INDOT contract R-43393-A bid tabulation
HMA OVERLAY, PREVENTIVE MAINTENANCE AND CULVERT REPLACEMENTS. Let by Indiana DOT on February 11, 2026, Shelby, Greenfield. 4 bids received; low bid $39,288,610 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 11 FEB 2026
- Pay items
- 233
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $39,288,610 | Low |
| 2 | Milestone Contractors LP | $41,963,778 | +7.0% |
| 3 | E & B Paving LLC | $44,327,682 | +13% |
| 4 | John R Jurgensen Company | $48,598,437 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. Milestone Contractors LP | 3. E & B Paving LLC | 4. John R Jurgensen Company |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $61,650 | $600,000 | $156,807 | $149,357 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 2 | $775.00 | $1,800.00 | $3,600.00 | $1,343.50 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $1,570,034 | $2,145,000 | $2,201,443 | $2,425,000 |
| 0013 | Clearing right-of-way (201-52370) | LS | 1 | $172,475 | $1,074,299 | $603,674 | $200,871 |
| 0014 | Pavement removal (202-02240) | SYS | 24,014 | $20.60 | $25.00 | $30.00 | $27.74 |
| 0015 | Headwall, remove (202-02271) | EACH | 10 | $714.00 | $1,450.00 | $1,500.00 | $871.46 |
| 0016 | Grated box end section, remove (202-02859) | EACH | 3 | $635.55 | $2,500.00 | $3,500.00 | $602.76 |
| 0017 | Catch basin, remove (202-02928) | EACH | 11 | $481.20 | $975.00 | $1,500.00 | $602.76 |
| 0018 | Safety terminal, remove (202-12026) | EACH | 16 | $637.40 | $3,915.10 | $200.00 | $1,462.60 |
| 0019 | Present structure, remove portions, structure no. , 1 (202-51328) | LS | 1 | $5,388.40 | $70,000 | $36,000 | $21,065 |
| 0020 | Present structure, remove portions, structure no. , 2 (202-51328) | LS | 1 | $3,381.93 | $70,000 | $36,000 | $21,144 |
| 0021 | Slopewall, remove (202-51368) | SYS | 580 | $30.75 | $38.00 | $50.00 | $35.00 |
| 0022 | Inlet, remove (202-91385) | EACH | 2 | $530.00 | $850.00 | $1,720.00 | $602.76 |
| 0023 | Guardrail end treatment, remove (202-93741) | EACH | 4 | $425.00 | $438.15 | $425.00 | $1,687.60 |
| 0024 | Barrier wall, concrete, remove (202-94954) | LFT | 20 | $35.00 | $82.25 | $98.00 | $101.07 |
| 0025 | Impact attenuator, remove (202-95027) | EACH | 1 | $1,400.00 | $1,159.75 | $1,125.00 | $1,125.00 |
| 0026 | Pipe end section, remove (202-98488) | EACH | 17 | $167.00 | $625.00 | $380.00 | $792.43 |
| 0027 | Excavation, common (203-02000) | CYS | 31,017 | $25.30 | $19.00 | $41.00 | $36.73 |
| 0028 | Pump around (205-11626) | EACH | 26 | $6,100.00 | $11,500 | $11,540 | $10,938 |
| 0029 | Stormwater management budget (205-12108) | DOL | 111,468 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0030 | Stormwater management implementation (205-12616) | LS | 1 | $29,445 | $150,000 | $250,000 | $46,720 |
| 0031 | SWQCP preparation (205-12618) | LS | 1 | $2,000.00 | $10,000 | $10,000 | $7,140.00 |
| 0032 | Cofferdam (206-51235) | LS | 1 | $27,050 | $200,000 | $10,000 | $40,000 |
| 0033 | Subgrade treatment, type II (207-08264) | SYS | 5,112 | $7.00 | $34.05 | $33.00 | $97.23 |
