Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | E-Z Bel Construction, LLC | $4,866,603 | Low | +8.0% |
| 2 | STX Civil | $4,876,748 | 0.0% | +8.0% |
| 3 | C. E. Barker, LTD. | $5,212,443 | +7.0% | +15% |
| 4 | Ragle Construction, Inc. | $6,726,952 | +38% | +49% |
| 5 | Forde Construction Company, Inc. | $6,788,622 | +39% | +50% |
Engineer's estimate: $4,523,384.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. E-Z Bel Construction, LLC | 2. STX Civil | 3. C. E. Barker, LTD. | 4. Ragle Construction, Inc. | 5. Forde Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 8.70 | $2,500.00 | $1,800.00 | $8,500.00 | $55,000 | $59,700 | $15,000 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 1,178 | $38.00 | $25.00 | $14.03 | $10.00 | $56.00 | |
| 3 | Excavation (roadway) (110-7001) | CY | 705 | $22.00 | $25.00 | $20.00 | $56.10 | $75.00 | $77.00 |
| 4 | Excavation (channel) (110-7002) | CY | 1,332 | $20.00 | $25.00 | $25.00 | $34.78 | $19.00 | $69.00 |
| 5 | Embankment (final)(OC)(type C) (132-7005) | CY | 1,167 | $30.00 | $40.00 | $50.00 | $34.78 | $30.00 | $88.00 |
| 6 | Blading (150-7002) | HR | 48 | $120.00 | $50.00 | $100.00 | $117.81 | $177.00 | $125.00 |
| 7 | Block sodding (162-7002) | SY | 2,373 | $7.50 | $8.00 | $6.00 | $11.22 | $12.00 | $13.00 |
| 8 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 1,225 | $0.16 | $1.00 | $1.12 | $1.00 | $3.40 | |
| 9 | Broadcast seed (temporary_warm) (164-7005) | SY | 902 | $1.00 | $1.00 | $1.00 | $1.12 | $0.75 | $3.00 |
| 10 | Broadcast seed (temporary_cool) (164-7006) | SY | 902 | $1.00 | $1.00 | $1.00 | $1.12 | $0.75 | $3.00 |
| 11 | Vegetative watering (168-7001) | TGL | 46.50 | $100.00 | $72.00 | $50.00 | $117.81 | $117.00 | $93.00 |
| 12 | FL BS (compacted in place)(type E GR 5)(final pos) (247-7196) | CY | 620 | $129.00 | $175.00 | $130.00 | $142.38 | $134.00 | $207.00 |
| 13 | Lime (com or QK)(slurry) (260-7005) | TON | 24 | $375.00 | $470.00 | $394.94 | $352.00 | $542.00 | |
| 14 | Lime TRT (existing material)(8") (260-7007) | SY | 1,485 | $11.00 | $14.00 | $5.89 | $7.10 | $32.00 | |
| 15 | Asphalt (RC-250) (316-7016) | GAL | 465 | $15.00 | $18.00 | $15.00 | $11.22 | $17.75 | $6.00 |
| 16 | Aggregate (type-E, GR-5)(sac-B) (316-7194) | CY | 19.50 | $550.00 | $1,000.00 | $1,200.00 | $841.50 | $1,000.00 | $1,100.00 |
| 17 | Aggregate (type-PE, GR-4)(sac-B) (316-7232) | CY | 19.60 | $1,300.00 | $1,005.00 | $1,250.00 | $841.50 | $1,005.00 | $1,100.00 |
| 18 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 790 | $20.00 | $15.00 | $15.00 | $11.22 | $15.10 | $5.00 |
| 19 | D-GR HMA type-B PG64-22 (341-7001) | TON | 413 | $181.00 | $200.00 | $196.35 | $210.00 | $262.00 | |
| 20 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 125 | $225.00 | $180.00 | $200.00 | $218.79 | $290.00 | $435.00 |
