TxDOT contract A00197805 bid tabulation
Bridge Maintenance, US 287 (AT FM 281 & RR to .). Let by Texas DOT on April 4, 2025, Moore, Amarillo District. 5 bids received; low bid $3,547,552 by Ti-Zack Concrete, LLC, -16% against the engineer's estimate of $4,198,525.
- Owner
- Texas DOT
- Letting
- 04 APR 2025
- Pay items
- 70
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ti-Zack Concrete, LLC | $3,547,552 | Low | -16% |
| 2 | Built Right Construction of Oklahoma, LLC | $3,648,092 | +3.0% | -13% |
| 3 | Icos Management, LLC | $4,037,046 | +14% | -4.0% |
| 4 | Gibson & Associates, Inc. | $4,481,822 | +26% | +7.0% |
| 5 | Ragle Construction, Inc. | $5,552,691 | +57% | +32% |
Engineer's estimate: $4,198,525.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Ti-Zack Concrete, LLC | 2. Built Right Construction of Oklahoma, LLC | 3. Icos Management, LLC | 4. Gibson & Associates, Inc. | 5. Ragle Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7006) | SY | 55 | $80.00 | $41.30 | $25.00 | $165.00 | $150.00 | $100.00 |
| 2 | Removing concrete (abutment backwall) (104-7032) | CY | 28 | $1,650.00 | $531.00 | $50.00 | $66.00 | $3,000.00 | $500.00 |
| 3 | Excavation (channel) (110-7002) | CY | 60 | $75.00 | $147.50 | $100.00 | $66.00 | $50.00 | $150.00 |
| 4 | Embankment (final)(OC)(type B) (132-7003) | CY | 564 | $75.00 | $29.50 | $25.00 | $55.00 | $50.00 | $257.00 |
| 5 | Drill seed (permanent_rural_clay) (164-7010) | SY | 4,310 | $4.72 | $1.55 | $1.00 | $4.84 | $0.66 | |
| 6 | Planing asphalt concrete pavement(0" to 3") (354-7033) | SY | 6,118 | $10.00 | $8.26 | $17.00 | $38.00 | $13.75 | $25.00 |
| 7 | Full - depth repair CRCP (13") (361-7008) | CY | 14 | $400.00 | $1,416.00 | $1,000.00 | $2,160.00 | $1,500.00 | $2,000.00 |
| 8 | Struct excavation (bridge) (400-7004) | CY | 226 | $75.00 | $147.50 | $20.00 | $86.00 | $180.00 | $56.00 |
| 9 | Cem stabil BKFL (400-7010) | CY | 226 | $400.00 | $484.96 | $300.00 | $302.00 | $360.00 | $186.00 |
| 10 | Flowable backfill (401-7001) | CY | 19 | $650.00 | $472.00 | $300.00 | $302.00 | $715.00 | $431.00 |
| 11 | Temporary special shoring (403-7001) | SF | 960 | $45.00 | $41.30 | $65.00 | $10.00 | $1.20 | $71.00 |
| 12 | Class C concrete (abutment) (420-7012) | CY | 48 | $2,250.00 | $1,178.82 | $700.00 | $1,760.00 | $3,900.00 | $1,700.00 |
| 13 | Approach slab (422-7013) | CY | 60 | $1,300.00 | $1,003.00 | $700.00 | $1,100.00 | $1,560.00 | $950.00 |
| 14 | Epoxy waterproof finish (type X) (427-7005) | SF | 10,229 | $13.50 | $17.70 | $10.00 | $8.00 | $7.70 | $7.00 |
| 15 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 1,652 | $100.00 | $171.10 | $320.00 | $121.00 | $25.00 | $25.00 |
| 16 | Concrete structure repair(deck rep (full depth)) (429-7005) | SF | 551 | $180.00 | $194.70 | $300.00 | $132.00 | $50.00 | $92.00 |
| 17 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 408 | $195.00 | $208.86 | $230.00 | $165.00 | $220.00 | $150.00 |
| 18 | Riprap (concrete)(4 in) (432-7001) | CY | 258 | $725.00 | $531.00 | $550.00 | $540.00 | $588.63 | $750.00 |
| 19 | Riprap (concrete)(5 in) (432-7002) | CY | 48 | $700.00 | $767.00 | $600.00 | $756.00 | $664.49 | $750.00 |
