MoDOT contract 250117-F03 bid tabulation
JSL0078, JSL0121 - ROUTE 141 - ST LOUIS COUNTY. Let by Missouri DOT on January 17, 2025, St Louis, St. Louis. 3 bids received; low bid $4,314,703 by Gershenson Construction Co., Inc..
- Owner
- Missouri DOT
- Letting
- 17 JAN 2025
- Pay items
- 156
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gershenson Construction Co., Inc. | $4,314,703 | Low |
| 2 | N.B. West Contracting Company | $4,395,000 | +2.0% |
| 3 | Pace Construction Company, LLC | $4,594,777 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gershenson Construction Co., Inc. | 2. N.B. West Contracting Company | 3. Pace Construction Company, LLC |
|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $40,000 | $37,900 | $41,743 |
| 0030 | Culvert cleanout (2063500) | EACH | 2 | $2,000.00 | $5,500.00 | $2,700.00 |
| 0040 | Misc.shaping slopes class III, modified (2159910) | 100F | 6 | $1,400.00 | $1,400.00 | $1,400.00 |
| 0050 | Asphaltic concrete mixture PG 70-22 (SP095CLP mix) (4030011) | TON | 4,824.90 | $141.00 | $164.50 | $130.00 |
| 0060 | Misc.polymer modified emulsion membrane (4079912) | GAL | 10,112 | $10.00 | $4.10 | $14.25 |
| 0070 | Bituminous fog seal (4134000) | GAL | 207 | $6.00 | $21.40 | $5.75 |
| 0080 | Concrete pavement (11 inch non-reinforced) (5021111) | SY | 267 | $370.00 | $530.00 | $125.00 |
| 0090 | Furnishing and placing concrete material for full depth pavement repair (6131010) | SY | 252 | $370.00 | $520.00 | $410.00 |
| 0100 | Subgrade compaction (6 in. depth) (pavement repair) (6131012) | SY | 25 | $1.00 | $1.00 | $10.00 |
| 0110 | Type 1 or 5 aggregate for base (4 in. thick) (pavement repair) (6131013) | SY | 25 | $10.00 | $1.00 | $12.00 |
| 0120 | Full depth pavement repair saw cut (for perimeter and internal saw cuts) (6131014) | LF | 1,313 | $12.00 | $7.00 | $11.00 |
| 0130 | Dowel bar (drilling, furnishing and installation) for full depth pavement repair (6131015) | EACH | 401 | $10.00 | $10.00 | $8.00 |
| 0140 | Tie bar (drilling, furnishing and installation) for full depth pavement repair (type L joints) (6131018) | EACH | 421 | $10.00 | $8.50 | $7.00 |
| 0150 | Furnishing and placing bituminous material for class B partial depth pavement repair (6133018) | TON | 10 | $415.00 | $600.00 | $84.00 |
| 0160 | Removal for class B partial depth pavement repair (6133019) | SY | 46 | $5.75 | $200.00 | $260.00 |
| 0170 | Changeable message sign without communication interface, contractor furnished, contractor retained (6161098A) | EACH | 3 | $2,000.00 | $4,400.00 | $4,400.00 |
| 0180 | Misc.temporary traffic control (6169901) | LS | 1 | $25,000 | $59,500 | $9,200.00 |
| 0190 | Mobilization (6181000) | LS | 1 | $100,000 | $126,300 | $180,000 |
| 0200 | Preformed thermoplastic pavement marking, 6 in. white (6200009) | LF | 318 | $5.25 | $5.25 | $6.00 |
| 0210 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 399 | $22.00 | $22.00 | $25.00 |
| 0220 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 54 | $233.00 | $233.00 | $280.00 |
| 0230 | Preformed thermoplastic pavement marking, straight arrow (6200024) | EACH | 6 | $125.00 | $125.00 | $220.00 |
| 0240 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 3 | $330.00 | $330.00 | $485.00 |
| 0250 | Preformed thermoplastic pavement marking, word (only) (6200030) | EACH | 5 | $375.00 | $375.00 | $350.00 |
| 0260 | Preformed thermoplastic pavement marking, 12 in white, yield line triangles (6200042) | EACH | 168 | $19.00 | $19.00 | $22.50 |
| 0270 | 4 in. yellow high build waterborne pavement marking paint, type L beads (6205901A) | LF | 13,303 | $0.16 | $0.16 | $0.40 |
| 0280 | 6 in. white high build waterborne pavement marking paint, type L beads (6205902A) | LF | 30,295 | $0.29 | $0.29 | $0.45 |
| 0290 | Misc.pavement marking removal within concrete surfaces (6209901) | LS | 1 | $6,000.00 | $6,000.00 | $10,000 |
| 0300 | Misc.temporary pavement marking paint (6209901) | LS | 1 | $11,500 | $1.00 | $8,500.00 |
| 0310 | Misc.curb reflectors (6209902) | EACH | 72 | $25.00 | $20.00 | $5.00 |
| 0320 | Coldmilling concrete pavement for removal of surface (6221011) | SY | 3,780 | $5.75 | $4.40 | $7.00 |
| 0330 | Misc.coldmilling bituminous pavement with additional cleaning (6229905) | SY | 50,562 | $2.95 | $3.60 | $3.75 |
| 0340 | Mulching (8025006) | ACRE | 1 | $1,800.00 | $3,000.00 | $3,000.00 |
| 0350 | Seeding - cool season grasses (8051000A) | ACRE | 1 | $3,000.00 | $3,500.00 | $3,500.00 |
| 0360 | Rock ditch check (8061005) | LF | 20 | $25.00 | $14.50 | $14.50 |
| 0370 | Curb inlet check (8061007A) | EACH | 2 | $125.00 | $250.00 | $250.00 |
| 0380 | Sediment removal (8061016) | CY | 64 | $1.00 | $29.00 | $75.00 |
| 0390 | Silt fence (8061019) | LF | 4,160 | $1.00 | $2.90 | $2.90 |
| 0400 | MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061) | LF | 3,313 | $34.00 | $34.00 | $34.00 |
| 0410 | MGS vertical concrete barrier transition (6061070) | EACH | 2 | $4,200.00 | $4,200.00 | $4,200.00 |
| 0420 | MGS end anchor (6061080) | EACH | 5 | $2,100.00 | $2,100.00 | $2,100.00 |
| 0430 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 5 | $3,900.00 | $3,900.00 | $3,900.00 |
| 0440 | Misc.18 in. island tubular markers (9039902) | EACH | 24 | $85.00 | $85.00 | $110.00 |
| 0450 | Misc.modot ITS assets relocation (9109903) | LF | 181 | $28.00 | $28.00 | $28.00 |
| 0460 | Clearing and grubbing (2013000) | ACRE | 1 | $9,100.00 | $30,000 | $16,500 |
| 0470 | Removal of improvements (2022010) | LS | 1 | $225,000 | $137,000 | $350,000 |
| 0480 | Class A excavation (2031000) | CY | 1,680 | $38.00 | $7.00 | $34.50 |
| 0490 | Embankment in place (2035500) | CY | 4,099 | $38.00 | $34.00 | $41.00 |
| 0500 | Compacting in cut (2037075) | STA | 32 | $100.00 | $380.00 | $712.00 |
| 0510 | Class 3 excavation (2063000) | CY | 102 | $10.00 | $1.00 | $80.00 |
| 0520 | Culvert cleanout (2063500) | EACH | 2 | $2,000.00 | $5,800.00 | $2,650.00 |
| 0530 | Misc.shaping slopes, class III (2159910) | 100F | 5 | $1,400.00 | $1,400.00 | $1,400.00 |
| 0540 | Type A2 shoulder (4010150) | SY | 1,666 | $72.00 | $70.00 | $75.00 |
| 0550 | Bituminous pavement mixture PG64-22, (BP-1) (4011209) | TON | 68.50 | $225.00 | $130.30 | $251.00 |
| 0560 | Misc.optional pavement (4019905) | SY | 4,922 | $130.00 | $187.33 | $141.49 |
| 0570 | Asphaltic concrete mixture PG 76-22 (SP125BSM mix) (4030132) | TON | 307 | $190.00 | $233.10 | $167.00 |
| 0580 | Tack coat - non-tracking (4071007) | GAL | 63 | $6.00 | $4.15 | $8.05 |
| 0590 | Misc.polymer modified emulsion membrane (4079912) | GAL | 577 | $10.00 | $4.15 | $22.00 |
| 0600 | Pipe collar, type C (6044013) | EACH | 2 | $2,700.00 | $2,050.00 | $1,400.00 |
| 0610 | 6 in. concrete median strip (6083006) | SY | 45.20 | $140.00 | $450.00 | $185.00 |
| 0620 | Furnishing type 2 rock ditch liner (6096020) | CY | 151 | $56.00 | $41.00 | $54.00 |
| 0630 | Placing type 2 rock ditch liner (6096042) | CY | 151 | $28.00 | $30.00 | $54.00 |
| 0640 | Impact attenuator 45 MPH (sand barrel array) (6122009) | EACH | 1 | $3,200.00 | $3,200.00 | $3,200.00 |
| 0650 | Impact attenuator 50 MPH (sand barrel array) (6122010) | EACH | 4 | $3,400.00 | $3,400.00 | $3,400.00 |
| 0660 | Replacement sand barrel (6122020) | EACH | 12 | $550.00 | $550.00 | $550.00 |
| 0670 | Impact attenuator (relocation) (6122030) | EACH | 2 | $875.00 | $875.00 | $875.00 |
| 0680 | Furnishing and placing concrete material for full depth pavement repair (6131010) | SY | 33 | $500.00 | $825.00 | $475.00 |
| 0690 | Subgrade compaction (6 in. depth) (pavement repair) (6131012) | SY | 33 | $1.00 | $1.00 | $10.00 |
| 0700 | Type 1 or 5 aggregate for base (4 in. thick) (pavement repair) (6131013) | SY | 33 | $10.00 | $1.00 | $12.00 |
| 0710 | Full depth pavement repair saw cut (for perimeter and internal saw cuts) (6131014) | LF | 134 | $15.00 | $15.00 | $11.00 |
| 0720 | Dowel bar (furnishing and installation with baskets) for full depth pavement repair (6131017) | EACH | 16 | $10.00 | $9.00 | $8.00 |
| 0730 | Tie bar (drilling, furnishing and installation) for full depth pavement repair (type L joints) (6131018) | EACH | 13 | $10.00 | $28.00 | $7.00 |
| 0740 | Furnishing and placing bituminous material for class B partial depth pavement repair (6133018) | TON | 0.90 | $550.00 | $500.00 | $800.00 |
| 0750 | Removal for class B partial depth pavement repair (6133019) | SY | 11.10 | $15.00 | $100.00 | $1,100.00 |
| 0760 | Misc.class A partial depth concrete pavement repair using flexible, hot polymer modified repair material (6139911) | LB | 320 | $25.00 | $20.00 | $13.25 |
| 0770 | Grate and bearing plate (3 FT. X 3 FT. or 914 MM X 914 MM) (6141022) | EACH | 1 | $2,600.00 | $1,700.00 | $2,750.00 |
| 0780 | Grate and bearing plate (5 FT. X 2 FT. or 1524 MM X 610 MM) (6141023) | EACH | 1 | $3,100.00 | $1,500.00 | $3,200.00 |
| 0790 | Manhole frame and cover, type 1-A (6143010) | EACH | 2 | $550.00 | $600.00 | $750.00 |
| 0800 | Changeable message sign without communication interface, contractor furnished, contractor retained (6161098A) | EACH | 3 | $2,000.00 | $4,400.00 | $4,400.00 |
| 0810 | Misc.temporary traffic control (6169901) | LS | 1 | $25,000 | $54,200 | $10,500 |
| 0820 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 3,875 | $26.00 | $26.00 | $26.00 |
| 0830 | Mobilization (6181000) | LS | 1 | $465,000 | $66,624 | $385,000 |
| 0840 | Additional mobilization for seeding (6181020) | EACH | 1 | $600.00 | $600.00 | $600.00 |
| 0850 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 85 | $22.00 | $22.00 | $25.00 |
| 0860 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 11 | $233.00 | $233.00 | $280.00 |
| 0870 | Preformed thermoplastic pavement marking, straight arrow (6200024) | EACH | 3 | $125.00 | $125.00 | $220.00 |
| 0880 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 3 | $330.00 | $330.00 | $480.00 |
