TxDOT contract A00197319 bid tabulation
Traffic Signal Improvements, Various (VARIOUS LOCATIONS DISTRICTWIDE to .). Let by Texas DOT on May 2, 2025, Travis, Austin District. 5 bids received; low bid $2,265,741 by E-Z Bel Construction, LLC, -18% against the engineer's estimate of $2,764,605.
- Owner
- Texas DOT
- Letting
- 02 MAY 2025
- Pay items
- 122
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | E-Z Bel Construction, LLC | $2,265,741 | Low | -18% |
| 2 | The Levy Company, Inc. | $2,399,451 | +6.0% | -13% |
| 3 | Austin Traffic Signal Construction Co., Inc. | $2,608,825 | +15% | -6.0% |
| 4 | Elecnor Belco Electric, Inc. | $2,724,846 | +20% | -1.0% |
| 5 | Florida Traffic Control Devices, Inc. | $2,764,200 | +22% | 0.0% |
Engineer's estimate: $2,764,605.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. E-Z Bel Construction, LLC | 2. The Levy Company, Inc. | 3. Austin Traffic Signal Construction Co., Inc. | 4. Elecnor Belco Electric, Inc. | 5. Florida Traffic Control Devices, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (pavers) (104-7010) | SY | 6 | $25.00 | $20.00 | $100.00 | $6,000.00 | $171.00 | $580.00 |
| 2 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 164 | $40.00 | $25.00 | $16.00 | $90.00 | $57.00 | $75.00 |
| 3 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 126 | $19.00 | $5.00 | $16.00 | $42.00 | $18.00 | $57.00 |
| 4 | Remove (21") TRT/untrt base & asphalt pavement (105-7041) | SY | 10 | $30.00 | $154.00 | $53.00 | $560.00 | $114.00 | $109.00 |
| 5 | Subgr widen (OC) (112-7003) | SY | 30 | $20.00 | $170.00 | $36.00 | $300.00 | $968.00 | $170.00 |
| 6 | Furn & place topsoil (4") (160-7002) | SY | 8 | $2.50 | $30.00 | $120.00 | $24.00 | $171.00 | $22.25 |
| 7 | Block sodding (162-7002) | SY | 72 | $10.00 | $30.00 | $20.00 | $24.00 | $74.00 | $28.00 |
| 8 | D-GR HMA type-B PG64-22 (exempt) (341-7003) | TON | 20 | $235.00 | $280.00 | $230.00 | $500.00 | $626.00 | $250.00 |
| 9 | D-GR HMA type D PG 76-22 (exempt) (341-7065) | TON | 3 | $600.00 | $600.00 | $300.00 | $1,500.00 | $683.00 | $250.00 |
| 10 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 165 | $250.00 | $260.00 | $290.00 | $285.00 | $347.00 | $500.00 |
| 11 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 182 | $515.00 | $280.00 | $360.00 | $497.00 | $391.00 | $620.00 |
| 12 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 92 | $670.00 | $410.00 | $500.00 | $740.00 | $523.00 | $850.00 |
| 13 | Mobilization (500-7001) | LS | 1 | $211,298 | $175,000 | $239,945 | $150,000 | $117,000 | $260,000 |
| 14 | Barricades, signs and traffic handling (502-7001) | MO | 17 | $4,000.00 | $2,500.00 | $5,000.00 | $3,000.00 | $3,983.00 | $5,980.00 |
| 15 | Portable changeable message sign (503-7001) | DAY | 8 | $500.00 | $170.00 | $110.00 | $500.00 | $192.00 | $165.00 |
| 16 | TMA (stationary) (505-7001) | DAY | 24 | $250.00 | $700.00 | $57.00 | $450.00 | $181.00 | $410.00 |
| 17 | TMA (mobile operation) (505-7002) | HR | 64 | $250.00 | $80.00 | $7.25 | $150.00 | $181.00 | $155.00 |
| 18 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 800 | $8.00 | $2.00 | $4.50 | $16.00 | $10.00 | $16.00 |
| 19 | Biodegradable erosion control logs (remove) (506-7046) | LF | 800 | $2.75 | $1.00 | $1.50 | $2.00 | $4.00 | $2.00 |
| 20 | Remove and relay pavers (528-7003) | SY | 4 | $430.00 | $130.00 | $56.00 | $1,000.00 | $569.00 | $650.00 |
| 21 | Concrete curb & gutter (type II) (529-7009) | LF | 72 | $65.00 | $100.00 | $36.00 | $74.00 | $86.00 | $80.00 |
| 22 | Concrete sidewalks (5") (531-7002) | SY | 56 | $150.00 | $140.00 | $120.00 | $200.00 | $176.00 | $210.00 |
| 23 | Curb ramps (type 7) (531-7010) | EACH | 6 | $3,000.00 | $2,500.00 | $3,300.00 | $4,200.00 | $3,983.00 | $3,050.00 |
| 24 | Curb ramps (type 21) (531-7013) | EACH | 1 | $6,600.00 | $5,650.00 | $3,300.00 | $9,000.00 | $5,121.79 | $4,318.85 |
| 25 | Curb ramps (type 2) (531-7016) | SY | 33 | $1,100.00 | $200.00 | $120.00 | $400.00 | $251.00 | $325.00 |
| 26 | Concrete directional island (536-7004) | SY | 2 | $330.00 | $175.00 | $190.00 | $1,200.00 | $911.00 | $965.00 |
| 27 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 2,853 | $20.00 | $13.00 | $10.00 | $16.00 | $23.00 | $12.00 |
| 28 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 2,210 | $30.00 | $17.50 | $18.00 | $22.00 | $26.00 | $18.00 |
| 29 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 5,552 | $40.00 | $30.00 | $25.00 | $43.00 | $32.00 | $29.00 |
| 30 | Conduit (RM) (2") (618-7078) | LF | 390 | $35.00 | $33.00 | $53.00 | $55.00 | $36.00 | $29.00 |
| 31 | Conduit (RM) (3") (618-7082) | LF | 780 | $60.00 | $37.00 | $75.00 | $65.00 | $58.00 | $45.00 |
| 32 | Electrical conductor (no.8) bare (620-7007) | LF | 10,955 | $2.25 | $1.44 | $1.65 | $1.20 | $1.92 | $1.50 |
| 33 | Electrical conductor (no.8) insulated (620-7008) | LF | 22,207 | $2.50 | $1.75 | $1.65 | $1.30 | $1.92 | $2.00 |
| 34 | Electrical conductor (no.6) bare (620-7009) | LF | 1,260 | $2.50 | $2.10 | $2.10 | $3.00 | $2.43 | $2.00 |
| 35 | Electrical conductor (no.6) insulated (620-7010) | LF | 2,500 | $2.75 | $2.25 | $2.15 | $4.00 | $2.43 | $2.50 |
| 36 | Ground box type D (162922)W/apron (624-7008) | EACH | 43 | $1,750.00 | $1,300.00 | $1,500.00 | $1,900.00 | $1,726.00 | $1,725.00 |
| 37 | Elc SRV type D 120/240 070(NS)AL(E)PS(U) (628-7168) | EACH | 2 | $5,300.00 | $8,000.00 | $7,700.00 | $7,500.00 | $6,687.00 | $6,350.00 |
| 38 | Elc SRV type D 120/240 070(NS)AL(E)SP(O) (628-7169) | EACH | 5 | $9,000.00 | $10,000 | $8,400.00 | $5,800.00 | $7,618.00 | $7,100.00 |
| 39 | Elc SRV type D 120/240 070(NS)AL(N)PS(U) (628-7173) | EACH | 1 | $6,000.00 | $7,600.00 | $7,600.00 | $7,000.00 | $5,914.00 | $5,800.00 |
| 40 | Aluminum signs (type A) (636-7001) | SF | 603 | $45.00 | $30.00 | $34.00 | $50.00 | $45.00 | $25.00 |
| 41 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 14 | $950.00 | $1,000.00 | $950.00 | $1,800.00 | $1,138.00 | $900.00 |
| 42 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $1,100.00 | $1,500.00 | $1,200.00 | $1,800.00 | $1,707.00 | $1,300.00 |
| 43 | Remove SM RD SN sup&AM (644-7073) | EACH | 19 | $175.00 | $127.00 | $100.00 | $65.00 | $171.00 | $180.00 |
| 44 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 190 | $5.50 | $1.45 | $5.00 | $6.00 | $1.65 | $9.00 |
| 45 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,161 | $2.50 | $1.35 | $1.65 | $5.00 | $1.54 | $11.00 |
| 46 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,750 | $15.00 | $10.00 | $8.00 | $15.00 | $11.37 | $21.00 |
| 47 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 17 | $290.00 | $300.00 | $200.00 | $230.00 | $342.00 | $390.00 |
| 48 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 8 | $310.00 | $300.00 | $300.00 | $250.00 | $342.00 | $445.00 |
| 49 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 17 | $300.00 | $300.00 | $250.00 | $250.00 | $342.00 | $335.00 |
| 50 | Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087) | EACH | 16 | $65.00 | $60.00 | $38.00 | $85.00 | $69.00 | $75.00 |
| 51 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 8 | $8.00 | $5.00 | $4.00 | $13.00 | $6.00 | $5.00 |
| 52 | Pavement sler 6" (666-7347) | LF | 1,725 | $4.00 | $0.75 | $0.50 | $1.50 | $0.85 | $0.75 |
| 53 | Pavement sler 8" (666-7348) | LF | 900 | $10.00 | $0.95 | $0.65 | $2.00 | $1.10 | $1.25 |
| 54 | Pavement sler 24" (666-7352) | LF | 422 | $12.00 | $3.00 | $3.85 | $2.30 | $44.00 | $7.00 |
| 55 | Pavement sler (arrow) (666-7353) | EACH | 4 | $175.00 | $35.00 | $73.00 | $70.00 | $40.00 | $140.00 |
| 56 | Pavement sler (word) (666-7354) | EACH | 4 | $175.00 | $35.00 | $83.00 | $85.00 | $40.00 | $140.00 |
| 57 | Pavement sler (double arrow) (666-7356) | EACH | 8 | $60.00 | $35.00 | $93.00 | $100.00 | $40.00 | $140.00 |
| 58 | Pavement sler (yld tri) (666-7365) | EACH | 16 | $50.00 | $25.00 | $15.00 | $48.00 | $29.00 | $45.00 |
| 59 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 1,180 | $2.25 | $1.25 | $1.25 | $1.00 | $1.50 | $1.75 |
| 60 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 2,558 | $3.50 | $1.15 | $1.25 | $3.00 | $1.40 | $2.25 |
| 61 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 1,710 | $1.00 | $1.25 | $1.25 | $1.00 | $1.42 | $1.75 |
| 62 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 3,909 | $2.00 | $1.15 | $1.25 | $3.00 | $1.40 | $1.75 |
| 63 | Reflectorized pavement marker type I-C (672-7002) | EACH | 168 | $9.00 | $7.00 | $7.50 | $11.00 | $8.00 | $14.00 |
| 64 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 150 | $9.00 | $7.00 | $7.50 | $11.00 | $8.00 | $14.00 |
| 65 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 80 | $8.00 | $7.00 | $7.50 | $11.00 | $8.00 | $14.00 |
| 66 | Eliminating existing PM & markers (4") (677-7001) | LF | 5,261 | $2.25 | $1.00 | $1.00 | $1.20 | $1.15 | $6.00 |
| 67 | Eliminating existing PM & markers (6") (677-7002) | LF | 4,454 | $4.00 | $1.40 | $1.50 | $2.00 | $1.60 | $17.00 |
| 68 | Eliminating existing PM & markers (8") (677-7004) | LF | 1,366 | $4.50 | $1.80 | $2.00 | $2.50 | $2.05 | $17.00 |
| 69 | Eliminating existing PM & markers (12") (677-7006) | LF | 252 | $8.50 | $4.00 | $3.00 | $5.00 | $4.55 | $17.00 |
| 70 | Eliminating existing PM & markers (24") (677-7008) | LF | 358 | $10.25 | $6.00 | $6.00 | $62.00 | $6.83 | $25.00 |
| 71 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 13 | $275.00 | $80.00 | $130.00 | $90.00 | $92.00 | $330.00 |
| 72 | Eliminating existing PM & markers (word) (677-7015) | EACH | 13 | $325.00 | $80.00 | $130.00 | $100.00 | $92.00 | $330.00 |
| 73 | Eliminating existing PM & markers (18")(yld tri) (677-7023) | EACH | 8 | $20.00 | $60.00 | $35.00 | $25.00 | $69.00 | $110.00 |
