TxDOT contract A00197808 bid tabulation
Bridge Maintenance, US 60 (AT FILLMORE ST to .). Let by Texas DOT on October 8, 2025, Potter, Amarillo District. 4 bids received; low bid $17,113,098 by Ragle Construction, Inc., +2.3% against the engineer's estimate of $16,734,930.
- Owner
- Texas DOT
- Letting
- 08 OCT 2025
- Pay items
- 108
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ragle Construction, Inc. | $17,113,098 | Low | +2.0% |
| 2 | Built Right Construction of Oklahoma, LLC | $17,843,434 | +4.0% | +7.0% |
| 3 | Gilvin-Terrill, LTD. | $18,559,789 | +8.0% | +11% |
| 4 | Gibson & Associates, Inc. | $18,667,033 | +9.0% | +12% |
Engineer's estimate: $16,734,930.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Ragle Construction, Inc. | 2. Built Right Construction of Oklahoma, LLC | 3. Gilvin-Terrill, LTD. | 4. Gibson & Associates, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7006) | SY | 280 | $25.00 | $20.00 | $15.00 | $70.00 | $16.89 |
| 2 | Removing concrete (appr slab) (104-7030) | SY | 729 | $30.00 | $15.00 | $70.00 | $40.00 | |
| 3 | Removing concrete (traffic barrier) (104-7035) | LF | 976 | $20.00 | $25.00 | $75.00 | $8.14 | |
| 4 | Removing concrete (rail) (104-7036) | LF | 618 | $32.00 | $30.00 | $75.00 | $18.36 | |
| 5 | Excavation (channel) (110-7002) | CY | 170 | $40.00 | $150.00 | $50.00 | $24.75 | |
| 6 | Embankment (final)(OC)(type B) (132-7003) | CY | 1,114 | $30.00 | $35.00 | $50.00 | $43.01 | |
| 7 | Drill seed (permanent_rural_clay) (164-7010) | SY | 2,570 | $1.59 | $4.00 | $2.00 | $2.00 | |
| 8 | SP mixes SP-D PG70-28 (344-7056) | TON | 3,367 | $225.00 | $230.00 | $250.00 | $310.20 | |
| 9 | Tack coat (344-7077) | GAL | 2,043 | $7.00 | $25.00 | $6.00 | $9.90 | |
| 10 | Flexible pavement structure repair(5") (351-7004) | SY | 184 | $120.00 | $400.00 | $250.00 | $478.50 | |
| 11 | Planing asphalt concrete pavement(0" to 4") (354-7034) | SY | 9,588 | $8.00 | $11.00 | $15.00 | $15.00 | $8.78 |
| 12 | Planing asphalt concrete pavement(0" to 6") (354-7035) | SY | 1,430 | $11.00 | $25.00 | $15.00 | $10.98 | |
| 13 | Planing asphalt concrete pavement(2" to 4") (354-7039) | SY | 20,387 | $6.00 | $12.00 | $15.00 | $2.74 | |
| 14 | Full - depth repair CPCD (12") (361-7023) | CY | 72.90 | $700.00 | $750.00 | $1,200.00 | $1,100.00 | |
| 15 | Flowable backfill (401-7001) | CY | 74 | $400.00 | $550.00 | $450.00 | $500.00 | $330.00 |
| 16 | Reinforced concrete slab (422-7001) | SF | 50,676 | $12.25 | $45.00 | $30.00 | $29.70 | |
| 17 | Approach slab (422-7013) | CY | 313.90 | $600.00 | $600.00 | $1,350.00 | $1,155.00 | |
| 18 | Concrete paint finish (427-7002) | SF | 62,515 | $0.65 | $1.00 | $1.00 | $0.72 | |
| 19 | Epoxy waterproof finish (type X) (427-7005) | SF | 21,445 | $10.50 | $6.50 | $11.00 | $9.40 | $8.80 |
| 20 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 2,869 | $180.00 | $40.00 | $325.00 | $100.00 | $85.00 |
| 21 | Concrete structure repair(deck rep (full depth)) (429-7005) | SF | 958 | $235.00 | $95.00 | $325.00 | $100.00 | $180.00 |
| 22 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 4,287 | $230.00 | $95.00 | $235.00 | $100.00 | $224.40 |
| 23 | Pneumatically placed concrete (repair) (431-7002) | CF | 120 | $120.00 | $225.00 | $150.00 | $313.50 | |
| 24 | Riprap (concrete)(4 in) (432-7001) | CY | 383 | $515.00 | $700.00 | $650.00 | $383.90 | |
| 25 | Riprap (concrete)(5 in) (432-7002) | CY | 37 | $800.00 | $760.00 | $750.00 | $825.00 | $812.90 |
| 26 | Cleaning and sealing existing joints (CL5) (438-7006) | LF | 122 | $30.00 | $75.00 | $45.00 | $20.90 | |
| 27 | Clean and seal existing JTS (strip seal) (438-7014) | LF | 1,012 | $30.00 | $85.00 | $45.00 | $97.90 | |
| 28 | Multi-layer polymer overlay (439-7014) | SY | 3,308 | $55.00 | $65.00 | $50.00 | $56.00 | |
| 29 | CL CO concrete ovrly(steel fiber rein)(2.5 in) (439-7022) | SY | 2,605 | $125.00 | $125.00 | $160.00 | $130.00 | |
| 30 | CL CO concrete ovrly(steel fiber rein)(3 in) (439-7023) | SY | 6,983 | $135.00 | $130.00 | $130.00 | $170.00 | $135.00 |
| 31 | CL CO concrete ovrly(steel fiber rein)(3.5 in) (439-7024) | SY | 1,430 | $135.00 | $135.00 | $175.00 | $150.00 | |
| 32 | STR steel (pedestal) (442-7010) | LB | 3,560 | $7.00 | $15.00 | $15.00 | $40.00 | $18.00 |
| 33 | Clean and paint existing STR (ref no. 1) (446-7020) | EACH | 1 | $44,000 | $190,000 | $280,000 | $250,000 | $268,795 |
| 34 | Clean and paint existing STR (ref no. 3) (446-7022) | EACH | 1 | $190,000 | $265,000 | $250,000 | $243,151 | |
| 35 | Clean and paint existing STR (ref no. 4) (446-7023) | EACH | 1 | $190,000 | $265,000 | $250,000 | $243,151 | |
| 36 | Clean and paint existing STR (ref no. 5) (446-7024) | EACH | 1 | $190,000 | $235,000 | $250,000 | $222,460 | |
| 37 | Clean and paint existing STR (ref no. 6) (446-7025) | EACH | 1 | $190,000 | $265,000 | $250,000 | $243,151 | |
| 38 | Clean and paint existing STR (ref no. 7) (446-7026) | EACH | 1 | $190,000 | $265,000 | $250,000 | $243,151 | |
| 39 | Clean and paint existing STR (ref no. 8) (446-7027) | EACH | 1 | $190,000 | $265,000 | $250,000 | $243,151 | |
| 40 | Clean and paint existing STR (ref no. 9) (446-7028) | EACH | 1 | $190,000 | $265,000 | $250,000 | $243,151 | |
| 41 | Rail (type T551) (450-7016) | LF | 618 | $90.00 | $140.00 | $145.00 | $153.45 | |
| 42 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 656 | $220.00 | $350.00 | $185.00 | $330.00 | |
| 43 | Gabion mattresses (galvanized)(6 in) (459-7005) | SY | 106 | $120.00 | $100.00 | $350.00 | $150.00 | $429.00 |
| 44 | Gabions (3' X 3')(galvanized) (459-7010) | CY | 6 | $450.00 | $600.00 | $500.00 | $1,500.00 | $880.00 |
| 45 | Grate (471-7001) | EACH | 9 | $3,275.00 | $2,500.00 | $2,150.00 | $1,000.00 | |
| 46 | Pipe (PVC) (schedule 40) (12 in) (481-7016) | LF | 33 | $235.00 | $100.00 | $200.00 | $50.00 | |
| 47 | Hydro-demolition (1/2 in) (483-7006) | SY | 11,018 | $90.00 | $105.00 | $85.00 | $70.00 | $118.00 |
| 48 | Shot blasting (483-7016) | SY | 3,308 | $4.50 | $8.00 | $2.00 | $9.50 | |
| 49 | Support existing struct (495-7006) | LS | 1 | $125,000 | $200,000 | $60,000 | $450,000 | |
| 50 | Removing structure (bridge slab) (496-7013) | EACH | 1 | $2,650,000 | $100,000 | $1,650,000 | $860,000 | |
| 51 | Adjust steel shoes (499-7001) | EACH | 1 | $10,000 | $20,000 | $11,000 | $14,500 | |
| 52 | Mobilization (500-7001) | LS | 1 | $1,400,000 | $1,690,000 | $1,555,000 | $1,850,000 | $2,185,000 |
