TxDOT contract A00215754 bid tabulation
Intersection Improvement, FM 364 (0.06 MILES SOUTH OF IH 10, SOUTH to SH 124). Let by Texas DOT on July 1, 2026, Jefferson, Beaumont District. 4 bids received; low bid $6,391,809 by Elite Contractors and Equipment LTD, +5.6% against the engineer's estimate of $6,050,406.
- Owner
- Texas DOT
- Letting
- 01 JUL 2026
- Pay items
- 146
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Elite Contractors and Equipment LTD | $6,391,809 | Low | +6.0% |
| 2 | Ragle Construction, Inc. | $6,487,326 | +1.0% | +7.0% |
| 3 | Isi Contracting, Inc. | $7,117,142 | +11% | +18% |
| 4 | Texas Materials Group, Inc. | $7,456,711 | +17% | +23% |
Engineer's estimate: $6,050,406.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Elite Contractors and Equipment LTD | 2. Ragle Construction, Inc. | 3. Isi Contracting, Inc. | 4. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 0.47 | $10,000 | $25,000 | $1,200,000 | $32,500 | $17,500 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 828 | $26.00 | $15.00 | $13.00 | $32.00 | $28.35 |
| 3 | Remove (15"-19") TRT/untrt base & asphalt pavement (105-7015) | SY | 1,542 | $12.00 | $27.50 | $7.67 | $17.85 | |
| 4 | Remove (6") TRT/untrt base & asphalt pavement (105-7026) | SY | 1,252 | $5.00 | $8.00 | $7.00 | $8.65 | $14.15 |
| 5 | Remove (8") TRT/untrt base & asphalt pavement (105-7028) | SY | 783 | $12.00 | $10.00 | $12.31 | $35.15 | |
| 6 | Remove (9") TRT/untrt base & asphalt pavement (105-7029) | SY | 5,681 | $11.00 | $8.00 | $6.00 | $3.92 | $21.75 |
| 7 | Excavation (roadway) (110-7001) | CY | 5,926 | $20.00 | $18.00 | $33.00 | $41.96 | $26.35 |
| 8 | Embankment (final)(DC)(type C) (132-7006) | CY | 4,642 | $22.00 | $23.00 | $33.00 | $24.03 | $35.00 |
| 9 | Furn & place topsoil (4") (160-7002) | SY | 20,912 | $4.00 | $4.50 | $2.50 | $5.61 | $2.55 |
| 10 | Block sodding (162-7002) | SY | 2,279 | $10.00 | $8.00 | $6.75 | $4.89 | $8.00 |
| 11 | Broadcast seed (temporary_warm) (164-7005) | SY | 9,319 | $0.15 | $0.25 | $0.25 | $0.28 | $0.25 |
| 12 | Broadcast seed (temporary_cool) (164-7006) | SY | 9,319 | $0.15 | $0.25 | $0.25 | $0.28 | $0.25 |
| 13 | Hydro mulch seed (permanent_rural_clay) (164-7018) | SY | 18,633 | $0.75 | $0.50 | $0.40 | $0.45 | $0.50 |
| 14 | Vegetative watering (168-7001) | TGL | 352 | $15.00 | $10.00 | $40.00 | $38.00 | $23.00 |
| 15 | Proof rolling (216-7001) | HR | 40 | $100.00 | $105.00 | $116.00 | $140.00 | |
| 16 | Lime (commercial lime slurry) (260-7004) | TON | 222 | $335.00 | $400.00 | $360.00 | $396.00 | $420.00 |
| 17 | Lime TRT (existing material)(6") (260-7006) | SY | 14,806 | $4.00 | $3.50 | $3.90 | $13.00 | $8.00 |
| 18 | Cem TRT(PLNT MX)(CL L)(tya)(GR1-2)(6") (276-7117) | SY | 14,806 | $20.00 | $27.00 | $31.00 | $33.00 | $31.00 |
| 19 | Asphalt TRT base (GR 4)(PG 64) (292-7014) | TON | 5,089 | $175.00 | $175.00 | $197.00 | $182.00 | |
| 20 | Prime coat (AE-P) (310-7001) | GAL | 2,962 | $5.00 | $8.00 | $6.00 | $3.78 | $3.50 |
| 21 | Asphalt (AC-20-5TR or AC-20XP) (316-7067) | GAL | 3,741 | $16.00 | $8.00 | $5.07 | $4.85 | |
| 22 | Aggregate (type-PD or PL, GR-4) (316-7258) | CY | 79 | $580.00 | $350.00 | $602.00 | $565.00 | |
| 23 | D-GR HMA type D PG64-22 (level-UP) (341-7046) | TON | 542 | $215.00 | $180.00 | $253.00 | $230.00 | |
| 24 | D-GR HMA type D PG 64-22 (exempt) (341-7064) | TON | 814 | $140.00 | $215.00 | $180.00 | $305.00 | $228.00 |
| 25 | Tom-C PG76-22 sac-A (347-7001) | TON | 1,579 | $280.00 | $230.00 | $295.00 | $281.00 | |
| 26 | Planing asphalt concrete pavement(8") (354-7057) | SY | 1,252 | $10.00 | $10.00 | $7.00 | $6.25 | $14.50 |
| 27 | Planing asphalt concrete pavement (3" to 5") (354-7084) | SY | 5,681 | $7.00 | $5.00 | $4.10 | $2.33 | $19.00 |
| 28 | Concrete pavement (CRCP) (9") (360-7003) | SY | 13,654 | $120.00 | $108.00 | $87.00 | $120.00 | $115.75 |
| 29 | Concrete pavement (CRCP)(fast TRK) (12") (360-7076) | SY | 529 | $315.00 | $166.00 | $125.00 | $195.00 | $184.00 |
| 30 | Cem stabil BKFL (400-7010) | CY | 113 | $119.00 | $168.00 | $110.00 | $166.00 | $109.00 |
| 31 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 59 | $425.00 | $330.00 | $322.00 | $421.00 | $390.00 |
| 32 | Class A concrete (collar) (420-7008) | EACH | 8 | $2,000.00 | $1,500.00 | $600.00 | $4,197.00 | $975.00 |
| 33 | Riprap (concrete) (CL B) (4 in) (432-7007) | CY | 8 | $800.00 | $725.00 | $700.00 | $1,119.00 | $1,750.00 |
| 34 | Riprap (mow strip)(4 in) (432-7013) | CY | 31 | $725.00 | $565.00 | $978.00 | $845.00 | |
| 35 | RC pipe (CL III)(18 in) (464-7003) | LF | 868 | $95.00 | $84.00 | $75.00 | $196.00 | $147.00 |
| 36 | RC pipe (CL III)(24 in) (464-7005) | LF | 836 | $140.00 | $105.00 | $85.00 | $232.00 | $182.00 |
| 37 | RC pipe (CL III)(30 in) (464-7007) | LF | 516 | $127.00 | $105.00 | $159.00 | $190.00 | |
| 38 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 4 | $1,000.00 | $1,700.00 | $1,760.00 | $3,346.00 | $1,600.00 |
| 39 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 26 | $1,000.00 | $1,300.00 | $1,760.00 | $1,966.00 | $1,600.00 |
| 40 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 32 | $2,000.00 | $1,650.00 | $1,850.00 | $2,408.00 | $2,050.00 |
| 41 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 2 | $4,100.00 | $2,750.00 | $2,937.00 | $2,650.00 | |
| 42 | Removing structure (set) (496-7004) | EACH | 29 | $460.00 | $400.00 | $450.00 | $1,037.00 | $625.00 |
| 43 | Removing structure (pipe) (496-7007) | LF | 1,243 | $30.00 | $15.00 | $16.50 | $45.00 | $52.00 |
| 44 | Mobilization (500-7001) | LS | 1 | $553,000 | $550,000 | $640,000 | $2,809.06 | $735,500 |
| 45 | Barricades, signs and traffic handling (502-7001) | MO | 26 | $5,000.00 | $3,000.00 | $1,500.00 | $4,000.00 | $800.00 |
| 46 | Portable changeable message sign (503-7002) | EACH | 4 | $12,500 | $8,000.00 | $12,000 | $6,510.72 | $18,850 |
| 47 | Rock filter dams (install) (type 2) (506-7002) | LF | 97 | $50.00 | $50.00 | $45.00 | $41.86 | $52.00 |
| 48 | Rock filter dams (remove) (506-7011) | LF | 97 | $15.00 | $12.00 | $20.00 | $20.93 | $12.00 |
| 49 | Construction exits (install) (type 1) (506-7020) | SY | 333 | $30.00 | $40.00 | $45.00 | $29.30 | $39.00 |
| 50 | Construction exits (remove) (506-7024) | SY | 333 | $9.00 | $10.00 | $20.00 | $13.60 | $1.25 |
| 51 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 1,178 | $8.50 | $5.00 | $7.00 | $10.47 | $6.00 |
| 52 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,178 | $2.00 | $1.00 | $1.50 | $5.23 | $1.20 |
| 53 | Colored textured concrete (8") (528-7005) | SY | 1,183 | $225.00 | $100.00 | $100.00 | $108.38 | $170.00 |
| 54 | Concrete curb (mono) (type II) (529-7007) | LF | 1,256 | $5.00 | $9.00 | $20.00 | $20.40 | $9.50 |
| 55 | Driveways (concrete) (530-7006) | SY | 1,716 | $120.00 | $115.00 | $95.00 | $162.68 | $161.00 |
| 56 | Driveways (ACP) (530-7010) | SY | 484 | $65.00 | $50.00 | $196.02 | $133.00 | |
| 57 | Turnouts (ACP) (530-7018) | SY | 55 | $90.00 | $65.00 | $140.00 | $1,712.11 | $665.00 |
| 58 | Metal W-beam guard fence (timber post) (540-7001) | LF | 325 | $32.00 | $30.00 | $30.06 | $33.00 | |
| 59 | Short radius (28") (540-7013) | LF | 25 | $50.00 | $60.00 | $68.54 | $50.00 | |
| 60 | Driveway terminal anchor section (540-7014) | EACH | 2 | $1,350.00 | $775.00 | $2,197.73 | $1,385.00 | |
| 61 | Downstream anchor terminal section (540-7015) | EACH | 3 | $1,600.00 | $1,550.00 | $1,725.57 | $1,625.00 | |
| 62 | Metal beam guard fence (long span system) (540-7027) | EACH | 1 | $1,600.00 | $1,150.00 | $6,447.11 | $1,600.00 | |
| 63 | Guardrail end treatment (install) (544-7001) | EACH | 3 | $3,500.00 | $3,750.00 | $3,276.17 | $3,550.00 | |
| 64 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 2 | $360.00 | $320.00 | $350.00 | $790.80 | $330.00 |
| 65 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 2 | $320.00 | $400.00 | $790.80 | $330.00 | |
| 66 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 1 | $700.00 | $750.00 | $790.83 | $715.00 | |
| 67 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 70 | $13.50 | $22.00 | $18.84 | $14.65 | $22.75 |
| 68 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 300 | $17.00 | $24.00 | $19.76 | $25.12 | $23.75 |
| 69 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 30 | $25.00 | $28.00 | $21.95 | $41.86 | $62.75 |
| 70 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 830 | $43.00 | $38.00 | $26.95 | $29.30 | $32.50 |
| 71 | Electrical conductor (no.6) bare (620-7009) | LF | 1,235 | $2.50 | $3.80 | $2.32 | $3.14 | $2.80 |
| 72 | Electrical conductor (no.4) bare (620-7011) | LF | 70 | $3.50 | $5.00 | $3.38 | $4.19 | $4.00 |
| 73 | Electrical conductor (no.4) insulated (620-7012) | LF | 130 | $3.65 | $5.50 | $3.63 | $5.23 | $4.50 |
| 74 | Ground box type D (162922)W/apron (624-7008) | EACH | 5 | $1,800.00 | $1,900.00 | $1,215.00 | $1,046.53 | $1,450.00 |
| 75 | Elc SRV type D 120/240 070(NS)SS(E)SP(O) (628-7191) | EACH | 1 | $12,000 | $10,500 | $7,625.00 | $10,256 | $9,200.00 |
| 76 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 26 | $700.00 | $715.00 | $750.00 | $862.28 | $715.00 |
| 77 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 3 | $920.00 | $925.00 | $1,012.98 | $925.00 | |
| 78 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 4 | $2,000.00 | $1,350.00 | $1,500.00 | $302.39 | $1,350.00 |
| 79 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,250.00 | $1,700.00 | $1,465.61 | $1,250.00 | |
| 80 | Remove SM RD SN sup&AM (644-7073) | EACH | 25 | $125.00 | $120.00 | $175.00 | $82.62 | $120.00 |
| 81 | Work zone pavement marking non-removing (W)4"(solid) (662-7004) | LF | 3,320 | $0.30 | $0.50 | $0.32 | $0.40 | $0.45 |
| 82 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 30 | $3.50 | $12.00 | $3.20 | $10.41 | $12.00 |
| 83 | Work zone pavement marking non-removing (Y)4"(solid) (662-7035) | LF | 3,320 | $0.45 | $0.50 | $0.32 | $0.40 | $0.45 |
| 84 | Work zone pavement marking removing (W)4"(solid) (662-7064) | LF | 8,965 | $1.00 | $0.75 | $1.25 | $0.63 | $0.75 |
| 85 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 120 | $2.00 | $1.80 | $2.25 | $1.57 | $1.80 |