| 74 | Eliminating existing PM & markers (rumble strip) (677-7030) | LF | 160 | $20.00 | $4.00 | $10.00 | $15.00 | $4.56 | $11.00 |
| 75 | Pavement surface preparation for marking (6") (678-7002) | LF | 6,628 | $1.00 | $0.20 | $0.20 | $1.00 | $0.25 | $0.30 |
| 76 | Pavement surface preparation for marking (8") (678-7004) | LF | 2,075 | $1.00 | $0.40 | $0.30 | $1.00 | $0.50 | $0.50 |
| 77 | Pavement surface preparation for marking (24") (678-7008) | LF | 1,607 | $4.00 | $1.20 | $1.00 | $1.00 | $1.40 | $11.00 |
| 78 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 13 | $40.00 | $30.00 | $35.00 | $1.00 | $35.00 | $55.00 |
| 79 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 8 | $22.00 | $30.00 | $45.00 | $1.00 | $35.00 | $60.00 |
| 80 | Pavement surface preparation for marking (word) (678-7016) | EACH | 13 | $40.00 | $30.00 | $40.00 | $1.00 | $35.00 | $60.00 |
| 81 | Install highway traffic signal (flash beacon) (680-7001) | EACH | 2 | $9,000.00 | $7,000.00 | $6,200.00 | $1,500.00 | $4,233.00 | $7,500.00 |
| 82 | Install highway traffic signal (isolated) (680-7002) | EACH | 6 | $12,500 | $11,000 | $7,600.00 | $5,000.00 | $35,000 | $8,700.00 |
| 83 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 58 | $375.00 | $300.00 | $340.00 | $290.00 | $280.00 | $300.00 |
| 84 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 14 | $390.00 | $300.00 | $340.00 | $290.00 | $280.00 | $300.00 |
| 85 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 84 | $390.00 | $300.00 | $340.00 | $290.00 | $240.00 | $300.00 |
| 86 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 22 | $380.00 | $300.00 | $340.00 | $290.00 | $280.00 | $300.00 |
| 87 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 74 | $490.00 | $300.00 | $340.00 | $290.00 | $280.00 | $300.00 |
| 88 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 12 | $385.00 | $300.00 | $340.00 | $290.00 | $280.00 | $300.00 |
| 89 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 16 | $1,000.00 | $680.00 | $760.00 | $900.00 | $708.00 | $600.00 |
| 90 | Back plate (12")(1 sec) (682-7021) | EACH | 32 | $225.00 | $125.00 | $120.00 | $90.00 | $264.00 | $150.00 |
| 91 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 12 | $215.00 | $220.00 | $240.00 | $190.00 | $471.00 | $300.00 |
| 92 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 58 | $225.00 | $145.00 | $160.00 | $150.00 | $510.00 | $250.00 |
| 93 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 4,797 | $2.00 | $1.80 | $1.50 | $1.50 | $3.05 | $1.75 |
| 94 | Traffic signal CBL (type A)(14 AWG)(2 conductor) (684-7028) | LF | 1,550 | $3.50 | $1.50 | $1.25 | $1.50 | $3.05 | $1.75 |
| 95 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 16,770 | $3.25 | $2.15 | $2.05 | $2.00 | $3.60 | $2.00 |
| 96 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 3,592 | $5.00 | $2.60 | $2.50 | $3.00 | $4.35 | $2.50 |
| 97 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 5 | $6,500.00 | $6,900.00 | $6,800.00 | $8,000.00 | $8,073.00 | $11,000 |
| 98 | Removing RDSD FLSH BCN AM (solar PWRD) (685-7006) | EACH | 6 | $875.00 | $1,200.00 | $660.00 | $1,500.00 | $800.00 | $525.00 |
