Install delineator assembly (D-SW)SZ (BRF)CTB (BR), TxDOT 658-6069

Low bidders on TxDOT contracts carried a median of $26.00 per EACH for this item, from 09 JUL 2020 to 10 JUL 2024, across 41 low bids. Half of all 190 bids fell between $20.00 and $42.00.

Owner
Texas DOT
Item
658-6069
Unit
EACH
Data through
19 NOV 2026

TxDOT prints this item as “INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)”.

TxDOT has bid this work under another code: 6586069 on lettings from 09 JUL 2020 to 10 JUL 2024 (190 bids). They are combined here into one trend.

$26.00Low bidder's median, per EACH
$27.05Median of all bids, per EACH
41Contracts in the window
$30.00Engineer's estimate, median per EACH

By year of letting

Install delineator assembly (D-SW)SZ (BRF)CTB (BR), TxDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
202033$40.0015$40.00
20211313$23.0073$23.00
20221010$31.0546$33.35
202355$26.4020$36.38
20241010$34.0036$32.50

Bid prices as published, not adjusted for inflation.

By district

DistrictLow bidsLow-bid medianAll bidsMedian, all bids
Abilene District8$42.5035$45.00
San Antonio District5$21.0026$20.50
Dallas District3$13.7521$20.45
Houston District4$22.7512$23.20
Beaumont District3$42.0012$22.00
Amarillo District3$39.5012$41.50
Install delineator assembly (D-SW)SZ (BRF)CTB (BR), TxDOT: unit prices by district, all lettings

Districts with at least three low bids, over all lettings.

By quantity

Quantity (EACH)Low bidsLow-bid median
3 to 1010$34.50
10 to 2610$24.50
30 to 6010$30.55
74 to 98111$15.00
Install delineator assembly (D-SW)SZ (BRF)CTB (BR), TxDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Who is lowest on this line

Install delineator assembly (D-SW)SZ (BRF)CTB (BR), TxDOT: bidders most often lowest on this line

The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.

Latest contracts with this item

LetContractDistrictQuantityLow bidder's priceMedianEstimateBidsLow bidderSource
10 JUL 202407243205Laredo District10$22.00$25.00$35.004Anderson Columbia Co., Inc.TxDOT
09 JUL 202407243005Abilene District35$45.00$47.10$60.003FNF Construction, Inc.TxDOT
06 JUN 202406243201San Antonio District218$23.95$24.17$44.435Webber, LLCTxDOT
05 JUN 202406243019Abilene District4$60.00$60.00$40.001Hodges and Son Construction Company, Inc.TxDOT
04 APR 202404243013Abilene District10$45.00$50.00$33.006Coppell Construction Co., Inc.TxDOT
06 MAR 202403243202Laredo District55$26.00$25.70$30.002Anderson Columbia Co., Inc.TxDOT
06 MAR 202403243213Beaumont District42$42.00$30.35$23.554Texas Materials Group, Inc.TxDOT
01 FEB 202402243006Odessa District18$55.20$57.60$35.003Jones Bros. Dirt & Paving Contractors, Inc.TxDOT
05 JAN 202401243207San Antonio District30$21.00$35.00$20.007Anderson Columbia Co., Inc.TxDOT
05 JAN 202401243232Houston District981$14.00$14.00$28.001Select Maintenance, L.L.C.TxDOT
07 SEP 202309233203Amarillo District10$43.50$45.72$40.004Duininck, Inc.TxDOT
03 AUG 202308233209Lubbock District43$19.00$26.00$100.002Webber, LLCTxDOT
28 JUN 202306233601Dallas District336$15.00$15.00$14.005Williams Brothers Construction Co., Inc.TxDOT
05 MAY 202305233228Abilene District3$26.40$26.40$30.005SCR Civil Construction, LLCTxDOT
08 MAR 202303233211Abilene District20$33.00$43.00$35.004Duininck, Inc.TxDOT
Latest TxDOT contracts carrying Install delineator assembly (D-SW)SZ (BRF)CTB (BR)

Filter this item by your own quantity, district and period, or check your price against it, in the TxDOT explorer.

How these prices were read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are TxDOT's own: this item is compared with TxDOT contracts only.
  • Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
  • The data runs to the TxDOT letting of 19 NOV 2026 and was rebuilt on 26 NOV 2026.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy