2773-10-70. Let by Wisconsin DOT on April 8, 2025, Waukesha. 2 bids received; low bid $23,975,918 by Musson Bros., Inc..
- Owner
- Wisconsin DOT
- Letting
- 08 APR 2025
- Pay items
- 426
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Musson Bros., Inc. | $23,975,918 | Low |
| 2 | James Peterson Sons, Inc. | $24,235,654 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Musson Bros., Inc. | 2. James Peterson Sons, Inc. |
|---|---|---|---|---|---|
| 1 | CPM progress schedule (108.4400) | EACH | 1 | $22,000 | $5,000.00 |
| 2 | Clearing (201.0110) | SY | 487 | $9.75 | $9.75 |
| 3 | Clearing (201.0120) | ID | 70 | $29.00 | $29.00 |
| 4 | Grubbing (201.0210) | SY | 6,617 | $2.00 | $2.00 |
| 5 | Grubbing (201.0220) | ID | 100 | $12.99 | $12.99 |
| 6 | Removing structure (structure) 001. C-67-46 (203.0220) | EACH | 1 | $185,000 | $27,865 |
| 7 | Removing concrete pavement (204.0100) | SY | 122,939 | $2.40 | $0.69 |
| 8 | Removing asphaltic surface (204.0110) | SY | 7 | $100.00 | $10.00 |
| 9 | Removing asphaltic surface milling (204.0125) | TON | 1,216 | $45.00 | $45.00 |
| 10 | Removing curb & gutter (204.0150) | LF | 7,167 | $5.00 | $1.75 |
| 11 | Removing concrete sidewalk (204.0155) | SY | 2,375 | $3.00 | $4.25 |
| 12 | Removing guardrail (204.0165) | LF | 982 | $4.00 | $2.50 |
| 13 | Removing surface drains (204.0190) | EACH | 1 | $219.00 | $400.00 |
| 14 | Removing concrete bases (204.0195) | EACH | 24 | $300.00 | $425.00 |
| 15 | Removing manholes (204.0210) | EACH | 55 | $611.00 | $900.00 |
| 16 | Removing inlets (204.0220) | EACH | 223 | $422.00 | $700.00 |
| 17 | Removing storm sewer (size) 001. 10-inch (204.0245) | LF | 291 | $9.80 | $23.93 |
| 18 | Removing storm sewer (size) 002. 12-inch (204.0245) | LF | 5,694 | $11.00 | $23.93 |
| 19 | Removing storm sewer (size) 003. 15-inch (204.0245) | LF | 1,724 | $11.50 | $24.01 |
| 20 | Removing storm sewer (size) 004. 18-inch (204.0245) | LF | 2,537 | $11.50 | $24.34 |
| 21 | Removing storm sewer (size) 005. 21-inch (204.0245) | LF | 1,531 | $13.50 | $24.72 |
| 22 | Removing storm sewer (size) 006. 24-inch (204.0245) | LF | 1,925 | $14.00 | $32.23 |
| 23 | Removing storm sewer (size) 007. 30-inch (204.0245) | LF | 538 | $15.50 | $32.63 |
| 24 | Removing storm sewer (size) 008. 36-inch (204.0245) | LF | 679 | $16.00 | $39.38 |
| 25 | Removing storm sewer (size) 009. 42-inch (204.0245) | LF | 183 | $18.00 | $40.51 |
| 26 | Removing storm sewer (size) 010. 48-inch (204.0245) | LF | 815 | $22.00 | $41.13 |
| 27 | Removing storm sewer (size) 011. 19"X30" (204.0245) | LF | 340 | $14.00 | $32.25 |
| 28 | Removing storm sewer (size) 012. 24"X34" (204.0245) | LF | 90 | $15.50 | $34.17 |
| 29 | Removing storm sewer (size) 013. 29"X45" (204.0245) | LF | 894 | $17.50 | $33.88 |
| 30 | Abandoning inlets (204.0260) | EACH | 1 | $443.00 | $814.00 |
| 31 | Removing (item description) 001. railroad crossbar footing (204.9060.S) | EACH | 4 | $1,500.00 | $1,325.00 |
| 32 | Removing (item description) 100. traffic signals ush 18/STH 59/164 & arcadian ave (204.9060.S) | EACH | 1 | $4,177.46 | $4,177.46 |
| 33 | Removing (item description) 101. traffic signals ush 18/STH 59/164 & pearl ST (204.9060.S) | EACH | 1 | $3,439.52 | $3,439.52 |
| 34 | Removing (item description) 102. traffic signals ush 18/STH 59/164 & CTH D (204.9060.S) | EACH | 1 | $7,191.15 | $7,191.15 |
| 35 | Removing (item description) 103. traffic signals ush 18/STH 59/164 & CTH Y (204.9060.S) | EACH | 1 | $4,010.67 | $4,010.67 |
| 36 | Removing (item description) 104. traffic signals ush 18/STH 59/164 & sunset DR (204.9060.S) | EACH | 1 | $10,095 | $10,095 |
| 37 | Removing (item description) 105. loop detector wire & lead-in cable ush 18/STH 59/164 & pearl ST (204.9060.S) | EACH | 1 | $1,106.91 | $1,106.91 |
| 38 | Removing (item description) 106. loop detector wire & lead-in cable ush 18/STH 59/164 & CTH D (204.9060.S) | EACH | 1 | $1,106.91 | $1,106.91 |
| 39 | Removing (item description) 107. loop detector wire & lead-in cable ush 18/STH 59/164 & CTH Y (204.9060.S) | EACH | 1 | $1,106.91 | $1,106.91 |
| 40 | Removing (item description) 108. loop detector wire & lead-in cable ush 18/STH 59/164 & sunset DR (204.9060.S) | EACH | 1 | $1,106.91 | $1,106.91 |
| 41 | Removing (item description) 109. communications vault (204.9060.S) | EACH | 1 | $454.57 | $454.57 |
| 42 | Excavation common (205.0100) | CY | 149,460 | $12.00 | $10.84 |
| 43 | Excavation marsh (205.0400) | CY | 1,985 | $20.50 | $10.84 |
| 44 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 3,070 | $37.83 | $34.03 |
| 45 | Excavation for structures culverts (structure) 001. C-67-46 (206.2001) | EACH | 1 | $7,490.00 | $12,980 |
| 46 | Borrow (208.0100) | CY | 153 | $15.00 | $15.00 |
| 47 | Backfill granular grade 2 (209.2500) | TON | 15,724 | $18.89 | $14.81 |
| 48 | Finishing roadway (project) 001. 2773-10-70 (213.0100) | EACH | 1 | $100.00 | $3,500.00 |
| 49 | Finishing roadway (project) 002. 2773-10-72 (213.0100) | EACH | 1 | $100.00 | $500.00 |
| 50 | Base aggregate dense 3/4-inch (305.0110) | TON | 124 | $44.50 | $40.66 |
| 51 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 145,537 | $18.50 | $16.75 |
| 52 | Base aggregate open-graded (310.0110) | TON | 3,422 | $25.59 | $20.54 |
| 53 | Select crushed material (312.0110) | TON | 114,627 | $12.56 | $12.41 |
| 54 | QMP base aggregate dense 1 1/4- inch compaction (371.2000.S) | EACH | 56 | $801.91 | $619.73 |
| 55 | Base patching asphaltic (390.0201) | TON | 50 | $265.00 | $265.00 |
| 56 | Concrete pavement 9-inch (415.0090) | SY | 33 | $75.00 | $110.42 |
| 57 | Concrete pavement 10-inch (415.0100) | SY | 1,263 | $66.00 | $77.92 |
| 58 | Rout and seal (415.6000.S) | LF | 610 | $2.55 | $2.55 |
| 59 | Drilled tie bars (416.0610) | EACH | 1,495 | $9.00 | $5.98 |
| 60 | Drilled dowel bars (416.0620) | EACH | 40 | $19.00 | $11.58 |
| 61 | Concrete pavement repair (416.1710) | SY | 42 | $91.00 | $130.38 |
| 62 | HMA cold weather paving (450.4000) | TON | 4,500 | $2.00 | $2.00 |
| 63 | Tack coat (455.0605) | GAL | 18,244 | $0.15 | $0.15 |
| 64 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $1,500.00 | $1,500.00 |
| 65 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $9,000.00 | $9,000.00 |
| 66 | Incentive density PWL HMA pavement (460.2005) | DOL | 37,290 | $1.00 | $1.00 |
| 67 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 8,800 | $1.00 | $1.00 |
| 68 | Incentive air voids HMA pavement (460.2010) | DOL | 47,020 | $1.00 | $1.00 |
| 69 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 18,803 | $66.75 | $66.75 |
| 70 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 28,223 | $77.75 | $77.75 |
| 71 | Asphaltic surface (465.0105) | TON | 411 | $195.00 | $195.00 |
| 72 | Asphaltic surface temporary (465.0125) | TON | 5,577 | $56.00 | $56.00 |
| 73 | Cold patch (495.1000.S) | TON | 5 | $200.00 | $750.00 |
| 74 | Temporary shoring (location) 001. STH 59 (511.1300) | SF | 300 | $5.40 | $0.01 |
| 75 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 1 | $331.00 | $371.00 |
| 76 | Concrete collars for pipe (520.8000) | EACH | 9 | $992.00 | $770.00 |
| 77 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 1 | $950.00 | $1,069.04 |
| 78 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 2 | $1,170.00 | $1,210.85 |
| 79 | Apron endwalls for culvert pipe reinforced concrete 21-inch (522.1021) | EACH | 1 | $1,230.00 | $1,260.39 |
| 80 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $1,350.00 | $1,370.21 |
| 81 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $1,530.00 | $1,533.69 |
| 82 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 1 | $1,420.00 | $1,547.34 |
| 83 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 2 | $2,080.00 | $2,200.41 |
| 84 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 38X60-inch (522.2638) | EACH | 2 | $3,030.00 | $3,496.27 |
| 85 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 43X68-inch (522.2643) | EACH | 1 | $3,550.00 | $4,289.78 |
| 86 | Drilling shaft 42-inch (531.2042) | LF | 36 | $275.00 | $250.00 |
| 87 | Drilling shaft 48-inch (531.2048) | LF | 46 | $275.00 | $300.00 |
| 88 | Foundation single-shaft type MC-III (structure) 001. S-67-986 (531.5130) | EACH | 1 | $9,040.00 | $11,000 |
| 89 | Foundation single-shaft type MC-III (structure) 002. S-67-987 (531.5130) | EACH | 1 | $9,040.00 | $11,000 |
| 90 | Foundation single-shaft type TC-III (structure) 001. S-67-982 (531.5330) | EACH | 1 | $14,840 | $17,500 |
| 91 | Foundation single-shaft type TC-III (structure) 002. S-67-985 (531.5330) | EACH | 1 | $14,840 | $17,500 |
| 92 | Monotube cantilever type III (structure) 001. S-67-986 (532.5130) | EACH | 1 | $32,000 | $48,500 |
| 93 | Monotube cantilever type III (structure) 002. S-67-987 (532.5130) | EACH | 1 | $32,000 | $48,500 |
| 94 | Truss cantilever 2-chord type III (structure) 001. S-67-982 (532.5330) | EACH | 1 | $32,000 | $41,500 |
| 95 | Truss cantilever 2-chord type III (structure) 002. S-67-985 (532.5330) | EACH | 1 | $32,000 | $41,500 |
| 96 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 907 | $22.00 | $15.67 |
| 97 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 2,455 | $23.00 | $18.87 |
| 98 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 6,327 | $23.00 | $20.57 |
| 99 | Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415) | LF | 22,760 | $22.00 | $19.05 |
| 100 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 365 | $24.00 | $31.79 |
| 101 | Concrete curb pedestrian (601.0600) | LF | 776 | $38.00 | $31.30 |
| 102 | Concrete sidewalk 5-inch (602.0410) | SF | 57,228 | $7.00 | $5.30 |
| 103 | Concrete sidewalk 7-inch (602.0420) | SF | 400 | $7.50 | $8.80 |
| 104 | Curb ramp detectable warning field yellow (602.0505) | SF | 740 | $40.00 | $31.73 |
| 105 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 203 | $50.00 | $45.88 |
| 106 | Concrete driveway 6-inch (602.0810) | SY | 49 | $57.00 | $60.07 |
| 107 | Concrete driveway 7-inch (602.0815) | SY | 77 | $57.00 | $75.20 |
| 108 | Concrete surface drains (602.3010) | CY | 18 | $800.00 | $642.96 |
| 109 | Concrete barrier temporary precast delivered (603.8000) | LF | 238 | $17.00 | $20.60 |
| 110 | Concrete barrier temporary precast installed (603.8125) | LF | 238 | $20.00 | $26.76 |
| 111 | Anchoring concrete barrier temporary precast (603.8500) | LF | 238 | $20.00 | $29.03 |
| 112 | Riprap medium (606.0200) | CY | 171 | $107.29 | $95.00 |
| 113 | Storm sewer pipe reinforced concrete class II 18-inch (608.0218) | LF | 225 | $179.00 | $158.79 |
| 114 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 152 | $95.50 | $151.82 |
| 115 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 150 | $98.00 | $152.42 |
| 116 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 263 | $99.00 | $118.64 |
| 117 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 966 | $106.00 | $114.02 |
| 118 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 783 | $159.00 | $155.28 |
| 119 | Storm sewer pipe reinforced concrete class III 48-inch (608.0348) | LF | 266 | $268.00 | $276.80 |
| 120 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 6,482 | $83.50 | $104.54 |
| 121 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 3,146 | $88.50 | $109.92 |
| 122 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 838 | $93.00 | $94.00 |
| 123 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 4,716 | $108.00 | $102.40 |
| 124 | Storm sewer pipe reinforced concrete class IV 27-inch (608.0427) | LF | 23 | $138.00 | $192.59 |
| 125 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 909 | $154.00 | $131.52 |
| 126 | Storm sewer pipe reinforced concrete class IV 36-inch (608.0436) | LF | 136 | $177.00 | $181.36 |
| 127 | Storm sewer pipe reinforced concrete class IV 42-inch (608.0442) | LF | 276 | $225.00 | $225.93 |
| 128 | Storm sewer pipe reinforced concrete class IV 48-inch (608.0448) | LF | 260 | $294.00 | $301.55 |
| 129 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419) | LF | 427 | $171.00 | $177.65 |
| 130 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (608.2429) | LF | 400 | $259.00 | $265.53 |
| 131 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 18 | $84.00 | $145.49 |
| 132 | Manhole covers type J (611.0530) | EACH | 92 | $1,210.00 | $1,137.39 |
| 133 | Inlet covers type C (611.0612) | EACH | 1 | $1,240.00 | $1,169.59 |
| 134 | Inlet covers type H (611.0624) | EACH | 51 | $1,250.00 | $1,161.32 |
| 135 | Inlet covers type HM-GJ (611.0630) | EACH | 259 | $1,140.00 | $1,161.32 |
| 136 | Inlet covers type HM-GJ-S (611.0633) | EACH | 28 | $1,250.00 | $1,161.32 |
| 137 | Inlet covers type H-S (611.0639) | EACH | 14 | $1,250.00 | $1,161.32 |
| 138 | Inlet covers type MS (611.0642) | EACH | 15 | $600.00 | $534.80 |
| 139 | Catch basins 5-FT diameter (611.1005) | EACH | 13 | $3,740.00 | $4,796.66 |
| 140 | Catch basins 6-FT diameter (611.1006) | EACH | 3 | $4,010.00 | $6,219.03 |
| 141 | Catch basins 2X3-FT (611.1230) | EACH | 1 | $1,710.00 | $2,534.29 |
| 142 | Manholes 4-FT diameter (611.2004) | EACH | 26 | $2,100.00 | $3,305.50 |
| 143 | Manholes 5-FT diameter (611.2005) | EACH | 32 | $3,250.00 | $4,998.41 |
| 144 | Manholes 6-FT diameter (611.2006) | EACH | 6 | $4,470.00 | $6,560.41 |
| 145 | Manholes 7-FT diameter (611.2007) | EACH | 6 | $8,260.00 | $9,630.86 |
| 146 | Manholes 8-FT diameter (611.2008) | EACH | 12 | $9,770.00 | $10,927 |
| 147 | Manholes 9-FT diameter (611.2009) | EACH | 1 | $13,900 | $15,431 |
| 148 | Manholes 10-FT diameter (611.2010) | EACH | 2 | $21,100 | $19,357 |
| 149 | Manholes 6X6-FT (611.2066) | EACH | 7 | $13,600 | $13,179 |
| 150 | Inlets 3-FT diameter (611.3003) | EACH | 1 | $1,480.00 | $1,853.03 |
| 151 | Inlets 4-FT diameter (611.3004) | EACH | 78 | $1,930.00 | $2,932.71 |
| 152 | Inlets 2X3-FT (611.3230) | EACH | 252 | $1,420.00 | $2,550.69 |
| 153 | Inlets median 1 grate (611.3901) | EACH | 5 | $2,540.00 | $2,198.00 |
| 154 | Adjusting manhole covers (611.8110) | EACH | 12 | $665.00 | $616.59 |
| 155 | Adjusting inlet covers (611.8115) | EACH | 20 | $665.00 | $730.12 |
| 156 | Cover plates temporary (611.8120.S) | EACH | 29 | $157.00 | $350.00 |
| 157 | Salvaged inlet covers (611.9710) | EACH | 10 | $532.00 | $1,496.71 |
| 158 | Drain slotted vane (611.9900.S) | EACH | 4 | $3,930.00 | $11,654 |
| 159 | Pipe underdrain 6-inch (612.0106) | LF | 35,608 | $7.70 | $8.00 |
| 160 | Steel plate beam guard class A (614.0305) | LF | 25 | $50.00 | $35.00 |
| 161 | Steel plate beam guard short radius (614.0345) | LF | 26 | $50.00 | $35.00 |
| 162 | Steel plate beam guard short radius terminal (614.0390) | EACH | 1 | $2,500.00 | $2,400.00 |
| 163 | Guardrail mow strip asphalt (614.0396) | SY | 291 | $45.00 | $77.25 |
| 164 | Salvaged guardrail end treatments (614.0925) | EACH | 1 | $500.00 | $340.00 |
| 165 | MGS guardrail 3 (614.2300) | LF | 550 | $30.00 | $29.90 |
| 166 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $4,800.00 | $3,400.00 |
| 167 | MGS guardrail terminal type 2 (614.2620) | EACH | 4 | $3,600.00 | $3,500.00 |
| 168 | Maintenance and repair of haul roads (project) 001. 2773-10-70 (618.0100) | EACH | 1 | $1.00 | $1,000.00 |
| 169 | Maintenance and repair of haul roads (project) 002. 2773-10-72 (618.0100) | EACH | 1 | $1.00 | $1,000.00 |
| 170 | Mobilization (619.1000) | EACH | 1 | $825,000 | $917,671 |
| 171 | Concrete corrugated median (620.0100) | SF | 2,263 | $20.00 | $9.12 |
| 172 | Concrete median sloped nose (620.0300) | SF | 1,873 | $15.00 | $13.13 |
| 173 | Water (624.0100) | MGAL | 2,902 | $1.00 | $10.00 |
| 174 | Topsoil (625.0100) | SY | 52,300 | $3.00 | $2.18 |
| 175 | Salvaged topsoil (625.0500) | SY | 13,173 | $3.00 | $2.18 |
| 176 | Mulching (627.0200) | SY | 16,010 | $0.50 | $0.28 |
| 177 | Silt fence (628.1504) | LF | 7,552 | $2.20 | $1.55 |
| 178 | Silt fence maintenance (628.1520) | LF | 7,552 | $0.01 | $0.04 |
| 179 | Silt fence heavy duty (628.1530.S) | LF | 2,275 | $11.00 | $11.90 |
| 180 | Silt fence heavy duty maintenance (628.1535.S) | LF | 2,275 | $0.01 | $0.10 |
| 181 | Mobilizations erosion control (628.1905) | EACH | 5 | $500.00 | $150.00 |
| 182 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $200.00 | $100.00 |
| 183 | Erosion mat class I type A (628.2002) | SY | 55,721 | $1.10 | $1.06 |
| 184 | Erosion mat class I type B (628.2004) | SY | 8,319 | $1.25 | $1.11 |
| 185 | Erosion mat urban class I type A (628.2006) | SY | 1,435 | $2.50 | $1.39 |
| 186 | Soil stabilizer type B (628.6510) | ACRE | 14 | $250.00 | $575.00 |
| 187 | Inlet protection type A (628.7005) | EACH | 368 | $10.00 | $68.00 |
| 188 | Inlet protection type B (628.7010) | EACH | 7 | $105.00 | $40.00 |
| 189 | Inlet protection type C (628.7015) | EACH | 615 | $105.00 | $25.00 |
| 190 | Inlet protection type D (628.7020) | EACH | 24 | $200.00 | $70.00 |
| 191 | Temporary ditch checks (628.7504) | LF | 173 | $15.00 | $7.50 |
| 192 | Culvert pipe checks (628.7555) | EACH | 200 | $18.00 | $18.00 |
| 193 | Tracking pads (628.7560) | EACH | 4 | $500.00 | $3,225.00 |
| 194 | Rock bags (628.7570) | EACH | 172 | $18.00 | $9.10 |
| 195 | Fertilizer type B (629.0210) | CWT | 46.20 | $180.00 | $76.10 |
| 196 | Seeding mixture no. 30 (630.0130) | LB | 1,060 | $14.00 | $8.22 |
| 197 | Seeding mixture no. 40 (630.0140) | LB | 86 | $14.00 | $9.25 |
| 198 | Seeding mixture no. 70 (630.0170) | LB | 35 | $150.00 | $97.00 |
| 199 | Seeding temporary (630.0200) | LB | 505 | $4.00 | $3.20 |
| 200 | Seed water (630.0500) | MGAL | 1,467 | $0.01 | $5.00 |
| 201 | Delineators flexible (633.0200) | EACH | 13 | $75.00 | $68.50 |
| 202 | Markers culvert end (633.5200) | EACH | 1 | $100.00 | $65.50 |
| 203 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 262 | $125.00 | $77.00 |
| 204 | Signs type I reflective SH (637.1220) | SF | 78.50 | $40.00 | $33.50 |
| 205 | Signs type II reflective H (637.2210) | SF | 1,905.65 | $25.00 | $18.90 |
| 206 | Signs type II reflective H folding (637.2215) | SF | 298.40 | $38.00 | $23.90 |
| 207 | Signs type II reflective F (637.2230) | SF | 407.25 | $26.00 | $20.50 |
| 208 | Moving signs type II (638.2102) | EACH | 72 | $125.00 | $75.00 |
| 209 | Removing signs type II (638.2602) | EACH | 193 | $50.00 | $15.00 |
| 210 | Removing small sign supports (638.3000) | EACH | 219 | $50.00 | $17.00 |
| 211 | Traffic control drums (643.0300) | DAY | 471,211 | $0.12 | $0.08 |
| 212 | Traffic control barricades type III (643.0420) | DAY | 59,985 | $0.45 | $0.45 |
| 213 | Traffic control flexible tubular marker posts (643.0500) | EACH | 1,055 | $35.00 | $28.00 |
| 214 | Traffic control flexible tubular marker bases (643.0600) | EACH | 1,055 | $11.50 | $5.00 |
| 215 | Traffic control warning lights type A (643.0705) | DAY | 61,171 | $0.25 | $0.05 |
| 216 | Traffic control warning lights type C (643.0715) | DAY | 39,111 | $0.10 | $0.05 |
| 217 | Traffic control arrow boards (643.0800) | DAY | 1,441 | $7.25 | $8.00 |
| 218 | Traffic control signs (643.0900) | DAY | 213,998 | $0.15 | $0.25 |
| 219 | Traffic control covering signs type II (643.0920) | EACH | 2 | $95.00 | $35.00 |
| 220 | Traffic control signs fixed message (643.1000) | SF | 342.50 | $23.50 | $13.25 |
| 221 | Traffic control signs PCMS (643.1050) | DAY | 112 | $35.00 | $20.00 |
| 222 | Temporary marking line paint 6- inch (643.3165) | LF | 53,731 | $0.18 | $0.40 |
| 223 | Temporary marking line epoxy 6- inch (643.3170) | LF | 109,074 | $0.30 | $0.50 |
| 224 | Temporary marking line removable tape 6-inch (643.3180) | LF | 120,978 | $1.60 | $1.25 |
| 225 | Temporary marking line paint 10- inch (643.3265) | LF | 6,704 | $0.30 | $0.92 |
| 226 | Temporary marking line epoxy 10- inch (643.3270) | LF | 6,530 | $1.00 | $1.15 |
| 227 | Temporary marking line removable tape 10-inch (643.3280) | LF | 9,858 | $3.00 | $2.00 |
| 228 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 633 | $2.00 | $0.65 |
| 229 | Temporary marking crosswalk epoxy 6-inch (643.3320) | LF | 950 | $8.00 | $1.50 |
| 230 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 3,621 | $2.05 | $1.35 |
| 231 | Temporary marking stop line paint 18-inch (643.3805) | LF | 416 | $4.25 | $3.00 |
| 232 | Temporary marking stop line epoxy 18-inch (643.3820) | LF | 1,050 | $10.00 | $4.00 |
| 233 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 1,178 | $6.00 | $3.92 |
| 234 | Traffic control (643.5000) | EACH | 1 | $115,000 | $168,373 |
| 235 | Temporary pedestrian surface asphalt (644.1410) | SF | 294 | $17.00 | $17.00 |
| 236 | Temporary pedestrian surface plate (644.1430) | SF | 3,392 | $8.00 | $4.00 |
| 237 | Temporary pedestrian curb ramp (644.1601) | DAY | 748 | $5.15 | $4.00 |
| 238 | Temporary pedestrian detectable warning field (644.1605) | SF | 288 | $8.25 | $4.00 |
| 239 | Temporary pedestrian barricade (644.1810) | LF | 3,080 | $5.00 | $6.00 |
| 240 | Geotextile type DF schedule A (645.0111) | SY | 19,783 | $0.67 | $2.23 |
| 241 | Geotextile type HR (645.0120) | SY | 582 | $3.40 | $5.10 |
| 242 | Geogrid type SR (645.0220) | SY | 146,200 | $1.00 | $0.70 |
| 243 | Marking line epoxy 4-inch (646.1020) | LF | 3,697 | $0.32 | $0.99 |
| 244 | Marking line grooved wet ref epoxy 4-inch (646.1040) | LF | 185 | $2.00 | $1.20 |
| 245 | Marking line grooved wet ref contrast epoxy 4-inch (646.1545) | LF | 425 | $3.00 | $3.50 |
| 246 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 11,647 | $1.50 | $1.10 |
| 247 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 74,917 | $1.08 | $1.37 |
| 248 | Marking line epoxy 8-inch (646.3020) | LF | 88 | $2.00 | $1.98 |
| 249 | Marking line grooved wet ref epoxy 8-inch (646.3040) | LF | 100 | $3.00 | $2.00 |
| 250 | Marking line grooved wet ref contrast epoxy 8-inch (646.3545) | LF | 667 | $2.00 | $6.85 |
| 251 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 13,716 | $1.90 | $3.00 |
| 252 | Marking arrow epoxy (646.5020) | EACH | 91 | $215.00 | $225.00 |
| 253 | Marking word epoxy (646.5120) | EACH | 25 | $250.00 | $250.00 |
| 254 | Marking outfall epoxy (646.5520) | EACH | 13 | $34.20 | $68.00 |
| 255 | Marking stop line epoxy 18-inch (646.6120) | LF | 1,033 | $10.00 | $13.15 |
| 256 | Marking yield line epoxy 18-inch (646.6220) | EACH | 172 | $26.67 | $65.00 |
| 257 | Cold weather marking epoxy 6-inch (646.6466) | LF | 71,189 | $0.35 | $0.60 |
| 258 | Cold weather marking epoxy 10- inch (646.6470) | LF | 7,384 | $0.85 | $1.10 |
| 259 | Marking diagonal epoxy 12-inch (646.7120) | LF | 1,169 | $10.89 | $9.50 |
| 260 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 4,453 | $10.00 | $10.00 |
| 261 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 178 | $18.00 | $17.00 |
| 262 | Marking corrugated median epoxy (646.8020) | SF | 913 | $6.52 | $9.00 |
| 263 | Marking curb epoxy (646.8120) | LF | 1,100 | $5.36 | $8.25 |
| 264 | Marking island nose epoxy (646.8220) | EACH | 48 | $200.00 | $275.00 |
| 265 | Marking removal line 4-inch (646.9000) | LF | 1,165 | $0.20 | $0.50 |
| 266 | Marking removal line 6-inch (646.9002) | LF | 26,291 | $0.20 | $0.65 |
| 267 | Marking removal line water blasting 4-inch (646.9010) | LF | 1,772 | $0.30 | $1.00 |
| 268 | Marking removal line water blasting 6-inch (646.9012) | LF | 16,590 | $0.30 | $1.00 |
| 269 | Marking removal line 8-inch (646.9100) | LF | 398 | $0.35 | $1.20 |
| 270 | Marking removal line 10-inch (646.9102) | LF | 2,979 | $0.40 | $1.25 |
| 271 | Marking removal line water blasting 8-inch (646.9110) | LF | 285 | $0.75 | $2.00 |
| 272 | Marking removal line water blasting 10-inch (646.9112) | LF | 1,358 | $0.85 | $2.00 |
| 273 | Marking removal line wide (646.9200) | LF | 779 | $2.50 | $3.00 |
| 274 | Marking removal line water blasting wide (646.9210) | LF | 377 | $5.75 | $4.00 |
| 275 | Marking removal special marking water blasting (646.9310) | EACH | 2 | $220.00 | $250.00 |
| 276 | Construction staking storm sewer (650.4000) | EACH | 448 | $74.00 | $74.00 |
| 277 | Construction staking subgrade (650.4500) | LF | 25,116 | $0.01 | $1.50 |
| 278 | Construction staking base (650.5000) | LF | 26,687 | $1.75 | $1.75 |
| 279 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 51,802 | $0.95 | $0.95 |
| 280 | Construction staking concrete pavement (650.7000) | LF | 665 | $3.40 | $3.40 |
| 281 | Construction staking electrical installations (project) 001. 2773-10- 70 (650.8501) | EACH | 1 | $8,350.00 | $8,350.00 |
| 282 | Construction staking curb ramps (650.9000) | EACH | 82 | $152.00 | $152.00 |
| 283 | Construction staking sidewalk (project) 001. 2773-10-70 (650.9500) | EACH | 1 | $10,900 | $10,900 |
| 284 | Construction staking sidewalk (project) 002. 2773-10-72 (650.9500) | EACH | 1 | $3,800.00 | $3,800.00 |
| 285 | Construction staking supplemental control (project) 001. 2773-10-70 (650.9911) | EACH | 1 | $3,600.00 | $3,600.00 |
| 286 | Construction staking supplemental control (project) 002. 2773-10-72 (650.9911) | EACH | 1 | $220.00 | $220.00 |
| 287 | Construction staking slope stakes (650.9920) | LF | 27,019 | $0.76 | $0.76 |
| 288 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 8,896 | $10.84 | $10.84 |
| 289 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 7,337 | $13.59 | $13.59 |
| 290 | Conduit loop detector (652.0800) | LF | 12,388 | $10.82 | $10.82 |
| 291 | Pull boxes steel 24X36-inch (653.0135) | EACH | 46 | $1,448.44 | $1,448.44 |
| 292 | Pull boxes steel 24X42-inch (653.0140) | EACH | 68 | $1,520.78 | $1,520.78 |
| 293 | Adjusting pull boxes (653.0900) | EACH | 28 | $655.14 | $655.14 |
| 294 | Removing pull boxes (653.0905) | EACH | 96 | $127.74 | $127.74 |
| 295 | Concrete bases type 1 (654.0101) | EACH | 30 | $973.20 | $973.20 |
| 296 | Concrete bases type 2 (654.0102) | EACH | 4 | $1,269.70 | $1,269.70 |
| 297 | Concrete bases type 5 (654.0105) | EACH | 9 | $1,129.64 | $1,129.64 |
| 298 | Concrete bases type 10 (654.0110) | EACH | 4 | $6,394.93 | $6,394.93 |
| 299 | Concrete bases type 13 (654.0113) | EACH | 2 | $10,854 | $10,854 |
| 300 | Concrete bases type 10-special (654.0120) | EACH | 6 | $7,964.20 | $7,964.20 |
| 301 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,218.79 | $2,218.79 |
| 302 | Cable traffic signal 5-14 AWG (655.0230) | LF | 4,855 | $1.79 | $1.79 |
| 303 | Cable traffic signal 7-14 AWG (655.0240) | LF | 11,008 | $2.21 | $2.21 |
| 304 | Cable traffic signal 12-14 AWG (655.0260) | LF | 4,078 | $3.70 | $3.70 |
| 305 | Cable traffic signal 15-14 AWG (655.0270) | LF | 2,355 | $4.51 | $4.51 |
| 306 | Cable traffic signal 21-14 AWG (655.0290) | LF | 3,158 | $5.64 | $5.64 |
| 307 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 7,333 | $1.86 | $1.86 |
| 308 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 17,501 | $1.74 | $1.74 |
| 309 | Electrical wire lighting 12 AWG (655.0610) | LF | 5,516 | $0.94 | $0.94 |
| 310 | Loop detector lead in cable (655.0700) | LF | 51,172 | $1.25 | $1.25 |
| 311 | Loop detector wire (655.0800) | LF | 49,196 | $0.94 | $0.94 |
| 312 | Traffic signal evp detector cable (655.0900) | LF | 8,435 | $1.24 | $1.24 |
| 313 | Electrical service meter breaker pedestal (location) 100. ush 18/STH 59/164 & pearl ST (656.0201) | EACH | 1 | $1,530.98 | $1,530.98 |
| 314 | Pedestal bases (657.0100) | EACH | 34 | $372.63 | $372.63 |
| 315 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 13 | $659.92 | $659.92 |
| 316 | Poles type 3 (657.0310) | EACH | 4 | $3,735.44 | $3,735.44 |
| 317 | Poles type 5-aluminum (657.0322) | EACH | 9 | $2,057.36 | $2,057.36 |
| 318 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 4 | $464.87 | $464.87 |
| 319 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 11 | $878.48 | $878.48 |
| 320 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 5 | $918.20 | $918.20 |
| 321 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 14 | $824.72 | $824.72 |
| 322 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 6 | $339.98 | $339.98 |
| 323 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 9 | $334.14 | $334.14 |
| 324 | Traffic signal face 3S 12-inch (658.0173) | EACH | 59 | $934.14 | $934.14 |
| 325 | Traffic signal face 4S 12-inch (658.0174) | EACH | 17 | $1,254.33 | $1,254.33 |
| 326 | Pedestrian signal face 16-inch (658.0416) | EACH | 35 | $564.27 | $564.00 |
| 327 | Signal mounting hardware (location) 100. ush 18/STH 59/164 & sunset DR (658.5070) | EACH | 1 | $4,786.19 | $4,786.19 |
| 328 | Signal mounting hardware (location) 101. ush 18/STH 59/164 & CTH Y (658.5070) | EACH | 1 | $1,971.10 | $1,971.10 |
| 329 | Signal mounting hardware (location) 102. ush 18/STH 59/164 & CTH D (658.5070) | EACH | 1 | $3,289.24 | $3,289.24 |
| 330 | Signal mounting hardware (location) 103. ush 18/STH 59/164 & pearl ST (658.5070) | EACH | 1 | $4,993.03 | $4,993.03 |
| 331 | Signal mounting hardware (location) 104. ush 18/STH 59/164 & arcadian ave (658.5070) | EACH | 1 | $4,316.43 | $4,316.43 |
| 332 | Signal mounting hardware (location) 105. ush 18/STH 59 & oakdale DR (658.5070) | EACH | 1 | $894.83 | $894.83 |
| 333 | Luminaires utility LED C (659.1125) | EACH | 25 | $589.91 | $589.91 |
| 334 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 89 | $12.91 | $12.91 |
| 335 | Temporary traffic signals for intersections (location) 100. ush 18/STH 59/164 & arcadian ave (661.0201) | EACH | 1 | $88,573 | $88,573 |
| 336 | Temporary traffic signals for intersections (location) 101. ush 18/STH 59/164 & pearl ST (661.0201) | EACH | 1 | $75,387 | $75,387 |
| 337 | Temporary traffic signals for intersections (location) 102. ush 18/STH 59/164 & CTH D (661.0201) | EACH | 1 | $73,532 | $73,532 |
| 338 | Temporary traffic signals for intersections (location) 103. ush 18/STH 59/164 & CTH Y (661.0201) | EACH | 1 | $86,389 | $86,389 |
| 339 | Temporary traffic signals for intersections (location) 104. ush 18/STH 59/164 & sunset DR (661.0201) | EACH | 1 | $72,968 | $72,968 |
| 340 | Generators (661.0300) | DAY | 5 | $96.67 | $96.67 |
| 341 | Field system integrator (670.0101) | EACH | 1 | $25,075 | $25,075 |
| 342 | ITS documentation (670.0201) | EACH | 1 | $5,793.66 | $5,793.66 |
| 343 | Communication vault type 1 (673.0105) | EACH | 1 | $3,798.32 | $3,798.32 |
| 344 | Remove cable (674.0300) | LF | 3,615 | $1.30 | $1.30 |
| 345 | Reinstall cable (674.0400) | LF | 124 | $5.71 | $5.71 |
| 346 | Install camera assembly (677.0200) | EACH | 5 | $7,555.00 | $7,555.00 |
| 347 | Install fiber optic cable outdoor plant 6-CT (678.0006) | LF | 3,777 | $1.65 | $1.65 |
| 348 | Fiber optic splice enclosure (678.0200) | EACH | 5 | $2,036.68 | $2,036.68 |
| 349 | Fiber optic splice (678.0300) | EACH | 32 | $185.68 | $185.68 |
| 350 | Communication system testing (678.0501) | EACH | 1 | $5,793.66 | $5,793.66 |
| 351 | Install ethernet switches (678.0600) | EACH | 2 | $1,310.99 | $1,310.99 |
| 352 | Sawing asphalt (690.0150) | LF | 3,705 | $1.15 | $1.15 |
| 353 | Sawing concrete (690.0250) | LF | 22,988 | $2.20 | $2.20 |
| 354 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 |
| 355 | Incentive iri ride (740.0440) | DOL | 26,000 | $1.00 | $1.00 |
| 356 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 6,300 | $5.00 | $5.00 |
| 357 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 10,000 | $5.00 | $5.00 |
| 358 | Special 001. backfill slurry (SPV.0035) | CY | 1,783 | $93.00 | $152.66 |
| 359 | Special 001. section corner monuments (SPV.0060) | EACH | 1 | $3,000.00 | $1,250.00 |
| 360 | Special 002. storm sewer locate (SPV.0060) | EACH | 1 | $1,350.00 | $1,500.00 |
| 361 | Special 003. temporary pipe connection 12-inch (SPV.0060) | EACH | 7 | $500.00 | $1,590.50 |
| 362 | Special 004. temporary pipe connection 15-inch (SPV.0060) | EACH | 2 | $500.00 | $1,814.03 |
| 363 | Special 005. temporary pipe connection 18-inch (SPV.0060) | EACH | 3 | $500.00 | $2,063.21 |
| 364 | Special 006. temporary pipe connection 24-inch (SPV.0060) | EACH | 4 | $500.00 | $2,361.01 |
| 365 | Special 007. temporary pipe connection 30-inch (SPV.0060) | EACH | 1 | $500.00 | $2,646.65 |
| 366 | Special 008. temporary pipe connection 36-inch (SPV.0060) | EACH | 1 | $500.00 | $3,100.80 |
| 367 | Special 009. field facilities office space (SPV.0060) | EACH | 1 | $70,000 | $88,192 |
| 368 | Special 010. adjusting manhole frames and covers (SPV.0060) | EACH | 15 | $1,200.00 | $712.44 |
| 369 | Special 011. catch basins 8-FT diameter (SPV.0060) | EACH | 5 | $8,920.00 | $12,403 |
| 370 | Special 100. install poles type 9 - over height (SPV.0060) | EACH | 1 | $1,347.79 | $1,347.79 |
| 371 | Special 101. install poles type 10 (SPV.0060) | EACH | 3 | $1,532.27 | $1,532.27 |
| 372 | Special 102. install poles type 9 special (SPV.0060) | EACH | 1 | $1,347.79 | $1,347.79 |
| 373 | Special 103. install poles type 9 special - over height (SPV.0060) | EACH | 2 | $1,347.79 | $1,347.79 |
| 374 | Special 104. install poles type 10 special (SPV.0060) | EACH | 2 | $1,532.27 | $1,532.27 |
| 375 | Special 105. install poles type 10 special - over height (SPV.0060) | EACH | 1 | $1,532.27 | $1,532.27 |
| 376 | Special 106. install poles type 12 - over height (SPV.0060) | EACH | 2 | $1,532.27 | $1,532.27 |
| 377 | Special 107. install poles type 13 - over height (SPV.0060) | EACH | 3 | $1,532.27 | $1,532.27 |
| 378 | Special 108. install monotube arms 15-FT (SPV.0060) | EACH | 2 | $1,589.53 | $1,589.53 |
| 379 | Special 109. install monotube arms 25-FT (SPV.0060) | EACH | 1 | $1,589.53 | $1,589.53 |
| 380 | Special 110. install monotube arms 30-FT (SPV.0060) | EACH | 1 | $1,958.50 | $1,958.50 |
| 381 | Special 111. install monotube arms 35-FT type 9/10 special pole (SPV.0060) | EACH | 2 | $2,327.47 | $2,327.47 |
| 382 | Special 112. install monotube arms 40-FT type 9/10 special pole (SPV.0060) | EACH | 3 | $2,327.47 | $2,327.47 |
| 383 | Special 113. install monotube arms 45-FT type 9/10 special pole (SPV.0060) | EACH | 1 | $2,327.47 | $2,327.47 |
| 384 | Special 114. install monotube arms 45-FT type 12/13 pole (SPV.0060) | EACH | 1 | $2,327.47 | $2,327.47 |
| 385 | Special 115. install monotube arms 55-FT (SPV.0060) | EACH | 4 | $2,820.32 | $2,820.32 |
| 386 | Special 116. install luminaire arms steel 15-FT (SPV.0060) | EACH | 10 | $161.74 | $161.74 |
| 387 | Special 117. transport & install SF traffic signal cabinet ush 18/STH 59/164 & pearl ST (SPV.0060) | EACH | 1 | $9,665.22 | $9,665.22 |
| 388 | Special 118. transport & install SF traffic signal cabinet ush 18/STH 59/164 & sunset DR (SPV.0060) | EACH | 1 | $11,317 | $11,317 |
| 389 | Special 119. transport traffic signal & inter LGT matl ush 18/STH 59/164 & arcadian ave (SPV.0060) | EACH | 1 | $4,268.50 | $4,268.50 |
| 390 | Special 120. transport traffic signal & inter LGT matl ush 18/STH 59/164 & pearl ST (SPV.0060) | EACH | 1 | $737.94 | $737.94 |
| 391 | Special 121. transport traffic signal & inter LGT matl ush 18/STH 59/164 & CTH D (SPV.0060) | EACH | 1 | $9,093.57 | $9,093.57 |
| 392 | Special 122. transport traffic signal & inter LGT matl ush 18/STH 59/164 & CTH Y (SPV.0060) | EACH | 1 | $10,289 | $10,289 |
| 393 | Special 123. transport traffic signal & inter LGT matl ush 18/STH 59/164 & sunset DR (SPV.0060) | EACH | 1 | $737.94 | $737.94 |
| 394 | Special 124. transport & install SF evp detector heads ush 18/STH 59/164 & arcadian ave (SPV.0060) | EACH | 1 | $2,264.37 | $2,264.37 |
| 395 | Special 125. transport & install SF evp detector heads ush 18/STH 59/164 & pearl ST (SPV.0060) | EACH | 1 | $2,264.37 | $2,264.37 |
| 396 | Special 126. transport & install SF evp detector heads ush 18/STH 59/164 & CTH D (SPV.0060) | EACH | 1 | $2,264.37 | $2,264.37 |
| 397 | Special 127. transport & install SF evp detector heads ush 18/STH 59/164 & CTH Y (SPV.0060) | EACH | 1 | $2,264.37 | $2,264.37 |
| 398 | Special 128. transport & install SF evp detector heads ush 18/STH 59/164 & sunset DR (SPV.0060) | EACH | 1 | $2,264.37 | $2,264.37 |
| 399 | Special 129. transport & install SF evp detector heads ush 18/STH 59/164 & oakdale DR (SPV.0060) | EACH | 1 | $2,264.37 | $2,264.37 |
| 400 | Special 130. transport & install SF video detection sys ush 18/STH 59/164 & arcadian (SPV.0060) | EACH | 1 | $6,507.54 | $6,507.54 |
| 401 | Special 131. transport & install SF video detection sys ush 18/STH 59/164 & pearl ST (SPV.0060) | EACH | 1 | $3,740.26 | $3,740.26 |
| 402 | Special 132. transport & install SF video detection sys ush 18/STH 59/164 & CTH D (SPV.0060) | EACH | 1 | $3,740.26 | $3,740.26 |
| 403 | Special 133. transport & install SF video detection sys ush 18/STH 59/164 & sunset DR (SPV.0060) | EACH | 1 | $3,740.26 | $3,740.26 |
| 404 | Special 134. transport & install SF radar detection sys ush 18/STH 59/164 & CTH Y (SPV.0060) | EACH | 1 | $3,740.26 | $3,740.26 |
| 405 | Special 135. temporary infrared evp system ush 18/STH 59/164 & arcadian ave (SPV.0060) | EACH | 1 | $3,586.60 | $3,586.60 |
| 406 | Special 136. temporary infrared evp system ush 18/STH 59/164 & pearl ST (SPV.0060) | EACH | 1 | $3,586.60 | $3,586.60 |
| 407 | Special 137. temporary infrared evp system ush 18/STH 59/164 & CTH D (SPV.0060) | EACH | 1 | $3,586.60 | $3,586.60 |
| 408 | Special 138. temporary infrared evp system ush 18/STH 59/164 & CTH Y (SPV.0060) | EACH | 1 | $3,586.60 | $3,586.60 |
| 409 | Special 139. temporary infrared evp system ush 18/STH 59/164 & sunset DR (SPV.0060) | EACH | 1 | $3,586.60 | $3,586.60 |
| 410 | Special 140. transport & install SF audible ped sig sys ush 18/STH 59/164 & arcadian ave (SPV.0060) | EACH | 1 | $1,844.86 | $1,844.86 |
| 411 | Special 141. transport & install SF audible ped sig sys ush 18/STH 59/164 & pearl ST (SPV.0060) | EACH | 1 | $2,951.77 | $2,951.77 |
| 412 | Special 142. transport & install SF audible ped sig sys ush 18/STH 59/164 & CTH D (SPV.0060) | EACH | 1 | $2,951.77 | $2,951.77 |
| 413 | Special 143. transport & install SF audible ped sig sys ush 18/STH 59/164 & CTH Y (SPV.0060) | EACH | 1 | $4,058.68 | $4,058.68 |
| 414 | Special 144. transport & install SF audible ped sig sys ush 18/STH 59/164 & sunset DR (SPV.0060) | EACH | 1 | $3,689.71 | $3,689.71 |
| 415 | Special 145. transport & install SF audible ped sig sys ush 18/STH 59/164 & oakdale DR (SPV.0060) | EACH | 1 | $1,475.89 | $1,475.89 |
| 416 | Special 146. temporary accessible pedestrian signal system ush 18/STH 59/164 & CTH Y (SPV.0060) | EACH | 1 | $12,635 | $12,635 |
| 417 | Special 147. temporary accessible pedestrian signal system ush 18/STH59/164 & sunset DR (SPV.0060) | EACH | 1 | $5,872.38 | $5,872.38 |
| 418 | Special 148. removing concrete traffic signal bases type 13 (SPV.0060) | EACH | 2 | $2,554.19 | $2,554.19 |
| 419 | Special 001. concrete curb & gutter 66-inch type D (SPV.0090) | LF | 1,765 | $32.50 | $36.50 |
| 420 | Special 002. concrete curb & gutter 6-inch sloped 68-inch type J (SPV.0090) | LF | 18,872 | $32.50 | $34.77 |
| 421 | Special 003. SS pipe reinforced concrete horizontal elliptical class HE-IV 38X60-inch (SPV.0090) | LF | 1,558 | $353.00 | $372.86 |
| 422 | Special 004. SS pipe reinforced concrete horizontal elliptical class HE-IV 43X68-inch (SPV.0090) | LF | 319 | $432.00 | $423.99 |
| 423 | Special 100. fiber optic warning tape (SPV.0090) | LF | 2,942 | $0.56 | $0.56 |
| 424 | Special 101. foundation drilling 36- inch diameter (SPV.0090) | LF | 15 | $1,481.04 | $1,481.04 |
| 425 | Special 001. excavation of phragmites contaminated soil (SPV.0180) | SY | 271 | $64.50 | $12.80 |
| 426 | Special 002. herbicide application (SPV.0180) | SY | 271 | $30.00 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.