TxDOT contract A00196756 bid tabulation
Intersection Improvements With Right And/Or Left Turn Lanes, US 290 (0.3 miles West of FM 2679 to 0.27 miles East of FM 2679). Let by Texas DOT on May 2, 2025, Washington, Bryan District. 7 bids received; low bid $965,907 by Cornerstone Paving and Construction, L.L.C., -27% against the engineer's estimate of $1,325,224.
- Owner
- Texas DOT
- Letting
- 02 MAY 2025
- Pay items
- 94
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Cornerstone Paving and Construction, L.L.C. | $965,907 | Low | -27% |
| 2 | Larry Young Paving, Inc. | $1,020,481 | +6.0% | -23% |
| 3 | Big Creek Construction, LTD. | $1,070,801 | +11% | -19% |
| 4 | Texas Materials Group, Inc. | $1,119,506 | +16% | -16% |
| 5 | Knife River Corporation - South | $1,152,504 | +19% | -13% |
| 6 | Forde Construction Company, Inc. | $1,218,206 | +26% | -8.0% |
| 7 | Acme Bridge Company, Inc. | $1,423,698 | +47% | +7.0% |
Engineer's estimate: $1,325,224.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Cornerstone Paving and Construction, L.L.C. | 2. Larry Young Paving, Inc. | 3. Big Creek Construction, LTD. | 4. Texas Materials Group, Inc. | 5. Knife River Corporation - South | 6. Forde Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Remove (16"-20") TRT/untrt base & asphalt pavement (105-7016) | SY | 910 | $27.50 | $27.50 | $33.00 | $40.00 | $25.00 | $22.00 | $28.00 |
| 2 | Excavation (roadway) (110-7001) | CY | 1,158 | $18.50 | $29.35 | $43.00 | $30.00 | $40.00 | $21.00 | $42.00 |
| 3 | Embankment (final)(DC)(type C) (132-7006) | CY | 306 | $22.50 | $43.29 | $23.00 | $30.00 | $115.00 | $8.00 | $52.00 |
| 4 | Furn & place topsoil (4") (160-7002) | SY | 5,556 | $6.00 | $4.50 | $2.25 | $1.00 | $4.00 | $0.62 | $5.00 |
| 5 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 5,556 | $1.25 | $0.85 | $0.75 | $1.00 | $0.26 | $0.94 | $1.00 |
| 6 | Broadcast seed (temporary_warm) (164-7005) | SY | 2,778.50 | $0.75 | $0.75 | $1.00 | $1.00 | $0.26 | $0.83 | $0.90 |
| 7 | Broadcast seed (temporary_cool) (164-7006) | SY | 2,778.50 | $1.75 | $0.75 | $1.00 | $1.00 | $0.26 | $0.83 | $0.90 |
| 8 | Vegetative watering (168-7001) | TGL | 56 | $100.00 | $150.00 | $36.00 | $55.00 | $50.00 | $69.45 | $178.00 |
| 9 | Proof rolling (216-7001) | HR | 2 | $215.00 | $500.00 | $230.00 | $100.00 | $150.00 | $99.00 | $500.00 |
| 10 | FL BS (compacted in place)(type A GR 1-2) (6") (247-7044) | SY | 1,994 | $40.00 | $46.18 | $30.00 | $32.00 | $19.50 | $32.70 | $40.00 |
| 11 | Cement (275-7001) | TON | 44 | $325.00 | $250.00 | $280.00 | $275.00 | $280.00 | $260.00 | $230.00 |
| 12 | Cement TRT (new base)(6") (275-7010) | SY | 1,994 | $16.00 | $6.27 | $7.00 | $8.00 | $12.00 | $3.92 | $14.00 |
| 13 | Cement treat (subgrade) (8") (275-7017) | SY | 2,193 | $8.00 | $5.70 | $6.25 | $10.00 | $10.00 | $3.56 | $13.00 |
| 14 | Asphalt (RC-250) (316-7016) | GAL | 499 | $30.00 | $19.50 | $10.00 | $7.00 | $8.00 | $9.60 | $4.00 |
| 15 | Aggregate (type-B or L, GR-5) (316-7251) | CY | 15 | $450.00 | $1,260.00 | $600.00 | $375.00 | $900.00 | $767.00 | $1,400.00 |
| 16 | SP mixes SP-B PG64-22 (344-7001) | TON | 606 | $250.00 | $141.25 | $180.00 | $170.00 | $172.00 | $156.00 | $184.00 |
| 17 | SP mixes SP-C PG76-22 (344-7029) | TON | 313 | $350.00 | $170.00 | $200.00 | $200.00 | $205.00 | $223.00 | $203.00 |
| 18 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 235 | $250.00 | $200.00 | $220.00 | $245.00 | $253.00 | $261.00 | $265.00 |
| 19 | Plane & text asphalt concrete pavement(0" to 4") (354-7004) | SY | 1,258 | $6.00 | $11.00 | $8.75 | $6.00 | $8.00 | $16.00 | $14.00 |
| 20 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 14 | $600.00 | $177.47 | $250.00 | $220.00 | $250.00 | $197.20 | $188.53 |
| 21 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 44 | $675.00 | $317.90 | $390.00 | $375.00 | $380.00 | $353.30 | $337.71 |
| 22 | Riprap (concrete) (CL B) (4 in) (432-7007) | CY | 5 | $1,000.00 | $520.00 | $1,000.00 | $1,750.00 | $1,500.00 | $1,890.00 | $1,500.00 |
| 23 | Mobilization (500-7001) | LS | 1 | $118,250 | $95,000 | $69,000 | $99,000 | $110,000 | $139,000 | $120,000 |
| 24 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $5,000.00 | $1,100.00 | $2,200.00 | $4,000.00 | $5,000.00 | $18,300 | $15,000 |
| 25 | Portable changeable message sign (503-7002) | EACH | 2 | $7,500.00 | $8,500.00 | $2,500.00 | $20,000 | $15,000 | $4,400.00 | $5,000.00 |
| 26 | TMA (stationary) (505-7001) | DAY | 150 | $275.00 | $220.00 | $280.00 | $130.00 | $200.00 | $500.00 | $200.00 |
| 27 | TMA (mobile operation) (505-7003) | DAY | 4 | $400.00 | $175.00 | $1,500.00 | $600.00 | $200.00 | $900.00 | $200.00 |
| 28 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 100 | $10.00 | $9.00 | $25.00 | $10.00 | $5.00 | $10.00 | $10.00 |
| 29 | Biodegradable erosion control logs (remove) (506-7046) | LF | 100 | $6.50 | $4.00 | $6.75 | $5.00 | $5.00 | $4.40 | $3.00 |
| 30 | Driveways (ACP) (530-7010) | SY | 205 | $95.00 | $16.00 | $68.00 | $65.00 | $220.00 | $149.00 | $220.00 |
| 31 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 842 | $2.75 | $5.00 | $7.50 | $6.00 | $3.40 | $6.00 | $9.00 |
| 32 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 2 | $500.00 | $475.00 | $650.00 | $500.00 | $500.00 | $406.00 | $465.00 |
| 33 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 1,894 | $21.00 | $11.70 | $13.00 | $14.00 | $8.50 | $13.00 | $13.00 |
| 34 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 565 | $27.50 | $15.68 | $22.00 | $20.00 | $15.00 | $17.42 | $17.00 |
| 35 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 105 | $27.50 | $18.10 | $16.00 | $22.00 | $23.00 | $20.00 | $20.00 |
| 36 | Conduit (PVC) (schedule 40) (4") (bore) (618-7041) | LF | 175 | $105.00 | $19.71 | $24.00 | $25.00 | $25.00 | $22.00 | $21.00 |
| 37 | Electrical conductor (no.8) insulated (620-7008) | LF | 445 | $2.75 | $1.71 | $2.25 | $2.00 | $2.00 | $2.00 | $2.00 |
| 38 | Electrical conductor (no.6) insulated (620-7010) | LF | 2,650 | $4.00 | $2.35 | $2.00 | $2.75 | $2.00 | $2.61 | $2.50 |
| 39 | Ground box type B (122322)W/apron (624-7004) | EACH | 6 | $1,300.00 | $1,097.94 | $1,300.00 | $1,300.00 | $1,100.00 | $1,220.00 | $1,200.00 |
| 40 | Ground box type D (162922)W/apron (624-7008) | EACH | 4 | $1,700.00 | $1,097.94 | $1,400.00 | $1,300.00 | $1,400.00 | $1,220.00 | $1,200.00 |
| 41 | Aluminum signs (type A) (636-7001) | SF | 82 | $50.00 | $45.00 | $61.00 | $75.00 | $32.00 | $32.25 | $50.00 |
| 42 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 7 | $1,025.00 | $496.20 | $680.00 | $700.00 | $510.00 | $612.00 | $690.00 |
| 43 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 10 | $1,200.00 | $584.80 | $800.00 | $850.00 | $600.00 | $834.00 | $830.00 |
| 44 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 2 | $1,350.00 | $712.80 | $970.00 | $1,050.00 | $720.00 | $1,067.00 | $960.00 |
| 45 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 1 | $1,100.00 | $831.00 | $1,100.00 | $1,200.00 | $900.00 | $1,167.00 | $1,100.00 |
| 46 | Remove SM RD SN sup&AM (644-7073) | EACH | 24 | $175.00 | $85.00 | $120.00 | $20.00 | $100.00 | $184.00 | $210.00 |
| 47 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 200 | $3.00 | $3.00 | $4.00 | $6.00 | $3.20 | $6.00 | $2.50 |
| 48 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 200 | $2.00 | $3.00 | $4.00 | $6.00 | $3.20 | $6.00 | $5.50 |
| 49 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 100 | $4.00 | $3.00 | $4.00 | $6.00 | $3.20 | $6.00 | $5.50 |
| 50 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 50 | $5.00 | $1.00 | $1.00 | $4.00 | $2.00 | $2.00 | $2.00 |
| 51 | Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017) | LF | 76 | $3.50 | $1.55 | $1.25 | $2.50 | $3.50 | $3.00 | $2.10 |
| 52 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 1,782 | $3.00 | $1.55 | $2.00 | $2.25 | $1.60 | $1.94 | $1.90 |
| 53 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 143 | $20.00 | $9.10 | $12.00 | $10.00 | $10.00 | $9.00 | $8.50 |
| 54 | Reflectorized pavement marking type I (Y)8"(solid)(090MIL) (666-7113) | LF | 79 | $3.50 | $1.55 | $4.00 | $10.00 | $3.20 | $9.00 | $8.50 |
| 55 | Reflectorized pavement marking type I (W)6"(broken)(090MIL)(callout) (666-7144) | LF | 1,276 | $2.00 | $1.55 | $2.00 | $1.00 | $1.70 | $1.00 | $1.00 |
| 56 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 5,632 | $1.00 | $1.45 | $2.00 | $1.50 | $1.50 | $1.30 | $1.25 |
| 57 | Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269) | LF | 6,571 | $1.00 | $1.45 | $2.00 | $1.50 | $1.50 | $1.30 | $1.25 |
| 58 | Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273) | LF | 497 | $1.25 | $1.50 | $2.00 | $1.50 | $1.60 | $1.30 | $1.25 |
| 59 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 8 | $275.00 | $375.00 | $510.00 | $330.00 | $421.50 | $343.00 | $327.00 |
| 60 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 6 | $315.00 | $285.00 | $390.00 | $425.00 | $320.35 | $419.00 | $400.00 |
| 61 | Reflectorized pavement marker type I-C (672-7002) | EACH | 8 | $7.50 | $9.00 | $12.00 | $10.00 | $10.15 | $9.00 | $8.50 |
| 62 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 50 | $8.50 | $9.00 | $12.00 | $10.00 | $10.15 | $9.00 | $8.50 |
| 63 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 165 | $7.25 | $6.00 | $8.25 | $10.00 | $6.75 | $9.00 | $8.50 |
| 64 | Eliminating existing PM & markers (6") (677-7002) | LF | 4,812 | $1.00 | $0.55 | $0.75 | $0.75 | $0.65 | $0.58 | $0.55 |
| 65 | Eliminating existing PM & markers (8") (677-7004) | LF | 137 | $2.00 | $1.00 | $1.25 | $1.25 | $1.15 | $1.20 | $1.10 |
| 66 | Eliminating existing PM & markers (24") (677-7008) | LF | 48 | $5.25 | $3.50 | $4.75 | $2.50 | $3.95 | $2.40 | $2.20 |
| 67 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 2 | $125.00 | $55.00 | $75.00 | $85.00 | $61.85 | $78.00 | $74.00 |
| 68 | Eliminating existing PM & markers (word) (677-7015) | EACH | 2 | $125.00 | $55.00 | $75.00 | $85.00 | $61.85 | $78.00 | $74.00 |
| 69 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $60,000 | $30,397 | $63,000 | $42,000 | $46,700 | $33,775 | $33,000 |
| 70 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 7 | $300.00 | $222.57 | $250.00 | $275.00 | $460.00 | $247.00 | $236.00 |
| 71 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 2 | $320.00 | $222.48 | $250.00 | $275.00 | $460.00 | $247.00 | $236.00 |
| 72 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 13 | $360.00 | $222.54 | $250.00 | $275.00 | $460.00 | $247.00 | $236.00 |
| 73 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 2 | $375.00 | $222.48 | $250.00 | $275.00 | $460.00 | $247.00 | $236.00 |
| 74 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 7 | $300.00 | $222.57 | $250.00 | $275.00 | $460.00 | $247.00 | $236.00 |
| 75 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 1 | $300.00 | $223.03 | $250.00 | $275.00 | $460.00 | $248.00 | $236.00 |
| 76 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 6 | $200.00 | $146.45 | $180.00 | $200.00 | $250.00 | $163.00 | $155.00 |
| 77 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 2 | $350.00 | $187.05 | $220.00 | $225.00 | $350.00 | $208.00 | $200.00 |
| 78 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 4,441 | $5.00 | $1.93 | $2.50 | $2.25 | $3.00 | $2.14 | $2.05 |
| 79 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 835 | $3.75 | $2.36 | $3.25 | $2.75 | $4.00 | $2.62 | $2.50 |
| 80 | Install RDSD flash beacon assembly (685-7001) | EACH | 3 | $6,000.00 | $4,622.39 | $4,700.00 | $5,500.00 | $5,800.00 | $5,137.00 | $5,000.00 |
| 81 | Ins traffic signal PL AM (S)STR(type A) (686-7006) | EACH | 1 | $8,000.00 | $6,086.39 | $11,000 | $7,200.00 | $12,000 | $6,763.00 | $6,500.00 |
| 82 | Ins traffic signal PL AM(S)1 arm(50')lum (686-7055) | EACH | 1 | $45,000 | $37,268 | $35,000 | $46,000 | $40,000 | $41,410 | $39,000 |
| 83 | Ins traffic signal PL AM(S)2 arm(65-44')lum (686-7279) | EACH | 1 | $60,000 | $44,711 | $46,000 | $56,000 | $51,000 | $49,680 | $47,000 |
| 84 | Bonding course (3007-7001) | GAL | 406 | $7.00 | $3.50 | $11.00 | $6.00 | $4.00 | $4.50 | $3.00 |
| 85 | ITS com CBL (ethernet) (6005-7001) | LF | 50 | $5.00 | $2.93 | $2.00 | $3.50 | $2.00 | $3.26 | $3.20 |
| 86 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $9,700.00 | $10,416 | $9,500.00 | $12,000 | $11,000 | $11,575 | $11,000 |
| 87 | Installation of cellular modem (6015-7001) | EACH | 1 | $1,200.00 | $52.09 | $660.00 | $75.00 | $3,000.00 | $58.00 | $55.00 |
| 88 | VDS prosr sys (6017-7001) | EACH | 1 | $13,500 | $11,847 | $14,000 | $14,000 | $16,000 | $13,170 | $12,600 |
| 89 | VIVDS cam assy var LNS (6017-7003) | EACH | 1 | $3,200.00 | $2,055.56 | $2,400.00 | $2,500.00 | $3,000.00 | $2,290.00 | $2,200.00 |
| 90 | HVDS W/var LNS (6017-7008) | EACH | 2 | $7,500.00 | $10,630 | $6,100.00 | $12,000 | $7,000.00 | $11,800 | $11,300 |
| 91 | VDS CNTRL software (6017-7009) | EACH | 1 | $520.00 | $361.79 | $1,400.00 | $425.00 | $760.00 | $405.00 | $385.00 |
| 92 | VDS cabling (6017-7012) | LF | 670 | $2.60 | $2.30 | $3.00 | $3.00 | $1.40 | $2.56 | $2.50 |
| 93 | CCTV field equipment (digital) (6018-7002) | EACH | 1 | $7,500.00 | $5,921.39 | $2,900.00 | $7,500.00 | $3,800.00 | $6,580.00 | $6,290.00 |
| 94 | CCTV mount (pole) (6018-7003) | EACH | 1 | $1,500.00 | $403.74 | $480.00 | $600.00 | $1,000.00 | $450.00 | $428.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 2, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.