| 20 | Riprap (mow strip)(4 in) (432-7013) | CY | 40 | $885.00 | $500.00 | $756.00 | $595.54 | $675.00 | |
| 21 | Riprap (stone protection)(18 in) (432-7043) | CY | 6 | $500.00 | $1,180.00 | $250.00 | $432.00 | $750.00 | $650.00 |
| 22 | Cleaning and sealing joints (foam) (438-7010) | LF | 251 | $413.00 | $100.00 | $55.00 | $154.00 | $88.00 | |
| 23 | Concrete overlay (2.5 in) (439-7003) | SY | 6,118 | $128.00 | $56.25 | $45.00 | $86.00 | $88.00 | $100.00 |
| 24 | Retrofit rail (type SSTR) (451-7024) | LF | 896 | $149.86 | $190.00 | $716.00 | $206.80 | $211.00 | |
| 25 | Waterproofing (type 10) (458-7007) | SY | 72 | $16.00 | $206.50 | $95.00 | $432.00 | $120.00 | $60.00 |
| 26 | Hydro-demolition (1 in) (483-7008) | SY | 6,118 | $77.00 | $17.70 | $70.00 | $46.00 | $105.61 | $62.00 |
| 27 | Removing structure (approach slab) (496-7022) | EACH | 2 | $4,905.00 | $8,260.00 | $1,000.00 | $21,600 | $21,000 | $5,720.00 |
| 28 | Mobilization (500-7001) | LS | 1 | $350,000 | $322,000 | $250,000 | $80,000 | $642,758 | $550,000 |
| 29 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $20,000 | $11,800 | $3,500.00 | $1.00 | $15,000 | $189,000 |
| 30 | Portable changeable message sign (503-7002) | EACH | 2 | $8,260.00 | $5,000.00 | $11,000 | $21,000 | $25,000 | |
| 31 | TMA (stationary) (505-7001) | DAY | 60 | $345.00 | $182.90 | $325.00 | $275.00 | $350.00 | $550.00 |
| 32 | TMA (mobile operation) (505-7002) | HR | 72 | $100.00 | $295.00 | $325.00 | $220.00 | $50.00 | $87.00 |
| 33 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 1,960 | $14.16 | $10.00 | $5.00 | $12.49 | $6.75 | |
| 34 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,960 | $2.36 | $3.00 | $1.00 | $10.45 | $1.50 | |
| 35 | One-way traffic control (port traffic signal) (510-7003) | MO | 4 | $17,700 | $7,500.00 | $10,800 | $4,750.00 | $5,000.00 | |
| 36 | Portable concrete traffic barrier (des source)(F-shape)(type 1) (512-7017) | LF | 1,080 | $28.00 | $53.10 | $120.00 | $55.00 | $41.00 | $15.00 |
| 37 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 2,280 | $14.00 | $41.30 | $35.00 | $44.00 | $19.00 | $10.00 |
| 38 | Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041) | LF | 1,080 | $28.00 | $53.10 | $35.00 | $44.00 | $36.50 | $15.00 |
| 39 | Portable concrete traffic barrier (connection hardware) (512-7070) | EACH | 74 | $55.00 | $118.00 | $150.00 | $220.00 | $25.00 | $198.63 |
| 40 | Permanent CTB (single slope) (type 1) (42 ) (514-7001) | LF | 840 | $150.00 | $90.86 | $135.00 | $324.00 | $160.60 | $125.00 |
| 41 | Metal W-beam guard fence (steel post) (540-7002) | LF | 400 | $118.00 | $33.00 | $44.00 | $36.03 | $32.75 | |
| 42 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $8,850.00 | $3,000.00 | $4,320.00 | $2,486.00 | $2,260.00 | |
| 43 | Remove metal beam guard fence (542-7001) | LF | 800 | $8.00 | $17.70 | $5.00 | $5.00 | $3.30 | $3.00 |
| 44 | Remove terminal anchor section (542-7002) | EACH | 2 | $5,900.00 | $250.00 | $550.00 | $242.00 | $220.00 | |
| 45 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 2 | $650.00 | $9,440.00 | $250.00 | $550.00 | $280.50 | $255.00 |