| 86 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 40 | $15.00 | $6.50 | $4.00 | $5.49 | $6.30 |
| 87 | Work zone pavement marking removing (W)(arrow) (662-7082) | EACH | 2 | $150.00 | $240.00 | $75.00 | $209.31 | $240.00 |
| 88 | Work zone pavement marking removing (W)(word) (662-7092) | EACH | 2 | $190.00 | $325.00 | $75.00 | $282.56 | $325.00 |
| 89 | Work zone pavement marking removing (Y)4"(solid) (662-7097) | LF | 8,610 | $0.80 | $0.75 | $1.25 | $0.63 | $0.75 |
| 90 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 4,765 | $1.05 | $1.15 | $0.98 | $0.94 | $1.15 |
| 91 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 192 | $3.00 | $4.50 | $3.25 | $3.82 | $4.00 |
| 92 | Pavement sler 6" (666-7347) | LF | 27,230 | $0.20 | $0.22 | $0.25 | $0.20 | $0.22 |
| 93 | Pavement sler 8" (666-7348) | LF | 4,765 | $0.30 | $0.30 | $0.45 | $0.27 | $0.30 |
| 94 | Pavement sler 12" (666-7350) | LF | 192 | $0.50 | $0.90 | $0.88 | $0.78 | $0.90 |
| 95 | Pavement sler 24" (666-7352) | LF | 168 | $1.70 | $1.65 | $1.20 | $1.41 | $1.60 |
| 96 | Pavement sler (arrow) (666-7353) | EACH | 10 | $35.00 | $36.00 | $25.00 | $31.40 | $36.00 |
| 97 | Pavement sler (word) (666-7354) | EACH | 10 | $35.00 | $42.00 | $25.00 | $36.63 | $42.00 |
| 98 | Pavement sler (double arrow) (666-7356) | EACH | 2 | $35.00 | $42.00 | $35.00 | $36.63 | $42.00 |
| 99 | Pavement sler (LN reduct arrow) (666-7359) | EACH | 4 | $66.00 | $50.00 | $57.56 | $66.00 | |
| 100 | Pavement sler (RR crossing) (666-7364) | EACH | 2 | $40.00 | $65.00 | $50.00 | $57.04 | $65.00 |
| 101 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 1,210 | $0.85 | $0.90 | $0.75 | $0.78 | $0.90 |
| 102 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 11,180 | $0.80 | $0.85 | $0.75 | $0.73 | $0.80 |
| 103 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 740 | $0.85 | $0.90 | $0.75 | $0.78 | $0.90 |
| 104 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 14,100 | $0.80 | $0.85 | $0.75 | $0.73 | $0.85 |
| 105 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 168 | $20.00 | $22.00 | $25.00 | $19.36 | $22.00 |
| 106 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 10 | $250.00 | $300.00 | $200.00 | $261.63 | $300.00 |
| 107 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 2 | $375.00 | $360.00 | $250.00 | $313.96 | $360.00 |
| 108 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 4 | $600.00 | $400.00 | $528.50 | $600.00 | |
| 109 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 10 | $330.00 | $390.00 | $200.00 | $340.12 | $390.00 |
| 110 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 2 | $600.00 | $810.00 | $450.00 | $706.41 | $800.00 |
| 111 | Reflectorized pavement marker type I-C (672-7002) | EACH | 276 | $5.75 | $7.80 | $6.00 | $6.80 | $7.80 |
| 112 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 638 | $5.75 | $7.80 | $6.00 | $6.80 | $7.80 |
| 113 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 4 | $5.75 | $7.80 | $6.00 | $6.80 | $7.80 |
| 114 | Eliminating existing PM & markers (4") (677-7001) | LF | 4,180 | $0.40 | $0.42 | $0.35 | $0.37 | $0.45 |
| 115 | Eliminating existing PM & markers (12") (677-7006) | LF | 78 | $1.25 | $2.00 | $1.25 | $1.67 | $1.95 |
| 116 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 2 | $60.00 | $46.00 | $125.00 | $39.77 | $45.00 |
| 117 | Eliminating existing PM & markers (word) (677-7015) | EACH | 2 | $60.00 | $53.00 | $125.00 | $46.05 | $53.00 |
| 118 | Pavement surface preparation for marking (6") (678-7002) | LF | 27,230 | $0.11 | $0.06 | $0.01 | $0.05 | $0.06 |
| 119 | Pavement surface preparation for marking (8") (678-7004) | LF | 4,765 | $0.13 | $0.07 | $0.03 | $0.06 | $0.07 |
| 120 | Pavement surface preparation for marking (12") (678-7006) | LF | 192 | $0.28 | $0.32 | $0.15 | $0.28 | $0.35 |
| 121 | Pavement surface preparation for marking (24") (678-7008) | LF | 166 | $0.90 | $0.60 | $0.30 | $0.50 | $0.60 |
| 122 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 14 | $25.00 | $18.00 | $15.00 | $15.70 | $18.00 |
| 123 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 2 | $25.00 | $24.00 | $25.00 | $20.93 | $24.00 |
| 124 | Pavement surface preparation for marking (word) (678-7016) | EACH | 10 | $25.00 | $30.00 | $15.00 | $26.16 | $30.00 |
| 125 | Pavement surface preparation for marking (RR crossing) (678-7020) | EACH | 2 | $40.00 | $60.00 | $25.00 | $52.33 | $60.00 |
| 126 | Install highway traffic signal (system) (680-7003) | EACH | 1 | $40,000 | $48,000 | $37,500 | $38,722 | $45,250 |
| 127 | Temporary traffic signals (681-7001) | EACH | 1 | $50,000 | $110,000 | $45,000 | $61,955 | $54,300 |
| 128 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 8 | $320.00 | $435.00 | $330.00 | $319.00 | $400.00 |
| 129 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 5 | $350.00 | $450.00 | $330.00 | $319.00 | $400.00 |
| 130 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 8 | $300.00 | $440.00 | $330.00 | $319.00 | $400.00 |
| 131 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 6 | $350.00 | $445.00 | $330.00 | $319.00 | $400.00 |
| 132 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 8 | $320.00 | $435.00 | $330.00 | $319.00 | $400.00 |
| 133 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 4 | $350.00 | $445.00 | $330.00 | $319.00 | $400.00 |
| 134 | Back plate (12")(3 sect) (682-7052) | EACH | 8 | $220.00 | $270.00 | $155.00 | $188.00 | $185.00 |
| 135 | Back plate (12")(4 sect) (682-7053) | EACH | 3 | $250.00 | $370.00 | $175.00 | $293.00 | $210.00 |
| 136 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 1,960 | $4.00 | $5.00 | $5.50 | $3.35 | $6.65 |
| 137 | Ins traffic signal PL AM (S)1 arm(24') (686-7025) | EACH | 1 | $8,500.00 | $16,500 | $11,330 | $10,884 | $13,675 |
| 138 | Ins traffic signal PL AM(S)1 arm(44') (686-7045) | EACH | 3 | $15,000 | $20,000 | $13,800 | $15,489 | $16,650 |
| 139 | Install vid image vehicle det sys (VIVDS) (690-7084) | EACH | 1 | $22,000 | $2,500.00 | $17,945 | $2,512.00 | $21,650 |
| 140 | Install bbu system (690-7131) | EACH | 1 | $12,000 | $1,200.00 | $3,205.00 | $2,302.00 | $3,850.00 |
| 141 | VIVDS cable (install) (690-7137) | LF | 870 | $4.00 | $2.00 | $2.80 | $2.09 | $3.50 |
| 142 | VIVDS camera (install) (690-7138) | EACH | 4 | $2,000.00 | $300.00 | $950.00 | $6,070.00 | $1,145.00 |
| 143 | VIVDS prosr sys (6006-7001) | EACH | 1 | $15,000 | $12,000 | $1,000.00 | $3,140.00 | $1,200.00 |
| 144 | VIVDS CNTRL software (6006-7005) | EACH | 1 | $1,500.00 | $505.00 | $150.00 | $890.00 | $180.00 |
| 145 | VIVDS temporary (6006-7006) | EACH | 1 | $14,000 | $40,000 | $22,500 | $25,117 | $27,150 |
| 146 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $12,000 | $11,500 | $6,499.00 | $9,419.00 | $7,580.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.