| 99 | Ins traffic signal PL AM (S)1 arm(24') (686-7025) | EACH | 1 | $11,500 | $10,250 | $7,900.00 | $10,000 | $9,000.00 | $9,500.00 |
| 100 | Ins traffic signal PL AM(S)1 arm(24')lum (686-7027) | EACH | 3 | $13,000 | $11,500 | $11,500 | $12,000 | $12,200 | $11,000 |
| 101 | Ins traffic signal PL AM (S)1 arm(28') (686-7029) | EACH | 2 | $10,500 | $10,500 | $8,400.00 | $12,500 | $9,500.00 | $10,000 |
| 102 | Ins traffic signal PL AM(S)1 arm(28')lum (686-7031) | EACH | 2 | $14,000 | $14,500 | $11,600 | $13,000 | $12,300 | $11,000 |
| 103 | Ins traffic signal PL AM(S)1 arm(32') (686-7033) | EACH | 1 | $14,000 | $11,100 | $9,800.00 | $10,500 | $10,700 | $10,000 |
| 104 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 3 | $15,000 | $12,550 | $12,800 | $11,000 | $13,400 | $11,000 |
| 105 | Ins traffic signal PL AM(S)1 arm(36') (686-7037) | EACH | 1 | $15,250 | $12,350 | $10,900 | $13,000 | $11,700 | $11,000 |
| 106 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 1 | $15,000 | $16,500 | $14,200 | $16,000 | $14,700 | $13,000 |
| 107 | Ins traffic signal PL AM(S)1 arm(40') (686-7041) | EACH | 2 | $17,000 | $13,000 | $12,000 | $14,000 | $12,100 | $12,000 |
| 108 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 6 | $13,500 | $17,000 | $15,300 | $18,000 | $15,100 | $14,000 |
| 109 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 3 | $15,000 | $15,500 | $15,900 | $18,500 | $15,600 | $14,500 |
| 110 | Ins traffic signal PL AM(S)1 arm(50')lum (686-7055) | EACH | 3 | $28,000 | $37,000 | $40,900 | $30,000 | $38,900 | $33,500 |
| 111 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 1 | $33,000 | $40,500 | $42,600 | $31,000 | $40,400 | $35,250 |
| 112 | Ins traffic signal PL AM(S)2 arm(28-24')lum (686-7087) | EACH | 1 | $22,000 | $16,200 | $17,400 | $15,000 | $17,400 | $13,600 |
| 113 | Pedestrian pole assembly (687-7001) | EACH | 16 | $3,500.00 | $2,400.00 | $2,500.00 | $4,000.00 | $2,684.00 | $2,600.00 |
| 114 | Pedestrian detect push button (APS) (688-7001) | EACH | 24 | $1,800.00 | $900.00 | $920.00 | $800.00 | $1,151.00 | $900.00 |
| 115 | Pedestrian detector controller unit (688-7003) | EACH | 3 | $4,000.00 | $4,500.00 | $3,800.00 | $3,500.00 | $3,773.00 | $3,900.00 |
| 116 | Bonding course (3007-7001) | GAL | 3 | $7.50 | $50.00 | $100.00 | $100.00 | $114.00 | $80.00 |
| 117 | ITS com CBL (ethernet) (6005-7001) | LF | 745 | $3.00 | $2.50 | $1.25 | $3.00 | $2.05 | $2.00 |
| 118 | Bbu system (external battery cabinet) (6007-7001) | EACH | 6 | $8,000.00 | $8,500.00 | $8,600.00 | $8,800.00 | $8,500.00 | $7,400.00 |
| 119 | RVDS (presence detection only) (6008-7001) | EACH | 25 | $7,000.00 | $7,500.00 | $8,500.00 | $7,500.00 | $8,845.00 | $7,500.00 |
| 120 | RVDS (advance detection only) (6008-7002) | EACH | 15 | $7,000.00 | $7,500.00 | $8,900.00 | $7,500.00 | $8,930.00 | $8,000.00 |
| 121 | Preformed in-lane (trans) rumble strip (6024-7001) | LF | 160 | $20.00 | $15.00 | $20.00 | $60.00 | $17.10 | $40.00 |
| 122 | Subsurface util locate (outside rdbed) (7019-7001) | EACH | 16 | $1,200.00 | $500.00 | $1,200.00 | $900.00 | $783.00 | $1,350.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 2, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.