PCL Civil Constructors Inc: NCDOT bid record
PCL Civil Constructors Inc submitted 18 bids on North Carolina DOT contracts in the data, from 18 JUN 2013 to 21 JAN 2025, and was the low bidder on 4 of them (22%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- North Carolina DOT
- Low bid volume
- $106,492,136
- Latest bid
- 21 JAN 2025
- Data through
- 20 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2013 | 3 | 0 | 0% |
| 2014 | 4 | 0 | 0% |
| 2015 | 1 | 0 | 0% |
| 2017 | 2 | 1 | 50% |
| 2018 | 5 | 2 | 40% |
| 2019 | 1 | 1 | 100% |
| 2023 | 1 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| New Hanover | 3 | 2 | 67% |
| Dare | 2 | 0 | 0% |
| Carteret | 2 | 0 | 0% |
| Yancey | 1 | 0 | 0% |
| Wake | 1 | 0 | 0% |
| Jackson | 1 | 0 | 0% |
| Tyrrell, Dare | 1 | 0 | 0% |
| Perquimans | 1 | 1 | 100% |
| Brunswick | 1 | 0 | 0% |
| Mecklenburg | 1 | 0 | 0% |
| Stanly | 1 | 1 | 100% |
| Alleghany | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Grooving bridge floors | 8161000000-E | SF | 10 | 6 (60%) | $0.28 | $0.80 |
| Temporary silt fence | 6000000000-E | LF | 9 | 5 (56%) | $2.00 | $2.63 |
| Seed for repair seeding | 6090000000-E | LB | 9 | 5 (56%) | $3.25 | $5.50 |
| Seed for supplemental seeding | 6096000000-E | LB | 9 | 5 (56%) | $3.00 | $4.50 |
| Work zone signs (barricade mounted) | 4410000000-E | SF | 14 | 4 (29%) | $8.75 | $7.50 |
| Work zone signs (portable) | 4405000000-E | SF | 13 | 4 (31%) | $10.00 | $11.02 |
| Fertilizer for repair seeding | 6093000000-E | TON | 9 | 4 (44%) | $900.00 | $1,110.00 |
| CSL testing | 8115000000-N | EACH | 5 | 4 (80%) | $1,500.00 | $2,500.00 |
| Work zone signs (stationary) | 4400000000-E | SF | 14 | 3 (21%) | $7.75 | $7.25 |
| Seeding and mulching | 6084000000-E | ACRE | 10 | 3 (30%) | $1,775.00 | $2,365.00 |
| Temporary mulching | 6015000000-E | ACRE | 9 | 3 (33%) | $635.00 | $1,100.00 |
| Seed for temporary seeding | 6018000000-E | LB | 9 | 3 (33%) | $3.05 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Archer Western Construction LLC | 5 | 0 of 5 |
| Conti Enterprises, Inc | 5 | 3 of 5 |
| Balfour Beatty Infrastructure Inc | 5 | 3 of 5 |
| Carolina Bridge Co., Inc. | 4 | 2 of 4 |
| Flatiron Constructors Inc | 4 | 4 of 4 |
| Smith-Rowe, LLC | 3 | 2 of 3 |
| American Bridge Company | 3 | 0 of 3 |
| S T Wooten Corporation | 3 | 1 of 3 |
| Dragados USA Inc | 3 | 1 of 3 |
| Southern Road & Bridge LLC | 3 | 1 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 21 JAN 2025 | C205023 | Yancey | ROADWAY AND BRIDGE CONSTRUCTION (EXPRESS DESIGN BUILD). BRG #990100 AND BRG #990062 BOTH ON SR-1153, AND BRG #990097 ON SR-1152 | 2 of 3 | $13,954,361 | +34% |
| 21 NOV 2023 | C204902 | New Hanover | Bridge preservation. CAPE FEAR MEMORIAL BRIDGE. | 3 of 3 | $9,627,900 | +35% |
| 19 FEB 2019 | C204203 | New Hanover | Bridge preservation. BRIDGE NO. 640011 ON US-74 OVER NORTH EAST CAPE FEAR RIVER. | 1 of 5 | $17,999,991 | Low, 19% under the second |
