TxDOT contract A00058758 bid tabulation
Rehabilitate Existing Roadway, FM 879 (IH 45 to FM 813). Let by Texas DOT on March 4, 2025, Ellis, Dallas District. 6 bids received; low bid $9,167,314 by Knife River Corporation - South, -18% against the engineer's estimate of $11,176,341.
- Owner
- Texas DOT
- Letting
- 04 MAR 2025
- Pay items
- 103
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Knife River Corporation - South | $9,167,314 | Low | -18% |
| 2 | A. L. Helmcamp, Inc. | $9,842,066 | +7.0% | -12% |
| 3 | Ed Bell Construction Company | $10,969,427 | +20% | -2.0% |
| 4 | Big Creek Construction, LTD. | $11,015,587 | +20% | -1.0% |
| 5 | Grey Sky Construction LLC | $13,763,960 | +50% | +23% |
| 6 | Texas Materials Group, Inc. | $16,301,192 | +78% | +46% |
Engineer's estimate: $11,176,341.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Knife River Corporation - South | 2. A. L. Helmcamp, Inc. | 3. Ed Bell Construction Company | 4. Big Creek Construction, LTD. | 5. Grey Sky Construction LLC | 6. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 270.03 | $1,100.00 | $525.00 | $1,000.00 | $1,365.00 | $650.00 | $4,074.00 | $1,975.00 |
| 2 | Removing concrete (mowstrip) (104-7005) | LF | 360 | $15.00 | $10.00 | $30.00 | $21.00 | $20.00 | $50.00 | $18.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 1,499 | $24.00 | $23.00 | $16.00 | $21.00 | $25.00 | $20.00 | $30.00 |
| 4 | Remove (2"-8") TRT/untrt base & asphalt pavement (105-7112) | CY | 5,423 | $11.00 | $6.25 | $20.00 | $1.00 | $25.00 | $20.00 | $9.98 |
| 5 | Excavation (roadway) (110-7001) | CY | 188 | $50.00 | $55.00 | $55.00 | $21.00 | $45.00 | $20.00 | $80.00 |
| 6 | Subgr widen (OC) (112-7001) | STA | 270.03 | $475.00 | $400.00 | $500.00 | $630.00 | $1,250.00 | $350.00 | $200.00 |
| 7 | Embankment (final)(OC)(type C) (132-7005) | CY | 14,697 | $40.00 | $28.55 | $30.00 | $21.00 | $38.00 | $30.00 | $80.00 |
| 8 | Backfill (type A or B) (134-7004) | STA | 270.03 | $300.00 | $190.00 | $175.00 | $200.00 | $165.00 | $250.00 | $500.00 |
| 9 | Road grader work (ord comp) (152-7001) | STA | 270.03 | $225.00 | $115.00 | $350.00 | $200.00 | $260.00 | $250.00 | $700.00 |
| 10 | Compost manuf topsoil (4") (161-7002) | SY | 127,656 | $1.30 | $1.05 | $1.17 | $1.17 | $2.50 | $3.00 | $1.16 |
| 11 | Block sodding (162-7002) | SY | 998 | $10.00 | $5.40 | $9.00 | $12.00 | $11.00 | $10.00 | $11.46 |
| 12 | Drill seed (permanent_rural_clay) (164-7010) | SY | 127,656 | $0.22 | $0.27 | $0.26 | $0.16 | $0.17 | $0.50 | $0.26 |
| 13 | Drill seed (temporary_warm_cool) (164-7015) | SY | 127,656 | $0.22 | $0.27 | $0.21 | $0.14 | $0.17 | $0.50 | $0.21 |
| 14 | Vegetative watering (168-7001) | TGL | 38,135 | $3.80 | $0.01 | $1.00 | $1.00 | $2.50 | $10.00 | $1.00 |
| 15 | FL BS (compacted in place)(type D GR 1-2) (12") (247-7125) | SY | 85,014 | $30.00 | $25.50 | $30.00 | $31.50 | $34.00 | $26.00 | $50.00 |
| 16 | FL BS (roadway del) (type D GR 1-2) (247-7209) | TON | 13,884 | $43.00 | $36.50 | $43.00 | $31.50 | $45.00 | $80.00 | $35.00 |
| 17 | Rework BS metal (type C)(10")(ord comp) (251-7053) | SY | 66,022 | $4.00 | $2.25 | $1.10 | $3.00 | $3.50 | $6.00 | $3.00 |
| 18 | Cement (275-7001) | TON | 472 | $240.00 | $230.00 | $280.00 | $275.00 | $325.00 | $350.00 | $300.00 |
| 19 | Cement TRT (existing material & new base)(6") (275-7006) | SY | 92,508 | $3.00 | $2.00 | $1.70 | $2.00 | $3.00 | $6.00 | $3.00 |
| 20 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 26,120 | $5.00 | $3.50 | $5.60 | $7.35 | $5.00 | $6.00 | $4.00 |
| 21 | Asphalt (CRS-2P) (316-7012) | GAL | 21,264 | $5.50 | $3.85 | $4.60 | $5.00 | $4.25 | $6.00 | $4.00 |
| 22 | Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071) | GAL | 17,867 | $4.70 | $4.15 | $5.20 | $5.60 | $4.25 | $6.00 | $4.00 |
| 23 | Aggregate (type-B or L, GR-3)(sac-B) (316-7244) | CY | 812 | $250.00 | $178.00 | $180.00 | $225.00 | $150.00 | $250.00 | $250.00 |
| 24 | SP mixes SP-C sac-B PG64-22 (344-7011) | TON | 10,053 | $130.00 | $134.00 | $148.00 | $151.00 | $120.00 | $165.00 | $200.00 |
| 25 | Tack coat (344-7077) | GAL | 256 | $2.00 | $3.50 | $40.00 | $4.00 | $5.00 | $6.00 | $5.00 |
| 26 | Planing asphalt concrete pavement(2") (354-7051) | SY | 68,029 | $2.25 | $1.40 | $2.00 | $2.50 | $2.00 | $6.00 | $3.00 |
| 27 | Cut & restore asphalt paving (400-7008) | SY | 203 | $400.00 | $350.00 | $130.00 | $175.00 | $120.00 | $200.00 | $100.00 |
| 28 | Trench excavation protection (402-7001) | LF | 503 | $12.00 | $14.00 | $16.00 | $15.00 | $15.00 | $10.00 | $1.00 |
| 29 | Temporary special shoring (403-7001) | SF | 320 | $50.00 | $30.00 | $100.00 | $125.00 | $35.00 | $55.00 | $60.00 |
| 30 | Riprap (mow strip)(4 in) (432-7013) | CY | 48 | $750.00 | $628.00 | $700.00 | $1,000.00 | $850.00 | $550.00 | $675.00 |
| 31 | Riprap (stone common)(dry)(18 in) (432-7033) | CY | 129 | $325.00 | $340.00 | $300.00 | $320.00 | $155.00 | $185.00 | $270.00 |
| 32 | Concrete box culvert (7 FT X 6 FT)(extend) (462-7073) | LF | 16 | $1,800.00 | $1,300.00 | $1,500.00 | $2,000.00 | $1,125.00 | $2,500.00 | $1,604.00 |
| 33 | RC pipe (CL III)(18 in) (464-7003) | LF | 1,900 | $90.00 | $68.00 | $58.00 | $80.00 | $70.00 | $80.00 | $65.00 |
| 34 | RC pipe (CL III)(24 in) (464-7005) | LF | 672 | $120.00 | $110.00 | $90.00 | $110.00 | $112.00 | $120.00 | $81.00 |
| 35 | RC pipe (CL III)(30 in) (464-7007) | LF | 714 | $160.00 | $178.00 | $125.00 | $125.00 | $152.00 | $130.00 | $115.00 |
| 36 | RC pipe (CL III)(36 in) (464-7009) | LF | 108 | $220.00 | $215.00 | $180.00 | $210.00 | $195.00 | $175.00 | $205.00 |
| 37 | RC pipe (CL III)(48 in) (464-7011) | LF | 14 | $350.00 | $522.00 | $295.00 | $750.00 | $550.00 | $275.00 | $412.00 |
| 38 | RC pipe (CL III)(54 in) (464-7012) | LF | 14 | $450.00 | $661.00 | $400.00 | $850.00 | $650.00 | $450.00 | $487.00 |
| 39 | Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158) | EACH | 5 | $8,800.00 | $10,700 | $8,500.00 | $9,500.00 | $7,000.00 | $15,000 | $6,200.00 |
| 40 | Headwall (CH - FW - 0) (diameter= 36 in) (466-7009) | EACH | 1 | $13,000 | $11,700 | $12,000 | $12,000 | $9,500.00 | $8,500.00 | $11,850 |
| 41 | Headwall (CH - FW - 0) (diameter= 48 in) (466-7011) | EACH | 1 | $20,000 | $14,600 | $14,000 | $17,000 | $17,050 | $15,000 | $17,700 |
| 42 | Headwall (CH - FW - 0) (diameter= 54 in) (466-7012) | EACH | 1 | $23,000 | $19,100 | $15,000 | $27,000 | $30,400 | $35,000 | $19,800 |
| 43 | Headwall (CH - FW - 30) (diameter= 30 in) (466-7037) | EACH | 2 | $20,000 | $13,800 | $11,000 | $17,000 | $18,050 | $25,000 | $19,700 |
| 44 | Headwall (CH - PW - 0) (diameter= 30 in) (466-7103) | EACH | 1 | $11,000 | $11,300 | $12,000 | $11,000 | $7,800.00 | $25,000 | $12,000 |
| 45 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 1 | $14,000 | $13,000 | $13,000 | $15,000 | $20,800 | $25,000 | $17,750 |
| 46 | Headwall (CH - PW - S) (diameter= 48 in) (466-7122) | EACH | 2 | $17,000 | $17,700 | $15,000 | $20,000 | $21,900 | $25,000 | $25,675 |
| 47 | Headwall (CH - PW - S) (diameter= 54 in) (466-7123) | EACH | 1 | $19,000 | $13,200 | $19,000 | $48,000 | $48,050 | $35,000 | $34,200 |
| 48 | Wingwall (PW - 1) (HW=7 FT) (466-7177) | EACH | 2 | $43,000 | $22,200 | $32,000 | $36,000 | $40,300 | $50,000 | $49,375 |
| 49 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 156 | $1,300.00 | $1,500.00 | $1,000.00 | $860.00 | $1,125.00 | $1,500.00 | $1,075.00 |
| 50 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 2 | $1,530.00 | $1,400.00 | $1,300.00 | $1,553.00 | $1,250.00 | $3,000.00 | $975.00 |
| 51 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 3 | $1,400.00 | $1,525.00 | $1,400.00 | $1,642.00 | $1,500.00 | $3,000.00 | $1,100.00 |
| 52 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 3 | $1,785.00 | $1,800.00 | $1,600.00 | $1,908.00 | $1,575.00 | $3,000.00 | $1,325.00 |
| 53 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 32 | $1,500.00 | $1,800.00 | $1,600.00 | $1,415.00 | $1,575.00 | $3,000.00 | $1,325.00 |
| 54 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 3 | $2,125.00 | $2,800.00 | $2,300.00 | $3,517.00 | $2,125.00 | $5,000.00 | $3,800.00 |
| 55 | Set (type II) (30 in) (RCP) (6: 1) (C) (467-7347) | EACH | 5 | $2,975.00 | $5,000.00 | $3,200.00 | $4,048.00 | $2,900.00 | $5,000.00 | $5,700.00 |
| 56 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 2 | $2,550.00 | $3,400.00 | $3,200.00 | $2,479.00 | $2,500.00 | $5,000.00 | $5,300.00 |
| 57 | Removing structure (pipe) (496-7007) | LF | 3,253.50 | $22.00 | $13.00 | $11.00 | $25.00 | $21.50 | $25.00 | $10.00 |
| 58 | Mobilization (500-7001) | LS | 1 | $1,016,031 | $805,000 | $750,000 | $1,019,000 | $1,100,000 | $1,200,000 | $1,600,000 |
| 59 | Barricades, signs and traffic handling (502-7001) | MO | 17 | $15,000 | $11,750 | $10,000 | $36,750 | $5,000.00 | $8,500.00 | $120,000 |
| 60 | Portable changeable message sign (503-7002) | EACH | 2 | $20,000 | $19,000 | $10,000 | $9,450.00 | $11,100 | $17,500 | $25,000 |
| 61 | TMA (stationary) (505-7001) | DAY | 269 | $175.00 | $5.00 | $240.00 | $105.00 | $250.00 | $250.00 | $425.00 |
| 62 | TMA (mobile operation) (505-7002) | HR | 180 | $70.00 | $20.00 | $60.00 | $152.50 | $100.00 | $55.00 | $75.00 |
| 63 | Rock filter dams (install) (type 2) (506-7002) | LF | 178 | $65.00 | $54.00 | $43.00 | $68.90 | $60.00 | $40.00 | $75.00 |
| 64 | Rock filter dams (install) (type 3) (506-7003) | LF | 782 | $70.00 | $80.00 | $90.00 | $79.50 | $96.00 | $50.00 | $85.00 |
| 65 | Rock filter dams (remove) (506-7011) | LF | 960 | $15.00 | $11.00 | $15.00 | $42.40 | $9.00 | $20.00 | $15.00 |
| 66 | Construction exits (install) (type 1) (506-7020) | SY | 235 | $25.00 | $30.00 | $20.00 | $31.80 | $34.00 | $50.00 | $33.00 |
| 67 | Construction exits (remove) (506-7024) | SY | 235 | $8.50 | $10.00 | $5.00 | $17.49 | $10.00 | $20.00 | $10.00 |
| 68 | Temporary sediment control fence (install) (506-7039) | LF | 5,780 | $4.00 | $5.70 | $4.10 | $2.92 | $3.50 | $4.00 | $4.00 |
| 69 | Temporary sediment control fence (remove) (506-7041) | LF | 5,780 | $1.00 | $1.00 | $0.80 | $1.86 | $1.00 | $2.00 | $0.75 |
| 70 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 3,906 | $8.00 | $6.50 | $5.20 | $5.30 | $6.00 | $18.00 | $5.00 |
| 71 | Biodegradable erosion control logs (remove) (506-7046) | LF | 3,906 | $3.00 | $1.00 | $1.00 | $2.65 | $2.00 | $9.00 | $1.00 |
| 72 | Driveways (concrete) (530-7006) | SY | 1,559 | $150.00 | $160.00 | $110.00 | $120.00 | $120.00 | $100.00 | $115.00 |
| 73 | Driveways (ACP) (530-7010) | SY | 5,626 | $80.00 | $57.00 | $50.00 | $55.00 | $40.00 | $45.00 | $63.00 |
| 74 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 53,442 | $0.25 | $0.25 | $0.20 | $0.30 | $0.20 | $0.25 | $0.30 |
| 75 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 26,651 | $0.25 | $0.25 | $0.20 | $0.38 | $0.20 | $0.25 | $0.40 |
| 76 | Metal W-beam guard fence (timber post) (540-7001) | LF | 375 | $27.00 | $30.00 | $30.00 | $29.68 | $35.00 | $30.00 | $28.00 |
| 77 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 3 | $2,200.00 | $3,100.00 | $2,400.00 | $3,289.68 | $2,650.00 | $1,850.00 | $4,500.00 |
| 78 | Guardrail end treatment (install) (544-7001) | EACH | 5 | $3,300.00 | $3,300.00 | $3,500.00 | $3,472.03 | $3,650.00 | $3,250.00 | $4,000.00 |
| 79 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 64 | $300.00 | $295.00 | $300.00 | $307.40 | $310.00 | $1,100.00 | $285.00 |
| 80 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 6 | $305.00 | $325.00 | $320.00 | $333.90 | $330.00 | $1,100.00 | $300.00 |
| 81 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 3 | $700.00 | $620.00 | $810.00 | $763.20 | $830.00 | $1,100.00 | $755.00 |
| 82 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 27 | $680.00 | $700.00 | $710.00 | $673.10 | $625.00 | $1,500.00 | $572.00 |
| 83 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 3 | $850.00 | $800.00 | $780.00 | $736.70 | $785.00 | $1,500.00 | $715.00 |
| 84 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 3 | $765.00 | $850.00 | $800.00 | $752.60 | $800.00 | $1,500.00 | $725.00 |
| 85 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $935.00 | $900.00 | $1,100.00 | $1,012.30 | $1,010.00 | $1,500.00 | $920.00 |
| 86 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 5 | $935.00 | $1,050.00 | $1,200.00 | $1,144.80 | $1,085.00 | $1,500.00 | $990.00 |
| 87 | Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032) | EACH | 2 | $1,060.00 | $1,100.00 | $1,300.00 | $1,298.50 | $1,300.00 | $1,500.00 | $1,190.00 |
| 88 | Install small roadside sign support and assembly TYS80(1)SA(U-2EXT) (644-7033) | EACH | 1 | $1,150.00 | $1,250.00 | $1,400.00 | $1,457.50 | $1,475.00 | $1,500.00 | $1,350.00 |
| 89 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 3 | $1,200.00 | $1,150.00 | $1,300.00 | $1,300.62 | $1,310.00 | $1,500.00 | $1,200.00 |
| 90 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 22 | $21.00 | $27.00 | $26.00 | $26.50 | $43.00 | $100.00 | $39.00 |
| 91 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 39 | $68.00 | $70.00 | $72.00 | $47.70 | $62.00 | $100.00 | $56.50 |
| 92 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 4,156 | $0.65 | $0.27 | $0.27 | $0.27 | $0.30 | $0.65 | $0.25 |
| 93 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 32,046 | $0.55 | $0.16 | $0.16 | $0.16 | $0.20 | $0.65 | $0.15 |
| 94 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 2,875 | $1.50 | $1.50 | $0.90 | $3.25 | $1.50 | $6.00 | $1.00 |
| 95 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 55 | $9.00 | $14.00 | $14.00 | $13.78 | $15.00 | $20.00 | $13.00 |
| 96 | Pavement sler 6" (666-7347) | LF | 1,720 | $1.00 | $0.54 | $0.54 | $0.53 | $0.55 | $1.00 | $0.50 |
| 97 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 57,134 | $0.90 | $0.63 | $0.62 | $0.61 | $0.65 | $0.65 | $0.58 |
| 98 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 4,156 | $0.90 | $0.76 | $0.75 | $0.74 | $0.75 | $0.65 | $0.70 |
| 99 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 32,046 | $0.90 | $0.63 | $0.62 | $0.61 | $0.65 | $0.65 | $0.58 |
| 100 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 811 | $5.00 | $5.75 | $6.00 | $5.83 | $6.00 | $6.00 | $5.50 |
| 101 | Eliminating existing PM & markers (4") (677-7001) | LF | 1,720 | $0.60 | $0.80 | $0.80 | $0.80 | $1.00 | $1.00 | $0.75 |
| 102 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,720 | $0.40 | $1.05 | $1.10 | $1.06 | $1.10 | $2.00 | $1.00 |
| 103 | Full - width mowing (730-7019) | CYC | 4 | $3,400.00 | $3,000.00 | $6,100.00 | $5,000.00 | $6,000.00 | $2,500.00 | $7,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2025. Compiled by Mirage Metrics.