ODOT contract 250375 bid tabulation
CLE-SR 48/SR 132-06.62/17.76 (BRIDGE REPAIR). Let by Ohio DOT on August 14, 2025, CLE. 3 bids received; low bid $1,143,789 by Eagle Bridge Co, -4.7% against the engineer's estimate of $1,200,000.
- Owner
- Ohio DOT
- Letting
- 14 AUG 2025
- Pay items
- 73
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Eagle Bridge Co | $1,143,789 | Low | -5.0% |
| 2 | Complete General Construction Company | $1,172,049 | +2.0% | -2.0% |
| 3 | Sunesis Construction Co | $1,283,046 | +12% | +7.0% |
Engineer's estimate: $1,200,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eagle Bridge Co | 2. Complete General Construction Company | 3. Sunesis Construction Co |
|---|---|---|---|---|---|---|
| 1 | Walk removed (202E30000) | SF | 100 | $10.00 | $10.00 | $19.23 |
| 2 | Guardrail removed (202E38000) | FT | 330.50 | $3.70 | $2.40 | $3.70 |
| 3 | Anchor assembly removed, type A, as per plan (202E42001) | EACH | 1 | $550.00 | $345.00 | $947.32 |
| 4 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $150.00 | $100.00 | $150.00 |
| 5 | Bridge terminal assembly removed (202E47000) | EACH | 5 | $150.00 | $85.00 | $970.85 |
| 6 | Reshaping under guardrail (209E15050) | MI | 0.07 | $5,000.00 | $1,500.00 | $5,000.00 |
| 7 | Guardrail, type MGS (606E15050) | FT | 293.75 | $22.00 | $21.60 | $22.00 |
| 8 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 1 | $2,600.00 | $2,880.00 | $2,600.00 |
| 9 | Anchor assembly, MGS type E (606E26150) | EACH | 1 | $2,600.00 | $2,880.00 | $2,600.00 |
| 10 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 2 | $2,750.00 | $2,720.00 | $2,750.00 |
| 11 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 2 | $2,750.00 | $2,640.00 | $2,750.00 |
| 12 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 1 | $500.00 | $530.00 | $500.00 |
| 14 | 4" concrete walk (608E10000) | SF | 100 | $30.00 | $40.00 | $37.28 |
| 15 | Seeding and mulching (659E10000) | SY | 750 | $5.00 | $4.50 | $10.44 |
| 16 | Commercial fertilizer (659E20000) | TON | 0.10 | $1,500.00 | $1,250.00 | $1,250.00 |
| 17 | Lime (659E31000) | ACRE | 0.16 | $5.00 | $150.00 | $150.00 |
| 18 | Water (659E35000) | MGAL | 4 | $10.00 | $1.00 | $1.00 |
| 19 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 | $1.00 |
| 20 | RPM (621E00100) | EACH | 6 | $467.00 | $476.00 | $466.95 |
| 21 | Raised pavement marker removed (621E54000) | EACH | 6 | $40.00 | $20.00 | $49.49 |
| 22 | Barrier reflector, type 2 (BI-directional) (626E00110) | EACH | 14 | $12.00 | $11.70 | $12.00 |
| 23 | Edge line, 6" (646E10010) | MI | 0.09 | $23,350 | $33,390 | $23,350 |
| 24 | Center line (646E10200) | MI | 0.07 | $31,165 | $85,857 | $31,165 |
| 25 | Detour signing (614E12420) | LS | 1 | $20,000 | $18,000 | $20,113 |
| 26 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 34 | $100.00 | $100.00 | $88.12 |
| 27 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 169 | $22.00 | $22.00 | $18.73 |
| 28 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 34 | $26.50 | $26.50 | $88.12 |
| 29 | Patching concrete structures with trowelable mortar (843E50000) | SF | 15 | $250.00 | $175.00 | $200.00 |
| 30 | Polymer modified asphalt expansion joint system (846E00110) | CF | 24 | $806.00 | $805.87 | $918.29 |
| 31 | Micro silica modified concrete overlay using hydrodemolition, as per plan (848E10001) | SY | 566 | $110.00 | $80.00 | $105.24 |
| 32 | Surface preparation using hydrodemolition (848E20000) | SY | 566 | $125.00 | $110.00 | $93.63 |
| 33 | Micro silica modified concrete overlay (variable thickness), material only (848E30000) | CY | 8 | $475.00 | $398.00 | $678.31 |
| 34 | Hand chipping (848E50000) | SY | 19 | $115.00 | $150.00 | $375.23 |
| 35 | Test slab (848E50100) | LS | 1 | $2,500.00 | $500.00 | $4,108.12 |
