WisDOT contract 20250114012 bid tabulation
5350-02-72. Let by Wisconsin DOT on January 14, 2025, Rock. 4 bids received; low bid $4,172,822 by Rock Road Companies, Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 226
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rock Road Companies, Inc. | $4,172,822 | Low |
| 2 | Lalonde Contractors Incorporated | $4,282,648 | +3.0% |
| 3 | Zignego Company, Inc. | $4,457,794 | +7.0% |
| 4 | Parisi Construction, LLC | $4,715,024 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rock Road Companies, Inc. | 2. Lalonde Contractors Incorporated | 3. Zignego Company, Inc. | 4. Parisi Construction, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 1 | $1,580.00 | $1,580.00 | $1,580.00 | $1,700.00 |
| 2 | Grubbing (201.0205) | STA | 1 | $330.00 | $330.00 | $330.00 | $350.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 8,693 | $11.00 | $7.99 | $3.63 | $6.40 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 117 | $53.49 | $53.00 | $53.00 | $56.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 725 | $6.84 | $7.01 | $10.00 | $5.50 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 713 | $12.02 | $11.69 | $10.00 | $17.00 |
| 7 | Removing masonry (204.0185) | CY | 3 | $90.41 | $206.58 | $100.00 | $300.00 |
| 8 | Removing concrete bases (204.0195) | EACH | 17 | $213.37 | $350.00 | $500.00 | $420.00 |
| 9 | Removing manholes (204.0210) | EACH | 11 | $560.47 | $750.00 | $750.00 | $720.00 |
| 10 | Removing inlets (204.0220) | EACH | 18 | $560.47 | $750.00 | $750.00 | $720.00 |
| 11 | Removing storm sewer (size) 012. 12-inch (204.0245) | LF | 967 | $15.95 | $10.50 | $10.50 | $27.75 |
| 12 | Removing storm sewer (size) 018. 18-inch (204.0245) | LF | 80 | $15.95 | $10.50 | $10.50 | $35.25 |
| 13 | Removing storm sewer (size) 021. 21-inch (204.0245) | LF | 153 | $15.95 | $12.25 | $12.25 | $36.75 |
| 14 | Removing storm sewer (size) 024. 24-inch (204.0245) | LF | 46 | $15.95 | $12.25 | $12.25 | $46.00 |
| 15 | Removing storm sewer (size) 030. 30-inch (204.0245) | LF | 191 | $15.95 | $15.50 | $15.50 | $48.00 |
| 16 | Removing storm sewer (size) 042. 42-inch (204.0245) | LF | 46 | $23.93 | $16.75 | $16.75 | $61.00 |
| 17 | Abandoning manholes (204.0250) | EACH | 4 | $1,154.79 | $1,150.00 | $1,150.00 | $420.00 |
| 18 | Abandoning inlets (204.0260) | EACH | 4 | $1,154.79 | $975.00 | $975.00 | $420.00 |
| 19 | Abandoning sewer (204.0291.S) | CY | 35 | $434.00 | $55.00 | $55.00 | $280.00 |
| 20 | Removing (item description) 201. traffic signals ush 51 & court ST/milwaukee ST (204.9060.S) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,200.00 |
| 21 | Excavation common (205.0100) | CY | 8,536 | $18.64 | $20.26 | $18.00 | $24.50 |
| 22 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 4,842 | $45.37 | $64.28 | $76.00 | $67.00 |
| 23 | Finishing roadway (project) 002. 5350-02-72 (213.0100) | EACH | 1 | $6,069.43 | $3,308.00 | $1,000.00 | $2,100.00 |
| 24 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 6,328 | $18.96 | $20.51 | $23.39 | $17.75 |
| 25 | Base aggregate open-graded (310.0110) | TON | 58 | $10.94 | $44.76 | $50.00 | $50.00 |
| 26 | Select crushed material (312.0110) | TON | 6,488 | $16.65 | $18.24 | $16.21 | $16.75 |
| 27 | Concrete pavement 9-inch (415.0090) | SY | 5,670 | $61.20 | $74.16 | $87.50 | $102.00 |
| 28 | Concrete pavement joint filling (415.4100) | SY | 4,547 | $3.12 | $2.00 | $1.50 | $7.40 |
| 29 | Drilled tie bars (416.0610) | EACH | 61 | $9.64 | $21.88 | $30.00 | $16.00 |
| 30 | Drilled dowel bars (416.0620) | EACH | 88 | $13.87 | $25.22 | $30.00 | $26.00 |
| 31 | Tack coat (455.0605) | GAL | 74 | $5.11 | $0.10 | $0.10 | $0.10 |
| 32 | Incentive density HMA pavement (460.2000) | DOL | 630 | $1.00 | $1.00 | $1.00 | $1.00 |
| 33 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 976 | $91.00 | $101.00 | $101.00 | $110.00 |
| 34 | Asphaltic surface driveways and field entrances (465.0120) | TON | 53 | $210.00 | $215.00 | $215.00 | $230.00 |
| 35 | Asphaltic flumes (465.0315) | SY | 29 | $65.00 | $50.00 | $50.00 | $53.00 |
| 36 | Concrete curb & gutter 30-inch type K (601.0417) | LF | 1,781 | $29.55 | $36.53 | $50.00 | $31.00 |
| 37 | Concrete curb & gutter 30-inch type L (601.0419) | LF | 1,363 | $29.42 | $33.08 | $50.00 | $31.00 |
| 38 | Concrete curb pedestrian (601.0600) | LF | 64 | $77.35 | $52.11 | $100.00 | $50.00 |
| 39 | Concrete sidewalk 4-inch (602.0405) | SF | 9,096 | $4.36 | $8.13 | $10.00 | $8.00 |
| 40 | Concrete sidewalk 6-inch (602.0415) | SF | 1,104 | $6.52 | $9.20 | $12.00 | $13.75 |
| 41 | Curb ramp detectable warning field natural patina (602.0515) | SF | 340 | $48.93 | $40.70 | $50.00 | $55.00 |
| 42 | Concrete driveway 8-inch (602.0820) | SY | 98 | $68.94 | $95.16 | $100.00 | $100.00 |
| 43 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 327 | $118.08 | $95.00 | $95.00 | $120.00 |
| 44 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 47 | $171.00 | $185.00 | $185.00 | $220.00 |
| 45 | Storm sewer pipe reinforced concrete class V 12-inch (608.0512) | LF | 79 | $109.78 | $95.00 | $95.00 | $120.00 |
| 46 | Storm sewer pipe reinforced concrete class V 42-inch (608.0542) | LF | 32 | $385.89 | $275.00 | $275.00 | $380.00 |
| 47 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 19X30-inch (608.2319) | LF | 76 | $278.19 | $205.00 | $205.00 | $200.00 |
| 48 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 385 | $146.54 | $95.00 | $95.00 | $140.00 |
| 49 | Storm sewer pipe class III-A 18- inch (608.3018) | LF | 197 | $184.98 | $98.00 | $98.00 | $180.00 |
| 50 | Storm sewer pipe class III-A 24- inch (608.3024) | LF | 241 | $196.29 | $165.00 | $165.00 | $170.00 |
| 51 | Storm sewer pipe class III-A 30- inch (608.3030) | LF | 447 | $145.54 | $195.00 | $195.00 | $240.00 |
| 52 | Reconstructing manholes (611.0420) | EACH | 1 | $1,513.83 | $3,675.00 | $3,675.00 | $1,500.00 |
| 53 | Inlet covers type C (611.0612) | EACH | 3 | $998.70 | $675.00 | $675.00 | $1,000.00 |
| 54 | Inlet covers type Z (611.0666) | EACH | 4 | $1,256.18 | $1,150.00 | $1,150.00 | $1,200.00 |
| 55 | Catch basins 3-FT diameter (611.1003) | EACH | 4 | $3,306.01 | $2,975.00 | $2,975.00 | $2,700.00 |
| 56 | Catch basins 4-FT diameter (611.1004) | EACH | 11 | $3,989.04 | $3,850.00 | $3,850.00 | $3,300.00 |
| 57 | Catch basins 5-FT diameter (611.1005) | EACH | 1 | $5,816.50 | $4,950.00 | $4,950.00 | $5,300.00 |
| 58 | Catch basins 6-FT diameter (611.1006) | EACH | 1 | $8,527.71 | $6,450.00 | $6,450.00 | $9,300.00 |
| 59 | Catch basins 2X3-FT (611.1230) | EACH | 8 | $3,468.71 | $3,275.00 | $3,275.00 | $2,900.00 |
| 60 | Manholes 4-FT diameter (611.2004) | EACH | 6 | $3,830.81 | $5,995.00 | $5,995.00 | $3,300.00 |
| 61 | Manholes 5-FT diameter (611.2005) | EACH | 4 | $5,464.07 | $6,675.00 | $6,675.00 | $5,300.00 |
| 62 | Manholes 6-FT diameter (611.2006) | EACH | 3 | $7,414.10 | $9,650.00 | $9,650.00 | $9,300.00 |
| 63 | Manholes 7-FT diameter (611.2007) | EACH | 2 | $8,576.62 | $11,750 | $11,750 | $12,300 |
| 64 | Manholes 8-FT diameter (611.2008) | EACH | 1 | $17,800 | $16,250 | $16,250 | $19,000 |
| 65 | Manholes 5X5-FT (611.2055) | EACH | 1 | $14,265 | $12,750 | $12,750 | $25,100 |
| 66 | Inlets median 1 grate (611.3901) | EACH | 3 | $3,630.34 | $1,450.00 | $1,450.00 | $3,200.00 |
| 67 | Pipe underdrain 6-inch (612.0106) | LF | 800 | $19.46 | $18.00 | $15.00 | $17.25 |
| 68 | Fence chain link 5-FT (616.0205) | LF | 255 | $46.00 | $46.00 | $46.00 | $48.75 |
| 69 | Mobilization (619.1000) | EACH | 1 | $504,633 | $375,027 | $373,000 | $350,000 |
| 70 | Concrete median sloped nose (620.0300) | SF | 408 | $12.47 | $17.52 | $20.00 | $11.50 |
| 71 | Landmark reference monuments and cast iron covers (621.1100) | EACH | 1 | $1,250.00 | $1,769.00 | $1,000.00 | $790.00 |
| 72 | Water (624.0100) | MGAL | 108 | $0.01 | $54.40 | $60.00 | $41.75 |
| 73 | Topsoil (625.0100) | SY | 3,206 | $0.01 | $4.95 | $4.95 | $13.75 |
| 74 | Mulching (627.0200) | SY | 160 | $5.00 | $1.25 | $1.25 | $5.30 |
| 75 | Mobilizations erosion control (628.1905) | EACH | 5 | $1.00 | $225.00 | $225.00 | $1.10 |
| 76 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $1.00 | $225.00 | $225.00 | $1.10 |
| 77 | Inlet protection type A (628.7005) | EACH | 35 | $1.00 | $100.00 | $100.00 | $1.10 |
| 78 | Inlet protection type B (628.7010) | EACH | 11 | $95.00 | $55.00 | $55.00 | $100.00 |
| 79 | Inlet protection type C (628.7015) | EACH | 44 | $95.00 | $60.00 | $60.00 | $100.00 |
| 80 | Inlet protection type D (628.7020) | EACH | 14 | $150.00 | $90.00 | $90.00 | $160.00 |
| 81 | Tracking pads (628.7560) | EACH | 10 | $707.07 | $1,552.00 | $1.00 | $630.00 |
| 82 | Fertilizer type B (629.0210) | CWT | 2.05 | $150.00 | $85.00 | $85.00 | $160.00 |
| 83 | Seeding temporary (630.0200) | LB | 5 | $5.00 | $25.00 | $25.00 | $5.30 |
| 84 | Sod water (631.0300) | MGAL | 75 | $1.00 | $50.00 | $50.00 | $1.10 |
| 85 | Sod lawn (631.1000) | SY | 3,206 | $12.00 | $7.50 | $7.50 | $12.75 |
| 86 | Posts tubular steel 2X2-inch X 8-FT (634.0808) | EACH | 2 | $205.00 | $190.00 | $190.00 | $220.00 |
| 87 | Posts tubular steel 2X2-inch X 11- FT (634.0811) | EACH | 18 | $205.00 | $200.00 | $200.00 | $220.00 |
