| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,500.00 | $9,000.00 |
| 2 | Guardrail removed (202E38000) | FT | 691 | $2.80 | $2.40 |
| 3 | Excavation (203E10000) | CY | 268 | $27.00 | $30.00 |
| 4 | Embankment (203E20000) | CY | 82 | $35.00 | $39.00 |
| 5 | Subgrade compaction (204E10000) | SY | 693 | $7.00 | $9.00 |
| 6 | Preparing subgrade for shoulder paving (209E72000) | STA | 13 | $133.00 | $328.13 |
| 7 | Guardrail, type MGS (606E15050) | FT | 462.50 | $23.00 | $19.20 |
| 8 | Anchor assembly, MGS type A (606E25550) | EACH | 1 | $1,850.00 | $1,580.00 |
| 9 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 2 | $2,500.00 | $2,540.00 |
| 10 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,250.00 | $1,360.00 |
| 11 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 4 | $2,500.00 | $2,400.00 |
| 12 | Seeding and mulching (659E10000) | SY | 2,162 | $1.50 | $1.50 |
| 13 | Commercial fertilizer (659E20000) | TON | 0.19 | $1,250.00 | $1,250.00 |
| 14 | Lime (659E31000) | ACRE | 0.45 | $160.00 | $150.00 |
| 15 | Water (659E35000) | MGAL | 6 | $1.00 | $1.00 |
| 16 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 |
| 17 | Aggregate drains (605E31100) | FT | 132 | $16.00 | $20.00 |
| 18 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 109 | $295.00 | $295.00 |
| 19 | Aggregate base (304E20000) | CY | 111 | $140.00 | $95.00 |
| 20 | Non-tracking tack coat (407E20000) | GAL | 248 | $4.00 | $4.00 |
| 21 | Prime coat (408E10000) | GAL | 111 | $10.00 | $10.00 |
| 22 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 98 | $330.00 | $330.00 |
| 23 | Asphalt concrete intermediate course, 12.5 MM, type A (449) (442E22300) | CY | 22 | $440.00 | $440.00 |
| 24 | Compacted aggregate (617E10100) | CY | 19 | $130.00 | $125.00 |
| 25 | Raised pavement marker removed (621E54000) | EACH | 8 | $16.00 | $55.00 |
| 26 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 13 | $13.00 | $13.20 |
| 27 | Removal of ground mounted sign and reerection (630E85100) | EACH | 4 | $80.00 | $115.00 |
| 28 | Removal of ground mounted post support and reerection (630E86010) | EACH | 4 | $80.00 | $195.00 |
| 29 | Edge line, 6", type 1 (642E00104) | MI | 0.34 | $2,250.00 | $2,100.00 |
| 30 | Center line, type 1 (642E00300) | MI | 0.17 | $3,800.00 | $3,600.00 |
| 31 | Stop line, type 1 (642E00500) | FT | 16 | $13.00 | $12.00 |
| 32 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 4 | $2,300.00 | $2,740.00 |
| 33 | Work zone lighting system (614E12740) | EACH | 1 | $39,000 | $25,000 |
| 34 | Barrier reflector, type 1 (bidirectional) (614E13310) | EACH | 43 | $11.00 | $16.00 |
| 35 | Object marker, two way (614E13360) | EACH | 43 | $14.00 | $28.00 |
| 36 | Work zone center line, class I (614E21000) | MI | 0.20 | $5,900.00 | $5,550.00 |
| 37 | Work zone edge line, class I, 6" (614E22010) | MI | 0.57 | $2,600.00 | $2,450.00 |
| 38 | Work zone stop line, class I (614E26000) | FT | 35 | $12.00 | $12.00 |
| 39 | Roads for maintaining traffic (615E10000) | LS | 1 | $8,000.00 | $9,000.00 |
| 40 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 196 | $92.00 | $115.00 |
| 41 | Portable barrier, unanchored (622E41100) | FT | 1,008 | $20.00 | $30.00 |
| 42 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $125,000 | $165,000 |
| 43 | Wearing course removed (202E23500) | SY | 1,109 | $13.50 | $15.00 |
| 44 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $33,400 | $20,000 |
| 45 | Unclassified excavation (503E21300) | LS | 1 | $20,000 | $25,000 |
| 46 | Galvanized steel reinforcement (509E26000) | LB | 70,057 | $2.60 | $2.75 |
| 47 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 244 | $32.00 | $30.00 |
| 48 | Class QC2 concrete, bridge deck (511E34444) | CY | 242 | $1,250.00 | $1,300.00 |
| 49 | Class QC1 concrete, abutment (511E45710) | CY | 25 | $3,600.00 | $2,900.00 |
| 50 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 232 | $12.00 | $16.50 |
| 51 | Type 2 waterproofing (512E33000) | SY | 40 | $42.00 | $39.00 |
| 52 | Structural steel members, level UF (513E10200) | LB | 4,300 | $15.00 | $16.50 |
| 53 | Structural steel members, level UF, as per plan (513E10201) | LB | 130 | $100.00 | $110.00 |
| 54 | Welded stud shear connectors (513E20000) | EACH | 3,774 | $4.99 | $4.30 |
| 55 | Field painting of damaged structural steel, as per plan (514E20001) | SF | 264 | $345.00 | $310.00 |
| 56 | Structural expansion joint including elastomeric strip seal (516E11210) | FT | 84 | $900.00 | $825.00 |
| 57 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 6 | $1,400.00 | $2,500.00 |
| 58 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 6 | $1,800.00 | $2,500.00 |
| 59 | Elastomeric bearing with internal laminates and load plate (516E44200) | EACH | 6 | $1,700.00 | $1,700.00 |
| 60 | Elastomeric bearing with internal laminates and load plate (516E44200) | EACH | 6 | $1,800.00 | $2,500.00 |
| 61 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $40,000 | $50,000 |
| 62 | Railing (three steel tube bridge railing) (517E70100) | FT | 416 | $435.00 | $470.00 |
| 63 | Porous backfill with geotextile fabric (518E21200) | CY | 52 | $140.00 | $195.00 |
| 64 | Special - steel drip strip (518E22300) | FT | 233.81 | $15.00 | $15.25 |
| 65 | 6" perforated corrugated plastic pipe (518E40000) | FT | 116 | $9.00 | $13.00 |
| 66 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 50 | $20.00 | $13.00 |
| 67 | Reinforced concrete approach slabs (T=15"), as per plan (526E25001) | SY | 234 | $500.00 | $395.00 |
| 68 | Type A installation (526E90010) | FT | 84 | $300.00 | $305.00 |
| 69 | Polymer modified asphalt expansion joint system (846E00110) | CF | 35 | $700.00 | $755.00 |
| 70 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $10,000 | $12,000 |
| 71 | Maintaining traffic (614E11000) | LS | 1 | $25,000 | $22,500 |
| 72 | Construction layout stakes and surveying (623E10000) | LS | 1 | $25,000 | $20,000 |
| 73 | Mobilization (624E10000) | LS | 1 | $96,000 | $97,000 |