WisDOT contract 20250211013 bid tabulation

2110-03-71. Let by Wisconsin DOT on February 11, 2025, Milwaukee. 2 bids received; low bid $4,163,346 by Lalonde Contractors Incorporated.

Owner
Wisconsin DOT
Letting
11 FEB 2025
Pay items
217
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lalonde Contractors Incorporated$4,163,346Low
2Zignego Company, Inc.$4,297,854+3.0%
WisDOT contract 20250211013: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lalonde Contractors Incorporated2. Zignego Company, Inc.
1Grubbing (201.0220)ID46$54.25$19.80
2Removing concrete pavement (204.0100)SY14,769$22.05$6.08
3Removing asphaltic surface milling (204.0120)SY839$11.00$11.00
4Removing curb (204.0130)LF14$5.66$20.00
5Removing curb & gutter (204.0150)LF80$5.65$20.00
6Removing concrete sidewalk (204.0155)SY1,558$8.38$8.00
7Removing masonry (204.0185)CY0.60$1,126.33$1,000.00
8Removing concrete bases (204.0195)EACH20$316.67$500.00
9Removing manholes (204.0210)EACH13$575.00$575.00
10Removing catch basins (204.0215)EACH12$575.00$575.00
11Removing storm sewer (size) 01. 10-inch (204.0245)LF140$5.00$5.00
12Removing storm sewer (size) 02. 12-inch (204.0245)LF1,396$5.00$5.00
13Removing storm sewer (size) 03. 15-inch (204.0245)LF82$5.00$5.00
14Removing (item description) 01. traffic signals - W lincoln ave & W national ave (204.9060.S)EACH1$13,613$13,613
15Removing (item description) 02. lighting units (204.9060.S)EACH15$544.50$544.50
16Removing (item description) 03. monotube bases (204.9060.S)EACH4$904.00$2,089.40
17Removing (item description) 01. concrete steps (204.9165.S)SF62$4.27$20.00
18Excavation common (205.0100)CY11,874$0.01$19.14
19Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S)TON1,275$53.42$55.34
20Finishing roadway (project) 01. 2110-03-71 (213.0100)EACH1$3,208.00$1,000.00
21Base aggregate dense 1 1/4-inch (305.0120)TON5,874$0.01$22.57
22Base aggregate open-graded (310.0110)TON15$50.00$50.00
23Breaker run (311.0110)TON9,070$0.01$21.07
24Concrete base 8-inch (320.0145)SY155$65.22$60.00
25Concrete pavement 8-inch (415.0080)SY11,764$63.18$60.00
26Concrete pavement joint filling (415.4100)SY13,798$1.56$1.30
27Drilled tie bars (416.0610)EACH366$12.28$20.00
28Drilled dowel bars (416.0620)EACH240$16.05$20.00
29Tack coat (455.0605)GAL51$11.00$11.00
30Incentive density HMA pavement (460.2000)DOL70$1.00$1.00
31HMA pavement 4 MT 58-28 S (460.6224)TON99$211.00$211.00
32Asphaltic surface driveways and field entrances (465.0120)TON26$211.00$211.00
33Asphaltic surface temporary (465.0125)TON67$151.00$151.00
34Concrete collars for pipe (520.8000)EACH1$1,500.00$1,500.00
35Concrete curb type A (601.0105)LF10$48.28$45.00
36Concrete curb type D (601.0110)LF8$47.78$45.00
37Concrete curb & gutter 19-inch (601.0319)LF1,569$26.54$23.00
38Concrete curb & gutter 31-inch (601.0331)LF1,513$33.19$24.00
39Concrete curb & gutter 18-inch type D (601.0407)LF10$48.47$23.00
40Concrete curb pedestrian (601.0600)LF202$49.22$35.00
41Concrete sidewalk 5-inch (602.0410)SF18,449$7.40$7.00
42Curb ramp detectable warning field yellow (602.0505)SF249$43.94$40.00
43Curb ramp detectable warning field radial yellow (602.0605)SF53$56.76$45.00
44Concrete driveway 7-inch (602.0815)SY439$73.67$67.00
45Concrete driveway hes 7-inch (602.0865)SY241$76.69$75.00
46Concrete steps (602.1500)SF62$84.43$88.00
47Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF77$145.00$145.00
48Storm sewer pipe reinforced concrete class V 12-inch (608.0512)LF943$125.00$125.00
49Storm sewer pipe reinforced concrete class V 15-inch (608.0515)LF363$127.00$127.00
50Manhole covers type J (611.0530)EACH5$550.00$550.00
51Inlet covers type R (611.0648)EACH16$1,200.00$1,200.00
52Manholes 5-FT diameter (611.2005)EACH7$4,000.00$4,000.00
53Adjusting catch basin covers (611.8105)EACH1$1,600.00$1,600.00
54Adjusting manhole covers (611.8110)EACH6$1,600.00$1,600.00
55Cover plates temporary (611.8120.S)EACH20$400.00$250.00
56Pipe underdrain 4-inch (612.0104)LF160$38.00$38.00
57Maintenance and repair of haul roads (project) 01. 2110-03-71 (618.0100)EACH1$1.00$1.00
58Mobilization (619.1000)EACH1$279,065$105,000
59Concrete median sloped nose (620.0300)SF510$16.30$16.00
60Water (624.0100)MGAL58$0.01$50.00
61Topsoil (625.0100)SY1,724$4.95$4.60
62Mulching (627.0200)SY100$0.55$0.01
63Erosion bales (628.1104)EACH25$12.00$0.01
64Silt fence (628.1504)LF100$2.05$0.01
65Silt fence maintenance (628.1520)LF100$0.01$0.01
66Mobilizations erosion control (628.1905)EACH2$100.00$50.00
67Mobilizations emergency erosion control (628.1910)EACH4$100.00$1.00
68Inlet protection type A (628.7005)EACH18$95.00$50.00
69Inlet protection type B (628.7010)EACH3$50.00$50.00
70Inlet protection type C (628.7015)EACH27$55.00$71.00
71Tracking pads (628.7560)EACH4$1.00$1.00
72Fertilizer type B (629.0210)CWT1.40$85.00$80.00
73Seeding temporary (630.0200)LB5$5.00$0.01
74Seed water (630.0500)MGAL5$50.00$0.01
75Sod water (631.0300)MGAL20$50.00$35.00
76Sod lawn (631.1000)SY1,767$6.95$6.50
77Signs type II reflective H (637.2210)SF227.71$21.00$22.10
78Signs type II reflective F (637.2230)SF4$23.00$23.10
79Moving signs type II (638.2102)EACH19$105.00$70.00
80Removing signs type II (638.2602)EACH51$28.00$13.00
81Removing small sign supports (638.3000)EACH22$28.00$13.00
82Field office type C (642.5201)EACH1$18,768$20,000
83Traffic control drums (643.0300)DAY30,292$0.14$0.14
84Traffic control barricades type III (643.0420)DAY10,261$0.35$0.35
85Traffic control flexible tubular marker posts (643.0500)EACH17$14.31$14.31
86Traffic control flexible tubular marker bases (643.0600)EACH17$3.08$3.08
87Traffic control warning lights type A (643.0705)DAY20,522$0.09$0.09
88Traffic control warning lights type C (643.0715)DAY5,216$0.11$0.11
89Traffic control arrow boards (643.0800)DAY307$7.00$7.00
90Traffic control signs (643.0900)DAY45,307$0.20$0.20
91Traffic control covering signs type II (643.0920)EACH12$50.00$50.00
92Traffic control signs fixed message (643.1000)SF227.25$10.50$10.50
93Traffic control signs PCMS (643.1050)DAY28$20.00$20.00
94Temporary marking line paint 4- inch (643.3105)LF1,622$1.50$1.50
95Temporary marking line removable tape 4-inch (643.3150)LF2,845$1.74$1.74
96Temporary marking line paint 8- inch (643.3205)LF168$2.00$2.00
97Temporary marking line removable tape 8-inch (643.3250)LF310$5.83$5.83
98Temporary marking stop line paint 18-inch (643.3805)LF15$11.00$11.00
99Traffic control (643.5000)EACH1$3,000.00$3,000.00
100Temporary pedestrian surface plate (644.1430)SF1,026$1.50$5.00
101Temporary pedestrian curb ramp (644.1601)DAY1,048$3.46$0.01
102Temporary pedestrian detectable warning field (644.1605)SF216$17.00$50.00
103Temporary pedestrian barricade (644.1810)LF8,237$2.75$2.75
104Geotextile type DF schedule A (645.0111)SY89$15.00$5.00
105Geotextile type HR (645.0120)SY50$5.33$10.00
106Geogrid type SR (645.0220)SY15,116$1.74$2.00
107Marking line grooved wet ref epoxy 4-inch (646.1040)LF5,275$1.30$2.75
108Marking line grooved wet ref epoxy 8-inch (646.3040)LF1,026$2.30$4.75
109Marking arrow epoxy (646.5020)EACH31$220.00$275.00
110Marking word epoxy (646.5120)EACH1$240.00$375.00
111Marking symbol epoxy (646.5220)EACH22$230.00$175.00
112Marking stop line epoxy 18-inch (646.6120)LF245$12.00$16.00
113Marking diagonal epoxy 12-inch (646.7120)LF61$9.00$16.00
114Marking crosswalk epoxy transverse line 6-inch (646.7420)LF1,603$10.00$15.00
115Marking curb epoxy (646.8120)LF70$8.00$15.00
116Marking island nose epoxy (646.8220)EACH14$270.00$295.00
117Marking removal line 4-inch (646.9000)LF495$3.00$3.00
118Marking removal line 6-inch (646.9002)LF120$5.00$5.00
119Marking removal line 8-inch (646.9100)LF92$10.00$10.00
120Construction staking storm sewer (650.4000)EACH24$110.00$110.00
121Construction staking subgrade (650.4500)LF3,724$0.01$0.01
122Construction staking concrete pavement (650.7000)LF3,724$1.85$1.85
123Construction staking electrical installations (project) 01. 2110-03- 71 (650.8501)EACH1$1,300.00$1,300.00
124Construction staking curb ramps (650.9000)EACH19$130.00$130.00
125Construction staking sidewalk (project) 01. 2110-03-71 (650.9500)EACH1$2,200.00$2,200.00
126Construction staking supplemental control (project) 01. 2110-03-71 (650.9911)EACH1$800.00$800.00
127Construction staking slope stakes (650.9920)LF3,724$0.70$0.70
128Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF2,478$8.68$8.68
129Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF1,732$12.13$12.13
130Conduit special 2-inch (652.0605)LF160$28.25$28.25
131Pull boxes steel 24X36-inch (653.0135)EACH8$1,227.40$1,227.40
132Pull boxes steel 24X42-inch (653.0140)EACH11$1,313.40$1,313.40
133Removing pull boxes (653.0905)EACH9$132.50$132.50
134Concrete bases type 1 (654.0101)EACH6$992.00$992.00
135Concrete bases type 2 (654.0102)EACH2$1,398.50$1,398.50
136Concrete bases type 5 (654.0105)EACH14$1,191.00$1,191.00
137Concrete bases type 10 (654.0110)EACH1$6,278.00$6,278.00
138Concrete bases type 13 (654.0113)EACH1$11,022$11,022
139Concrete bases type 10-special (654.0120)EACH2$8,728.00$8,728.00
140Cable traffic signal 5-14 AWG (655.0230)LF573$1.76$1.76
141Cable traffic signal 7-14 AWG (655.0240)LF879$2.22$2.22
142Cable traffic signal 12-14 AWG (655.0260)LF1,194$3.31$3.31
143Cable traffic signal 15-14 AWG (655.0270)LF1,271$4.12$4.12
144Cable type UF 2-10 AWG grounded (655.0320)LF1,322$2.44$2.44
145Electrical wire traffic signals 10 AWG (655.0515)LF2,351$1.39$1.39
146Electrical wire lighting 12 AWG (655.0610)LF2,292$0.86$0.86
147Electrical wire lighting 6 AWG (655.0625)LF7,272$1.84$1.84
148Traffic signal evp detector cable (655.0900)LF1,439$1.63$1.63
149Pedestal bases (657.0100)EACH6$253.00$253.00
150Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH15$591.00$591.00
151Poles type 3 (657.0310)EACH2$3,341.00$3,341.00
152Poles type 5-aluminum (657.0322)EACH13$2,206.00$2,206.00
153Poles type 10 (657.0350)EACH1$8,151.50$8,151.50
154Poles type 10-special (657.0352)EACH1$10,862$10,862
155Traffic signal standards aluminum 3.5-FT (657.0405)EACH2$220.00$220.00
156Traffic signal standards aluminum 15-FT (657.0425)EACH2$569.50$569.50
157Traffic signal standards aluminum 10-FT (657.0430)EACH2$483.50$483.50
158Monotube arms 30-FT (657.0530)EACH1$5,917.00$5,917.00
159Monotube arms 45-FT-special (657.0546)EACH1$6,010.50$6,010.50
160Luminaire arms single member 4- inch clamp 8-FT (657.0614)EACH2$297.80$297.80
161Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615)EACH15$280.10$280.10
162Luminaire arms steel 10-FT (657.0810)EACH1$1,020.00$1,020.00
163Luminaire arms steel 15-FT (657.0815)EACH1$1,155.00$1,155.00
164Traffic signal face 3S 12-inch (658.0173)EACH12$822.00$822.00
165Traffic signal face 4S 12-inch (658.0174)EACH6$1,110.00$1,110.00
166Pedestrian signal face 16-inch (658.0416)EACH8$660.00$660.00
167Signal mounting hardware (location) 01. W lincoln ave & W national ave (658.5070)EACH1$7,545.00$7,545.00
168Luminaires utility LED C (659.1125)EACH21$288.50$288.50
169Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH45$5.00$5.00
170Sawing asphalt (690.0150)LF625$1.15$1.69
171Sawing concrete (690.0250)LF1,507$2.25$2.50
172Incentive compressive strength concrete pavement (715.0720)DOL3,529$1.00$1.00
173On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00$5.00
174On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS4,200$5.00$5.00
175Special 01. catch basin special (SPV.0060)EACH14$2,200.00$2,200.00
176Special 02. storm sewer reconnect (SPV.0060)EACH13$750.00$750.00
177Special 03. round steel sign post system (SPV.0060)EACH36$215.00$320.00
178Special 06. water service reconnect, 6-inch (SPV.0060)EACH1$15,000$15,000
179Special 07. water service reconnect, 8-inch (SPV.0060)EACH1$17,000$17,000
180Special 08. hydrant (SPV.0060)EACH7$12,000$12,000
181Special 09. water main valve, 8- inch (SPV.0060)EACH4$3,200.00$3,200.00
182Special 10. water main valve, 12- inch (SPV.0060)EACH3$4,700.00$4,700.00
183Special 11. water main connection, 8-inch (SPV.0060)EACH3$5,400.00$5,400.00
184Special 12. water main connection, 8-inch straight (SPV.0060)EACH1$4,300.00$4,300.00
185Special 13. water main connection, 12-inch (SPV.0060)EACH2$7,100.00$7,100.00
186Special 14. water main connection, 12-inch straight (SPV.0060)EACH1$4,700.00$4,700.00
187Special 15. water main connection, 97TH (SPV.0060)EACH1$5,400.00$5,400.00
188Special 16. air release assembly, 1.5-inch (SPV.0060)EACH1$4,500.00$4,500.00
189Special 17. adjust water valve box (SPV.0060)EACH17$450.00$450.00
190Special 18. sanitary manhole abandonment (SPV.0060)EACH2$1,000.00$1,000.00
191Special 19. internal sanitary manhole seal (SPV.0060)EACH10$400.00$400.00
192Special 20. sanitary manhole frame with solid gasketed lid (SPV.0060)EACH10$750.00$750.00
193Special 21. adjust sanitary manhole frame (SPV.0060)EACH10$1,300.00$1,300.00
194Special 22. APS push button system, 10 buttons, W lincoln ave & W national ave (SPV.0060)EACH1$12,110$12,111
195Special 23. salvage and reinstall evp system, W lincoln ave & W national ave (SPV.0060)EACH1$3,687.00$3,687.00
196Special 24. vehicle video detection system, W lincoln ave & W national ave (4 camera) (SPV.0060)EACH1$29,655$29,655
197Special 25. reinstalling monotube assembly (SPV.0060)EACH2$3,072.50$3,072.50
198Special 26. communications vault adjustment (SPV.0060)EACH1$11,818$11,818
199Special 27. utility line opening (ulo) (SPV.0060)EACH10$1,324.00$1.00
200Special 28. plug & air vent assembly (SPV.0060)EACH1$7,000.00$7,745.00
201Special 29. existing traffic signal cabinet with new controller and mmu (SPV.0060)EACH1$13,023$13,023
202Special 30. salvage wheel stops (SPV.0060)EACH2$250.00$45.00
203Special 01. water main relay, 8- inch (SPV.0090)LF485$170.00$170.00
204Special 02. water main relay, 12- inch (SPV.0090)LF1,551$195.00$195.00
205Special 03. water service, 1-inch (SPV.0090)LF780$118.00$118.00
206Special 04. water service, 1.5-inch (SPV.0090)LF67$170.00$170.00
207Special 05. water service, 2-inch (SPV.0090)LF23$180.00$180.00
208Special 06. sanitary sewer relay, SDR 35 PVC SP, 8-inch (SPV.0090)LF1,150$200.00$200.00
209Special 07. building sanitary sewer, 6-inch (SPV.0090)LF762$195.00$195.00
210Special 08. 6-inch PVC storm sewer lateral (SPV.0090)LF336$110.00$110.00
211Special 09. 8-inch PVC storm sewer lateral (SPV.0090)LF44$115.00$115.00
212Special 10. concrete curb and gutter 67-inch (SPV.0090)LF1,995$38.72$54.00
213Special 11. concrete curb special (SPV.0090)LF20$58.24$50.00
214Special 01. high friction green surfacing (SPV.0165)SF4,902$12.95$15.00
215Special 01. shredded hardwood bark mulch (SPV.0180)SY15$10.85$5.00
216Special 02. remove and replace decorative stone mulch (SPV.0180)SY68$28.00$5.00
217Special 01. sanitary manhole, 48- inch diameter (SPV.0200)VF121$350.00$350.00
WisDOT contract 20250211013: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy