| 0001 | Construction engineering (105-06845) | LS | 1 | $26,000 | $26,000 | $75,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $215,800 | $229,000 | $260,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $43,160 | $108,000 | $85,000 |
| 0012 | Pavement removal (202-02240) | SYS | 302 | $25.00 | $49.00 | $45.00 |
| 0013 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $40,000 | $24,000 | $29,000 |
| 0014 | Detector housing, remove (202-90277) | EACH | 1 | $50.00 | $300.00 | $180.00 |
| 0015 | Guardrail end treatment, remove (202-93741) | EACH | 12 | $100.00 | $500.00 | $275.00 |
| 0016 | Excavation, common (203-02000) | CYS | 1,241 | $50.00 | $68.00 | $123.00 |
| 0017 | Borrow (203-02070) | CYS | 202 | $32.00 | $99.00 | $30.00 |
| 0018 | Pump around (205-11626) | EACH | 10 | $1,000.00 | $12,500 | $14,000 |
| 0019 | Stormwater management budget (205-12108) | DOL | 66,100 | $1.00 | $1.00 | $1.00 |
| 0020 | Stormwater management implementation (205-12616) | LS | 1 | $500.00 | $21,000 | $32,500 |
| 0021 | SWQCP preparation (205-12618) | LS | 1 | $2,500.00 | $1,900.00 | $1,950.00 |
| 0022 | Excavation, X (206-51215) | CYS | 41 | $280.00 | $187.00 | $160.00 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 4,891 | $52.00 | $49.00 | $44.00 |
| 0024 | Structure backfill, type 1 (211-09264) | CYS | 15 | $66.00 | $105.00 | $140.00 |
| 0025 | Structure backfill, type 2 (211-09265) | CYS | 251 | $66.00 | $85.00 | $140.00 |
| 0026 | Structure backfill, type 3 (211-09266) | CYS | 358 | $66.00 | $112.00 | $140.00 |
| 0027 | Structure backfill, type 5 (211-09268) | CYS | 352 | $168.00 | $255.00 | $345.00 |
| 0028 | Geogrid, type IB (214-11796) | SYS | 4,261 | $3.00 | $3.00 | $2.00 |
| 0029 | Geotextile for pavement, type 2B (214-12239) | SYS | 818 | $5.00 | $4.50 | $2.50 |
| 0030 | Compacted aggregate, no. 8 (301-12233) | CYS | 18 | $130.00 | $116.00 | $245.00 |
| 0031 | Compacted aggregate, no. 53 (301-12234) | CYS | 50 | $100.00 | $105.00 | $110.00 |
| 0032 | Subbase for PCCP (302-06464) | CYS | 126 | $162.00 | $114.00 | $215.00 |
| 0033 | Compacted aggregate, no. 53 (303-01180) | TON | 601 | $50.00 | $99.00 | $80.00 |
| 0034 | Widening with HMA, type C (304-07494) | TON | 526 | $230.00 | $250.00 | $240.00 |
| 0035 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 16 | $50.00 | $70.00 | $10.00 |
| 0036 | Milling, asphalt, 2 in. (306-08036) | SYS | 3,609 | $5.00 | $7.00 | $3.00 |
| 0037 | Milling, transition (306-08043) | SYS | 1,781 | $5.00 | $13.00 | $3.00 |
| 0038 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 959 | $146.00 | $195.00 | $146.00 |
| 0039 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 412 | $225.00 | $426.00 | $225.00 |
| 0040 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 793 | $140.00 | $185.00 | $140.00 |
| 0041 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 534 | $168.00 | $145.00 | $168.00 |
| 0042 | Joint adhesive (401-11526) | LFT | 2,659 | $3.00 | $3.20 | $3.00 |
| 0043 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 2,095 | $16.00 | $14.00 | $16.00 |
| 0044 | Asphalt for tack coat (406-05521) | SYS | 12,744 | $0.30 | $0.30 | $0.30 |
| 0045 | Cracks in asphalt pavement, fill (408-12028) | TON | 3 | $1,900.00 | $3,000.00 | $1,900.00 |
| 0046 | Terminal joint, type HMA (503-12477) | LFT | 84 | $275.00 | $520.00 | $338.00 |
| 0047 | Guardrail terminal system, W-beam, curved, type 3 (601-01846) | EACH | 2 | $2,100.00 | $3,000.00 | $2,100.00 |
| 0048 | Guardrail, remove (601-02241) | LFT | 2,280 | $4.00 | $7.00 | $4.00 |
| 0049 | Guardrail, reset (601-06035) | LFT | 50 | $9.25 | $22.00 | $25.00 |
| 0050 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 1,013 | $21.00 | $26.00 | $21.00 |
| 0051 | Guardrail, MGS, long span, type 2 (601-12288) | EACH | 4 | $1,200.00 | $1,460.00 | $1,200.00 |
| 0052 | Guardrail height transition, MGS (601-12289) | EACH | 2 | $852.00 | $1,075.00 | $852.00 |
| 0053 | Guardrail transition, MGS without curb (601-12292) | EACH | 8 | $3,100.00 | $3,700.00 | $3,100.00 |
| 0054 | Guardrail end treatment, type OS (601-94689) | EACH | 14 | $2,225.00 | $3,340.00 | $2,225.00 |
| 0055 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 57 | $21.00 | $26.00 | $21.00 |
| 0056 | Barrier delineator (602-06729) | EACH | 18 | $30.00 | $54.00 | $65.00 |
| 0057 | Curb, HMA (605-05523) | LFT | 63 | $56.00 | $62.00 | $56.00 |
| 0058 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 494 | $180.00 | $252.00 | $320.00 |
| 0059 | HMA for approaches, type C (610-07488) | TON | 176 | $220.00 | $197.00 | $183.00 |
| 0060 | Mailbox assembly, single (611-06497) | EACH | 1 | $250.00 | $400.00 | $475.00 |
| 0061 | Right-of-way marker (615-06490) | EACH | 4 | $175.00 | $170.00 | $175.00 |
| 0062 | Riprap, class 1 (616-05688) | TON | 683 | $145.00 | $117.00 | $180.00 |
| 0063 | Riprap, revetment (616-06405) | TON | 52 | $135.00 | $190.00 | $205.00 |
| 0064 | Geotextile for riprap, type 1A (616-12246) | SYS | 3,509 | $2.50 | $3.00 | $3.50 |
| 0065 | Mobilization and demobilization for seeding (621-01004) | EACH | 5 | $950.00 | $1,000.00 | $900.00 |
| 0066 | Erosion control blanket (621-02770) | SYS | 2,934 | $6.00 | $2.00 | $2.25 |
| 0067 | Mulched seeding, type R (621-06559) | SYS | 3,081 | $10.00 | $1.50 | $0.45 |
| 0068 | Field office, type C (628-09403) | MOS | 12 | $2,400.00 | $3,600.00 | $2,500.00 |
| 0069 | Computer system equipment (628-11976) | EACH | 3 | $800.00 | $1,200.00 | $750.00 |
| 0070 | Topsoil processing and distribution (629-000149) | SYS | 3,081 | $16.00 | $14.00 | $34.00 |
| 0071 | Topsoil amendment budget (629-000150) | DOL | 6,114 | $1.00 | $1.00 | $1.00 |
| 0072 | Temporary shoring (702-04325) | LS | 1 | $200,000 | $132,000 | $251,200 |
| 0073 | Concrete, A, substructure (702-51005) | CYS | 48 | $1,200.00 | $2,160.00 | $2,400.00 |
| 0074 | Concrete, B, footings (702-51015) | CYS | 132 | $600.00 | $1,740.00 | $950.00 |
| 0075 | Concrete, A , structures (702-90915) | CYS | 34 | $1,900.00 | $1,880.00 | $2,400.00 |
| 0076 | Reinforcing bars (703-06028) | LBS | 17,115 | $3.50 | $1.70 | $2.00 |
| 0077 | Reinforcing bars, epoxy coated (703-06029) | LBS | 52,198 | $3.50 | $1.80 | $2.50 |
| 0078 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 411 | $52.00 | $64.00 | $35.00 |
| 0079 | Concrete, C, superstructure (704-51002) | CYS | 24.40 | $2,600.00 | $2,730.00 | $5,400.00 |
| 0080 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 8 | $3,300.00 | $5,500.00 | $6,500.00 |
| 0081 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $5,000.00 | $6,300.00 | $6,215.01 |
| 0082 | Surface seal , CV 046-007- 68.61 (709-51821) | LS | 1 | $1,200.00 | $1,200.00 | $1,120.02 |
| 0083 | Waterproofing membrane, type 2 (714-000086) | SFT | 3,679 | $2.60 | $3.50 | $6.50 |
| 0084 | Pipe, type 1, circular, diameter 18 in. (715-05121) | LFT | 150 | $110.00 | $72.00 | $109.00 |
| 0085 | Video inspection for pipe (715-09064) | LFT | 150 | $21.70 | $25.00 | $20.00 |
| 0086 | Pipe end section, diameter 18 in. (715-46010) | EACH | 2 | $2,100.00 | $2,800.00 | $1,150.00 |
| 0087 | Geotextile for underdrains, type 1A (718-12305) | SYS | 146 | $1.50 | $5.20 | $2.50 |
| 0088 | Bridge deck overlay, rigid (722-000134) | SYS | 835 | $125.00 | $165.00 | $115.00 |
| 0089 | Bridge deck, remove polymer overlay and surface (722-000146) | SYS | 835 | $13.00 | $15.00 | $11.15 |