| 0034 | Subgrade treatment, type IC (207-09935) | SYS | 32,218 | $35.00 | $31.55 | $40.00 | $32.97 |
| 0035 | Structure backfill, type 2 (211-09265) | CYS | 501 | $41.84 | $130.00 | $40.00 | $71.89 |
| 0036 | Flowable backfill, non- removable (213-09269) | CYS | 184 | $205.00 | $295.00 | $530.00 | $413.59 |
| 0037 | Geogrid, type IB (214-11796) | SYS | 37,330 | $1.58 | $2.75 | $5.00 | $3.50 |
| 0038 | Geotextile for pavement, type 2B (214-12239) | SYS | 284 | $4.87 | $13.30 | $10.00 | $5.00 |
| 0039 | Compacted aggregate, no. 8 (301-12233) | CYS | 97 | $95.72 | $150.00 | $84.00 | $328.34 |
| 0040 | Compacted aggregate, no. 53 (301-12234) | CYS | 3,249 | $56.00 | $64.25 | $72.00 | $69.12 |
| 0041 | Subbase for PCCP (302-06464) | CYS | 528 | $166.20 | $102.35 | $99.00 | $350.04 |
| 0042 | Compacted aggregate, no. 53 (303-01180) | TON | 5,817 | $39.40 | $40.00 | $45.00 | $56.32 |
| 0043 | HMA patching, partial depth, type B (304-12624) | TON | 117 | $532.85 | $783.55 | $300.00 | $1,457.22 |
| 0044 | HMA patching, full depth, type C (304-12625) | TON | 1,681 | $244.30 | $300.00 | $200.00 | $324.80 |
| 0045 | HMA patching, partial depth, type C (304-12626) | TON | 945 | $209.00 | $300.00 | $175.00 | $413.38 |
| 0046 | HMA patching, full depth, type D (304-12627) | TON | 1,091 | $377.85 | $350.00 | $300.00 | $623.81 |
| 0047 | HMA patching, partial depth, type D (304-12628) | TON | 1,954 | $217.00 | $350.00 | $200.00 | $352.62 |
| 0048 | Rubblizing PCCP (305-97019) | SYS | 38 | $110.00 | $180.00 | $150.00 | $40.00 |
| 0049 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 445,842 | $1.18 | $1.65 | $1.00 | $1.27 |
| 0050 | Milling, asphalt, 4 in. (306-08038) | SYS | 160,966 | $4.34 | $2.50 | $5.00 | $3.88 |
| 0052 | Milling, approach (306-08432) | SYS | 1,126 | $3.20 | $2.00 | $10.00 | $6.67 |
| 0053 | Corrective aggregate, FDR (307-12253) | TON | 8,735 | $10.92 | $3.50 | $5.00 | $4.71 |
| 0054 | Full depth reclamation (307-12254) | SYS | 47,657 | $7.28 | $5.10 | $6.75 | $6.34 |
| 0055 | Stabilizing material, portland cement (307-12256) | TON | 1,489 | $220.00 | $200.00 | $220.00 | $220.00 |
| 0056 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 12,527 | $102.20 | $110.00 | $110.00 | $121.51 |
| 0057 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 1,061 | $113.40 | $89.00 | $80.00 | $119.11 |
| 0058 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 46,440 | $89.00 | $85.00 | $105.00 | $103.35 |
| 0059 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 1,652 | $99.80 | $130.00 | $100.00 | $134.59 |
| 0060 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 4,942 | $88.10 | $97.00 | $90.00 | $98.06 |
| 0061 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 5,358 | $91.35 | $95.00 | $88.00 | $100.89 |
| 0062 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 10,222 | $86.85 | $95.00 | $84.00 | $98.28 |
| 0063 | QC/QA-HMA, 4, 58E, intermediate, OG, 19.0 MM (401-000067) | TON | 2,619 | $99.85 | $120.00 | $86.00 | $113.80 |
| 0064 | Joint adhesive (401-11526) | LFT | 64,810 | $0.50 | $0.60 | $2.00 | $1.04 |
| 0065 | Inertial profiler, HMA (401-12169) | LS | 1 | $3,332.00 | $19,000 | $8,500.00 | $11,133 |
| 0066 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 941 | $9.00 | $12.20 | $2.80 | $9.00 |
| 0067 | HMA spray paver emulsion (401-12664) | TON | 59 | $0.01 | $1,400.00 | $690.00 | $700.00 |
| 0068 | HMA for temporary pavement, type C (402-10086) | TON | 6,069 | $93.00 | $94.45 | $105.00 | $101.48 |
| 0069 | Asphalt for tack coat (406-05520) | TON | 194 | $0.01 | $600.00 | $1.00 | $1,000.00 |
| 0070 | Cracks in asphalt pavement, fill (408-12028) | TON | 10 | $2,535.00 | $3,200.00 | $3,500.00 | $5,962.82 |
| 0071 | QC/QA-HMA, 4, 58E, surface, 9.5 MM - SMA (410-000073) | TON | 25,829 | $132.00 | $115.00 | $131.00 | $150.50 |
| 0072 | Void reducing asphalt membrane for SMA (410-12466) | LFT | 314,576 | $3.90 | $4.50 | $1.80 | $3.90 |
| 0073 | SMA spray paver emulsion (410-12665) | TON | 218 | $0.01 | $1,400.00 | $710.00 | $700.00 |
| 0074 | PCCP, 14 in. (502-06331) | SYS | 1,268 | $134.20 | $187.00 | $150.00 | $170.00 |
| 0075 | Retrofitted tie bars (503-03489) | EACH | 226 | $15.24 | $58.70 | $37.00 | $49.49 |
| 0076 | D-1 contraction joint (503-05240) | LFT | 1,243 | $18.85 | $34.55 | $25.00 | $27.81 |
| 0077 | Terminal joint, polymer modified asphalt (503-12173) | LFT | 656 | $196.30 | $102.95 | $98.46 | $196.29 |
| 0078 | Terminal joint, type PCCP (503-12478) | LFT | 156 | $253.60 | $488.45 | $250.00 | $400.00 |
| 0079 | Expansion joint with load transfer (503-12479) | LFT | 152 | $46.60 | $40.90 | $250.00 | $75.00 |
| 0080 | Terminal joint, retrofit polymer modified asphalt (503-12480) | SFT | 476 | $98.46 | $125.85 | $98.46 | $98.46 |
| 0081 | Jointed reinforced concrete pavement, 14 in. (503-12505) | SYS | 676 | $136.90 | $197.70 | $250.00 | $305.00 |
| 0082 | PCCP patching, full depth (506-06333) | SYS | 1,555 | $410.00 | $204.25 | $263.00 | $439.62 |
| 0083 | Profiling PCCP (507-07480) | SYS | 23,398 | $7.60 | $3.20 | $6.50 | $2.19 |
| 0084 | Joints in PCCP, saw and seal (507-08272) | LFT | 49,351 | $3.00 | $1.70 | $1.65 | $1.59 |
| 0085 | Joint repair, partial depth (509-12191) | SFT | 2,362 | $57.00 | $72.15 | $104.00 | $169.22 |
| 0086 | Joint repair, bottom-half (509-12192) | SFT | 590 | $57.00 | $87.55 | $140.00 | $180.00 |
| 0087 | Guardrail transition, type TGB (601-01522) | EACH | 2 | $2,570.00 | $2,649.40 | $2,570.00 | $2,847.74 |
| 0088 | Guardrail, reset (601-06035) | LFT | 679 | $11.00 | $11.35 | $11.00 | $11.00 |
| 0089 | Guardrail, W-beam, nested (601-06854) | EACH | 4 | $3,700.00 | $3,814.35 | $3,700.00 | $3,700.00 |
| 0090 | Impact attenuator, LS-W1, TL-1 (601-07009) | EACH | 1 | $22,500 | $28,349 | $27,500 | $27,500 |
| 0091 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 3,415 | $19.50 | $20.00 | $19.50 | $19.50 |
| 0092 | Guardrail height transition, MGS (601-12289) | EACH | 6 | $815.00 | $840.20 | $815.00 | $1,092.74 |
| 0093 | Guardrail transition, MGS without curb (601-12292) | EACH | 3 | $3,000.00 | $3,077.10 | $3,000.00 | $3,277.74 |
| 0094 | Guardrail, MGS W-beam, cable terminal anchor (601-12294) | EACH | 5 | $1,000.00 | $1,025.70 | $1,000.00 | $1,000.00 |
| 0095 | Guardrail end treatment, type OS (601-94689) | EACH | 7 | $2,700.00 | $2,783.45 | $2,700.00 | $2,700.00 |
| 0096 | Guardrail end treatment, type MS (601-94690) | EACH | 2 | $5,100.00 | $5,257.60 | $5,100.00 | $5,100.00 |
| 0097 | Milled PCCP corrugations, conventional (606-11064) | LFT | 456 | $3.43 | $9.35 | $1.80 | $0.74 |
| 0098 | Milled HMA corrugations, conventional (606-12399) | LFT | 214,385 | $0.33 | $1.05 | $0.25 | $0.21 |
| 0099 | Reinforced concrete bridge approach, 14 in. (609-06262) | SYS | 412 | $180.10 | $316.25 | $250.00 | $262.00 |
| 0100 | Reinforced concrete bridge approach, 14 in. , modified (609-06262) | SYS | 284 | $215.25 | $437.35 | $275.00 | $262.00 |
| 0101 | HMA for approaches, type C (610-07488) | TON | 93 | $136.95 | $270.00 | $175.92 | $190.26 |
| 0102 | Riprap, class 1 (616-05688) | TON | 1,291 | $100.00 | $135.00 | $97.06 | $126.08 |
| 0103 | Riprap, class 2 (616-05689) | TON | 1,138 | $130.85 | $165.00 | $100.66 | $106.14 |
| 0104 | Riprap, revetment (616-06405) | TON | 7 | $102.00 | $215.00 | $155.50 | $480.19 |
| 0105 | Geotextile for riprap, type 1A (616-12246) | SYS | 888 | $4.77 | $8.00 | $3.18 | $3.00 |
| 0106 | Clean steel bridge, QP-2, bridge no. 1 (619-11052) | LS | 1 | $117,000 | $120,007 | $117,000 | $117,000 |
| 0107 | Clean steel bridge, QP-2, bridge no. 2 (619-11052) | LS | 1 | $117,000 | $120,007 | $117,000 | $117,000 |
| 0108 | Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459) | LS | 1 | $3,000.00 | $3,077.10 | $3,000.00 | $3,000.00 |
| 0109 | Disposal of cleaning waste, hazardous, bridge no. 2 (619-12459) | LS | 1 | $3,000.00 | $3,077.10 | $3,000.00 | $3,000.00 |
| 0110 | Coat steel bridge, bridge no. 1 (619-51859) | LS | 1 | $60,000 | $61,542 | $60,000 | $60,000 |
| 0111 | Coat steel bridge, bridge no. 2 (619-51859) | LS | 1 | $60,000 | $61,542 | $60,000 | $60,000 |
| 0112 | Mobilization and demobilization for seeding (621-01004) | EACH | 8 | $800.00 | $824.70 | $800.00 | $800.00 |
| 0113 | Erosion control blanket (621-02770) | SYS | 204 | $5.00 | $2.05 | $5.00 | $5.00 |
| 0114 | Fertilizer for permanent seeding (621-06545) | TON | 1 | $10.00 | $824.70 | $10.00 | $10.00 |
| 0115 | Seed mixture, type R (621-06553) | LBS | 36 | $20.00 | $14.90 | $20.00 | $20.00 |
| 0116 | Mulched seeding, type R (621-06559) | SYS | 5,582 | $0.80 | $0.90 | $0.80 | $0.80 |
| 0117 | Mulching material (621-06565) | TON | 1 | $800.00 | $525.75 | $800.00 | $800.00 |
| 0118 | Seed mixture, floodplain (621-12612) | LBS | 11 | $140.00 | $36.10 | $140.00 | $140.00 |
| 0119 | Safety terminal, type TL-3 (627-09330) | EACH | 16 | $6,400.00 | $6,597.75 | $6,400.00 | $6,400.00 |
| 0121 | Cable barrier system, type TL-4, reset (627-11647) | LFT | 24,017 | $11.50 | $11.85 | $11.50 | $11.50 |
| 0122 | Computer system equipment (628-11976) | EACH | 1 | $1,000.00 | $1,174.65 | $1,500.00 | $3,059.84 |