| 0890 | Preformed thermoplastic pavement marking, word (only) (6200030) | EACH | 2 | $375.00 | $375.00 | $350.00 |
| 0900 | 6 in. white high build waterborne pavement marking paint, type L beads (6205902A) | LF | 5,293 | $0.34 | $0.34 | $0.45 |
| 0910 | 6 in. yellow high build waterborne pavement marking paint, type L beads (6205903A) | LF | 2,876 | $0.34 | $0.34 | $0.45 |
| 0920 | Misc.18 in. white island tubular marker (6209902) | EACH | 10 | $126.00 | $85.00 | $110.00 |
| 0930 | Misc.18 in. yellow island tubular marker (6209902) | EACH | 3 | $126.00 | $85.00 | $110.00 |
| 0940 | Misc.curb reflectors (6209902) | EACH | 15 | $25.00 | $20.00 | $5.00 |
| 0950 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 552 | $10.25 | $12.00 | $15.75 |
| 0960 | Modified coldmilling (depth transitions) (6224010) | SY | 305 | $10.25 | $19.00 | $15.75 |
| 0970 | Permanent erosion control geotextile (6240103A) | SY | 904 | $4.00 | $1.15 | $1.25 |
| 0980 | Contractor furnished surveying and staking (6274000) | LS | 1 | $25,000 | $20,000 | $35,000 |
| 0990 | Type D barrier (7034219A) | LF | 64 | $230.00 | $275.00 | $288.50 |
| 1000 | Type C barrier (7034411) | LF | 61 | $230.00 | $325.00 | $269.75 |
| 1010 | 12 in. pipe group A (7261012) | LF | 36 | $101.00 | $66.00 | $74.00 |
| 1020 | 30 in. pipe group A (7261030) | LF | 37 | $176.00 | $143.00 | $137.00 |
| 1030 | 36 in. pipe group A (7261036) | LF | 4 | $580.00 | $525.00 | $1,100.00 |
| 1040 | 48 in. pipe group A (7261048) | LF | 81 | $300.00 | $240.00 | $260.00 |
| 1050 | Precast concrete manhole - 72 in. (7310072) | FT | 14 | $1,385.00 | $1,400.00 | $925.00 |
| 1060 | Precast concrete drop inlet 3 FT X 3 FT (7311033) | FT | 6 | $581.08 | $1,000.00 | $1,150.00 |
| 1070 | Precast concrete drop inlet 5 FT X 2 FT (7311052) | FT | 8 | $500.00 | $900.00 | $1,100.00 |
| 1080 | 48 in. or allowed substitute group A flared end section (7320648A) | EACH | 1 | $4,000.00 | $5,000.00 | $2,500.00 |
| 1090 | Mulching (8025006) | ACRE | 1.80 | $1,800.00 | $3,000.00 | $3,000.00 |
| 1100 | Seeding - warm season grasses (8052000A) | ACRE | 0.90 | $3,000.00 | $3,500.00 | $3,500.00 |
| 1110 | Rock ditch check (8061005) | LF | 480 | $10.00 | $14.50 | $14.50 |
| 1120 | Sediment removal (8061016) | CY | 60 | $1.00 | $29.00 | $100.00 |
| 1130 | Temporary seeding (8061017) | ACRE | 0.90 | $2,500.00 | $3,500.00 | $3,500.00 |
| 1140 | Silt fence (8061019) | LF | 3,390 | $1.00 | $2.90 | $2.90 |
| 1150 | MGS guardrail (6061060) | LF | 2,650 | $28.50 | $28.50 | $28.50 |
| 1160 | MGS end anchor (6061080) | EACH | 3 | $2,100.00 | $2,100.00 | $2,100.00 |
| 1170 | MGS bridge approach transition (thrie-beam bridge) (6061081) | EACH | 4 | $4,200.00 | $4,200.00 | $4,200.00 |
| 1180 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 5 | $3,900.00 | $3,900.00 | $3,900.00 |
| 1190 | Misc.guardrail posts in concrete (6069902) | EACH | 6 | $250.00 | $250.00 | $250.00 |
| 1200 | Signal head, type 3B (9020513) | EACH | 5 | $1,233.00 | $1,233.00 | $1,233.00 |
| 1210 | SH-flat sheet - signal sign (9020833) | SF | 28 | $33.00 | $33.00 | $33.00 |
| 1220 | Signal sign, mounting hardware (9020834) | EACH | 4 | $228.00 | $228.00 | $228.00 |
| 1230 | Post, type B, longest arm 55 FT. (9023355) | EACH | 1 | $32,888 | $32,888 | $32,888 |