| 18 DEC 2018 | C204255 | Alleghany | Grading, drainage, paving, and structure. BRIDGE #21 OVER LITTLE RIVER ON NC-18. | 7 of 8 | $7,407,709 | +53% |
| 20 NOV 2018 | C204259 | Stanly | Design build. BRIDGES 830050 AND 830051 OVER THE PEE DEE RIVER ON NC-24/NC-27/NC-73. | 1 of 7 | $20,154,128 | Low, 48% under the second |
| 29 MAY 2018 | C204058 | Mecklenburg | Grading, drainage, paving, structures, and architecture. CHARLOTTE GATEWAY STATION. | 3 of 5 | $55,205,563 | +14% |
| 15 MAY 2018 | C204185 | Brunswick | Milling, resurfacing, guardrail, and bridge preservation. BRIDGE #14 ON NC-133 OVER THE INTRACOASTAL WATERWAY, 1 SECTION OF NC-133, AND 1 SE | 2 of 3 | $15,862,492 | 0.0% |
| 20 FEB 2018 | C204119 | New Hanover | Bridge preservation. BRIDGE #13 OVER NE CAPE FEAR RIVER ON US-76/421. | 1 of 4 | $12,999,991 | Low, 6.0% under the second |
| 21 NOV 2017 | C204003 | Perquimans | Design-build. US-17 BUS/NC-37 (NORTH CHURCH ST) FROM SOUTH OF THE PERQUIMANS RIVER BRIDGE TO NORTH OF NC-37. | 1 of 3 | $55,338,025 | Low, 3.0% under the second |
| 21 FEB 2017 | C203993 | Tyrrell, Dare | Bridge rehabilitation. BRIDGE #7 OVER ALLIGATOR RIVER ON US-64. | 4 of 4 | $19,899,997 | +19% |
| 21 APR 2015 | C203563 | Carteret | Grading, drainage, paving, and structures. BRIDGE #33 OVER NORTH RIVER ON US-70. | 3 of 6 | $18,814,255 | +32% |
| 15 JUL 2014 | C203409 | Jackson | Grading, drainage, paving, and structure. BRIDGE #145 OVER SR-1705, SOUTHERN RAILROAD, AND SCOTT CREEK ON US-23/74. | 5 of 7 | $7,799,826 | +21% |
| 17 JUN 2014 | C203399 | Guilford | Grading, drainage, paving, signals, ret wall and structures. GREENSBORO EASTERN LOOP FROM NORTH OF US-70 TO US-29 NORTH OF GREENSBORO. | 6 of 10 | $122,919,902 | +10% |
| 18 FEB 2014 | C202573 | Wake | Grading, paving, drainage, and structure. BRIDGE OVER BEAVER CREEK AND APPROACHES ON SR-1163. | 5 of 8 | $4,255,998 | +8.0% |
| 21 JAN 2014 | C202848 | Carteret | Grading, drainage, paving, signals, and structures. US-70 FROM EXISTING 4 LANE AT RADIO ISLAND TO US-70 NORTH OF SR-1429 (OLGA RD). | 3 of 8 | $69,765,385 | +5.0% |
| 19 NOV 2013 | C203171 | Dare | Grading, drainage, paving, and structure. LONG TERM IMPROVEMENTS (PHASE II) TO PEA ISLAND ON NC-12. | 4 of 10 | $89,874,411 | +7.0% |
| 17 SEP 2013 | C203198 | Brunswick, New Hanover | Grading, drainage, paving, signing, and structures. US-17 (WILMINGTON BYPASS) FROM SR-1430 (CEDAR HILL RD) TO WEST OF US-421 NORTH OF WILMIN | 4 of 8 | $128,796,288 | +4.0% |
| 18 JUN 2013 | C203340 | Dare | Crutch bent repairs. BRIDGE #11 OVER OREGON INLET ON NC-12. | 3 of 4 | $1,895,635 | +43% |
How this record was read
NCDOT central letting bid tab workbooks, January 2013 to October 2026, each contract linked to the workbook it was read from. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; NCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.