| 21 | Concrete pavement (CPCD) (7") (360-7017) | SY | 1,802 | $150.00 | $110.00 | $105.80 | $70.50 | $143.00 | |
| 22 | Cem stabil BKFL (400-7010) | CY | 1,137 | $150.00 | $360.00 | $150.00 | $98.18 | $140.00 | $170.00 |
| 23 | Trench excavation protection (402-7001) | LF | 244 | $22.00 | $1.00 | $35.00 | $46.00 | $56.00 | $5.00 |
| 24 | Temporary special shoring (403-7001) | SF | 2,800 | $4.00 | $20.00 | $33.66 | $120.00 | $55.00 | |
| 25 | Temporary special shoring (cofferdam) (403-7002) | SF | 3,000 | $50.00 | $50.00 | $16.83 | $70.00 | $20.00 | |
| 26 | Sheet piling (PZ - 40) (407-7004) | SF | 5,381 | $90.00 | $100.00 | $76.55 | $85.00 | $138.00 | |
| 27 | Prestressed concrete pil (18 in SQ) (409-7002) | LF | 924 | $250.00 | $250.00 | $303.65 | $169.00 | $350.00 | |
| 28 | Drilled shaft (30 in) (416-7005) | LF | 495 | $360.00 | $290.00 | $360.00 | $345.58 | $299.00 | $500.00 |
| 29 | Class C concrete (abutment) (420-7012) | CY | 73 | $1,200.00 | $1,000.00 | $1,350.00 | $2,401.08 | $1,052.00 | $3,900.00 |
| 30 | Class C concrete (rail foundation) (420-7052) | CY | 69.50 | $400.00 | $1,300.00 | $830.28 | $680.00 | $1,400.00 | |
| 31 | Class C concrete (miscellaneous) (420-7067) | CY | 3.70 | $509.00 | $1,000.00 | $830.28 | $870.00 | $1,800.00 | |
| 32 | Reinforced concrete slab (box beam) (422-7005) | SF | 4,755 | $30.00 | $20.00 | $30.00 | $37.61 | $25.00 | $34.00 |
| 33 | Bridge sidewalk (422-7012) | SF | 467 | $25.00 | $10.00 | $35.00 | $10.38 | $17.00 | $67.00 |
| 34 | Shear key (422-7020) | CY | 36.10 | $700.00 | $805.00 | $850.00 | $392.70 | $554.00 | $250.00 |
| 35 | Prestressed concrete box beam (4B20) (425-7026) | LF | 238 | $325.00 | $340.00 | $299.80 | $303.00 | $410.00 | |
| 36 | Prestressed concrete box beam (5B20) (425-7027) | LF | 119 | $325.00 | $340.00 | $299.80 | $369.00 | $436.00 | |
| 37 | Prestressed concrete box beam (5B28) (425-7029) | LF | 625.50 | $370.00 | $325.00 | $340.00 | $337.10 | $320.00 | $420.00 |
| 38 | Riprap (stone protection)(18 in) (432-7043) | CY | 818 | $200.00 | $350.00 | $220.00 | $163.81 | $209.00 | $330.00 |
| 39 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 140 | $30.00 | $32.00 | $20.00 | $28.05 | $33.00 | $60.00 |
| 40 | Rail (type T223) (450-7008) | LF | 152 | $160.00 | $200.00 | $180.92 | $134.00 | $225.00 | |
| 41 | Rail (type C223) (450-7034) | LF | 411.40 | $75.00 | $140.00 | $240.00 | $309.95 | $165.00 | $252.00 |
| 42 | Armor joint (sealed) (454-7003) | LF | 112 | $150.00 | $108.00 | $160.00 | $112.20 | $120.00 | $230.00 |
| 43 | Concrete box culvert (9 FT X 9 FT) (462-7031) | LF | 558 | $1,550.00 | $1,700.00 | $1,613.82 | $1,640.00 | $2,000.00 | |
| 44 | RC pipe (CL III)(18 in) (464-7003) | LF | 124 | $140.00 | $102.00 | $104.86 | $121.00 | $120.00 | |
| 45 | RC pipe (CL III)(24 in) (464-7005) | LF | 103 | $170.00 | $205.00 | $120.00 | $116.27 | $137.00 | $150.00 |
| 46 | RC pipe (CL III)(42 in) (464-7010) | LF | 25 | $200.00 | $318.00 | $280.00 | $218.88 | $323.00 | $530.00 |
| 47 | RC pipe (CL III)(54 in) (464-7012) | LF | 90 | $400.00 | $490.00 | $575.00 | $369.90 | $501.00 | $478.00 |
| 48 | RC pipe (CL III)(60 in) (464-7013) | LF | 78 | $450.00 | $561.00 | $675.00 | $413.14 | $576.00 | $555.00 |
| 49 | Junction box(complete)(PJB)(3FTX3FT) (465-7005) | EACH | 1 | $13,482 | $2,800.00 | $7,923.00 | $5,100.00 | $13,000 | |
| 50 | Inlet (complete)(PSL)(RC)(3FTX3FT) (465-7070) | EACH | 1 | $7,500.00 | $13,936 | $8,000.00 | $12,321 | $8,820.00 | $15,200 |
| 51 | Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126) | EACH | 3 | $8,557.00 | $4,000.00 | $8,953.00 | $5,800.00 | $15,300 | |
| 52 | Inlet (complete)(PSL)(FG)(4FTX5FT-4FTX4FT) (465-7132) | EACH | 1 | $10,000 | $15,020 | $22,000 | $13,563 | $18,000 | $18,000 |
| 53 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 2 | $2,085.00 | $1,300.00 | $3,146.42 | $2,350.00 | $2,800.00 | |
| 54 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 1 | $3,000.00 | $2,939.00 | $2,300.00 | $3,700.80 | $3,100.00 | $6,600.00 |
| 55 | Removing structure (manhole) (496-7003) | EACH | 2 | $1,200.00 | $3,802.00 | $500.00 | $701.25 | $1,300.00 | $12,000 |
| 56 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 3 | $25,000 | $32,000 | $30,000 | $41,234 | $400,000 | $50,000 |
| 57 | Removing structure (small) (496-7036) | EACH | 11 | $1,500.00 | $1,354.00 | $250.00 | $1,178.10 | $5,000.00 | $1,200.00 |
| 58 | Mobilization (500-7001) | LS | 1 | $410,000 | $300,000 | $360,000 | $450,000 | $600,000 | $660,000 |
| 59 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $2,500.00 | $1,500.00 | $2,800.00 | $3,646.50 | $10,000 | $2,500.00 |
| 60 | Portable changeable message sign (503-7002) | EACH | 2 | $10,000 | $2,500.00 | $1.00 | $22,440 | $12,000 | $14,000 |
| 61 | Rock filter dams (install) (type 1) (506-7006) | CY | 18 | $320.00 | $150.00 | $280.00 | $56.10 | $150.00 | $400.00 |
| 62 | Rock filter dams (remove) (506-7012) | CY | 18 | $70.00 | $65.00 | $10.00 | $22.44 | $65.00 | $144.00 |
| 63 | Sandbags for erosion control (506-7035) | EACH | 90 | $21.50 | $16.00 | $1.00 | $22.44 | $16.00 | $11.00 |
| 64 | Temporary sediment control fence (install) (506-7039) | LF | 1,471 | $4.00 | $5.00 | $1.00 | $5.61 | $5.00 | $8.00 |
| 65 | Temporary sediment control fence (remove) (506-7041) | LF | 1,471 | $1.00 | $3.00 | $1.00 | $2.24 | $2.50 | $2.30 |
| 66 | Biodegradable erosion control logs (install) (6") (506-7042) | LF | 100 | $7.50 | $10.00 | $1.00 | $11.22 | $10.00 | $14.00 |
| 67 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 65 | $10.00 | $1.00 | $16.83 | $10.00 | $14.00 | |
| 68 | Biodegradable erosion control logs (remove) (506-7046) | LF | 165 | $2.50 | $5.00 | $1.00 | $8.98 | $5.00 | $3.00 |
| 69 | Concrete curb (mono) (type II) (529-7007) | LF | 486 | $23.00 | $30.00 | $8.42 | $15.00 | $28.00 | |
| 70 | Concrete curb & gutter (type II) (529-7009) | LF | 33 | $90.00 | $34.00 | $50.00 | $8.42 | $45.00 | $250.00 |
| 71 | Concrete curb & gutter (slotted) (529-7021) | LF | 260 | $60.00 | $45.00 | $60.00 | $8.42 | $34.00 | $45.00 |
| 72 | Driveways (ACP) (530-7010) | SY | 190 | $60.00 | $75.00 | $110.00 | $56.10 | $84.00 | $150.00 |
| 73 | Concrete sidewalks (5") (531-7002) | SY | 287 | $105.00 | $150.00 | $95.00 | $103.79 | $73.00 | $120.00 |
| 74 | Curb ramps (type 7) (531-7020) | SY | 8 | $2,958.00 | $280.00 | $103.79 | $241.00 | $630.00 | |
| 75 | Curb ramps (type 10) (531-7021) | SY | 25 | $2,800.00 | $280.00 | $103.79 | $362.00 | $380.00 | |
| 76 | Metal W-beam guard fence (timber post) (540-7001) | LF | 50 | $36.00 | $32.00 | $39.27 | $36.45 | $64.00 | |
| 77 | Metal beam guard fence trans (TL2) (540-7006) | EACH | 4 | $1,855.00 | $1,800.00 | $2,805.00 | $1,855.00 | $3,300.00 | |
| 78 | Downstream anchor terminal section (540-7015) | EACH | 2 | $1,290.00 | $1,500.00 | $2,805.00 | $1,290.00 | $2,300.00 | |
| 79 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,650.00 | $3,400.00 | $3,927.00 | $3,650.00 | $6,400.00 | |
| 80 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 5 | $525.00 | $810.00 | $1,000.00 | $841.50 | $550.00 | $960.00 |
| 81 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 18 | $25.00 | $21.00 | $35.00 | $56.10 | $24.50 | $43.00 |
| 82 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 6 | $28.00 | $35.00 | $56.10 | $30.00 | $52.00 | |
| 83 | Remove delin & object marker assms (658-7078) | EACH | 8 | $25.00 | $55.00 | $1.00 | $22.44 | $55.00 | $33.00 |
| 84 | Install delineator assembly (D-SW)SZ 1(WFLX)GNDLL (658-7105) | EACH | 12 | $60.00 | $106.00 | $485.00 | $56.10 | $70.00 | $123.00 |
| 85 | Install object marker assembly (OM-2Y)(WC)GNDLL (658-7246) | EACH | 2 | $195.00 | $485.00 | $56.10 | $84.00 | $147.00 | |
| 86 | Install object marker assembly (OM-3L)(TWT)GNDLL (658-7270) | EACH | 4 | $375.00 | $390.00 | $485.00 | $56.10 | $265.00 | $463.00 |
| 87 | Install object marker assembly (OM-3R)(TWT)GNDLL (658-7278) | EACH | 4 | $375.00 | $390.00 | $485.00 | $56.10 | $265.00 | $463.00 |
| 88 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 720 | $1.50 | $2.00 | $1.80 | $13.46 | $2.00 | $2.50 |
| 89 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 720 | $1.50 | $2.00 | $1.80 | $13.46 | $2.00 | $2.50 |
| 90 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 720 | $2.50 | $3.00 | $3.50 | $13.46 | $2.50 | $5.30 |
| 91 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 720 | $2.50 | $3.00 | $3.50 | $13.46 | $2.50 | $5.30 |
| 92 | Pavement surface preparation for marking (6") (678-7002) | LF | 280 | $3.60 | $1.00 | $0.10 | $5.61 | $1.00 | $0.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.