WisDOT contract 20250211013 bid tabulation
2110-03-71. Let by Wisconsin DOT on February 11, 2025, Milwaukee. 2 bids received; low bid $4,163,346 by Lalonde Contractors Incorporated.
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 217
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lalonde Contractors Incorporated | $4,163,346 | Low |
| 2 | Zignego Company, Inc. | $4,297,854 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lalonde Contractors Incorporated | 2. Zignego Company, Inc. |
|---|---|---|---|---|---|
| 1 | Grubbing (201.0220) | ID | 46 | $54.25 | $19.80 |
| 2 | Removing concrete pavement (204.0100) | SY | 14,769 | $22.05 | $6.08 |
| 3 | Removing asphaltic surface milling (204.0120) | SY | 839 | $11.00 | $11.00 |
| 4 | Removing curb (204.0130) | LF | 14 | $5.66 | $20.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 80 | $5.65 | $20.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 1,558 | $8.38 | $8.00 |
| 7 | Removing masonry (204.0185) | CY | 0.60 | $1,126.33 | $1,000.00 |
| 8 | Removing concrete bases (204.0195) | EACH | 20 | $316.67 | $500.00 |
| 9 | Removing manholes (204.0210) | EACH | 13 | $575.00 | $575.00 |
| 10 | Removing catch basins (204.0215) | EACH | 12 | $575.00 | $575.00 |
| 11 | Removing storm sewer (size) 01. 10-inch (204.0245) | LF | 140 | $5.00 | $5.00 |
| 12 | Removing storm sewer (size) 02. 12-inch (204.0245) | LF | 1,396 | $5.00 | $5.00 |
| 13 | Removing storm sewer (size) 03. 15-inch (204.0245) | LF | 82 | $5.00 | $5.00 |
| 14 | Removing (item description) 01. traffic signals - W lincoln ave & W national ave (204.9060.S) | EACH | 1 | $13,613 | $13,613 |
| 15 | Removing (item description) 02. lighting units (204.9060.S) | EACH | 15 | $544.50 | $544.50 |
| 16 | Removing (item description) 03. monotube bases (204.9060.S) | EACH | 4 | $904.00 | $2,089.40 |
| 17 | Removing (item description) 01. concrete steps (204.9165.S) | SF | 62 | $4.27 | $20.00 |
| 18 | Excavation common (205.0100) | CY | 11,874 | $0.01 | $19.14 |
| 19 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 1,275 | $53.42 | $55.34 |
| 20 | Finishing roadway (project) 01. 2110-03-71 (213.0100) | EACH | 1 | $3,208.00 | $1,000.00 |
| 21 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 5,874 | $0.01 | $22.57 |
| 22 | Base aggregate open-graded (310.0110) | TON | 15 | $50.00 | $50.00 |
| 23 | Breaker run (311.0110) | TON | 9,070 | $0.01 | $21.07 |
| 24 | Concrete base 8-inch (320.0145) | SY | 155 | $65.22 | $60.00 |
| 25 | Concrete pavement 8-inch (415.0080) | SY | 11,764 | $63.18 | $60.00 |
| 26 | Concrete pavement joint filling (415.4100) | SY | 13,798 | $1.56 | $1.30 |
| 27 | Drilled tie bars (416.0610) | EACH | 366 | $12.28 | $20.00 |
| 28 | Drilled dowel bars (416.0620) | EACH | 240 | $16.05 | $20.00 |
| 29 | Tack coat (455.0605) | GAL | 51 | $11.00 | $11.00 |
| 30 | Incentive density HMA pavement (460.2000) | DOL | 70 | $1.00 | $1.00 |
| 31 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 99 | $211.00 | $211.00 |
| 32 | Asphaltic surface driveways and field entrances (465.0120) | TON | 26 | $211.00 | $211.00 |
| 33 | Asphaltic surface temporary (465.0125) | TON | 67 | $151.00 | $151.00 |
| 34 | Concrete collars for pipe (520.8000) | EACH | 1 | $1,500.00 | $1,500.00 |
| 35 | Concrete curb type A (601.0105) | LF | 10 | $48.28 | $45.00 |
| 36 | Concrete curb type D (601.0110) | LF | 8 | $47.78 | $45.00 |
| 37 | Concrete curb & gutter 19-inch (601.0319) | LF | 1,569 | $26.54 | $23.00 |
| 38 | Concrete curb & gutter 31-inch (601.0331) | LF | 1,513 | $33.19 | $24.00 |
| 39 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 10 | $48.47 | $23.00 |
| 40 | Concrete curb pedestrian (601.0600) | LF | 202 | $49.22 | $35.00 |
| 41 | Concrete sidewalk 5-inch (602.0410) | SF | 18,449 | $7.40 | $7.00 |
| 42 | Curb ramp detectable warning field yellow (602.0505) | SF | 249 | $43.94 | $40.00 |
| 43 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 53 | $56.76 | $45.00 |
| 44 | Concrete driveway 7-inch (602.0815) | SY | 439 | $73.67 | $67.00 |
| 45 | Concrete driveway hes 7-inch (602.0865) | SY | 241 | $76.69 | $75.00 |
| 46 | Concrete steps (602.1500) | SF | 62 | $84.43 | $88.00 |
| 47 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 77 | $145.00 | $145.00 |
| 48 | Storm sewer pipe reinforced concrete class V 12-inch (608.0512) | LF | 943 | $125.00 | $125.00 |
| 49 | Storm sewer pipe reinforced concrete class V 15-inch (608.0515) | LF | 363 | $127.00 | $127.00 |
| 50 | Manhole covers type J (611.0530) | EACH | 5 | $550.00 | $550.00 |
| 51 | Inlet covers type R (611.0648) | EACH | 16 | $1,200.00 | $1,200.00 |
| 52 | Manholes 5-FT diameter (611.2005) | EACH | 7 | $4,000.00 | $4,000.00 |
| 53 | Adjusting catch basin covers (611.8105) | EACH | 1 | $1,600.00 | $1,600.00 |
| 54 | Adjusting manhole covers (611.8110) | EACH | 6 | $1,600.00 | $1,600.00 |
| 55 | Cover plates temporary (611.8120.S) | EACH | 20 | $400.00 | $250.00 |
| 56 | Pipe underdrain 4-inch (612.0104) | LF | 160 | $38.00 | $38.00 |
| 57 | Maintenance and repair of haul roads (project) 01. 2110-03-71 (618.0100) | EACH | 1 | $1.00 | $1.00 |
| 58 | Mobilization (619.1000) | EACH | 1 | $279,065 | $105,000 |
| 59 | Concrete median sloped nose (620.0300) | SF | 510 | $16.30 | $16.00 |
| 60 | Water (624.0100) | MGAL | 58 | $0.01 | $50.00 |
| 61 | Topsoil (625.0100) | SY | 1,724 | $4.95 | $4.60 |
| 62 | Mulching (627.0200) | SY | 100 | $0.55 | $0.01 |
| 63 | Erosion bales (628.1104) | EACH | 25 | $12.00 | $0.01 |
| 64 | Silt fence (628.1504) | LF | 100 | $2.05 | $0.01 |
| 65 | Silt fence maintenance (628.1520) | LF | 100 | $0.01 | $0.01 |
| 66 | Mobilizations erosion control (628.1905) | EACH | 2 | $100.00 | $50.00 |
| 67 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $100.00 | $1.00 |
| 68 | Inlet protection type A (628.7005) | EACH | 18 | $95.00 | $50.00 |
| 69 | Inlet protection type B (628.7010) | EACH | 3 | $50.00 | $50.00 |
| 70 | Inlet protection type C (628.7015) | EACH | 27 | $55.00 | $71.00 |
| 71 | Tracking pads (628.7560) | EACH | 4 | $1.00 | $1.00 |
| 72 | Fertilizer type B (629.0210) | CWT | 1.40 | $85.00 | $80.00 |
| 73 | Seeding temporary (630.0200) | LB | 5 | $5.00 | $0.01 |
| 74 | Seed water (630.0500) | MGAL | 5 | $50.00 | $0.01 |
| 75 | Sod water (631.0300) | MGAL | 20 | $50.00 | $35.00 |
| 76 | Sod lawn (631.1000) | SY | 1,767 | $6.95 | $6.50 |
| 77 | Signs type II reflective H (637.2210) | SF | 227.71 | $21.00 | $22.10 |
| 78 | Signs type II reflective F (637.2230) | SF | 4 | $23.00 | $23.10 |
| 79 | Moving signs type II (638.2102) | EACH | 19 | $105.00 | $70.00 |
| 80 | Removing signs type II (638.2602) | EACH | 51 | $28.00 | $13.00 |
| 81 | Removing small sign supports (638.3000) | EACH | 22 | $28.00 | $13.00 |
| 82 | Field office type C (642.5201) | EACH | 1 | $18,768 | $20,000 |
| 83 | Traffic control drums (643.0300) | DAY | 30,292 | $0.14 | $0.14 |
| 84 | Traffic control barricades type III (643.0420) | DAY | 10,261 | $0.35 | $0.35 |
| 85 | Traffic control flexible tubular marker posts (643.0500) | EACH | 17 | $14.31 | $14.31 |
| 86 | Traffic control flexible tubular marker bases (643.0600) | EACH | 17 | $3.08 | $3.08 |
| 87 | Traffic control warning lights type A (643.0705) | DAY | 20,522 | $0.09 | $0.09 |
| 88 | Traffic control warning lights type C (643.0715) | DAY | 5,216 | $0.11 | $0.11 |
| 89 | Traffic control arrow boards (643.0800) | DAY | 307 | $7.00 | $7.00 |
| 90 | Traffic control signs (643.0900) | DAY | 45,307 | $0.20 | $0.20 |
| 91 | Traffic control covering signs type II (643.0920) | EACH | 12 | $50.00 | $50.00 |
| 92 | Traffic control signs fixed message (643.1000) | SF | 227.25 | $10.50 | $10.50 |
| 93 | Traffic control signs PCMS (643.1050) | DAY | 28 | $20.00 | $20.00 |
| 94 | Temporary marking line paint 4- inch (643.3105) | LF | 1,622 | $1.50 | $1.50 |
| 95 | Temporary marking line removable tape 4-inch (643.3150) | LF | 2,845 | $1.74 | $1.74 |
| 96 | Temporary marking line paint 8- inch (643.3205) | LF | 168 | $2.00 | $2.00 |
| 97 | Temporary marking line removable tape 8-inch (643.3250) | LF | 310 | $5.83 | $5.83 |
| 98 | Temporary marking stop line paint 18-inch (643.3805) | LF | 15 | $11.00 | $11.00 |
| 99 | Traffic control (643.5000) | EACH | 1 | $3,000.00 | $3,000.00 |
| 100 | Temporary pedestrian surface plate (644.1430) | SF | 1,026 | $1.50 | $5.00 |
| 101 | Temporary pedestrian curb ramp (644.1601) | DAY | 1,048 | $3.46 | $0.01 |
| 102 | Temporary pedestrian detectable warning field (644.1605) | SF | 216 | $17.00 | $50.00 |
| 103 | Temporary pedestrian barricade (644.1810) | LF | 8,237 | $2.75 | $2.75 |
| 104 | Geotextile type DF schedule A (645.0111) | SY | 89 | $15.00 | $5.00 |
| 105 | Geotextile type HR (645.0120) | SY | 50 | $5.33 | $10.00 |
| 106 | Geogrid type SR (645.0220) | SY | 15,116 | $1.74 | $2.00 |
| 107 | Marking line grooved wet ref epoxy 4-inch (646.1040) | LF | 5,275 | $1.30 | $2.75 |
| 108 | Marking line grooved wet ref epoxy 8-inch (646.3040) | LF | 1,026 | $2.30 | $4.75 |
| 109 | Marking arrow epoxy (646.5020) | EACH | 31 | $220.00 | $275.00 |
| 110 | Marking word epoxy (646.5120) | EACH | 1 | $240.00 | $375.00 |
| 111 | Marking symbol epoxy (646.5220) | EACH | 22 | $230.00 | $175.00 |
| 112 | Marking stop line epoxy 18-inch (646.6120) | LF | 245 | $12.00 | $16.00 |
| 113 | Marking diagonal epoxy 12-inch (646.7120) | LF | 61 | $9.00 | $16.00 |
| 114 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,603 | $10.00 | $15.00 |
| 115 | Marking curb epoxy (646.8120) | LF | 70 | $8.00 | $15.00 |
| 116 | Marking island nose epoxy (646.8220) | EACH | 14 | $270.00 | $295.00 |
| 117 | Marking removal line 4-inch (646.9000) | LF | 495 | $3.00 | $3.00 |
| 118 | Marking removal line 6-inch (646.9002) | LF | 120 | $5.00 | $5.00 |
| 119 | Marking removal line 8-inch (646.9100) | LF | 92 | $10.00 | $10.00 |
| 120 | Construction staking storm sewer (650.4000) | EACH | 24 | $110.00 | $110.00 |
| 121 | Construction staking subgrade (650.4500) | LF | 3,724 | $0.01 | $0.01 |
| 122 | Construction staking concrete pavement (650.7000) | LF | 3,724 | $1.85 | $1.85 |
| 123 | Construction staking electrical installations (project) 01. 2110-03- 71 (650.8501) | EACH | 1 | $1,300.00 | $1,300.00 |
| 124 | Construction staking curb ramps (650.9000) | EACH | 19 | $130.00 | $130.00 |
| 125 | Construction staking sidewalk (project) 01. 2110-03-71 (650.9500) | EACH | 1 | $2,200.00 | $2,200.00 |
| 126 | Construction staking supplemental control (project) 01. 2110-03-71 (650.9911) | EACH | 1 | $800.00 | $800.00 |
| 127 | Construction staking slope stakes (650.9920) | LF | 3,724 | $0.70 | $0.70 |
| 128 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 2,478 | $8.68 | $8.68 |
| 129 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,732 | $12.13 | $12.13 |
| 130 | Conduit special 2-inch (652.0605) | LF | 160 | $28.25 | $28.25 |
| 131 | Pull boxes steel 24X36-inch (653.0135) | EACH | 8 | $1,227.40 | $1,227.40 |
| 132 | Pull boxes steel 24X42-inch (653.0140) | EACH | 11 | $1,313.40 | $1,313.40 |
| 133 | Removing pull boxes (653.0905) | EACH | 9 | $132.50 | $132.50 |
| 134 | Concrete bases type 1 (654.0101) | EACH | 6 | $992.00 | $992.00 |
| 135 | Concrete bases type 2 (654.0102) | EACH | 2 | $1,398.50 | $1,398.50 |
| 136 | Concrete bases type 5 (654.0105) | EACH | 14 | $1,191.00 | $1,191.00 |
| 137 | Concrete bases type 10 (654.0110) | EACH | 1 | $6,278.00 | $6,278.00 |
| 138 | Concrete bases type 13 (654.0113) | EACH | 1 | $11,022 | $11,022 |
| 139 | Concrete bases type 10-special (654.0120) | EACH | 2 | $8,728.00 | $8,728.00 |
| 140 | Cable traffic signal 5-14 AWG (655.0230) | LF | 573 | $1.76 | $1.76 |
| 141 | Cable traffic signal 7-14 AWG (655.0240) | LF | 879 | $2.22 | $2.22 |
| 142 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,194 | $3.31 | $3.31 |
| 143 | Cable traffic signal 15-14 AWG (655.0270) | LF | 1,271 | $4.12 | $4.12 |
| 144 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 1,322 | $2.44 | $2.44 |
| 145 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 2,351 | $1.39 | $1.39 |
| 146 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,292 | $0.86 | $0.86 |
| 147 | Electrical wire lighting 6 AWG (655.0625) | LF | 7,272 | $1.84 | $1.84 |
| 148 | Traffic signal evp detector cable (655.0900) | LF | 1,439 | $1.63 | $1.63 |
| 149 | Pedestal bases (657.0100) | EACH | 6 | $253.00 | $253.00 |
| 150 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 15 | $591.00 | $591.00 |
