Preventive Maintenance, FM 696 (US 290 to Mundine Road). Let by Texas DOT on October 8, 2025, Bastrop, Austin District. 9 bids received; low bid $6,445,912 by Dean Word Company, LTD., -23% against the engineer's estimate of $8,424,891.

Owner
Texas DOT
Letting
08 OCT 2025
Pay items
63
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Dean Word Company, LTD.$6,445,912Low-23%
2Dan Williams Company$6,879,001+7.0%-18%
3Larry Young Paving, Inc.$7,066,611+10%-16%
4Texas Materials Group, Inc.$7,089,632+10%-16%
5Hunter Industries, LTD.$7,108,466+10%-16%
6Chasco Constructors$7,519,559+17%-11%
7Big Creek Construction, LTD.$8,133,064+26%-3.0%
8Joe Bland Construction LLC$8,822,885+37%+5.0%
9Aaron Concrete Contractors, LLC$9,077,094+41%+8.0%
TxDOT contract A00178516: bids by rank

Engineer's estimate: $8,424,891.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Dean Word Company, LTD.2. Dan Williams Company3. Larry Young Paving, Inc.4. Texas Materials Group, Inc.5. Hunter Industries, LTD.6. Chasco Constructors
1Preparing row (100-7002)STA112$1,150.00$1,000.00$240.00$430.00$1,010.10$1,500.00
2Removing concrete (mowstrip) (104-7003)SY533$20.00$23.75$16.00$18.00$20.00$13.60$16.00
3Remove (4") TRT/untrt base & asphalt pavement (105-7024)SY58,620$1.50$2.55$1.50$2.16$3.40$3.50
4Remove (5") TRT/untrt base & asphalt pavement (105-7025)SY58,620$1.75$5.50$2.00$2.63$3.97$4.75
5Excavation (roadway) (110-7001)CY11,848$16.00$13.50$16.00$17.00$18.20$21.00
6Embankment (final)(OC)(type B) (132-7003)CY1,999$9.25$30.00$11.00$14.00$17.00$21.00
7Embankment (final)(OC)(type C) (132-7005)CY751$22.50$52.00$23.00$29.00$36.00$65.00
8Backfill (type A) (134-7001)STA146$250.00$244.75$220.00$250.00$146.00$158.00$690.00
9Furn & place topsoil (4") (160-7002)SY50,433$0.75$1.20$1.00$1.93$1.58$1.50
10Broadcast seed (permanent_rural_clay) (164-7002)SY50,433$0.25$0.25$0.25$0.14$0.14$0.20
11Broadcast seed (temporary_warm_cool) (164-7007)SY50,433$0.25$0.25$0.25$0.12$0.12$0.15
12Vegetative watering (168-7001)TGL847$0.50$5.00$41.00$39.00$23.80$25.00
13Soil ret BLKT(SL_mod_clay_short) (169-7001)SY50,433$0.75$1.00$0.75$0.59$0.59$0.60
14FL BS (compacted in place)(type D GR 5)(final pos) (247-7191)CY13,976$63.00$54.00$71.00$69.90$69.28$63.00
15Geogrid base reinforcement (type 1) (250-7001)SY66,162$1.25$1.12$1.50$0.62$1.23$1.70
16Rework BS metal (type B)(8")(ord comp) (251-7027)SY59,315$4.75$4.25$6.00$10.90$5.10$9.00
17Prime coat (AE-P) (310-7001)GAL11,763$3.50$5.00$6.50$5.00$4.66$5.50
18D-GR HMA type-B PG64-22 (341-7001)TON12,410$80.25$82.00$80.00$79.00$91.10$82.00
19D-GR HMA type D PG76-22 (341-7056)TON4,584$140.00$94.50$105.00$120.00$102.00$101.10$107.00
20D-GR HMA type D PG76-22 (level-UP) (341-7059)TON392$190.00$115.50$123.00$130.00$121.00$103.40$127.00
21Tom-C PG76-22 sac-B (347-7002)TON7,722$150.00$130.00$125.00$120.00$122.00$124.20$128.00
22Flexible pavement structure repair(5") (351-7004)SY5,000$65.00$35.75$36.00$31.00$39.00$38.64$46.00
23Plane & text asphalt concrete pavement(0" to 2") (354-7002)SY10,222$3.50$2.25$1.55$1.50$1.60$2.10$1.60
24Riprap (mow strip)(4 in) (432-7013)CY72$700.00$741.50$525.00$650.00$680.00$715.00$700.00
25Mobilization (500-7001)LS1$773,500$435,000$665,000$650,000$600,000$654,653$473,000
26Barricades, signs and traffic handling (502-7001)MO9$5,000.00$13,065$13,500$14,250$6,450.00$10,057$3,500.00
27Portable changeable message sign (503-7002)EACH2$11,221$10,000$1,200.00$8,250.00$3,576.90$7,622.00
28TMA (stationary) (505-7001)DAY122$50.00$200.00$250.00$200.00$127.75$260.00
29TMA (mobile operation) (505-7003)DAY122$1.00$0.01$690.00$25.00$281.04$400.00
30Rock filter dams (install) (type 1) (506-7001)LF415$31.25$39.00$38.00$30.00$29.57$35.00
31Rock filter dams (remove) (506-7011)LF415$13.25$15.00$16.00$12.50$12.48$13.00
32Temporary sediment control fence (install) (506-7039)LF3,385$4.25$5.00$5.00$3.90$3.90$5.00
33Temporary sediment control fence (remove) (506-7041)LF3,385$1.00$1.25$1.00$0.82$0.82$0.75
34Biodegradable erosion control logs (install) (12") (506-7044)LF1,290$5.25$6.00$6.25$4.95$4.95$6.00
35Biodegradable erosion control logs (remove) (506-7046)LF1,290$1.25$1.50$1.25$1.03$1.03$1.00
36Constructing detours (type 2) (508-7004)SY4,941$103.00$94.00$93.00$98.00$85.49$105.00
37PTB (fur&inst)(F shape)(type 1) or (steel) (512-7077)LF2,640$58.00$35.00$86.00$30.00$42.00$60.00
38PTB (move)(F shape)(type 1) or (steel) (512-7078)LF7,920$1.75$12.50$14.00$30.00$16.00$14.00
39PTB (remove)(F shape)(type 1) or (steel) (512-7080)LF2,640$52.75$20.00$23.00$14.50$15.00$25.00
40Mill rumble strips (asphalt) (centerline) (533-7002)LF11,318$0.25$0.55$0.40$0.75$0.88$0.60
41Metal W-beam guard fence (timber post) (540-7001)LF800$27.50$26.00$22.50$27.00$24.50$28.30$30.00
42Remove metal beam guard fence (542-7001)LF1,000$1.75$2.50$6.00$6.25$3.00$3.00$5.00
43Guardrail end treatment (install) (544-7001)EACH8$3,253.00$3,631.00$4,000.00$3,700.00$2,935.00$3,405.00$4,000.00
44Guardrail end treatment (remove) (544-7003)EACH8$595.56$238.50$300.00$350.00$275.00$275.00$350.00
45Crash cushion attenuator (move & reset) (545-7002)EACH6$821.25$10,000$1,600.00$1,200.00$1,100.00$2,500.00
46Crash cushion attenuator (remove) (545-7004)EACH2$582.50$5,000.00$950.00$620.00$975.00$600.00
47Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH2$1,810.25$15,000$7,700.00$8,400.00$7,985.00$9,000.00
48Relocate existing mailbox (560-7012)EACH1$270.25$500.00$350.00$295.00$424.76$350.00
49Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH7$736.75$800.00$950.00$820.00$1,157.68$925.00
50Remove SM RD SN sup&AM (644-7073)EACH9$116.50$125.00$180.00$150.00$183.23$170.00
51Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH12$38.00$47.75$55.00$57.00$46.50$74.96$55.00
52Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF94,948$1.00$0.25$0.20$0.25$0.20$0.25$0.25
53Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF1,952$0.30$0.28$0.25$0.28$0.25$0.30
54Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF87,141$1.00$0.30$0.28$0.25$0.28$0.25$0.30
55Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH1,457$1.62$2.00$2.00$1.00$1.61$1.50$2.20
56Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF96$13.07$21.25$20.00$25.00$20.00$7.00$21.00
57Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081)EACH2$585.47$816.25$770.00$980.00$770.00$610.00$800.00
58Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF50,804$1.00$1.00$0.82$1.00$0.82$0.92$0.90
59Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF42,997$1.30$1.00$0.82$1.00$0.82$0.95$0.90
60Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274)LF1,952$1.00$0.85$1.00$0.85$0.95$0.90
61Reflectorized pavement marker type II-A-A (672-7004)EACH638$7.16$6.50$6.10$7.75$6.10$4.30$6.50
62Eliminating existing PM & markers (6") (677-7002)LF63,202$0.80$0.25$0.20$0.25$0.20$0.34$0.25
63Bonding course (3007-7001)GAL11,960$4.25$3.75$4.90$6.25$5.50$3.31$5.00
TxDOT contract A00178516: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of October 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy