Archer Western Construction LLC: NCDOT bid record
Archer Western Construction LLC submitted 15 bids on North Carolina DOT contracts in the data, from 16 JUL 2013 to 22 JAN 2026, and was the low bidder on 2 of them (13%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $70,617,255
- Latest bid
- 22 JAN 2026
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 3 | 0 | 0% |
| 2014 | 2 | 0 | 0% |
| 2015 | 2 | 0 | 0% |
| 2017 | 2 | 0 | 0% |
| 2018 | 2 | 1 | 50% |
| 2019 | 1 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
| 2026 | 1 | 1 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Yancey | 2 | 1 | 50% |
| Guilford | 2 | 0 | 0% |
| Cabarrus, Mecklenburg | 1 | 0 | 0% |
| Forsyth | 1 | 0 | 0% |
| Warren, Vance | 1 | 0 | 0% |
| Wake | 1 | 0 | 0% |
| Johnston | 1 | 0 | 0% |
| Perquimans | 1 | 0 | 0% |
| New Hanover | 1 | 0 | 0% |
| Chatham | 1 | 0 | 0% |
| Onslow | 1 | 0 | 0% |
| Surry, Yadkin | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Stone for erosion control, class B | 6009000000-E | TON | 7 | 4 (57%) | $52.00 | $49.00 |
| Foundation conditioning geo-textile | 0320000000-E | SY | 7 | 4 (57%) | $1.00 | $3.00 |
| Geotextile for subsurface drains | 2026000000-E | SY | 5 | 4 (80%) | $0.90 | $4.10 |
| Flashing arrow board | 4415000000-N | EACH | 8 | 3 (38%) | $3,260.00 | $2,909.50 |
| Incidental stone base | 1220000000-E | TON | 7 | 3 (43%) | $26.00 | $40.00 |
| Stone for erosion control, class A | 6006000000-E | TON | 7 | 3 (43%) | $60.00 | $48.00 |
| Aggregate base course | 1121000000-E | TON | 7 | 3 (43%) | $28.00 | $38.37 |
| Stabilizer aggregate | 1110000000-E | TON | 7 | 3 (43%) | $23.00 | $33.77 |
| Geotextile for drainage | 8622000000-E | SY | 6 | 3 (50%) | $1.90 | $3.00 |
| Shotcrete repairs | 8664000000-E | CF | 5 | 3 (60%) | $750.00 | $902.50 |
| Asphalt binder for plant mix | 1575000000-E | TON | 9 | 2 (22%) | $570.00 | $595.00 |
| Sediment control stone | 6012000000-E | TON | 7 | 2 (29%) | $38.00 | $42.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| PCL Civil Constructors Inc | 5 | 5 of 5 |
| Blythe Construction Inc | 5 | 3 of 5 |
| The Lane Construction Corp | 5 | 3 of 5 |
| S T Wooten Corporation | 5 | 3 of 5 |
| Balfour Beatty Infrastructure Inc | 4 | 2 of 4 |
| Vecellio & Grogan Inc | 3 | 3 of 3 |
| Conti Enterprises, Inc | 3 | 2 of 3 |
| Sanford Contractors Inc | 2 | 2 of 2 |
| Dragados USA Inc | 2 | 2 of 2 |
| Webber LLC | 2 | 2 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 22 JAN 2026 | C205145 | Yancey | ROADWAY AND BRIDGE CONSTRUCTION (PROGRESSIVE DESIGN BUILD). NC-197 | 1 of 1 | $21,117,255 | Low |
| 21 JAN 2025 | C205023 | Yancey | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRG #990100 AND BRG #990062 BOTH ON SR-1153, AND BRG #990097 ON SR-1152 | 3 of 3 | $15,692,277 | +50% |
| 20 DEC 2022 | C204477 | Onslow | Grading, drainage, paving, and structure. BRIDGE #33 OVER WOLF SWAMP ON US-17 (NBL). | 4 of 5 | $4,617,616 | +33% |
| 19 MAR 2019 | C204238 | Chatham | Bridge preservation. US-64 EB OVER JORDAN LAKE STRUCTURE #180058 AND US-64 WB OVER JORDAN LAKE STRUCTURE #180059. | 7 of 7 | $2,599,777 | +59% |
| 05 JUN 2018 | C204165 | Surry, Yadkin | Express design build. I-77 FROM MILE MARKER 78.4 TO MILE MARKER 83.4. | 1 of 3 | $49,500,000 | Low, 11% under the second |
| 20 FEB 2018 | C204119 | New Hanover | Bridge preservation. BRIDGE #13 OVER NE CAPE FEAR RIVER ON US-76/421. | 4 of 4 | $15,237,296 | +17% |
| 21 NOV 2017 | C204003 | Perquimans | Design-build. US-17 BUS/NC-37 (NORTH CHURCH ST) FROM SOUTH OF THE PERQUIMANS RIVER BRIDGE TO NORTH OF NC-37. | 3 of 3 | $69,857,100 | +26% |
| 17 OCT 2017 | C203977 | Johnston | Signals, pavement and bridge rehabilitation. I-40 FROM SR-1010 (CLEVELAND ROAD) TO WEST OF SR-1211 (MORGAN ROAD). | 4 of 5 | $11,506,499 | +13% |
| 26 JUN 2015 | C203635 | Wake | Design-build. TRIANGLE EXPRESSWAY (TOLL NC-540)/OLD HOLLY SPRINGS - APEX ROAD (SR-1153) INTERCHANGE. | 2 of 4 | $20,840,800 | +13% |
| 17 MAR 2015 | C203646 | Warren, Vance | Grading, drainage, paving, and structures. I-85 FROM NORTH OF SR-1162 (DABNEY DR) IN VANCE COUNTY TO VIRGINIA STATE LINE. | 4 of 7 | $147,155,717 | +7.0% |
| 21 OCT 2014 | C203484 | Forsyth | Grading, drainage, paving, signing, signals, its, and strs. WINSTON-SALEM NORTHERN BELTWAY (EASTERN SECTION) FROM US-158 TO I-40 BUS/US-421. | 5 of 10 | $163,371,668 | +6.0% |
| 17 JUN 2014 | C203399 | Guilford | Grading, drainage, paving, signals, ret wall and structures. GREENSBORO EASTERN LOOP FROM NORTH OF US-70 TO US-29 NORTH OF GREENSBORO. | 9 of 10 | $130,294,939 | +17% |
| 24 SEP 2013 | C203197 | Guilford | Grading, drainage, paving, its, and structures. GREENSBORO-WESTERN LOOP FROM SOUTH OF SR-2137 (OLD OAK RIDGE RD) TO NORTH OF US-220 (BATTLEG | 4 of 6 | $131,995,416 | +7.0% |
| 17 SEP 2013 | C203198 | Brunswick, New Hanover | Grading, drainage, paving, signing, and structures. US-17 (WILMINGTON BYPASS) FROM SR-1430 (CEDAR HILL RD) TO WEST OF US-421 NORTH OF WILMIN | 7 of 8 | $144,435,393 | +16% |
| 16 JUL 2013 | C203206 | Cabarrus, Mecklenburg | Grading, drainage, paving, retain wall, rr roadbed, and str. NORTH CAROLINA RR / NORFOLK SOUTHERN MAINLINE HAYDOCK TO JUNKER RAILROAD ROADBE | 4 of 5 | $27,427,395 | +10% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.