| 1240 | Conduit, 3 in., trench with tracer wire (9025300) | LF | 17 | $20.00 | $20.00 | $20.00 |
| 1250 | Conduit, 3 in., pushed with tracer wire (9027300) | LF | 103 | $33.00 | $33.00 | $33.00 |
| 1260 | Cable, 16 AWG 7 conductor (9028311) | LF | 1,070 | $3.00 | $3.00 | $3.00 |
| 1270 | Pull box, preformed class 2 (9028811) | EACH | 1 | $1,840.00 | $1,840.00 | $1,840.00 |
| 1280 | Base, concrete (9029100) | CY | 3.70 | $1,547.00 | $1,547.00 | $1,547.00 |
| 1285 | Misc.lump sum traffic signal maintenance & programming (9029901) | LS | 1 | $6,000.00 | $9,500.00 | $9,500.00 |
| 1290 | Misc.reconfiguration of video detection zones (9029902) | EACH | 1 | $400.00 | $400.00 | $400.00 |
| 1300 | Misc.SL district traffic signal detection system (9029902) | EACH | 1 | $29,188 | $29,188 | $29,188 |
| 1310 | Concrete footings, embedded (9031010) | CY | 3 | $2,800.00 | $2,800.00 | $2,800.00 |
| 1320 | Concrete footings, bolt down (9031020) | CY | 9.60 | $3,000.00 | $3,000.00 | $3,000.00 |
| 1330 | Optional overhead sign truss substructures (9031026) | CY | 14.60 | $3,000.00 | $3,000.00 | $3,000.00 |
| 1340 | Structural steel posts (9031210) | LB | 650 | $6.00 | $6.00 | $6.00 |
| 1350 | Pipe posts (9031220) | LB | 1,230 | $8.00 | $8.00 | $8.00 |
| 1360 | SH-flat sheet (9035004A) | SF | 102 | $32.00 | $32.00 | $32.00 |
| 1370 | ST-structural (9035011A) | SF | 569 | $38.00 | $38.00 | $38.00 |
| 1380 | SHF-flat sheet fluorescent (9035069A) | SF | 32 | $36.00 | $36.00 | $36.00 |
| 1390 | STF-structural fluorescent (9035071A) | SF | 102 | $42.00 | $42.00 | $42.00 |
| 1400 | Misc.23 FT. cantilever box truss (9039901) | LS | 1 | $62,800 | $62,800 | $62,800 |
| 1410 | Misc.tubular support, type S-23316.5-65 (9039901) | LS | 1 | $80,200 | $80,200 | $80,200 |
| 1420 | Misc.sign removal and relocation (9039902) | EACH | 7 | $150.00 | $150.00 | $150.00 |
| 1430 | Misc.ITS asset management tool (9109901) | LS | 1 | $450.00 | $450.00 | $450.00 |
| 1440 | Misc.fiber optic fusion splice (9109902) | EACH | 102 | $50.00 | $50.00 | $50.00 |
| 1450 | Misc.fiber optic jumper (9109902) | EACH | 12 | $20.00 | $20.00 | $20.00 |
| 1460 | Misc.fiber optic pigtail (9109902) | EACH | 12 | $20.00 | $20.00 | $20.00 |
| 1470 | Misc.install conduit into existing pull box (9109902) | EACH | 3 | $250.00 | $250.00 | $250.00 |
| 1480 | Misc.intercept conduit with pull box (9109902) | EACH | 1 | $2,200.00 | $2,200.00 | $2,200.00 |
| 1490 | Misc.ITS pull box with concrete pad, preformed class 2 (9109902) | EACH | 3 | $2,370.00 | $2,370.00 | $2,370.00 |
| 1500 | Misc.modot buried cable drivable delineator post (9109902) | EACH | 23 | $200.00 | $200.00 | $200.00 |
| 1510 | Misc.underground splice enclosure (9109902) | EACH | 1 | $850.00 | $850.00 | $850.00 |
| 1520 | Misc.wall-mounted interconnect center (9109902) | EACH | 3 | $622.00 | $622.00 | $622.00 |
| 1530 | Misc.conduit, HDPE, drill, 2" (9109903) | LF | 1,683 | $22.00 | $22.00 | $22.00 |
| 1540 | Misc.fiber optic cable, 24 strand, single mode (9109903) | LF | 7,592 | $3.25 | $3.25 | $3.25 |
| 1550 | Misc.relocate fiber optic cable (9109903) | LF | 575 | $20.00 | $20.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of January 17, 2025. Compiled by Mirage Metrics.