| 88 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 7 | $205.00 | $205.00 | $205.00 | $220.00 |
| 89 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 1 | $225.00 | $210.00 | $210.00 | $220.00 |
| 90 | Signs type II reflective H (637.2210) | SF | 299.54 | $29.50 | $20.00 | $20.00 | $31.25 |
| 91 | Signs type II reflective H folding (637.2215) | SF | 56.98 | $39.00 | $28.00 | $28.00 | $41.25 |
| 92 | Signs type II reflective F (637.2230) | SF | 38.07 | $33.00 | $23.00 | $23.00 | $35.00 |
| 93 | Moving signs type II (638.2102) | EACH | 2 | $150.00 | $90.00 | $90.00 | $160.00 |
| 94 | Removing signs type II (638.2602) | EACH | 38 | $25.00 | $28.00 | $28.00 | $26.50 |
| 95 | Removing small sign supports (638.3000) | EACH | 19 | $75.00 | $28.00 | $28.00 | $79.00 |
| 96 | Field office type C (642.5201) | EACH | 1 | $5,000.00 | $19,460 | $30,000 | $22,800 |
| 97 | Traffic control drums (643.0300) | DAY | 3,862 | $0.70 | $0.70 | $0.70 | $0.25 |
| 98 | Traffic control barricades type III (643.0420) | DAY | 7,071 | $1.00 | $1.00 | $1.00 | $0.25 |
| 99 | Traffic control flexible tubular marker posts (643.0500) | EACH | 87 | $25.00 | $25.00 | $25.00 | $42.50 |
| 100 | Traffic control flexible tubular marker bases (643.0600) | EACH | 87 | $7.00 | $7.00 | $7.00 | $6.40 |
| 101 | Traffic control warning lights type A (643.0705) | DAY | 14,142 | $0.20 | $0.20 | $0.20 | $0.10 |
| 102 | Traffic control warning lights type C (643.0715) | DAY | 857 | $1.00 | $1.00 | $1.00 | $0.10 |
| 103 | Traffic control arrow boards (643.0800) | DAY | 91 | $20.00 | $20.00 | $20.00 | $6.40 |
| 104 | Traffic control signs (643.0900) | DAY | 41,038 | $0.25 | $0.25 | $0.25 | $0.25 |
| 105 | Traffic control covering signs type II (643.0920) | EACH | 10 | $25.00 | $25.00 | $25.00 | $53.00 |
| 106 | Traffic control signs PCMS (643.1050) | DAY | 28 | $75.00 | $75.00 | $75.00 | $31.75 |
| 107 | Temporary marking line removable tape 6-inch (643.3180) | LF | 3,941 | $1.20 | $1.20 | $1.20 | $1.80 |
| 108 | Temporary marking line removable tape 10-inch (643.3280) | LF | 236 | $3.00 | $3.00 | $3.00 | $3.00 |
| 109 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 280 | $1.20 | $1.20 | $1.20 | $2.00 |
| 110 | Temporary marking arrow removable tape (643.3550) | EACH | 3 | $59.99 | $59.99 | $59.99 | $100.00 |
| 111 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 397 | $2.00 | $2.00 | $2.00 | $2.10 |
| 112 | Traffic control (643.5000) | EACH | 1 | $6,200.00 | $6,200.00 | $6,200.00 | $34,700 |
| 113 | Temporary pedestrian surface asphalt (644.1410) | SF | 462 | $9.22 | $17.41 | $10.00 | $10.50 |
| 114 | Temporary pedestrian curb ramp (644.1601) | DAY | 418 | $12.00 | $12.00 | $1.00 | $12.75 |
| 115 | Temporary pedestrian detectable warning field (644.1605) | SF | 90 | $12.00 | $12.00 | $100.00 | $10.50 |
| 116 | Temporary pedestrian barricade (644.1810) | LF | 4,076 | $4.99 | $4.99 | $4.99 | $4.20 |
| 117 | Geotextile type DF schedule A (645.0111) | SY | 535 | $1.21 | $2.65 | $10.00 | $2.90 |
| 118 | Marking line grooved wet ref epoxy 4-inch (646.1040) | LF | 3,211 | $1.30 | $1.30 | $1.30 | $2.70 |
| 119 | Marking line grooved wet ref epoxy 8-inch (646.3040) | LF | 963 | $2.80 | $2.80 | $2.80 | $3.70 |
| 120 | Marking curb epoxy (646.8120) | LF | 224 | $8.00 | $8.00 | $8.00 | $10.50 |
| 121 | Marking island nose epoxy (646.8220) | EACH | 6 | $270.00 | $270.00 | $270.00 | $370.00 |
| 122 | Marking removal special marking water blasting (646.9310) | EACH | 2 | $170.00 | $170.00 | $100.00 | $600.00 |
| 123 | Construction staking storm sewer (650.4000) | EACH | 45 | $200.00 | $200.00 | $200.00 | $210.00 |
| 124 | Construction staking subgrade (650.4500) | LF | 1,884 | $0.01 | $0.01 | $0.01 | $0.01 |
| 125 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,468 | $3.00 | $3.00 | $3.00 | $3.20 |
| 126 | Construction staking concrete pavement (650.7000) | LF | 1,135 | $10.00 | $10.00 | $10.00 | $10.50 |
| 127 | Construction staking electrical installations (project) 001. 5350-02- 72 (650.8501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,200.00 |
| 128 | Construction staking curb ramps (650.9000) | EACH | 34 | $200.00 | $200.00 | $200.00 | $210.00 |
| 129 | Construction staking sidewalk (project) 001. 5350-02-72 (650.9500) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,200.00 |
| 130 | Construction staking supplemental control (project) 001. 5350-02-72 (650.9911) | EACH | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,300.00 |
| 131 | Construction staking slope stakes (650.9920) | LF | 1,884 | $1.00 | $1.00 | $1.00 | $1.10 |
| 132 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,072 | $9.00 | $9.00 | $9.00 | $9.50 |
| 133 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 2,046 | $10.00 | $10.00 | $10.00 | $10.50 |
| 134 | Conduit special 2-inch (652.0605) | LF | 160 | $25.00 | $25.00 | $25.00 | $26.50 |
| 135 | Conduit special 3-inch (652.0615) | LF | 166 | $30.00 | $30.00 | $30.00 | $31.75 |
| 136 | Conduit loop detector (652.0800) | LF | 1,616 | $7.00 | $7.00 | $7.00 | $7.40 |
| 137 | Pull boxes steel 24X36-inch (653.0135) | EACH | 5 | $900.00 | $900.00 | $900.00 | $950.00 |
| 138 | Pull boxes steel 24X42-inch (653.0140) | EACH | 21 | $925.00 | $925.00 | $925.00 | $980.00 |
| 139 | Removing pull boxes (653.0905) | EACH | 2 | $213.37 | $150.00 | $150.00 | $160.00 |
| 140 | Concrete bases type 1 (654.0101) | EACH | 15 | $950.00 | $950.00 | $950.00 | $1,000.00 |
| 141 | Concrete bases type 2 (654.0102) | EACH | 2 | $1,100.00 | $1,100.00 | $1,100.00 | $1,165.00 |
| 142 | Concrete bases type 5 (654.0105) | EACH | 1 | $1,050.00 | $1,050.00 | $1,050.00 | $1,100.00 |
| 143 | Concrete bases type 10 (654.0110) | EACH | 4 | $7,000.00 | $7,000.00 | $7,000.00 | $7,400.00 |
| 144 | Concrete bases type 10-special (654.0120) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,900.00 |
| 145 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,100.00 |
| 146 | Cable traffic signal 5-14 AWG (655.0230) | LF | 1,269 | $1.25 | $1.25 | $1.25 | $1.30 |
| 147 | Cable traffic signal 7-14 AWG (655.0240) | LF | 2,920 | $1.50 | $1.50 | $1.50 | $1.60 |
| 148 | Cable traffic signal 12-14 AWG (655.0260) | LF | 2,775 | $2.50 | $2.50 | $2.50 | $2.70 |
| 149 | Cable traffic signal 15-14 AWG (655.0270) | LF | 927 | $3.50 | $3.50 | $3.50 | $3.70 |
| 150 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 1,445 | $2.00 | $2.00 | $2.00 | $2.10 |
| 151 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 3,626 | $1.10 | $1.10 | $1.10 | $1.20 |
| 152 | Electrical wire lighting 12 AWG (655.0610) | LF | 234 | $1.00 | $1.00 | $1.00 | $1.10 |
| 153 | Loop detector lead in cable (655.0700) | LF | 5,346 | $1.25 | $1.25 | $1.25 | $1.30 |
| 154 | Loop detector wire (655.0800) | LF | 3,664 | $1.00 | $1.00 | $1.00 | $1.10 |
| 155 | Traffic signal evp detector cable (655.0900) | LF | 1,344 | $1.00 | $1.00 | $1.00 | $1.10 |
| 156 | Electrical service meter breaker pedestal (location) 201. ush 51 & court ST/milwaukee ST (656.0201) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,100.00 |
| 157 | Pedestal bases (657.0100) | EACH | 15 | $230.00 | $230.00 | $230.00 | $240.00 |
| 158 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 3 | $675.00 | $675.00 | $675.00 | $720.00 |
| 159 | Poles type 2 (657.0305) | EACH | 1 | $2,150.00 | $2,150.00 | $2,150.00 | $2,300.00 |
| 160 | Poles type 3 (657.0310) | EACH | 1 | $3,400.00 | $3,400.00 | $3,400.00 | $3,600.00 |
| 161 | Poles type 5-aluminum (657.0322) | EACH | 1 | $1,800.00 | $1,800.00 | $1,800.00 | $1,900.00 |
| 162 | Poles type 9 (657.0345) | EACH | 4 | $7,500.00 | $7,500.00 | $7,500.00 | $7,900.00 |
| 163 | Poles type 9-special (657.0347) | EACH | 1 | $11,000 | $11,000 | $11,000 | $11,700 |
| 164 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 8 | $620.00 | $620.00 | $620.00 | $660.00 |
| 165 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 4 | $675.00 | $675.00 | $675.00 | $720.00 |
| 166 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 3 | $540.00 | $540.00 | $540.00 | $570.00 |
| 167 | Monotube arms 20-FT (657.0520) | EACH | 1 | $3,100.00 | $3,100.00 | $3,100.00 | $3,300.00 |
| 168 | Monotube arms 25-FT (657.0525) | EACH | 2 | $3,300.00 | $3,300.00 | $3,300.00 | $3,500.00 |
| 169 | Monotube arms 30-FT (657.0530) | EACH | 1 | $4,350.00 | $4,350.00 | $4,350.00 | $4,600.00 |
| 170 | Monotube arms 35-FT-special (657.0536) | EACH | 1 | $3,900.00 | $3,900.00 | $3,900.00 | $4,100.00 |
| 171 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 1 | $300.00 | $300.00 | $300.00 | $320.00 |
| 172 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 1 | $300.00 | $300.00 | $300.00 | $320.00 |
| 173 | Traffic signal face 3S 12-inch (658.0173) | EACH | 30 | $800.00 | $800.00 | $800.00 | $850.00 |
| 174 | Pedestrian signal face 16-inch (658.0416) | EACH | 22 | $475.00 | $475.00 | $475.00 | $500.00 |
| 175 | Signal mounting hardware (location) 201. ush 51 & court ST/milwaukee ST (658.5070) | EACH | 1 | $11,000 | $11,000 | $11,000 | $11,700 |
| 176 | Luminaires utility LED C (659.1125) | EACH | 2 | $230.00 | $230.00 | $230.00 | $240.00 |
| 177 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 24 | $200.00 | $200.00 | $200.00 | $210.00 |
| 178 | Sawing asphalt (690.0150) | LF | 764 | $1.49 | $1.20 | $1.49 | $1.30 |
| 179 | Sawing concrete (690.0250) | LF | 2,224 | $2.25 | $2.25 | $2.25 | $2.20 |
| 180 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,710 | $1.00 | $1.00 | $1.00 | $1.00 |
| 181 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 |
| 182 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,800 | $5.00 | $5.00 | $5.00 | $5.00 |
| 183 | Special 101. abandoning sewer below railroad tracks (SPV.0035) | CY | 35 | $287.31 | $85.00 | $85.00 | $280.00 |
| 184 | Special 301. water main discontinued in place-railroad (SPV.0035) | CY | 1 | $6,268.01 | $3,850.00 | $3,850.00 | $1,400.00 |
| 185 | Special 101. utility line opening (ulo) (SPV.0060) | EACH | 50 | $280.00 | $150.00 | $1.00 | $480.00 |
| 186 | Special 102. manhole covers type coj (SPV.0060) | EACH | 19 | $671.23 | $975.00 | $975.00 | $1,400.00 |
| 187 | Special 103. inlet covers type coj (SPV.0060) | EACH | 3 | $1,446.16 | $1,075.00 | $1,075.00 | $1,600.00 |
| 188 | Special 104. inlet covers type coj low points (SPV.0060) | EACH | 18 | $1,446.16 | $1,075.00 | $1,075.00 | $1,500.00 |
| 189 | Special 105. adjusting water valve boxes (SPV.0060) | EACH | 9 | $363.69 | $550.00 | $550.00 | $600.00 |
| 190 | Special 106. marking railroad crossing grooved epoxy (SPV.0060) | EACH | 2 | $2,000.00 | $2,000.00 | $2,000.00 | $2,100.00 |
| 191 | Special 107. marking symbol grooved epoxy (SPV.0060) | EACH | 3 | $490.00 | $490.00 | $490.00 | $480.00 |
| 192 | Special 108. marking arrow grooved epoxy (SPV.0060) | EACH | 25 | $440.00 | $440.00 | $440.00 | $460.00 |
| 193 | Special 109. marking word grooved epoxy (SPV.0060) | EACH | 2 | $490.00 | $490.00 | $490.00 | $580.00 |
| 194 | Special 110. concrete pipe support (SPV.0060) | EACH | 7 | $1,186.44 | $1,800.00 | $1,800.00 | $2,300.00 |
| 195 | Special 201. furnish & install traffic signal cabinet & controller ush 51 & court ST/mil (SPV.0060) | EACH | 1 | $52,000 | $52,000 | $52,000 | $55,100 |
| 196 | Special 202. furnish & install evp system ush 51 & court ST/milwaukee ST (SPV.0060) | EACH | 1 | $7,000.00 | $7,000.00 | $7,000.00 | $7,400.00 |
| 197 | Special 203. furnish & install audible pedestrian push button system ush 51 & court ST/M (SPV.0060) | EACH | 1 | $15,000 | $15,000 | $15,000 | $15,900 |
| 198 | Special 204. remove & reinstall RR preempt cable & RPS unit ush 51 & court ST/milwaukee (SPV.0060) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,600.00 |
| 199 | Special 206. traffic signal LED no right turn blank out signs (SPV.0060) | EACH | 6 | $5,000.00 | $5,000.00 | $5,000.00 | $5,300.00 |
| 200 | Special 207. removing, salvaging, & reinstalling lighting cable (SPV.0060) | EACH | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,300.00 |
| 201 | Special 301. discontinue existing vault in place (SPV.0060) | EACH | 4 | $406.42 | $275.00 | $275.00 | $720.00 |
| 202 | Special 302. hydrant and hydrant valve removal (SPV.0060) | EACH | 4 | $962.64 | $1,250.00 | $1,250.00 | $1,600.00 |
| 203 | Special 303. water main offset (undistributed) (SPV.0060) | EACH | 2 | $8,325.81 | $8,600.00 | $8,600.00 | $9,000.00 |
| 204 | Special 304. 6" gate valve & box (SPV.0060) | EACH | 4 | $2,741.43 | $2,475.00 | $2,475.00 | $4,200.00 |
| 205 | Special 305. 8" gate valve & box (SPV.0060) | EACH | 1 | $3,833.87 | $3,175.00 | $3,175.00 | $5,000.00 |
| 206 | Special 306. 12" gate valve & box (SPV.0060) | EACH | 3 | $5,978.78 | $5,150.00 | $5,150.00 | $8,000.00 |
| 207 | Special 307. hydrant (SPV.0060) | EACH | 4 | $7,902.59 | $7,050.00 | $7,050.00 | $6,700.00 |
| 208 | Special 308. 3/4" curb stop and box (SPV.0060) | EACH | 2 | $3,445.27 | $250.00 | $250.00 | $3,500.00 |
| 209 | Special 309. water service exploration (SPV.0060) | EACH | 8 | $609.63 | $350.00 | $350.00 | $550.00 |
| 210 | Special 310. construction staking water main (SPV.0060) | EACH | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,300.00 |
| 211 | Special 311. discontinue existing curb stop/water service in place (SPV.0060) | EACH | 2 | $728.97 | $375.00 | $375.00 | $830.00 |
| 212 | Special 101. concrete curb & gutter 18-inch type K (SPV.0090) | LF | 791 | $22.86 | $36.44 | $50.00 | $28.00 |
| 213 | Special 102. concrete curb & gutter 18-inch type L (SPV.0090) | LF | 105 | $22.15 | $41.05 | $60.00 | $28.00 |
| 214 | Special 103. tree root sawing (SPV.0090) | LF | 110 | $8.02 | $10.00 | $30.00 | $10.50 |
| 215 | Special 104. boring and jacking storm sewer pipe smooth steel 42- inch (SPV.0090) | LF | 146 | $1,346.04 | $1,585.00 | $1,585.00 | $1,400.00 |
| 216 | Special 105. marking crosswalk grooved epoxy transverse line 6- inch (SPV.0090) | LF | 884 | $14.00 | $14.00 | $14.00 | $22.25 |
| 217 | Special 106. marking crosswalk grooved epoxy block style 12-inch (SPV.0090) | LF | 570 | $19.00 | $19.00 | $19.00 | $26.50 |
| 218 | Special 107. marking stop line grooved epoxy 18-inch (SPV.0090) | LF | 228 | $25.00 | $25.00 | $25.00 | $31.75 |
| 219 | Special 108. marking diagonal grooved epoxy 12-inch (SPV.0090) | LF | 34 | $19.00 | $19.00 | $19.00 | $26.50 |
| 220 | Special 201. boring and jacking casing pipe smooth steel 6-inch (SPV.0090) | LF | 138 | $575.81 | $860.00 | $860.00 | $490.00 |
| 221 | Special 301. 12" dia. water main (horizontal auger boring) (SPV.0090) | LF | 154 | $856.02 | $905.00 | $905.00 | $750.00 |
| 222 | Special 302. 6" dia. water main (granular backfill) (SPV.0090) | LF | 93 | $163.97 | $140.00 | $140.00 | $200.00 |
| 223 | Special 303. 8" dia. water main (granular backfill) (SPV.0090) | LF | 650 | $202.58 | $155.00 | $155.00 | $230.00 |
| 224 | Special 304. 12" dia. water main (granular backfill) (SPV.0090) | LF | 425 | $307.81 | $185.00 | $185.00 | $260.00 |
| 225 | Special 305. 3/4" water service (SPV.0090) | LF | 44 | $104.54 | $72.00 | $72.00 | $26.50 |
| 226 | Special 101. management of solid waste (SPV.0195) | TON | 1,562 | $45.37 | $64.23 | $76.00 | $76.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.