| 36 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $95,000 | $150,000 | $91,287 |
| 37 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 165 | $2.00 | $3.00 | $7.96 |
| 38 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 65 | $42.00 | $500.00 | $53.20 |
| 39 | Class QC2 concrete with QC/QA, superstructure (511E34412) | CY | 31 | $2,000.00 | $2,800.00 | $3,127.84 |
| 40 | Class QC1 concrete, abutment (511E45710) | CY | 1 | $4,250.00 | $8,500.00 | $627.55 |
| 41 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 374 | $29.50 | $29.50 | $44.06 |
| 42 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 374 | $26.50 | $26.50 | $88.12 |
| 43 | Surface preparation of existing structural steel (514E00050) | SF | 7,575 | $20.00 | $20.00 | $10.00 |
| 44 | Field painting of existing structural steel, prime coat (514E00056) | SF | 7,575 | $3.00 | $3.00 | $3.00 |
| 45 | Field painting structural steel, intermediate coat (514E00060) | SF | 7,575 | $3.00 | $3.00 | $5.00 |
| 46 | Field painting structural steel, finish coat (514E00066) | SF | 7,575 | $3.00 | $3.00 | $6.00 |
| 47 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 12 | $100.00 | $100.00 | $250.00 |
| 48 | Final inspection repair (514E10000) | EACH | 3 | $400.00 | $400.00 | $650.00 |
| 49 | Joint sealer (516E31000) | FT | 73 | $90.00 | $25.00 | $21.13 |
| 50 | Deep beam bridge retrofit railing, as per plan (517E75601) | FT | 187.50 | $160.00 | $178.00 | $160.00 |
| 51 | Patching concrete structure, as per plan (519E11101) | SF | 24 | $450.00 | $235.00 | $376.27 |
| 52 | Structure grounding system (625E33000) | EACH | 2 | $6,500.00 | $20,000 | $9,200.00 |
| 53 | Micro silica modified concrete overlay using hydrodemolition, as per plan (848E10001) | SY | 835 | $110.00 | $75.00 | $109.57 |
| 54 | Surface preparation using hydrodemolition (848E20000) | SY | 835 | $110.00 | $90.00 | $92.57 |
| 55 | Micro silica modified concrete overlay (variable thickness), material only (848E30000) | CY | 12 | $475.00 | $398.00 | $678.31 |
| 56 | Hand chipping (848E50000) | SY | 25 | $115.00 | $150.00 | $355.66 |
| 57 | Test slab (848E50100) | LS | 1 | $2,500.00 | $500.00 | $4,108.12 |
| 58 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $7,000.00 | $4,000.00 | $8,197.91 |
| 59 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $25,000 | $8,500.00 | $7,546.59 |
| 60 | Maintaining traffic (614E11000) | LS | 1 | $25,000 | $9,000.00 | $8,348.62 |
| 61 | Construction layout stakes and surveying (623E10000) | LS | 1 | $7,500.00 | $9,000.00 | $5,000.00 |
| 62 | Mobilization (624E10000) | LS | 1 | $55,000 | $60,000 | $205,508 |
| 100 | Guardrail removed (202E38000) | FT | 175 | $3.70 | $2.40 | $3.70 |
| 101 | Anchor assembly removed, type E (202E42010) | EACH | 1 | $300.00 | $175.00 | $300.00 |
| 102 | Anchor assembly removed, type T (202E42040) | EACH | 2 | $150.00 | $100.00 | $150.00 |
| 103 | Linear grading (209E60500) | MI | 0.05 | $5,000.00 | $4,700.00 | $72,470 |
| 104 | Guardrail, type MGS (606E15050) | FT | 175 | $22.00 | $21.60 | $22.00 |
| 105 | Anchor assembly, MGS type E(MASH 2016) (606E26150) | EACH | 1 | $2,600.00 | $2,880.00 | $2,600.00 |
| 106 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,250.00 | $1,360.00 | $1,250.00 |
| 107 | Barrier reflector, type 5(BI-directional) (614E13318) | EACH | 5 | $15.00 | $20.00 | $15.00 |
| 108 | Object marker, two way (614E13360) | EACH | 5 | $35.00 | $20.00 | $35.00 |
| 109 | Galvanized steel reinforcement (509E26000) | LB | 4,239 | $3.00 | $1.75 | $3.03 |
| 110 | Railing (three steel tube bridge railing) (517E70100) | FT | 192 | $515.00 | $524.00 | $515.00 |
| 111 | Special - steel drip strip (518E22300) | FT | 181.75 | $25.00 | $30.00 | $42.70 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of August 14, 2025. Compiled by Mirage Metrics.