| 46 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $8,260.00 | $4,000.00 | $4,950.00 | $3,410.00 | $3,100.00 | |
| 47 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $750.00 | $1,770.00 | $300.00 | $550.00 | $368.50 | $335.00 |
| 48 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 4 | $3,000.00 | $5,900.00 | $2,000.00 | $5,500.00 | $2,145.00 | $1,950.00 |
| 49 | Crash cushion attenuator (remove) (545-7004) | EACH | 4 | $2,090.00 | $5,900.00 | $1,500.00 | $5,500.00 | $1,100.00 | $1,000.00 |
| 50 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 2 | $30,000 | $39,900 | $32,000 | $38,500 | $33,715 | $30,650 |
| 51 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 4 | $10,000 | $14,160 | $12,000 | $13,200 | $9,460.00 | $8,600.00 |
| 52 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 10 | $64.90 | $30.00 | $55.00 | $45.65 | $41.50 | |
| 53 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 8 | $64.90 | $35.00 | $55.00 | $47.85 | $43.50 | |
| 54 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 1,265 | $2.00 | $2.30 | $2.50 | $2.00 | $2.20 | $2.00 |
| 55 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 11,760 | $2.00 | $1.44 | $1.75 | $2.00 | $1.38 | $1.25 |
| 56 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 24 | $24.15 | $25.00 | $33.00 | $23.10 | $21.00 | |
| 57 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 13,480 | $2.00 | $1.44 | $1.75 | $2.00 | $1.38 | $1.25 |
| 58 | Type I high perf PM (W)6"(broken)(090MIL) (666-7289) | LF | 1,120 | $1.00 | $2.88 | $3.00 | $3.00 | $2.75 | $2.50 |
| 59 | Type I high perf PM (W)6"(solid)(090MIL) (666-7292) | LF | 5,184 | $0.80 | $2.88 | $3.00 | $3.00 | $2.75 | $2.50 |
| 60 | Type I high perf PM (Y)6"(broken)(090MIL) (666-7301) | LF | 170 | $2.88 | $3.00 | $3.00 | $2.75 | $2.50 | |
| 61 | Type I high perf PM (Y)6"(solid)(090MIL) (666-7304) | LF | 5,454 | $0.80 | $2.88 | $3.00 | $3.00 | $2.75 | $2.50 |
| 62 | Pavement sler 6" (666-7347) | LF | 11,928 | $0.25 | $1.50 | $1.80 | $2.00 | $1.49 | $1.35 |
| 63 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 68 | $11.50 | $20.00 | $17.00 | $11.00 | $10.00 | |
| 64 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 58 | $7.50 | $11.50 | $20.00 | $17.00 | $11.00 | $10.00 |
| 65 | Eliminating existing PM & markers (4") (677-7001) | LF | 5,720 | $0.90 | $4.60 | $5.00 | $5.00 | $4.40 | $4.00 |
| 66 | Pavement surface preparation for marking (6") (678-7002) | LF | 11,928 | $0.20 | $1.44 | $1.75 | $2.00 | $1.38 | $1.25 |
| 67 | Crack cleaning and sealing (JCP) (713-7004) | LF | 620 | $20.00 | $22.00 | $25.00 | $86.00 | $44.00 | $22.00 |
| 68 | Concrete rail replacement (in-kind) (778-7004) | LF | 32 | $550.00 | $220.00 | $250.00 | $864.00 | $700.00 | $600.00 |
| 69 | Bridge joint replacement (SEJ) (785-7011) | LF | 270 | $900.00 | $357.50 | $500.00 | $385.00 | $1,300.00 | $540.00 |
| 70 | Carbon fiber reinforced polymer protection (786-7001) | SF | 318 | $135.00 | $60.50 | $125.00 | $86.00 | $77.00 | $115.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 4, 2025. Compiled by Mirage Metrics.