ODOT contract 250080 bid tabulation
ATB-US 322/VAR-22.48/VAR (TWO LANE RESURFACING). Let by Ohio DOT on February 13, 2025, ATB. 2 bids received; low bid $2,575,000 by Karvo Companies Inc, -9.7% against the engineer's estimate of $2,852,000.
- Owner
- Ohio DOT
- Letting
- 13 FEB 2025
- Pay items
- 81
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Karvo Companies Inc | $2,575,000 | Low | -10% |
| 2 | Ronyak Paving Inc | $2,768,000 | +7.0% | -3.0% |
Engineer's estimate: $2,852,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Karvo Companies Inc | 2. Ronyak Paving Inc |
|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 699 | $1.00 | $2.00 |
| 2 | Excavation (203E10000) | CY | 39 | $10.00 | $12.00 |
| 3 | Linear grading (209E60200) | STA | 250 | $34.00 | $20.00 |
| 4 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 1 | $1,500.00 | $1,200.00 |
| 5 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 |
| 6 | Catch basin adjusted to grade (611E98630) | EACH | 8 | $1,400.00 | $1,575.00 |
| 7 | Catch basin reconstructed to grade (611E98634) | EACH | 4 | $1,700.00 | $1,750.00 |
| 8 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 5 | $2,400.00 | $1,250.00 |
| 9 | Special - miscellaneous metal (611E99820) | LB | 800 | $2.00 | $5.00 |
| 10 | Partial depth pavement repair (441) (251E01000) | SY | 2,750 | $45.00 | $50.00 |
| 11 | Pavement repair (253E01000) | SY | 538 | $135.00 | $195.00 |
| 12 | Pavement repair (253E01000) | SY | 162 | $85.00 | $150.00 |
| 13 | Pavement planing, asphalt concrete (T=1.5") (254E01000) | SY | 156,971 | $1.00 | $1.50 |
| 14 | Pavement planing, asphalt concrete, as per plan (T (254E01001) | SY | 2,370 | $1.00 | $1.25 |
| 15 | Aggregate base (304E20000) | CY | 39 | $25.00 | $45.00 |
| 16 | Non-tracking tack coat (407E20000) | GAL | 14,405 | $2.75 | $2.50 |
| 17 | Prime coat, as per plan (408E10001) | GAL | 8,844 | $4.50 | $3.00 |
| 18 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 6,670 | $210.00 | $215.00 |
| 19 | Compacted aggregate, as per plan (617E10101) | CY | 616 | $45.00 | $120.00 |
| 20 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 6.51 | $1,100.00 | $2,100.00 |
| 21 | Longitudinal joint preparation (874E20000) | FT | 34,373 | $0.80 | $2.00 |
| 22 | RPM (621E00100) | EACH | 757 | $37.75 | $37.75 |
| 23 | Raised pavement marker removed (621E54000) | EACH | 606 | $1.00 | $1.00 |
| 24 | Edge line, 6" (646E10010) | MI | 18.81 | $3,100.00 | $3,100.00 |
| 25 | Center line (646E10200) | MI | 9.47 | $2,849.00 | $2,849.00 |
| 26 | Channelizing line, 8" (646E10300) | FT | 386 | $1.56 | $1.56 |
| 27 | Stop line (646E10400) | FT | 90 | $14.00 | $14.00 |
| 28 | Transverse/diagonal line (646E10600) | FT | 65 | $12.00 | $12.00 |
| 29 | Island marking (646E10800) | SF | 32 | $10.00 | $10.00 |
| 30 | Lane arrow (646E20300) | EACH | 8 | $169.00 | $169.00 |
| 31 | Advance radar detection, as per plan (809E69001) | EACH | 2 | $8,950.00 | $8,950.00 |
| 32 | Stop line radar detection, as per plan (809E69101) | EACH | 2 | $8,750.00 | $8,750.00 |
| 33 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $100.00 | $100.00 |
| 34 | Work zone marking sign (614E12460) | EACH | 8 | $75.00 | $75.00 |
| 35 | Portable changeable message sign, as per plan (614E18601) | SNMT | 8 | $800.00 | $800.00 |
| 36 | Work zone center line, class I (614E21000) | MI | 9.50 | $1,150.00 | $1,150.00 |
| 37 | Work zone center line, class III, 642 paint (614E21550) | MI | 9.52 | $999.00 | $999.00 |
| 38 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 18.90 | $675.00 | $675.00 |