| 151 | Poles type 3 (657.0310) | EACH | 2 | $3,341.00 | $3,341.00 |
| 152 | Poles type 5-aluminum (657.0322) | EACH | 13 | $2,206.00 | $2,206.00 |
| 153 | Poles type 10 (657.0350) | EACH | 1 | $8,151.50 | $8,151.50 |
| 154 | Poles type 10-special (657.0352) | EACH | 1 | $10,862 | $10,862 |
| 155 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 2 | $220.00 | $220.00 |
| 156 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 2 | $569.50 | $569.50 |
| 157 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 2 | $483.50 | $483.50 |
| 158 | Monotube arms 30-FT (657.0530) | EACH | 1 | $5,917.00 | $5,917.00 |
| 159 | Monotube arms 45-FT-special (657.0546) | EACH | 1 | $6,010.50 | $6,010.50 |
| 160 | Luminaire arms single member 4- inch clamp 8-FT (657.0614) | EACH | 2 | $297.80 | $297.80 |
| 161 | Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615) | EACH | 15 | $280.10 | $280.10 |
| 162 | Luminaire arms steel 10-FT (657.0810) | EACH | 1 | $1,020.00 | $1,020.00 |
| 163 | Luminaire arms steel 15-FT (657.0815) | EACH | 1 | $1,155.00 | $1,155.00 |
| 164 | Traffic signal face 3S 12-inch (658.0173) | EACH | 12 | $822.00 | $822.00 |
| 165 | Traffic signal face 4S 12-inch (658.0174) | EACH | 6 | $1,110.00 | $1,110.00 |
| 166 | Pedestrian signal face 16-inch (658.0416) | EACH | 8 | $660.00 | $660.00 |
| 167 | Signal mounting hardware (location) 01. W lincoln ave & W national ave (658.5070) | EACH | 1 | $7,545.00 | $7,545.00 |
| 168 | Luminaires utility LED C (659.1125) | EACH | 21 | $288.50 | $288.50 |
| 169 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 45 | $5.00 | $5.00 |
| 170 | Sawing asphalt (690.0150) | LF | 625 | $1.15 | $1.69 |
| 171 | Sawing concrete (690.0250) | LF | 1,507 | $2.25 | $2.50 |
| 172 | Incentive compressive strength concrete pavement (715.0720) | DOL | 3,529 | $1.00 | $1.00 |
| 173 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 |
| 174 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 4,200 | $5.00 | $5.00 |
| 175 | Special 01. catch basin special (SPV.0060) | EACH | 14 | $2,200.00 | $2,200.00 |
| 176 | Special 02. storm sewer reconnect (SPV.0060) | EACH | 13 | $750.00 | $750.00 |
| 177 | Special 03. round steel sign post system (SPV.0060) | EACH | 36 | $215.00 | $320.00 |
| 178 | Special 06. water service reconnect, 6-inch (SPV.0060) | EACH | 1 | $15,000 | $15,000 |
| 179 | Special 07. water service reconnect, 8-inch (SPV.0060) | EACH | 1 | $17,000 | $17,000 |
| 180 | Special 08. hydrant (SPV.0060) | EACH | 7 | $12,000 | $12,000 |
| 181 | Special 09. water main valve, 8- inch (SPV.0060) | EACH | 4 | $3,200.00 | $3,200.00 |
| 182 | Special 10. water main valve, 12- inch (SPV.0060) | EACH | 3 | $4,700.00 | $4,700.00 |
| 183 | Special 11. water main connection, 8-inch (SPV.0060) | EACH | 3 | $5,400.00 | $5,400.00 |
| 184 | Special 12. water main connection, 8-inch straight (SPV.0060) | EACH | 1 | $4,300.00 | $4,300.00 |
| 185 | Special 13. water main connection, 12-inch (SPV.0060) | EACH | 2 | $7,100.00 | $7,100.00 |
| 186 | Special 14. water main connection, 12-inch straight (SPV.0060) | EACH | 1 | $4,700.00 | $4,700.00 |
| 187 | Special 15. water main connection, 97TH (SPV.0060) | EACH | 1 | $5,400.00 | $5,400.00 |
| 188 | Special 16. air release assembly, 1.5-inch (SPV.0060) | EACH | 1 | $4,500.00 | $4,500.00 |
| 189 | Special 17. adjust water valve box (SPV.0060) | EACH | 17 | $450.00 | $450.00 |
| 190 | Special 18. sanitary manhole abandonment (SPV.0060) | EACH | 2 | $1,000.00 | $1,000.00 |
| 191 | Special 19. internal sanitary manhole seal (SPV.0060) | EACH | 10 | $400.00 | $400.00 |
| 192 | Special 20. sanitary manhole frame with solid gasketed lid (SPV.0060) | EACH | 10 | $750.00 | $750.00 |
| 193 | Special 21. adjust sanitary manhole frame (SPV.0060) | EACH | 10 | $1,300.00 | $1,300.00 |
| 194 | Special 22. APS push button system, 10 buttons, W lincoln ave & W national ave (SPV.0060) | EACH | 1 | $12,110 | $12,111 |
| 195 | Special 23. salvage and reinstall evp system, W lincoln ave & W national ave (SPV.0060) | EACH | 1 | $3,687.00 | $3,687.00 |
| 196 | Special 24. vehicle video detection system, W lincoln ave & W national ave (4 camera) (SPV.0060) | EACH | 1 | $29,655 | $29,655 |
| 197 | Special 25. reinstalling monotube assembly (SPV.0060) | EACH | 2 | $3,072.50 | $3,072.50 |
| 198 | Special 26. communications vault adjustment (SPV.0060) | EACH | 1 | $11,818 | $11,818 |
| 199 | Special 27. utility line opening (ulo) (SPV.0060) | EACH | 10 | $1,324.00 | $1.00 |
| 200 | Special 28. plug & air vent assembly (SPV.0060) | EACH | 1 | $7,000.00 | $7,745.00 |
| 201 | Special 29. existing traffic signal cabinet with new controller and mmu (SPV.0060) | EACH | 1 | $13,023 | $13,023 |
| 202 | Special 30. salvage wheel stops (SPV.0060) | EACH | 2 | $250.00 | $45.00 |
| 203 | Special 01. water main relay, 8- inch (SPV.0090) | LF | 485 | $170.00 | $170.00 |
| 204 | Special 02. water main relay, 12- inch (SPV.0090) | LF | 1,551 | $195.00 | $195.00 |
| 205 | Special 03. water service, 1-inch (SPV.0090) | LF | 780 | $118.00 | $118.00 |
| 206 | Special 04. water service, 1.5-inch (SPV.0090) | LF | 67 | $170.00 | $170.00 |
| 207 | Special 05. water service, 2-inch (SPV.0090) | LF | 23 | $180.00 | $180.00 |
| 208 | Special 06. sanitary sewer relay, SDR 35 PVC SP, 8-inch (SPV.0090) | LF | 1,150 | $200.00 | $200.00 |
| 209 | Special 07. building sanitary sewer, 6-inch (SPV.0090) | LF | 762 | $195.00 | $195.00 |
| 210 | Special 08. 6-inch PVC storm sewer lateral (SPV.0090) | LF | 336 | $110.00 | $110.00 |
| 211 | Special 09. 8-inch PVC storm sewer lateral (SPV.0090) | LF | 44 | $115.00 | $115.00 |
| 212 | Special 10. concrete curb and gutter 67-inch (SPV.0090) | LF | 1,995 | $38.72 | $54.00 |
| 213 | Special 11. concrete curb special (SPV.0090) | LF | 20 | $58.24 | $50.00 |
| 214 | Special 01. high friction green surfacing (SPV.0165) | SF | 4,902 | $12.95 | $15.00 |
| 215 | Special 01. shredded hardwood bark mulch (SPV.0180) | SY | 15 | $10.85 | $5.00 |
| 216 | Special 02. remove and replace decorative stone mulch (SPV.0180) | SY | 68 | $28.00 | $5.00 |
| 217 | Special 01. sanitary manhole, 48- inch diameter (SPV.0200) | VF | 121 | $350.00 | $350.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.