| 0123 | Field office, type D (628-12683) | MOS | 24 | $4,000.00 | $5,873.35 | $7,766.61 | $3,635.60 |
| 0124 | Topsoil processing and distribution (629-000149) | SYS | 5,582 | $1.75 | $18.00 | $3.11 | $10.59 |
| 0125 | Topsoil amendment budget (629-000150) | DOL | 11,164 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0126 | Field drilled hole in concrete (702-51863) | EACH | 444 | $52.65 | $15.85 | $25.00 | $35.00 |
| 0127 | Reinforcing bars, epoxy coated (703-06029) | LBS | 41,860 | $2.54 | $1.85 | $2.00 | $2.00 |
| 0128 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 184 | $61.60 | $41.05 | $100.00 | $50.00 |
| 0129 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 8 | $4,040.00 | $4,236.75 | $10,000 | $3,650.00 |
| 0130 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $4,946.36 | $5,100.00 | $7,500.00 | $5,000.00 |
| 0131 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $4,946.36 | $5,100.00 | $7,500.00 | $5,000.00 |
| 0132 | Patching concrete structures (710-09158) | SFT | 247 | $75.00 | $77.30 | $75.00 | $75.00 |
| 0133 | Structure, reinforced concrete, box sections, 4 FT X 3 FT (714-11192) | LFT | 187 | $927.50 | $1,150.00 | $1,250.00 | $743.35 |
| 0134 | Structure, reinforced concrete, box sections, 3 FT X 2 FT (714-11197) | LFT | 182 | $704.20 | $630.00 | $995.00 | $613.79 |
| 0135 | Pipe, type 1, circular, diameter 36 in. (715-05019) | LFT | 10 | $527.15 | $300.00 | $365.00 | $865.31 |
| 0136 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 6,746 | $12.45 | $15.50 | $10.00 | $14.95 |
| 0137 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 1,249 | $35.50 | $24.00 | $15.00 | $44.48 |
| 0138 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 46 | $297.40 | $140.00 | $145.00 | $665.00 |
| 0139 | Pipe, type 1, circular, diameter 18 in. (715-05121) | LFT | 36 | $334.50 | $165.00 | $155.00 | $740.00 |
| 0140 | Pipe, type 1, circular, diameter 24 in. (715-05123) | LFT | 8 | $400.00 | $315.00 | $165.00 | $935.00 |
| 0141 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 322 | $83.85 | $85.00 | $135.00 | $47.72 |
| 0142 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 94 | $93.35 | $115.00 | $145.00 | $115.45 |
| 0143 | Video inspection for pipe (715-09064) | LFT | 546 | $1.55 | $1.60 | $6.00 | $6.00 |
| 0144 | Pipe, roadway drain casting extension (715-10238) | EACH | 2 | $572.00 | $1,973.00 | $750.00 | $500.00 |
| 0145 | Geotextile for pipe, type 2A (715-12871) | SYS | 193 | $5.36 | $3.50 | $8.78 | $3.56 |
| 0146 | Pipe end section, diameter 15 in. (715-46005) | EACH | 6 | $839.65 | $1,500.00 | $1,820.00 | $1,800.71 |
| 0147 | Pipe end section, diameter 18 in. (715-46010) | EACH | 5 | $866.00 | $1,850.00 | $1,920.00 | $2,092.38 |
| 0148 | Pipe end section, diameter 24 in. (715-46020) | EACH | 2 | $960.55 | $1,850.00 | $2,320.00 | $2,767.77 |
| 0149 | Pipe end section, diameter 36 in. (715-46040) | EACH | 4 | $1,742.65 | $2,800.00 | $3,520.00 | $5,094.49 |
| 0150 | Pipe installation, trenchless, 15 in. (716-07631) | LFT | 420 | $497.00 | $733.00 | $825.00 | $960.81 |
| 0151 | Pipe installation, trenchless, 18 in. (716-07632) | LFT | 269 | $550.00 | $769.00 | $1,205.00 | $1,047.66 |
| 0152 | Pipe installation, trenchless, 24 in. (716-07633) | LFT | 119 | $696.50 | $856.00 | $1,345.00 | $1,281.95 |
| 0153 | Pipe installation, trenchless, 36 in. (716-07635) | LFT | 276 | $741.60 | $875.00 | $1,385.00 | $1,113.00 |
| 0154 | Outlet protector, type 1 (718-06528) | EACH | 14 | $1,300.00 | $1,616.85 | $1,100.00 | $2,475.10 |
| 0155 | Video inspection for underdrain (718-06532) | LFT | 7,995 | $1.55 | $1.60 | $1.25 | $1.25 |
| 0156 | Geotextile for underdrains, type 2B (718-12308) | SYS | 5,748 | $8.00 | $4.00 | $3.60 | $1.98 |
| 0157 | Aggregate for underdrains (718-52610) | CYS | 537 | $70.00 | $93.60 | $75.00 | $60.51 |
| 0158 | Inlet, type N12 (720-45065) | EACH | 19 | $6,536.00 | $8,500.00 | $6,500.00 | $7,488.69 |
| 0159 | Manhole, type C4 (720-45410) | EACH | 7 | $4,878.00 | $15,000 | $5,500.00 | $4,489.01 |
| 0160 | Bridge deck, remove concrete overlay and surface (722-000183) | SYS | 628 | $19.66 | $9.60 | $20.00 | $15.00 |
| 0161 | Hydrodemolition (722-01066) | SYS | 3,058 | $76.57 | $96.20 | $150.00 | $70.00 |
| 0162 | Bridge deck overlay budget (722-12380) | DOL | 109,974 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0163 | Bridge deck, remove concrete surface (722-12464) | SYS | 2,430 | $8.70 | $6.60 | $10.00 | $10.00 |
| 0164 | Longitudinal grooving (722-12732) | SYS | 3,754 | $4.44 | $5.75 | $10.00 | $5.00 |
| 0165 | Bridge deck patching, full depth (722-51401) | SFT | 838 | $145.00 | $83.70 | $25.00 | $160.00 |
| 0166 | Bridge deck overlay, latex modified (722-51842) | SYS | 3,058 | $112.90 | $146.40 | $185.00 | $145.00 |
| 0167 | Overlay dam (722-51874) | SFT | 164 | $110.10 | $70.75 | $250.00 | $25.00 |
| 0168 | Epoxy injection, epoxy injection adhesive (727-000188) | GAL | 2 | $50.00 | $51.30 | $50.00 | $50.00 |
| 0169 | Epoxy injection, crack preparation (727-90308) | LFT | 40 | $30.00 | $30.95 | $30.00 | $30.00 |
| 0170 | Epoxy injection, furnishing equipment , bridge no. 1 (727-93560) | LS | 1 | $1,500.00 | $1,540.00 | $1,500.00 | $1,500.00 |
| 0171 | Epoxy injection, furnishing equipment , bridge no. 2 (727-93560) | LS | 1 | $1,500.00 | $1,540.00 | $1,500.00 | $1,500.00 |
| 0172 | Road closure sign assembly (801-04308) | EACH | 41 | $450.00 | $463.90 | $450.00 | $450.00 |
| 0173 | Temporary pavement marking, 6 in. (801-06206) | LFT | 175,600 | $0.80 | $0.80 | $0.80 | $0.80 |
| 0174 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 1,058,181 | $1.25 | $1.30 | $1.25 | $1.25 |
| 0175 | Temporary pavement marking, removable, 8 in. (801-06469) | LFT | 7,020 | $1.75 | $1.80 | $1.75 | $1.75 |
| 0176 | Detour route marker assembly (801-06625) | EACH | 216 | $225.00 | $231.00 | $225.00 | $225.00 |
| 0177 | Construction sign, type A (801-06640) | EACH | 253 | $275.00 | $282.00 | $275.00 | $275.00 |
| 0178 | Construction sign, type B (801-06645) | EACH | 2 | $200.00 | $206.20 | $200.00 | $200.00 |
| 0179 | Flashing arrow sign (801-06710) | DAY | 1,095 | $5.00 | $5.00 | $5.00 | $5.00 |
| 0180 | Maintaining traffic (801-06775) | LS | 1 | $1,912,230 | $2,500,000 | $750,205 | $7,426,916 |
| 0181 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 14 | $5,325.00 | $5,489.55 | $5,325.00 | $7,449.40 |
| 0182 | Barricade, type III-B (801-07119) | LFT | 84 | $35.00 | $36.10 | $35.00 | $35.00 |
| 0183 | Temporary traffic barrier, type 1 (801-08400) | LFT | 23,408 | $58.55 | $28.00 | $62.00 | $15.56 |
| 0184 | Temporary traffic barrier, type 2 (801-08401) | LFT | 63,351 | $55.70 | $28.00 | $59.00 | $15.16 |
| 0185 | Portable changeable message sign (801-11642) | EACH | 4 | $6,500.00 | $6,500.00 | $6,500.00 | $6,500.00 |
| 0186 | Truck mounted attenuator , in use (801-12042) | DAY | 411 | $1,270.00 | $1,242.55 | $2,500.00 | $1,403.80 |
| 0187 | Law enforcement officer (801-12324) | HRS | 800 | $60.00 | $60.00 | $60.00 | $60.00 |
| 0188 | Automated work zone information system (801-12544) | EACH | 10 | $15,000 | $15,000 | $15,000 | $15,000 |
| 0189 | Queue truck , in use (801-12652) | DAY | 411 | $1,400.00 | $1,242.55 | $1,500.00 | $1,252.88 |
| 0190 | Temporary crossover, type B (801-52817) | EACH | 2 | $151,655 | $250,000 | $120,000 | $158,386 |
| 0191 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 7 | $221.00 | $227.85 | $221.00 | $30.00 |
| 0192 | Sign, panel, with legend (802-07057) | SFT | 392 | $37.20 | $38.00 | $37.20 | $55.00 |
| 0193 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 5 | $41.10 | $42.35 | $41.10 | $45.00 |
| 0194 | Overhead sign structure, cantilever, type H (802-09860) | EACH | 1 | $72,154 | $74,384 | $72,154 | $95,000 |
| 0195 | Cantilever sign support foundation, type fghij drilled shaft 36 in. (802-13009) | EACH | 1 | $28,636 | $29,400 | $28,636 | $27,000 |
| 0196 | Overhead sign structure, cantilever, remove (802-74080) | EACH | 1 | $5,663.00 | $9,849.60 | $5,663.00 | $7,500.00 |
| 0197 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 829 | $0.24 | $0.25 | $0.24 | $1.00 |
| 0198 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 320 | $19.40 | $19.90 | $19.40 | $11.00 |
| 0199 | Handhole, lighting (807-02191) | EACH | 10 | $1,759.00 | $1,804.00 | $1,759.00 | $1,500.00 |
| 0200 | Light pole , 25 FT emh 15 FT mast arm (807-04654) | EACH | 1 | $3,792.00 | $3,909.15 | $3,792.00 | $4,000.00 |
| 0201 | Conduit, steel, galvanized, 2 in. (807-06592) | LFT | 386 | $53.50 | $53.50 | $53.50 | $38.00 |
| 0202 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 5,170 | $17.50 | $18.05 | $17.50 | $24.00 |
| 0203 | Luminaire, low lumen roadway (807-12202) | EACH | 12 | $556.00 | $573.20 | $556.00 | $700.00 |
| 0204 | Lighting foundation, conventional pole, concrete, with grounding (807-12791) | EACH | 12 | $2,298.00 | $2,369.00 | $2,298.00 | $3,500.00 |
| 0205 | Light pole, 40 FT E.M.H., 10 FT mast arm, breakaway base (807-85752) | EACH | 1 | $4,383.00 | $4,518.45 | $4,383.00 | $4,600.00 |
| 0206 | Light pole, 40 FT E.M.H., 15 FT mast arm, breakaway base (807-85762) | EACH | 11 | $4,841.00 | $4,990.60 | $4,841.00 | $4,800.00 |
| 0207 | Service point, type II (807-86810) | EACH | 2 | $10,600 | $10,928 | $10,600 | $10,000 |
| 0208 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 690 | $1.10 | $1.15 | $1.10 | $1.75 |
| 0209 | Line, remove (808-06716) | LFT | 175,600 | $0.40 | $0.40 | $0.40 | $0.40 |
| 0210 | Retro-reflectivity testing (808-09381) | LS | 1 | $4,250.00 | $4,381.35 | $4,250.00 | $4,250.00 |
| 0211 | Line, multi-component, solid, white, 4 in. (808-10033) | LFT | 248 | $0.85 | $0.90 | $0.85 | $0.85 |
| 0212 | Line, multi-component, solid, yellow, 4 in. (808-10034) | LFT | 248 | $0.85 | $0.90 | $0.85 | $0.85 |
| 0213 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 13,172 | $1.25 | $1.30 | $1.25 | $1.25 |
| 0214 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 13,172 | $1.25 | $1.30 | $1.25 | $1.25 |
| 0215 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 340 | $1.25 | $1.30 | $1.25 | $1.25 |
| 0216 | Grooving for pavement markings (808-12032) | LFT | 263,452 | $0.43 | $0.45 | $0.43 | $0.43 |
| 0217 | Line, thermoplastic, solid, white, 10 in. (808-12667) | LFT | 4,972 | $1.75 | $1.80 | $1.75 | $1.75 |
| 0218 | Line, preformed plastic, dotted, white, 10 in. (808-12848) | LFT | 2,686 | $10.00 | $10.30 | $10.00 | $10.00 |
| 0219 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 102,216 | $1.00 | $1.10 | $1.05 | $1.05 |
| 0220 | Line, preformed plastic, broken, white, 6 in. (808-75055) | LFT | 26,022 | $6.00 | $6.20 | $6.00 | $6.00 |
| 0221 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 101,864 | $1.05 | $1.10 | $1.05 | $1.05 |
| 0222 | Transverse marking, thermoplastic, crosshatch line, white, 12 in. (808-75260) | LFT | 58 | $6.00 | $6.20 | $6.00 | $6.00 |
| 0223 | Transverse marking, thermoplastic, crosshatch line, white, 24 in. (808-75272) | LFT | 463 | $12.00 | $12.35 | $12.00 | $12.00 |
| 0224 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 148 | $12.00 | $12.35 | $12.00 | $12.00 |
| 0225 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 3 | $200.00 | $206.20 | $200.00 | $200.00 |
| 0226 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 1,753 | $11.03 | $12.35 | $12.00 | $12.49 |
| 0227 | Snowplowable raised pavement marker (808-75998) | EACH | 1,348 | $42.50 | $43.80 | $42.50 | $42.50 |
| 0228 | Surface seal , bridge no. 3 (709-51821) | LS | 1 | $2,245.00 | $2,315.10 | $7,500.00 | $2,300.00 |
| 0229 | Surface seal , bridge no. 4 (709-51821) | LS | 1 | $2,245.00 | $2,315.10 | $7,500.00 | $2,300.00 |
| 0230 | Borrow (203-02070) | CYS | 8,491 | $31.35 | $5.00 | $36.00 | $43.52 |
| 0231 | Milling, asphalt , 8 in. (306-08159) | SYS | 19,063 | $3.83 | $1.75 | $0.84 | $1.83 |
| 0232 | Truck mounted attenuator , standby (801-12042) | DAY | 309 | $367.40 | $1,242.00 | $2,200.00 | $745.39 |
| 0233 | Queue truck , standby (801-12652) | DAY | 309 | $95.00 | $1,242.00 | $2,200.00 | $594.47 |
| 0234 | Guardrail, remove (601-02241) | LFT | 3,600 | $4.00 | $4.10 | $4.00 | $4.00 |
| 0235 | Temporary shoring (702-04325) | LS | 1 | $51,896 | $75,000 | $205,000 | $358,179 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.