Abhe & Svoboda, Inc.: WSDOT bid record
Abhe & Svoboda, Inc. submitted 23 bids on Washington State DOT contracts in the data, from 05 JAN 2000 to 19 JAN 2023, and was the low bidder on 1 of them (4%). When it was not low, its total sat a median +52% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $5,743,770
- Latest bid
- 19 JAN 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 2 | 0 | 0% |
| 2002 | 1 | 0 | 0% |
| 2003 | 2 | 0 | 0% |
| 2006 | 1 | 0 | 0% |
| 2008 | 1 | 0 | 0% |
| 2009 | 1 | 0 | 0% |
| 2013 | 1 | 0 | 0% |
| 2014 | 1 | 0 | 0% |
| 2015 | 2 | 0 | 0% |
| 2017 | 3 | 1 | 33% |
| 2018 | 3 | 0 | 0% |
| 2019 | 1 | 0 | 0% |
| 2020 | 2 | 0 | 0% |
| 2021 | 1 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 9 | 1 | 11% |
| OR region | 7 | 0 | 0% |
| SCR region | 3 | 0 | 0% |
| SWR region | 2 | 0 | 0% |
| NCR region | 1 | 0 | 0% |
| Region 9 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion and sediment control lead | DAY | 8 | 4 (50%) | $119.00 | $100.00 | |
| Temporary impact attenuator | EACH | 8 | 3 (38%) | $2,925.00 | $4,000.00 | |
| Cleaning, sealing and caulking pack rust | LF | 11 | 2 (18%) | $7.50 | $10.25 | |
| Construction signs class A | SF | 10 | 2 (20%) | $21.00 | $16.21 | |
| Training | HR | 9 | 2 (22%) | $8.50 | $4.00 | |
| Resetting impact attenuator | EACH | 8 | 2 (25%) | $992.50 | $1,000.00 | |
| Raised pavement marker type 2 | HUND | 6 | 2 (33%) | $527.50 | $478.00 | |
| Paint line | LF | 6 | 1 (17%) | $0.52 | $0.25 | |
| Operation of portable changeable message sign | HR | 5 | 1 (20%) | $3.00 | $3.00 | |
| Temporary concrete barrier | LF | 5 | 1 (20%) | $15.30 | $14.00 | |
| Removing paint line | LF | 5 | 1 (20%) | $1.05 | $0.70 | |
| Traffic control labor | HR | 5 | 1 (20%) | $32.50 | $34.58 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| S & K Painting, Inc. | 8 | 5 of 8 |
| F.D. Thomas, Inc. | 8 | 5 of 8 |
| Purcell P & C, LLC DBA Purcell | 7 | 7 of 7 |
| Long Painting Company | 7 | 4 of 7 |
| Southern Road & Bridge, LLC | 6 | 5 of 6 |
| Certified Coatings Company | 5 | 1 of 5 |
| Vimas Painting Company, Inc. | 5 | 2 of 5 |
| Panther Industrial Painting, L | 5 | 5 of 5 |
| Dunkin & Bush, Inc. | 4 | 2 of 4 |
| Liberty Maintenance, Inc. | 4 | 3 of 4 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 19 JAN 2023 | 009913 | NWR region | I-5 snohomish river bridge (bn rr) painting | 8 of 12 | $17,249,120 | +26% |
| 24 FEB 2021 | 009648 | OR region | Us 101 hoquiam river - riverside bridge bridge painting - approach spans | 8 of 9 | $787,600 | +73% |
| 20 FEB 2020 | 009521 | Region 9 | Sr 525 clinton ferry terminal painting preservation | 4 of 4 | $2,377,710 | +171% |
| 08 JAN 2020 | 009510 | NWR region | Sr 99 nb duwamish river bridge select grid deck replacement | 3 of 3 | $1,984,910 | +121% |
| 30 JAN 2019 | 009366 | SCR region | Us 395 pioneer memorial bridge - bridge painting stage 1 | 6 of 9 | $9,483,310 | +46% |
| 14 MAR 2018 | 009217 | SWR region | Sr432 cowlitz river bridge painting | 6 of 9 | $3,842,680 | +54% |
| 07 FEB 2018 | 009206 | SCR region | Us 12 naches river nelson bridges - bridge painting | 6 of 8 | $5,589,680 | +27% |
| 31 JAN 2018 | 009200 | NWR region | Sr 410 white river bridge painting | 3 of 8 | $2,526,253 | +50% |
| 12 APR 2017 | 009064 | OR region | Us 101 sol duc river bridges bridge painting | 6 of 7 | $3,077,770 | +34% |
| 22 MAR 2017 | 009043 | NWR region | Sr 529 northbound steamboat slough bridge painter | 1 of 4 | $5,743,770 | Low, 6.0% under the second |
| 15 FEB 2017 | 009023 | SWR region | I-5 sb cowlitz river bridge repair bridge | 4 of 7 | $317,770 | +24% |
| 01 APR 2015 | 008723 | OR region | Us 101 hoquiam river-simpson ave bridge bridge painting 15c502 | 2 of 3 | $4,547,777 | +3.0% |
| 22 JAN 2015 | 008703 | NCR region | I-90 columbia river vantage bridge painting 14b010 | 2 of 7 | $6,711,770 | +45% |
| 02 APR 2014 | 008594 | NWR region | I-5 nooksack river bridges painting 14a005 | 3 of 5 | $3,366,260 | +5.0% |
| 20 MAR 2013 | 008435 | OR region | I-5 nisqually river bridges bridge painting | 4 of 7 | $6,341,985 | +27% |
| 25 MAR 2009 | 007700 | OR region | I-5 and us 12 capitol blvd. bridge & black river bridge - painting | 5 of 6 | $1,563,310 | +97% |
| 09 JAN 2008 | 007467 | OR region | Us 101 mud bay bridges - special repair | 8 of 8 | $1,431,710 | +211% |
| 08 MAR 2006 | 007105 | NWR region | I-90 east channel bridge 90/40n&s bridge painting | 6 of 6 | $1,163,310 | +491% |
| 19 MAR 2003 | 006524 | SCR region | Us 12 snake river bridge at burbank w/b | 8 of 8 | $1,867,723 | +112% |
| 12 MAR 2003 | 006513 | OR region | Us 101 chehalis river bridge seismic retrofit | 11 of 12 | $1,637,777 | +78% |
| 09 JAN 2002 | 006266 | NWR region | Sr 410 white river bridge 410/101 repairs | 5 of 6 | $271,410 | +68% |
| 29 MAR 2000 | 005817 | NWR region | Sr529 bridges 529/20 e&w, 529/25 elec/mech rehab. seismic and painting | 4 of 4 | $12,711,110 | +63% |
| 05 JAN 2000 | 005793 | NWR region | Sr 530 n fk stillaguamish river br 530/124 seismic retrofit & painting | 7 of 7 | $754,310 | +98% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.