| 53 | Barricades, signs and traffic handling (502-7001) | MO | 39 | $40,000 | $50,000 | $7,500.00 | $35,000 | $12,300 |
| 54 | Portable changeable message sign (503-7002) | EACH | 6 | $13,030 | $24,000 | $7,500.00 | $18,500 | $21,000 |
| 55 | TMA (stationary) (505-7001) | DAY | 380 | $360.00 | $350.00 | $50.00 | $580.00 | $325.00 |
| 56 | TMA (mobile operation) (505-7002) | HR | 416 | $98.00 | $60.00 | $325.00 | $70.00 | $50.00 |
| 57 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 2,705 | $7.75 | $3.25 | $8.00 | $5.00 | $6.00 |
| 58 | Biodegradable erosion control logs (remove) (506-7046) | LF | 2,705 | $2.75 | $1.00 | $3.00 | $1.00 | $6.00 |
| 59 | Portable concrete traffic barrier (des source)(F-shape)(type 1) (512-7017) | LF | 2,340 | $40.00 | $51.00 | $29.00 | $15.00 | $16.50 |
| 60 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 8,130 | $25.00 | $10.00 | $25.00 | $15.00 | $13.20 |
| 61 | Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041) | LF | 2,340 | $40.00 | $10.00 | $29.00 | $15.00 | $16.50 |
| 62 | Permanent CTB (single slope) (type 1) (42 ) (514-7001) | LF | 1,680 | $120.00 | $185.00 | $150.00 | $160.27 | |
| 63 | Permanent CTB (F-shape) (type 1) (514-7013) | LF | 976 | $75.00 | $175.00 | $130.00 | $138.58 | |
| 64 | Remove metal beam guard fence (542-7001) | LF | 1,000 | $4.00 | $5.00 | $5.00 | $3.30 | |
| 65 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $400.00 | $300.00 | $125.00 | $550.00 | |
| 66 | Cable barrier terminal sec (install)(TL-4) (543-7018) | EACH | 4 | $6,200.00 | $10,000 | $6,200.00 | $550.00 | |
| 67 | Cable barrier (remove) (543-7037) | LF | 450 | $11.00 | $25.00 | $11.00 | $11.00 | |
| 68 | Cable barrier terminal section (remove) (543-7038) | EACH | 4 | $1,500.00 | $2,500.00 | $1,500.00 | $5,500.00 | |
| 69 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $400.00 | $300.00 | $125.00 | $2,200.00 | |
| 70 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 18 | $2,500.00 | $1,500.00 | $2,900.00 | $1,200.00 | $2,200.00 |
| 71 | Crash cushion attenuator (remove) (545-7004) | EACH | 5 | $1,120.00 | $1,300.00 | $1,200.00 | $1,650.00 | |
| 72 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 4 | $30,000 | $42,000 | $32,000 | $46,200 | |
| 73 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 5 | $10,000 | $7,200.00 | $13,000 | $7,500.00 | $9,900.00 |
| 74 | Replace existing aluminum signs(type O) (636-7006) | SF | 210 | $55.00 | $48.69 | $250.00 | $100.00 | $50.00 |
| 75 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 66,705 | $1.10 | $1.50 | $1.10 | $1.21 | |
| 76 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 35,630 | $1.10 | $1.50 | $1.10 | $1.21 | |
| 77 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 90 | $2.25 | $2.25 | $0.10 | $1.50 | $10.00 |
| 78 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 85 | $2.50 | $2.33 | $0.10 | $1.50 | $10.00 |
| 79 | Reflectorized pavement marking type III (W)(6")(solid) (666-7236) | LF | 7,188 | $5.00 | $6.50 | $5.00 | $5.50 | |
| 80 | Reflectorized pavement marking type III (W)(6")(broken) (666-7237) | LF | 1,820 | $5.00 | $6.50 | $5.00 | $5.50 | |
| 81 | Reflectorized pavement marking type III (Y)(6")(solid) (666-7248) | LF | 7,188 | $5.00 | $6.50 | $5.00 | $5.50 | |
| 82 | Type I high perf PM (W)6"(broken)(090MIL) (666-7289) | LF | 6,020 | $1.00 | $2.10 | $2.65 | $2.10 | $2.31 |
| 83 | Type I high perf PM (W)6"(solid)(090MIL) (666-7292) | LF | 9,890 | $1.00 | $2.10 | $2.65 | $2.10 | $2.31 |
| 84 | Type I high perf PM (Y)6"(solid)(090MIL) (666-7304) | LF | 9,900 | $1.00 | $2.10 | $2.65 | $2.10 | $2.31 |
| 85 | Pavement sler 6" (666-7347) | LF | 25,810 | $0.25 | $1.00 | $1.20 | $1.00 | $1.10 |
| 86 | Prefabricated PM type B (W)(24")(solid) (668-7021) | LF | 48 | $45.00 | $60.00 | $45.00 | $49.50 | |
| 87 | Reflectorized pavement marker type I-C (672-7002) | EACH | 6 | $15.00 | $20.00 | $15.00 | $16.50 | |
| 88 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 12 | $15.00 | $20.00 | $15.00 | $16.50 | |
| 89 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 584 | $7.50 | $15.00 | $20.00 | $15.00 | $16.50 |
| 90 | Eliminating existing PM & markers (4") (677-7001) | LF | 59,375 | $1.50 | $1.90 | $1.50 | $1.65 | |
| 91 | Eliminating existing PM & markers (8") (677-7004) | LF | 1,115 | $1.75 | $2.20 | $1.75 | $1.93 | |
| 92 | Pavement surface preparation for marking (6") (678-7002) | LF | 42,006 | $0.10 | $1.10 | $1.40 | $1.10 | $1.21 |
| 93 | Crack cleaning and sealing (JCP) (713-7004) | LF | 8,313 | $20.00 | $8.00 | $15.00 | $10.00 | $12.05 |
| 94 | Debris removal (spot debris) (735-7072) | MI | 1 | $2,500.00 | $5,000.00 | $15,000 | $5,000.00 | |
| 95 | Drain inlet cleaning (764-7001) | EACH | 20 | $650.00 | $1,200.00 | $500.00 | $742.50 | |
| 96 | Concrete rail replacement (in-kind) (778-7004) | LF | 93 | $500.00 | $650.00 | $200.00 | $700.00 | $2,000.00 |
| 97 | Rep steel bridge member (diaphragm) (784-7003) | EACH | 1 | $5,000.00 | $7,500.00 | $3,500.00 | $8,000.00 | $9,500.00 |
| 98 | Rep steel bridge member (bearings) (784-7008) | EACH | 13 | $2,250.00 | $5,000.00 | $5,000.00 | $900.00 | |
| 99 | Bridge joint repair (header) (785-7002) | LF | 130 | $100.00 | $120.00 | $550.00 | $350.00 | |
| 100 | Bridge joint replacement (SEJ) (785-7011) | LF | 953 | $500.00 | $465.00 | $500.00 | $550.00 | $1,125.00 |
| 101 | Carbon fiber reinforced polymer protection (786-7001) | SF | 2,920 | $70.00 | $80.00 | $60.00 | $42.90 | |
| 102 | Replacing elastomeric bearing pads (787-7001) | EACH | 48 | $4,000.00 | $2,500.00 | $3,000.00 | $5,000.00 | $6,200.00 |
| 103 | Steel bridge zone painting (4010-7021) | SF | 5,546 | $57.00 | $55.00 | $30.00 | $30.00 | $27.50 |
| 104 | Prefb PV MK W/wnty type B (W)(6")(solid) (6064-7002) | LF | 6,860 | $12.00 | $11.00 | $13.00 | $11.00 | $12.10 |
| 105 | Prefb PV MK W/wnty type B(W)6"(broken)CNTST (6064-7003) | LF | 3,580 | $13.00 | $15.00 | $18.00 | $15.00 | $16.50 |
| 106 | Prefb PV MK W/wnty type B (Y)(6")(broken) (6064-7005) | LF | 100 | $11.00 | $14.00 | $11.00 | $12.10 | |
| 107 | Prefb PV MK W/wnty type B (Y)(6")(solid) (6064-7006) | LF | 7,220 | $12.00 | $11.00 | $14.00 | $11.00 | $12.10 |
| 108 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 16 | $1,500.00 | $1,000.00 | $500.00 | $2,500.00 | $874.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.