| 1 | Removing concrete (riprap) (104-7006) | SY | 25 | $45.00 | $50.00 | $50.00 | $100.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 288 | $25.00 | $10.00 | $40.00 | $20.00 |
| 3 | Remove (0"-12") TRT/untrt base & asphalt pavement (105-7052) | SY | 3,442 | $12.00 | $11.00 | $20.00 | $20.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 3,727 | $22.00 | $20.00 | $28.00 | $20.00 |
| 5 | Embankment (final)(DC)(type C) (132-7006) | CY | 2,157 | $22.00 | $25.00 | $35.00 | $50.00 |
| 6 | Spec excavation work (backhoe) (158-7001) | HR | 20 | $150.00 | $50.00 | $300.00 | $150.00 |
| 7 | Furn & place topsoil (4") (160-7002) | SY | 6,605 | $4.75 | $3.00 | $3.00 | $6.00 |
| 8 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 12,960 | $1.00 | $0.25 | $0.35 | $1.00 |
| 9 | Vegetative watering (168-7001) | TGL | 143 | $21.00 | $15.00 | $30.00 | $50.00 |
| 10 | Cement (275-7001) | TON | 178 | $290.00 | $325.00 | $300.00 | $350.00 |
| 11 | Cement TRT (existing material)(12") (275-7005) | SY | 6,584 | $3.50 | $5.00 | $5.00 | $12.00 |
| 12 | Prime coat (MC-30) (310-7004) | GAL | 1,975 | $6.75 | $7.00 | $7.00 | $6.00 |
| 13 | SP mixes SP-C PG64-22 (344-7009) | TON | 3,517 | $170.00 | $160.00 | $170.00 | $175.00 |
| 14 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 1,710 | $180.00 | $170.00 | $175.00 | $220.00 |
| 15 | Planing asphalt concrete pavement(2") (354-7051) | SY | 9,379 | $4.50 | $5.00 | $4.00 | $10.00 |
| 16 | Trench excavation protection (402-7001) | LF | 22 | $20.00 | $10.00 | $30.00 | $10.00 |
| 17 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 52 | $450.00 | $380.00 | $380.00 | $550.00 |
| 18 | Class A concrete (collar) (420-7008) | EACH | 3 | $1,940.00 | $1,700.00 | $1,500.00 | $1,500.00 |
| 19 | Riprap (stone protection)(18 in) (432-7043) | CY | 9 | $220.00 | $315.00 | $400.00 | $185.00 |
| 20 | Concrete box culvert (4 FT X 4 FT) (462-7005) | LF | 14 | $500.00 | $1,250.00 | $600.00 | $650.00 |
| 21 | RC pipe (CL III)(18 in) (464-7003) | LF | 72 | $65.00 | $75.00 | $75.00 | $85.00 |
| 22 | RC pipe (CL III)(24 in) (464-7005) | LF | 130 | $100.00 | $85.00 | $100.00 | $105.00 |
| 23 | RC pipe (CL III)(30 in) (464-7007) | LF | 14 | $155.00 | $250.00 | $200.00 | $125.00 |
| 24 | RC pipe (CL III)(48 in) (464-7011) | LF | 12 | $275.00 | $400.00 | $500.00 | $250.00 |
| 25 | Junction box(complete)(PJB)(6FTX6FT) (465-7011) | EACH | 1 | $10,890 | $17,500 | $18,000 | $12,500 |
| 26 | Headwall (CH - FW - 0) (diameter= 48 in) (466-7011) | EACH | 1 | $18,500 | $11,000 | $8,000.00 | $12,500 |
| 27 | Headwall (CH - PW - 0) (diameter= 30 in) (466-7103) | EACH | 1 | $9,100.00 | $9,000.00 | $6,000.00 | $8,500.00 |
| 28 | Wingwall (PW - 2) (HW=9 FT) (466-7193) | EACH | 1 | $38,000 | $29,500 | $40,000 | $65,000 |
| 29 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 4 | $950.00 | $1,300.00 | $900.00 | $1,850.00 |
| 30 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 6 | $1,250.00 | $1,500.00 | $1,300.00 | $2,000.00 |
| 31 | Removing structure (pipe) (496-7037) | EACH | 7 | $750.00 | $1,000.00 | $600.00 | $500.00 |
| 32 | Mobilization (500-7001) | LS | 1 | $176,849 | $200,000 | $200,000 | $200,000 |
| 33 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $8,500.00 | $4,000.00 | $20,000 | $8,500.00 |
| 34 | Rock filter dams (install) (type 2) (506-7002) | LF | 180 | $40.00 | $47.50 | $45.00 | $40.00 |
| 35 | Rock filter dams (install) (type 3) (506-7003) | LF | 60 | $87.00 | $48.50 | $70.00 | $50.00 |
| 36 | Rock filter dams (remove) (506-7011) | LF | 240 | $12.00 | $15.00 | $13.00 | $20.00 |
| 37 | Temporary sediment control fence (install) (506-7039) | LF | 2,696 | $4.50 | $4.50 | $5.00 | $4.00 |
| 38 | Temporary sediment control fence (remove) (506-7041) | LF | 2,696 | $1.20 | $1.25 | $1.00 | $2.00 |
| 39 | Driveways (concrete) (hes) (530-7007) | SY | 213 | $150.00 | $120.00 | $220.00 | $125.00 |
| 40 | Driveways (ACP) (530-7010) | SY | 414 | $72.00 | $60.00 | $85.00 | $55.00 |
| 41 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 1 | $325.00 | $550.00 | $550.00 | $1,100.00 |
| 42 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 1 | $390.00 | $600.00 | $600.00 | $1,100.00 |
| 43 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 220 | $16.00 | $14.50 | $15.00 | $30.00 |
| 44 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 115 | $26.75 | $20.00 | $19.00 | $40.00 |
| 45 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 185 | $24.75 | $24.00 | $23.00 | $60.00 |
| 46 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 185 | $31.50 | $28.00 | $27.00 | $70.00 |
| 47 | Electrical conductor (no.6) bare (620-7009) | LF | 30 | $2.75 | $6.00 | $6.00 | $3.00 |
| 48 | Electrical conductor (no.6) insulated (620-7010) | LF | 60 | $3.15 | $6.50 | $7.00 | $3.00 |
| 49 | Tray cable (3 conductor) (12 AWG) (621-7002) | LF | 920 | $3.75 | $3.20 | $3.00 | $3.00 |
| 50 | Ground box type D (162922)W/apron (624-7008) | EACH | 4 | $1,750.00 | $2,000.00 | $1,900.00 | $1,500.00 |
| 51 | Elc SRV type D 120/240 060(NS)SS(E)PS(U) (628-7147) | EACH | 1 | $8,810.00 | $9,500.00 | $9,500.00 | $12,500 |
| 52 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 4 | $150.00 | $850.00 | $850.00 | $1,500.00 |
| 53 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 1 | $625.00 | $760.00 | $750.00 | $1,100.00 |
| 54 | Remove SM RD SN sup&AM (644-7073) | EACH | 5 | $120.00 | $180.00 | $200.00 | $500.00 |
| 55 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 6 | $77.00 | $105.00 | $120.00 | $100.00 |
| 56 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 4,656 | $0.39 | $0.85 | $0.85 | $1.00 |
| 57 | Work zone pavement marking non-removing (W)8"(DOT) (662-7010) | LF | 156 | $0.87 | $2.25 | $2.20 | $6.00 |
| 58 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 2,401 | $0.62 | $1.65 | $1.70 | $6.00 |
| 59 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 109 | $4.00 | $3.85 | $40.00 | $20.00 |
| 60 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 6,896 | $0.39 | $0.85 | $0.85 | $1.00 |
| 61 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 448 | $1.50 | $2.20 | $2.00 | $5.00 |
| 62 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 344 | $1.50 | $2.20 | $2.00 | $5.00 |
| 63 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 156 | $2.00 | $2.20 | $2.20 | $6.00 |
| 64 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,401 | $1.25 | $1.65 | $1.70 | $6.00 |
| 65 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 109 | $7.50 | $7.50 | $8.00 | $20.00 |
| 66 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 8 | $195.00 | $160.00 | $160.00 | $250.00 |
| 67 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 8 | $236.00 | $200.00 | $200.00 | $250.00 |
| 68 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 4,656 | $0.75 | $1.10 | $1.10 | $1.00 |
| 69 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 6,896 | $0.75 | $1.10 | $1.10 | $1.00 |
| 70 | Reflectorized pavement marker type I-C (672-7002) | EACH | 134 | $5.00 | $6.60 | $7.00 | $5.00 |
| 71 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 349 | $5.00 | $6.60 | $7.00 | $5.00 |
| 72 | Install highway traffic signal (system) (680-7003) | EACH | 1 | $40,500 | $35,500 | $36,000 | $55,000 |
| 73 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 7 | $310.00 | $380.00 | $380.00 | $350.00 |
| 74 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 3 | $310.00 | $390.00 | $390.00 | $350.00 |
| 75 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 7 | $310.00 | $380.00 | $380.00 | $350.00 |
| 76 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 6 | $310.00 | $390.00 | $390.00 | $350.00 |
| 77 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 7 | $310.00 | $380.00 | $380.00 | $350.00 |
| 78 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 3 | $310.00 | $390.00 | $390.00 | $350.00 |
| 79 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 7 | $202.00 | $300.00 | $300.00 | $200.00 |
| 80 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 3 | $280.00 | $350.00 | $350.00 | $250.00 |
| 81 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 1,149 | $3.10 | $3.20 | $3.00 | $3.00 |
| 82 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 715 | $3.55 | $4.40 | $4.50 | $3.00 |
| 83 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 1 | $16,400 | $21,550 | $22,000 | $20,000 |
| 84 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 1 | $16,700 | $22,850 | $24,000 | $21,000 |
| 85 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 1 | $18,000 | $23,550 | $25,000 | $24,000 |
| 86 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 1 | $20,000 | $24,200 | $26,000 | $26,000 |
| 87 | Install bbu system (690-7131) | EACH | 1 | $5,000.00 | $11,000 | $11,000 | $8,500.00 |
| 88 | Membrane underseal (3005-7001) | GAL | 1,366 | $5.00 | $5.50 | $7.00 | $6.00 |
| 89 | VDS prosr sys (6017-7001) | EACH | 1 | $14,500 | $17,750 | $18,000 | $30,000 |
| 90 | VIVDS cam assy var LNS (6017-7003) | EACH | 2 | $3,200.00 | $5,600.00 | $5,700.00 | $8,500.00 |
| 91 | HVDS W/var LNS (6017-7008) | EACH | 2 | $7,500.00 | $8,000.00 | $8,000.00 | $6,500.00 |
| 92 | VDS CNTRL software (6017-7009) | EACH | 1 | $520.00 | $390.00 | $400.00 | $6,500.00 |
| 93 | VDS cabling (6017-7012) | LF | 1,016 | $2.60 | $3.25 | $3.20 | $3.00 |