| 0090 | Hydrodemolition (722-01066) | SYS | 835 | $140.00 | $95.00 | $96.00 |
| 0091 | Bridge deck overlay budget (722-12380) | DOL | 17,372 | $1.00 | $1.00 | $1.00 |
| 0092 | Longitudinal grooving (722-12732) | SYS | 1,361 | $12.50 | $4.00 | $7.00 |
| 0093 | Bridge deck patching, full depth (722-51401) | SFT | 151 | $50.00 | $90.00 | $45.00 |
| 0094 | Overlay dam (722-51874) | SFT | 94 | $55.00 | $84.00 | $92.00 |
| 0095 | Structure, coated reinforced concrete, three-sided sections, 240 in. X 84 in. (723-000139) | LFT | 90 | $7,000.00 | $4,800.00 | $7,650.00 |
| 0096 | Construction sign, type D (801-03291) | EACH | 4 | $195.00 | $200.00 | $195.00 |
| 0097 | Temporary pavement marking, 4 in. (801-06203) | LFT | 1,920 | $0.20 | $0.20 | $0.20 |
| 0098 | Temporary pavement marking, 6 in. (801-06206) | LFT | 4,875 | $0.20 | $0.20 | $0.20 |
| 0099 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 5,979 | $1.68 | $1.70 | $1.85 |
| 0100 | Temporary transverse pavement marking, 24 in. (801-06216) | LFT | 36 | $5.00 | $5.00 | $5.00 |
| 0101 | Detour route marker assembly (801-06625) | EACH | 54 | $140.00 | $140.00 | $140.00 |
| 0102 | Construction sign, type A (801-06640) | EACH | 50 | $175.00 | $180.00 | $175.00 |
| 0103 | Construction sign, type B (801-06645) | EACH | 27 | $98.00 | $100.00 | $98.00 |
| 0104 | Maintaining traffic (801-06775) | LS | 1 | $116,500 | $86,709 | $171,000 |
| 0105 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 8 | $3,500.00 | $6,000.00 | $3,481.25 |
| 0106 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 4 | $6,000.00 | $7,000.00 | $6,000.00 |
| 0107 | Barricade, type III-A (801-07118) | LFT | 48 | $17.55 | $18.00 | $17.55 |
| 0108 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 2,200 | $68.00 | $68.00 | $100.00 |
| 0109 | Portable changeable message sign (801-11642) | EACH | 10 | $2,955.00 | $3,000.00 | $2,955.00 |
| 0110 | Portable signal (801-12081) | LS | 1 | $95,000 | $60,000 | $100,000 |
| 0111 | Driveway assistance device (801-12482) | EACH | 3 | $4,055.00 | $5,900.00 | $7,800.00 |
| 0112 | Reference post (802-04893) | EACH | 2 | $1,000.00 | $300.00 | $250.00 |
| 0113 | Sign, ground mounted, reset (802-91122) | EACH | 1 | $750.00 | $300.00 | $475.00 |
| 0114 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 400 | $25.00 | $40.00 | $45.00 |
| 0115 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 333 | $5.00 | $2.00 | $1.50 |
| 0116 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 832 | $8.00 | $3.00 | $2.50 |
| 0117 | Signal detector housing (805-78785) | EACH | 1 | $2,500.00 | $2,200.00 | $4,500.00 |
| 0118 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 46 | $25.00 | $15.00 | $30.00 |
| 0119 | Line, remove (808-06716) | LFT | 6,144 | $0.55 | $0.55 | $0.55 |
| 0120 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 4,820 | $1.00 | $1.00 | $1.00 |
| 0121 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 20 | $14.55 | $14.55 | $14.55 |
| 0122 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 4,242 | $1.00 | $1.00 | $1.00 |
| 0123 | Grooving for pavement markings (808-12032) | LFT | 8,641 | $0.65 | $0.65 | $0.65 |
| 0124 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 170 | $2.00 | $2.00 | $2.00 |
| 0125 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 31 | $10.00 | $10.00 | $21.00 |
| 0126 | Snowplowable raised pavement marker (808-75998) | EACH | 34 | $55.00 | $55.00 | $25.55 |
| 0127 | Railing, concrete type FC (706-11600) | CYS | 2.80 | $4,700.00 | $5,700.00 | $2,600.00 |
| 0128 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 120 | $12.00 | $12.00 | $12.00 |