C.J. Hesse, Inc.: NJDOT bid record

C.J. Hesse, Inc. submitted 20 bids on New Jersey DOT contracts in the data, from 17 APR 2018 to 12 FEB 2026, and was the low bidder on 2 of them (10%). When it was not low, its total sat a median +22% above the low bid.

Owner
New Jersey DOT
Low bid volume
$72,627,793
Latest bid
12 FEB 2026
Data through
16 APR 2026
20Bids
2Low bids
10Win rate, percent
+22%Median gap to the low bid when not low, 18 bids

By year

YearBidsLow bidsWin rate
2018300%
2019100%
20208113%
2021400%
2022100%
202411100%
2025100%
2026100%
C.J. Hesse, Inc., NJDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
C111218%
S1400%
N1300%
C4200%
C.J. Hesse, Inc., NJDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Fuel price adjustment160004MDOL1717 (100%)$22,000$2,700.00
Asphalt price adjustment160007MDOL1515 (100%)$64,600$10,200
Prime coat401036MGAL99 (100%)$0.01$0.01
Pollution liability insurance152015PDOL187 (39%)$15,000$8,500.00
Excavation, unclassified202009PCY286 (21%)$62.50$78.60
Polymerized joint adhesive401027MLF206 (30%)$0.46$0.52
9" X 16" concrete vertical curb607018PLF206 (30%)$49.00$60.00
9" X 14" concrete vertical curb607034PLF126 (50%)$50.50$53.00
HMA milling, 3" or less401009PSY195 (26%)$5.50$6.85
Hot mix asphalt 25 M 64 base course401099MT135 (38%)$117.00$125.00
Reset existing casting602099MU105 (50%)$380.00$750.00
Construction signs159012MSF204 (20%)$15.00$15.00
C.J. Hesse, Inc., NJDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

C.J. Hesse, Inc., NJDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 FEB 202625139C1Route 36, Bridge over Troutman's Creek8 of 9$12,398,020+56%
29 MAY 202525104S1ROUTE 130, CR 545 (FARNSWORTH AVENUE) INT Improvements5 of 5$14,404,020+58%
04 JUN 202424107C1Route 66, Jumping Brook Road to Bowne Road / Wayside Road1 of 8$38,958,780Low, 18% under the second
04 AUG 202222137N1Route 22 Bridge over Echo Lake2 of 4$9,900,020+10%
16 SEP 202121136C1BROADWAY AVE. (CR 516), OVER ROUTE 354 of 4$6,435,503+29%
20 MAY 202121124C1Route 37 Thomas St to Fischer Blvd2 of 5$9,736,730+6.0%
06 MAY 202121118C1ROUTE 9 Jones Road to Longboat Ave3 of 4$10,628,922+17%
13 APR 202121405C4Maintenance Roadway Contract C215, DP 214057 of 7$13,569,012+29%
05 NOV 202020130C1ROUTE 72 MANAHAWKIN BAY BRIDGES1 of 9$33,669,013Low, 5.0% under the second
17 SEP 202020132S1Rt.70, Dakota Trail to Review Dr. (CR 48)6 of 6$16,669,313+30%
02 JUN 202020121C1Wright-Debow Rd, Bridge over Rt 1954 of 8$3,496,469+25%
21 MAY 202020120C1Milltown Rd/North Main St (CR 606), Bridge over Rt 18 of 10$11,571,486+32%
23 APR 202019140C1RT. 130, Charleston Rd./Cooper St. (CR 630) to Crafts Creek5 of 6$39,993,069+42%
09 APR 202020111N1ROUTE 171 FROM ROUTE 130 TO LINCOLN AVENUE2 of 7$2,962,636+8.0%
02 APR 202020113S1Rt 30 Mill Road (CR 651), UPC 1750302 of 5$1,055,055+15%
31 MAR 202019143S1US Route 30, Elwood Road/Weymouth Road (CR 623) to Haddon Av3 of 3$39,069,369+19%
11 APR 201919106N1Route 15 Bridge over Main Street6 of 7$6,169,169+51%
20 SEP 201818128C1Route 31 Bull Run Road to Branch of Stoney Brook5 of 9$8,289,586+10%
24 MAY 201818406C4MRRC Central, Sub-Region C-3, Contract No. C3102 of 7$11,969,691+6.0%
17 APR 201818103C1Route 70 East of North Branch Road to CR 5393 of 4$13,996,150+15%
C.J. Hesse, Inc.: latest NJDOT bids in the data

How this record was read

NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

  • Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy