Sign, sheet, with legend, 0.100 in. thickness (802-09840)SFT5.25$30.00$30.00$34.24$33.00$30.00$44.00
0114Sign, ground mounted, reset (802-91122)EACH9$278.00$278.00$374.50$360.00$278.00$210.00
0115Line, remove (808-06716)LFT1,240$0.55$0.55$1.31$0.55$0.55$0.55
0116Line, multi-component, solid, white, 6 in. (808-10049)LFT1,557$1.25$1.25$2.68$1.30$1.25$1.25
0117Line, multi-component, solid, yellow, 6 in. (808-10057)LFT1,557$1.25$1.25$2.68$1.30$1.25$1.25
0118Line, multi-component, broken, white, 6 in. (808-10071)LFT390$1.40$1.40$2.68$1.40$1.40$1.40
0119Grooving for pavement markings (808-12032)LFT800$1.50$1.50$6.09$1.50$1.50$1.50
0120Prismatic reflector (808-75994)EACH5$40.00$40.00$21.40$21.00$40.00$40.00
0121Snowplowable raised pavement marker, remove (808-75996)EACH11$45.55$25.00$13.67$103.00$45.55$12.00
0122Snowplowable raised pavement marker (808-75998)EACH11$75.00$75.00$133.75$77.00$75.00$75.00
0123PCCP, 12 in. (502-06329)SYS1,352$93.00$105.00$125.72$125.00$165.09$199.00
INDOT contract B-43780-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy