VDOT contract C0000119641C02 bid tabulation
Smart scale - road safety improvements. Let by Virginia DOT on July 22, 2026, Augusta, Staunton. 2 bids received; low bid $1,846,048 by G. B. Foltz Contracting, Inc..
- Owner
- Virginia DOT
- Letting
- 22 JUL 2026
- Pay items
- 103
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | G. B. Foltz Contracting, Inc. | $1,846,048 | Low |
| 2 | Caton Construction Group, Inc. | $2,393,294 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. G. B. Foltz Contracting, Inc. | 2. Caton Construction Group, Inc. |
|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $6,140.00 | $57,600 |
| 0001-0020 | 15" conc. pipe (302SD20-0025) | LF | 48 | $206.48 | $360.00 |
| 0001-0030 | 15" storm sewer pipe (302SD20-0027) | LF | 49 | $211.62 | $360.00 |
| 0001-0040 | Drop inlet DI-2B,L=4' (302SD20-0241) | EACH | 1 | $6,900.00 | $25,000 |
| 0001-0050 | Drop inlet DI-3C,L=6' (302SD20-0329) | EACH | 1 | $7,380.00 | $22,000 |
| 0001-0060 | Manhole MH-1 or 2 (302SD20-0662) | LF | 7 | $575.71 | $15,000 |
| 0001-0070 | Frame & cover MH-1 (302SD20-0663) | EACH | 1 | $818.00 | $12,000 |
| 0001-0080 | Regular excavation (303SD20-0001) | CY | 578 | $267.85 | $127.00 |
| 0001-0090 | Borrow excavation (303SD20-0007) | CY | 450 | $106.67 | $188.00 |
| 0001-0100 | Check dam rock TY. II (303SD20-0023) | EACH | 6 | $628.33 | $1,200.00 |
| 0001-0110 | Siltation control excavation (303SD20-0029) | CY | 716 | $4.86 | $10.00 |
| 0001-0120 | Inlet protection type A (303SD20-0030) | EACH | 5 | $157.00 | $653.32 |
| 0001-0130 | Inlet protection type B (303SD20-0031) | EACH | 11 | $170.27 | $200.01 |
| 0001-0140 | Temp. silt fence type A (303SD20-0034) | LF | 3,017 | $7.47 | $9.00 |
| 0001-0150 | Aggr.base mat.TY. I no.21A or 21B (305SD20-0012) | TON | 322 | $181.52 | $85.99 |
| 0001-0160 | Asphalt concrete TY. SM- 9.5A const (315SD20-0007) | TON | 138 | $244.96 | $339.09 |
| 0001-0170 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 492 | $212.35 | $301.02 |
| 0001-0180 | NS saw-cut asph conc saw-cut (315SX20-0011) | LF | 2,279 | $7.75 | $21.00 |
| 0001-0190 | Curb, STD. CG-2 (502SD20-0011) | LF | 375 | $37.60 | $81.99 |
| 0001-0200 | Curb, radial CG-2 (502SD20-0012) | LF | 4 | $40.40 | $79.48 |
| 0001-0210 | Comb. curb & gutter, STD. CG-6 (502SD20-0022) | LF | 138 | $41.63 | $84.07 |
| 0001-0220 | Comb. curb & gutter, rad. CG-6 (502SD20-0023) | LF | 264 | $41.97 | $84.00 |
| 0001-0230 | Median strip MS-1 (502SD20-0053) | SY | 800 | $182.18 | $170.54 |
| 0001-0240 | CG-12 detectable warning surface (504SD20-0002) | SY | 18 | $736.18 | $477.36 |
| 0001-0250 | Hydr. cement conc. sidewalk 4" (504SD20-0003) | SY | 1,094 | $76.66 | $110.16 |
| 0001-0260 | Handrail HR-1 type II (504SD20-0014) | LF | 302 | $182.52 | $215.00 |
| 0001-0270 | Demo. of PVMT. combination (508SD20-0002) | SY | 971 | $27.55 | $70.00 |
| 0001-0280 | Flowable backfill (509SD20-0001) | CY | 5 | $868.00 | $800.00 |
| 0001-0290 | Adjust exist. valve & box (510SD20-0038) | EACH | 4 | $938.00 | $3,800.00 |
| 0001-0300 | Adjust exist. fire hydrant (510SD20-0042) | EACH | 1 | $1,589.00 | $6,500.00 |
| 0001-0310 | Remove comb. curb and gutter (510SX20-0002) | LF | 501 | $41.37 | $40.00 |
| 0001-0320 | Allaying dust (511SD20-0001) | HR | 16 | $36.25 | $115.00 |
| 0001-0330 | Traffic barrier service MB-11A (512SD20-0003) | LF | 120 | $153.83 | $75.00 |
| 0001-0340 | Type 3 barricade 8' (512SD20-0013) | EACH | 4 | $315.00 | $1,100.00 |
| 0001-0350 | Temporary sign (512SD20-0014) | SF | 1,282 | $27.00 | $35.00 |
| 0001-0360 | Group 2 longitudinal channelizing device (512SD20-0022) | LF | 50 | $120.00 | $123.84 |
| 0001-0370 | Truck mounted attenuator (512SD20-0023) | HR | 2,198 | $33.37 | $68.00 |
| 0001-0380 | Group 2 channelizing devices (512SD20-0024) | DAY | 51,140 | $0.17 | $1.15 |
| 0001-0390 | Port.changeable mess. sign (512SD20-0025) | HR | 3,360 | $6.17 | $28.00 |
| 0001-0400 | Electronic arrow board (512SD20-0026) | HR | 2,940 | $2.81 | $18.00 |
| 0001-0410 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 3,095 | $2.60 | $1.50 |
| 0001-0420 | Eradicate nonlinear PVMT MRKG (512SD20-0043) | SF | 1,254 | $9.60 | $3.50 |
| 0001-0430 | NS police patrol police patrol (512SX20-0040) | HR | 16 | $122.00 | $100.00 |
| 0001-0440 | Mobilization (513SD20-0001) | LS | 1 | $117,869 | $119,600 |
| 0001-0450 | Flex. pave. tie-in planing 0"-2" (515SD20-0002) | SY | 829 | $17.43 | $24.37 |
| 0001-0460 | Construction surveying constr. (517SD20-0001) | LS | 1 | $38,000 | $55,000 |
| 0001-0470 | 6" DI water main (520SD20-0014) | LF | 18 | $307.17 | $325.00 |
| 0001-0480 | 8" DI water main (520SD20-0016) | LF | 316 | $185.66 | $298.00 |
| 0001-0490 | 6" gate valve & box (520SD20-0089) | EACH | 1 | $2,145.00 | $5,985.00 |
| 0001-0500 | 8"X8" tapping sleeve valve & box (520SD20-0140) | EACH | 1 | $5,933.00 | $29,000 |
| 0001-0510 | 14"X8" tapping sleeve valve & box (520SD20-0143) | EACH | 1 | $7,031.00 | $29,000 |
| 0001-0520 | Fire hydrant (520SD20-0162) | EACH | 1 | $5,889.00 | $16,000 |
| 0001-0530 | NS topsoil (class B 3") (602SX20-0005) | ACRE | 0.63 | $128,333 | $5,000.00 |
| 0001-0540 | Temporary seed (603SD20-0002) | LB | 63 | $5.56 | $15.00 |
| 0001-0550 | Regular seed (603SD20-0003) | LB | 252 | $8.21 | $10.00 |
| 0001-0560 | Overseeding (603SD20-0004) | LB | 202 | $10.63 | $5.00 |
| 0001-0570 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 2,965 | $0.65 | $1.25 |
| 0001-0580 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 3,896 | $10.30 | $1.50 |
| 0001-0590 | Fertilizer nitrogen - N (603SD20-0014) | LB | 63 | $3.75 | $4.00 |
| 0001-0600 | Fertilizer phosphorous - P (603SD20-0015) | LB | 44 | $3.75 | $4.00 |
| 0001-0610 | Fertilizer potassium - K (603SD20-0016) | LB | 44 | $3.75 | $4.00 |
| 0001-0620 | Lime (603SD20-0017) | TON | 3.47 | $256.20 | $450.00 |
| 0001-0630 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 416 | $4.44 | $2.85 |
| 0001-0640 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 9 | $150.00 | $215.00 |
| 0001-0650 | Remove existing 1 post sign panel (700SD20-0007) | EACH | 1 | $109.00 | $215.00 |
| 0001-0660 | Relocate EX. 1 post GRND mount SGN panel (700SD20-0012) | EACH | 2 | $504.00 | $500.00 |
| 0001-0670 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 96 | $25.50 | $30.00 |
| 0001-0680 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 28 | $51.50 | $35.00 |
| 0001-0690 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 125 | $36.00 | $30.00 |
| 0001-0700 | Conc. found. STP-1, TY. A (700SD20-0038) | EACH | 16 | $492.00 | $680.00 |
| 0001-0710 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 2 | $1,499.00 | $930.00 |
| 0001-0720 | Pedestal pole PF-2, 12' (700SD20-0067) | EACH | 4 | $6,228.00 | $5,600.00 |
| 0001-0730 | Conc. found. PF-2 (700SD20-0069) | EACH | 4 | $5,120.00 | $4,600.00 |
| 0001-0740 | 14/2 conductor cable (700SD20-0110) | LF | 554 | $8.20 | $6.53 |
| 0001-0750 | 14/4 conductor cable (700SD20-0112) | LF | 573 | $7.30 | $6.58 |
| 0001-0760 | 14/7 conductor cable (700SD20-0114) | LF | 349 | $7.95 | $7.14 |
| 0001-0770 | 8 conductor cable egc (700SD20-0148) | LF | 672 | $11.00 | $9.86 |
| 0001-0780 | Junction box JB-S2 (700SD20-0178) | EACH | 5 | $5,130.00 | $4,617.42 |
| 0001-0790 | Bored conduit 2" (700SD20-0191) | LF | 401 | $69.00 | $62.03 |
| 0001-0800 | Bored conduit 3" (700SD20-0192) | LF | 202 | $85.00 | $76.43 |
| 0001-0810 | Conduit PVC 2" (700SD20-0194) | LF | 764 | $9.40 | $8.43 |
| 0001-0820 | Conduit PVC 3" (700SD20-0195) | LF | 40 | $12.53 | $11.27 |
| 0001-0830 | Trench excavation eci-1 (700SD20-0197) | LF | 794 | $74.00 | $66.13 |
| 0001-0840 | NS traffic (controller cabinet adjustment for traffic loop devices) (700SX20-0004) | LS | 1 | $7,325.00 | $6,589.49 |
| 0001-0850 | NS traffic signalization furn. & inst. video det. camera - 360 degree fisheye (miovision or app. equal) (700SX20-0010) | EACH | 1 | $11,455 | $10,310 |
| 0001-0860 | NS traffic signalization furn. & inst. video det. sys. - type III (miovision or app. equal) (700SX20-0010) | EACH | 1 | $45,874 | $41,286 |
| 0001-0870 | Sign panel (701SD20-0001) | SF | 136 | $68.20 | $42.91 |
| 0001-0880 | Traf. sig. head sect. 12" HVS backplate (703SD20-0007) | EACH | 7 | $903.00 | $812.40 |
| 0001-0890 | Pedestrian actuation PA-2 (703SD20-0011) | EACH | 4 | $2,501.00 | $2,251.08 |
| 0001-0900 | Hanger assembly SMB-3, one way (703SD20-0039) | EACH | 1 | $645.00 | $580.47 |
| 0001-0910 | Remove existing manhole/junction box (703SD20-0048) | EACH | 2 | $3,580.00 | $3,221.00 |
| 0001-0920 | Pedestrian signal head SP-8 (703SD20-0060) | EACH | 4 | $1,509.00 | $1,358.00 |
| 0001-0930 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 1,688 | $3.00 | $1.25 |
| 0001-0940 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 1,214 | $3.30 | $2.25 |
| 0001-0950 | Type B class I PVMT line MRKG 12" (704SD20-0009) | LF | 622 | $4.80 | $5.00 |
| 0001-0960 | Type B class I PVMT line MRKG 24" (704SD20-0010) | LF | 852 | $21.00 | $10.00 |
| 0001-0970 | Inlaid pavement marker asphalt (704SD20-0032) | EACH | 44 | $239.00 | $125.00 |
| 0001-0980 | PVMT symb MRKG thru arrow TY B, CL II (704SD20-0045) | EACH | 4 | $428.00 | $250.00 |
| 0001-0990 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 17 | $414.00 | $250.00 |
| 0001-1000 | DBL turn arr.thru/LT or RT TY B, CL II (704SD20-0051) | EACH | 1 | $725.00 | $400.00 |
| 0001-1010 | Symb MRKG lane reduction arr TY B CL II (704SD20-0060) | EACH | 3 | $1,052.00 | $600.00 |
| 0001-1020 | PVMT MSG. mark. “only” TY B, CL II, 8’ (704SD20-0108) | EACH | 1 | $794.00 | $400.00 |
| 0001-1030 | Removal of SRPM (704SP20-0001) | EACH | 38 | $90.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of July 22, 2026. Compiled by Mirage Metrics.