| 1 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 |
| 2 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 4 | $1,000.00 | $3,000.00 | $2,200.00 |
| 3 | Special - miscellaneous metal (611E99820) | LB | 1,000 | $2.00 | $3.00 | $5.00 |
| 4 | Partial depth pavement repair (442), as per plan (251E01021) | SY | 500 | $110.00 | $100.00 | $95.00 |
| 5 | Partial depth pavement repair (442), as per plan (251E01021) | SY | 250 | $205.00 | $175.00 | $155.00 |
| 6 | Non-tracking tack coat (407E20000) | GAL | 37,408 | $2.50 | $2.25 | $3.00 |
| 7 | Fine graded polymer asphalt concrete, type B, (449) (424E14100) | CY | 9,170 | $285.00 | $315.00 | $340.00 |
| 8 | Rumble strips, shoulder (asphalt concrete), as per plan (618E40601) | MI | 21.96 | $635.00 | $635.00 | $635.00 |
| 9 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 54.05 | $1,200.00 | $1,200.00 | $1,200.00 |
| 11 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 3.07 | $1,750.00 | $1,750.00 | $1,750.00 |
| 13 | Longitudinal joint adhesive (875E10000) | LB | 8,223 | $0.60 | $1.00 | $5.00 |
| 14 | Pavement planing, asphalt concrete, class A, 3/4" (897E01010) | SY | 440,090 | $1.35 | $1.40 | $1.55 |
| 15 | RPM (621E00100) | EACH | 2,222 | $36.00 | $37.50 | $37.00 |
| 16 | Raised pavement marker removed (621E54000) | EACH | 2,100 | $3.00 | $1.00 | $5.00 |
| 20 | Stop line (646E10400) | FT | 199 | $10.00 | $10.00 | $10.00 |
| 21 | Crosswalk line, 12" (646E10510) | FT | 524 | $4.75 | $4.75 | $4.75 |
| 22 | Transverse/diagonal line (646E10600) | FT | 93 | $5.00 | $5.00 | $5.00 |
| 23 | Chevron marking (646E10620) | FT | 150 | $5.00 | $5.00 | $5.00 |
| 24 | Lane arrow (646E20300) | EACH | 47 | $150.00 | $150.00 | $150.00 |
| 25 | Wrong way arrow (646E20320) | EACH | 10 | $200.00 | $200.00 | $200.00 |
| 26 | Lane reduction arrow (646E20350) | EACH | 2 | $225.00 | $225.00 | $225.00 |
| 28 | Yield line (646E20800) | FT | 26 | $10.00 | $10.00 | $10.00 |
| 29 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 28.43 | $3,850.00 | $3,850.00 | $3,850.00 |
| 30 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 24.07 | $2,000.00 | $2,000.00 | $2,000.00 |
| 31 | Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310) | FT | 17,500 | $2.15 | $2.15 | $2.15 |
| 32 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 500 | $100.00 | $125.00 | $100.00 |
| 33 | Work zone increased penalties sign (614E12484) | EACH | 20 | $185.00 | $185.00 | $185.00 |
| 34 | Asphalt concrete for maintaining traffic, as per plan (614E13001) | CY | 50 | $150.00 | $100.00 | $125.00 |
| 35 | Portable changeable message sign, as per plan (614E18601) | SNMT | 36 | $700.00 | $800.00 | $800.00 |
| 36 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 23.60 | $575.00 | $575.00 | $575.00 |
| 37 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 23.60 | $575.00 | $575.00 | $575.00 |
| 38 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 27.77 | $800.00 | $800.00 | $800.00 |
| 39 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 27.77 | $650.00 | $650.00 | $650.00 |
| 40 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 14,536 | $1.00 | $1.00 | $1.00 |
| 41 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 14,536 | $0.75 | $0.75 | $0.75 |
| 42 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 10,511 | $0.65 | $0.65 | $0.65 |
| 43 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 10,511 | $0.60 | $0.60 | $0.60 |
| 44 | Work zone stop line, class I, 642 paint (614E26200) | FT | 199 | $3.50 | $3.50 | $3.50 |
| 45 | Work zone stop line, class III, 642 paint (614E26610) | FT | 199 | $3.50 | $3.50 | $3.50 |
| 46 | Work zone crosswalk line, class I, 12", 642 paint (614E27050) | FT | 452 | $2.65 | $2.65 | $2.65 |
| 47 | Work zone crosswalk line, class III, 12", 642 paint (614E27250) | FT | 452 | $2.65 | $2.65 | $2.65 |
| 48 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 43 | $50.00 | $50.00 | $50.00 |
| 49 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 43 | $50.00 | $50.00 | $50.00 |
| 50 | Signing, misc.: additional signs, ground mounted, (630E97800) | SF | 300 | $25.00 | $25.00 | $25.00 |
| 51 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 72 | $550.00 | $600.00 | $600.00 |
| 52 | Portable non-intrusive traffic sensor, class II (896E00012) | SNMT | 24 | $475.00 | $1,000.00 | $1,250.00 |
| 53 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $20,000 | $25,000 | $30,000 |
| 54 | Maintaining traffic (614E11000) | LS | 1 | $324,205 | $400,000 | $537,000 |
| 55 | Field office, type B, as per plan (619E16011) | MNTH | 6 | $2,000.00 | $3,000.00 | $3,000.00 |
| 56 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $7,500.00 | $10,000 | $10,000 |
| 57 | Mobilization (624E10000) | LS | 1 | $215,000 | $475,000 | $200,000 |
| 100 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 12,224 | $0.50 | $0.50 | $0.50 |
| 101 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 21,201 | $0.60 | $0.60 | $0.60 |
| 102 | Void reducing asphalt membrane (vram) (872E10000) | FT | 9,390 | $2.75 | $1.50 | $3.10 |
| 103 | Channelizing line, 12" (646E10310) | FT | 1,697 | $1.50 | $1.50 | $1.50 |
| 104 | Island marking (646E10800) | SF | 25 | $10.00 | $10.00 | $10.00 |
| 105 | Wet reflective epoxy pavement marking, dotted line, 6" (807E12410) | FT | 9,587 | $0.75 | $0.75 | $0.75 |
| 106 | Wet reflective epoxy pavement marking, dotted line, 12" (807E12430) | FT | 2,637 | $1.75 | $1.75 | $1.75 |
| 107 | Portable changeable message sign, as per plan (896E00021) | SNMT | 24 | $950.00 | $1,000.00 | $900.00 |