| 39 | Work zone channelizing line, class I, 8" (614E23000) | FT | 386 | $0.64 | $0.64 |
| 40 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 386 | $0.62 | $0.62 |
| 41 | Work zone stop line, class I (614E26000) | FT | 94 | $3.50 | $3.50 |
| 42 | Work zone stop line, class III, 642 paint (614E26610) | FT | 94 | $3.00 | $3.00 |
| 43 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $978.00 | $978.00 |
| 44 | Removal misc.:channel cleanout (202E98000) | LS | 1 | $4,962.00 | $4,962.00 |
| 45 | Embankment (203E20000) | CY | 3 | $175.50 | $175.50 |
| 46 | Dumped rock fill, type C (601E27000) | CY | 5 | $376.20 | $376.20 |
| 47 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $978.00 | $978.00 |
| 48 | Rock channel protection, type B with filter (601E32100) | CY | 5 | $412.20 | $412.20 |
| 49 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $978.00 | $978.00 |
| 50 | Removal misc.:channel cleanout (202E98000) | LS | 1 | $2,154.00 | $2,154.00 |
| 51 | Embankment (203E20000) | CY | 5 | $175.50 | $175.50 |
| 52 | Dumped rock fill, type C (601E27000) | CY | 5 | $376.20 | $376.20 |
| 53 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $1,530.00 | $1,530.00 |
| 54 | Embankment (203E20000) | CY | 5 | $175.50 | $175.50 |
| 55 | Dumped rock fill, type C (601E27000) | CY | 5 | $376.20 | $376.20 |
| 56 | Rock channel protection, type B with filter (601E32100) | CY | 5 | $412.20 | $412.20 |
| 57 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $1,095.00 | $1,095.00 |
| 58 | Removal misc.:channel cleanout (202E98000) | LS | 1 | $9,399.00 | $9,399.00 |
| 59 | Special - structures: concrete spall removal with (530E00800) | SY | 5 | $706.50 | $706.50 |
| 60 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $978.00 | $978.00 |
| 61 | Removal misc.:channel cleanout (202E98000) | LS | 1 | $1,443.00 | $1,443.00 |
| 62 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $978.00 | $978.00 |
| 63 | Removal misc.:channel cleanout (202E98000) | LS | 1 | $1,423.00 | $1,423.50 |
| 64 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $1,020.00 | $1,020.00 |
| 65 | Removal misc.:channel cleanout (202E98000) | LS | 1 | $3,997.50 | $3,997.50 |
| 66 | Embankment (203E20000) | CY | 3 | $175.50 | $175.50 |
| 67 | Dumped rock fill, type C (601E27000) | CY | 5 | $376.20 | $376.20 |
| 68 | Polymer modified asphalt expansion joint system (846E00110) | CF | 24 | $496.50 | $496.50 |
| 69 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $510.00 | $510.00 |
| 70 | Removal misc.:channel cleanout (202E98000) | LS | 1 | $10,149 | $10,149 |
| 71 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 56 | $33.06 | $33.06 |
| 72 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 6 | $269.00 | $269.00 |
| 73 | Patching concrete structure, as per plan (519E11101) | SF | 50 | $164.25 | $164.25 |
| 74 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $957.00 | $957.00 |
| 75 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 367 | $15.87 | $15.87 |
| 76 | Removal of existing pavement marking (512E74500) | FT | 309 | $1.25 | $1.25 |
| 77 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $17,000 | $18,399 |
| 78 | Maintaining traffic (614E11000) | LS | 1 | $130,938 | $150,000 |
| 79 | Field office, type B (619E16010) | MNTH | 6 | $2,500.00 | $1,500.00 |
| 80 | Construction layout stakes and surveying (623E10000) | LS | 1 | $4,247.21 | $8,720.00 |
| 81 | Mobilization (624E10000) | LS | 1 | $152,370 | $84,350 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.