TxDOT contract A00220799 bid tabulation

METAL BEAM GUARD FENCE REPAIR, US0069 (VARIOUS LOCATIONS IN to SMITH AND CHEROKEE COUNTIES). Let by Texas DOT on May 12, 2026, Smith, Tyler District. 1 bid received; low bid $631,830 by Catocon, Inc., +11% against the engineer's estimate of $568,750.

Owner
Texas DOT
Letting
12 MAY 2026
Pay items
39
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Catocon, Inc.$631,830Low+11%
TxDOT contract A00220799: bids by rank

Engineer's estimate: $568,750.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Catocon, Inc.
1Concrete structure repair(deck rep(part depth)) (429-7003)SF30$150.00$100.00
2Concrete structure repair(deck rep (full depth)) (429-7005)SF30$200.00$100.00
3Concrete structure repair (vertical & overhead) (429-7007)SF30$250.00$100.00
4Concrete structure repair (standard) (429-7009)SF30$200.00$100.00
5Riprap (mow strip)(4 in) (432-7013)CY10$700.00$500.00
6Mobilization (callout) (500-7002)EACH30$1,000.00$1.00
7TMA (stationary) (505-7001)DAY50$300.00$50.00
8Metal W-beam guard fence (timber post) (540-7001)LF500$30.00$40.00
9Metal W-beam guard fence adjustment (540-7009)LF1,000$5.00$5.00
10Metal thrie-beam guard fence adjustment (540-7010)LF50$25.00$10.00
11Short radius (28") (540-7013)LF50$40.00$50.00
12Downstream anchor terminal section (540-7015)EACH5$1,500.00$1,500.00
13Remove metal beam guard fence (542-7001)LF400$4.00$6.00
14Replace rail element (W-beam) (770-7001)LF4,000$25.00$35.00
15Replace rail element (thrie-beam) (770-7002)LF20$35.00$100.00
16Repl rail elmnt(thrie-BM trans to W-BM) (770-7003)EACH5$100.00$400.00
17Replace timber post W/O concrete FND (770-7006)EACH100$60.00$100.00
18Replace steel post W/O concrete FND (770-7007)EACH100$75.00$100.00
19Realign posts (770-7010)EACH300$20.00$20.00
20Replace terminal anchor posts (770-7012)EACH8$50.00$50.00
21Rem obsolete get & repl W/ SGT (770-7013)EACH60$4,000.00$4,500.00
22Repl single gdrail terminal impact head (770-7015)EACH15$1,000.00$1,100.00
23Replace single gdrail terminal rail (770-7016)LF500$40.00$43.00
24Replace single gdrail terminal post (770-7017)EACH25$120.00$200.00
25Replace blockout (770-7018)EACH200$35.00$25.00
26Repair steel post with base plate (770-7019)EACH5$100.00$300.00
27Reset SGT impact head (770-7020)EACH15$200.00$100.00
28Replace SGT object marker (770-7021)EACH10$40.00$100.00
29Replace SGT cable anchor (770-7022)EACH10$80.00$100.00
30Replace SGT cable assembly (770-7023)EACH10$80.00$100.00
31Replace hinged top SGT post (steel) (770-7032)EACH5$200.00$2,000.00
32Realign hinged top SGT post ((steel) (770-7033)EACH5$80.00$1,000.00
33Replace posts (TL-4)(gibraltar) (771-7005)EACH100$180.00$250.00
34Cable splice / turnbuckle (TL-4) (771-7010)EACH12$100.00$400.00
35Repair concrete foundation (TL-4) (771-7012)EACH6$100.00$200.00
36Repair or replace cable barrier terminal sec(TL-4) (771-7014)EACH6$2,000.00$3,000.00
37Check / RE-tension cable (TL-4) (771-7018)EACH6$100.00$500.00
38Post and cable fence (remv/ repl cable) (772-7007)LF1,000$7.50$8.00
39Repair (steel post W/channel iron rail) (776-7025)LF50$150.00$100.00
TxDOT contract A00220799: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy