WisDOT contract 20250408030 bid tabulation

2773-10-70. Let by Wisconsin DOT on April 8, 2025, Waukesha. 2 bids received; low bid $23,975,918 by Musson Bros., Inc..

Owner
Wisconsin DOT
Letting
08 APR 2025
Pay items
426
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Musson Bros., Inc.$23,975,918Low
2James Peterson Sons, Inc.$24,235,654+1.0%
WisDOT contract 20250408030: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Musson Bros., Inc.2. James Peterson Sons, Inc.
1CPM progress schedule (108.4400)EACH1$22,000$5,000.00
2Clearing (201.0110)SY487$9.75$9.75
3Clearing (201.0120)ID70$29.00$29.00
4Grubbing (201.0210)SY6,617$2.00$2.00
5Grubbing (201.0220)ID100$12.99$12.99
6Removing structure (structure) 001. C-67-46 (203.0220)EACH1$185,000$27,865
7Removing concrete pavement (204.0100)SY122,939$2.40$0.69
8Removing asphaltic surface (204.0110)SY7$100.00$10.00
9Removing asphaltic surface milling (204.0125)TON1,216$45.00$45.00
10Removing curb & gutter (204.0150)LF7,167$5.00$1.75
11Removing concrete sidewalk (204.0155)SY2,375$3.00$4.25
12Removing guardrail (204.0165)LF982$4.00$2.50
13Removing surface drains (204.0190)EACH1$219.00$400.00
14Removing concrete bases (204.0195)EACH24$300.00$425.00
15Removing manholes (204.0210)EACH55$611.00$900.00
16Removing inlets (204.0220)EACH223$422.00$700.00
17Removing storm sewer (size) 001. 10-inch (204.0245)LF291$9.80$23.93
18Removing storm sewer (size) 002. 12-inch (204.0245)LF5,694$11.00$23.93
19Removing storm sewer (size) 003. 15-inch (204.0245)LF1,724$11.50$24.01
20Removing storm sewer (size) 004. 18-inch (204.0245)LF2,537$11.50$24.34
21Removing storm sewer (size) 005. 21-inch (204.0245)LF1,531$13.50$24.72
22Removing storm sewer (size) 006. 24-inch (204.0245)LF1,925$14.00$32.23
23Removing storm sewer (size) 007. 30-inch (204.0245)LF538$15.50$32.63
24Removing storm sewer (size) 008. 36-inch (204.0245)LF679$16.00$39.38
25Removing storm sewer (size) 009. 42-inch (204.0245)LF183$18.00$40.51
26Removing storm sewer (size) 010. 48-inch (204.0245)LF815$22.00$41.13
27Removing storm sewer (size) 011. 19"X30" (204.0245)LF340$14.00$32.25
28Removing storm sewer (size) 012. 24"X34" (204.0245)LF90$15.50$34.17
29Removing storm sewer (size) 013. 29"X45" (204.0245)LF894$17.50$33.88
30Abandoning inlets (204.0260)EACH1$443.00$814.00
31Removing (item description) 001. railroad crossbar footing (204.9060.S)EACH4$1,500.00$1,325.00
32Removing (item description) 100. traffic signals ush 18/STH 59/164 & arcadian ave (204.9060.S)EACH1$4,177.46$4,177.46
33Removing (item description) 101. traffic signals ush 18/STH 59/164 & pearl ST (204.9060.S)EACH1$3,439.52$3,439.52
34Removing (item description) 102. traffic signals ush 18/STH 59/164 & CTH D (204.9060.S)EACH1$7,191.15$7,191.15
35Removing (item description) 103. traffic signals ush 18/STH 59/164 & CTH Y (204.9060.S)EACH1$4,010.67$4,010.67
36Removing (item description) 104. traffic signals ush 18/STH 59/164 & sunset DR (204.9060.S)EACH1$10,095$10,095
37Removing (item description) 105. loop detector wire & lead-in cable ush 18/STH 59/164 & pearl ST (204.9060.S)EACH1$1,106.91$1,106.91
38Removing (item description) 106. loop detector wire & lead-in cable ush 18/STH 59/164 & CTH D (204.9060.S)EACH1$1,106.91$1,106.91
39Removing (item description) 107. loop detector wire & lead-in cable ush 18/STH 59/164 & CTH Y (204.9060.S)EACH1$1,106.91$1,106.91
40Removing (item description) 108. loop detector wire & lead-in cable ush 18/STH 59/164 & sunset DR (204.9060.S)EACH1$1,106.91$1,106.91
41Removing (item description) 109. communications vault (204.9060.S)EACH1$454.57$454.57
42Excavation common (205.0100)CY149,460$12.00$10.84
43Excavation marsh (205.0400)CY1,985$20.50$10.84
44Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S)TON3,070$37.83$34.03
45Excavation for structures culverts (structure) 001. C-67-46 (206.2001)EACH1$7,490.00$12,980
46Borrow (208.0100)CY153$15.00$15.00
47Backfill granular grade 2 (209.2500)TON15,724$18.89$14.81
48Finishing roadway (project) 001. 2773-10-70 (213.0100)EACH1$100.00$3,500.00
49Finishing roadway (project) 002. 2773-10-72 (213.0100)EACH1$100.00$500.00
50Base aggregate dense 3/4-inch (305.0110)TON124$44.50$40.66
51Base aggregate dense 1 1/4-inch (305.0120)TON145,537$18.50$16.75
52Base aggregate open-graded (310.0110)TON3,422$25.59$20.54
53Select crushed material (312.0110)TON114,627$12.56$12.41
54QMP base aggregate dense 1 1/4- inch compaction (371.2000.S)EACH56$801.91$619.73
55Base patching asphaltic (390.0201)TON50$265.00$265.00
56Concrete pavement 9-inch (415.0090)SY33$75.00$110.42
57Concrete pavement 10-inch (415.0100)SY1,263$66.00$77.92
58Rout and seal (415.6000.S)LF610$2.55$2.55
59Drilled tie bars (416.0610)EACH1,495$9.00$5.98
60Drilled dowel bars (416.0620)EACH40$19.00$11.58
61Concrete pavement repair (416.1710)SY42$91.00$130.38
62HMA cold weather paving (450.4000)TON4,500$2.00$2.00
63Tack coat (455.0605)GAL18,244$0.15$0.15
64HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$1,500.00$1,500.00
65HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$9,000.00$9,000.00
66Incentive density PWL HMA pavement (460.2005)DOL37,290$1.00$1.00
67Incentive density HMA pavement longitudinal joints (460.2007)DOL8,800$1.00$1.00
68Incentive air voids HMA pavement (460.2010)DOL47,020$1.00$1.00
69HMA pavement 3 MT 58-28 S (460.6223)TON18,803$66.75$66.75
70HMA pavement 4 MT 58-28 S (460.6224)TON28,223$77.75$77.75
71Asphaltic surface (465.0105)TON411$195.00$195.00
72Asphaltic surface temporary (465.0125)TON5,577$56.00$56.00
73Cold patch (495.1000.S)TON5$200.00$750.00
74Temporary shoring (location) 001. STH 59 (511.1300)SF300$5.40$0.01
75Apron endwalls for culvert pipe 12- inch (520.1012)EACH1$331.00$371.00
76Concrete collars for pipe (520.8000)EACH9$992.00$770.00
77Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH1$950.00$1,069.04
78Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH2$1,170.00$1,210.85
79Apron endwalls for culvert pipe reinforced concrete 21-inch (522.1021)EACH1$1,230.00$1,260.39
80Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH1$1,350.00$1,370.21
81Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH2$1,530.00$1,533.69
82Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619)EACH1$1,420.00$1,547.34
83Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629)EACH2$2,080.00$2,200.41
84Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 38X60-inch (522.2638)EACH2$3,030.00$3,496.27
85Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 43X68-inch (522.2643)EACH1$3,550.00$4,289.78
86Drilling shaft 42-inch (531.2042)LF36$275.00$250.00
87Drilling shaft 48-inch (531.2048)LF46$275.00$300.00
88Foundation single-shaft type MC-III (structure) 001. S-67-986 (531.5130)EACH1$9,040.00$11,000
89Foundation single-shaft type MC-III (structure) 002. S-67-987 (531.5130)EACH1$9,040.00$11,000
90Foundation single-shaft type TC-III (structure) 001. S-67-982 (531.5330)EACH1$14,840$17,500
91Foundation single-shaft type TC-III (structure) 002. S-67-985 (531.5330)EACH1$14,840$17,500
92Monotube cantilever type III (structure) 001. S-67-986 (532.5130)EACH1$32,000$48,500
93Monotube cantilever type III (structure) 002. S-67-987 (532.5130)EACH1$32,000$48,500
94Truss cantilever 2-chord type III (structure) 001. S-67-982 (532.5330)EACH1$32,000$41,500
95Truss cantilever 2-chord type III (structure) 002. S-67-985 (532.5330)EACH1$32,000$41,500
96Concrete curb & gutter 18-inch type D (601.0407)LF907$22.00$15.67
97Concrete curb & gutter 30-inch type A (601.0409)LF2,455$23.00$18.87
98Concrete curb & gutter 30-inch type D (601.0411)LF6,327$23.00$20.57
99Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415)LF22,760$22.00$19.05
100Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF365$24.00$31.79
101Concrete curb pedestrian (601.0600)LF776$38.00$31.30
102Concrete sidewalk 5-inch (602.0410)SF57,228$7.00$5.30
103Concrete sidewalk 7-inch (602.0420)SF400$7.50$8.80
104Curb ramp detectable warning field yellow (602.0505)SF740$40.00$31.73
105Curb ramp detectable warning field radial yellow (602.0605)SF203$50.00$45.88
106Concrete driveway 6-inch (602.0810)SY49$57.00$60.07
107Concrete driveway 7-inch (602.0815)SY77$57.00$75.20
108Concrete surface drains (602.3010)CY18$800.00$642.96
109Concrete barrier temporary precast delivered (603.8000)LF238$17.00$20.60
110Concrete barrier temporary precast installed (603.8125)LF238$20.00$26.76
111Anchoring concrete barrier temporary precast (603.8500)LF238$20.00$29.03
112Riprap medium (606.0200)CY171$107.29$95.00
113Storm sewer pipe reinforced concrete class II 18-inch (608.0218)LF225$179.00$158.79
114Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF152$95.50$151.82
115Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF150$98.00$152.42
116Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF263$99.00$118.64
117Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF966$106.00$114.02
118Storm sewer pipe reinforced concrete class III 30-inch (608.0330)LF783$159.00$155.28
119Storm sewer pipe reinforced concrete class III 48-inch (608.0348)LF266$268.00$276.80
120Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF6,482$83.50$104.54
121Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF3,146$88.50$109.92
122Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF838$93.00$94.00
123Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF4,716$108.00$102.40
124Storm sewer pipe reinforced concrete class IV 27-inch (608.0427)LF23$138.00$192.59
125Storm sewer pipe reinforced concrete class IV 30-inch (608.0430)LF909$154.00$131.52
126Storm sewer pipe reinforced concrete class IV 36-inch (608.0436)LF136$177.00$181.36
127Storm sewer pipe reinforced concrete class IV 42-inch (608.0442)LF276$225.00$225.93
128Storm sewer pipe reinforced concrete class IV 48-inch (608.0448)LF260$294.00$301.55
129Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419)LF427$171.00$177.65
130Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (608.2429)LF400$259.00$265.53
131Storm sewer pipe class III-A 12- inch (608.3012)LF18$84.00$145.49
132Manhole covers type J (611.0530)EACH92$1,210.00$1,137.39
133Inlet covers type C (611.0612)EACH1$1,240.00$1,169.59
134Inlet covers type H (611.0624)EACH51$1,250.00$1,161.32
135Inlet covers type HM-GJ (611.0630)EACH259$1,140.00$1,161.32
136Inlet covers type HM-GJ-S (611.0633)EACH28$1,250.00$1,161.32
137Inlet covers type H-S (611.0639)EACH14$1,250.00$1,161.32
138Inlet covers type MS (611.0642)EACH15$600.00$534.80
139Catch basins 5-FT diameter (611.1005)EACH13$3,740.00$4,796.66
140Catch basins 6-FT diameter (611.1006)EACH3$4,010.00$6,219.03
141Catch basins 2X3-FT (611.1230)EACH1$1,710.00$2,534.29
142Manholes 4-FT diameter (611.2004)EACH26$2,100.00$3,305.50
143Manholes 5-FT diameter (611.2005)EACH32$3,250.00$4,998.41
144Manholes 6-FT diameter (611.2006)EACH6$4,470.00$6,560.41
145Manholes 7-FT diameter (611.2007)EACH6$8,260.00$9,630.86
146Manholes 8-FT diameter (611.2008)EACH12$9,770.00$10,927
147Manholes 9-FT diameter (611.2009)EACH1$13,900$15,431
148Manholes 10-FT diameter (611.2010)EACH2$21,100$19,357
149Manholes 6X6-FT (611.2066)EACH7$13,600$13,179
150Inlets 3-FT diameter (611.3003)EACH1$1,480.00$1,853.03
151Inlets 4-FT diameter (611.3004)EACH78$1,930.00$2,932.71
152Inlets 2X3-FT (611.3230)EACH252$1,420.00$2,550.69
153Inlets median 1 grate (611.3901)EACH5$2,540.00$2,198.00
154Adjusting manhole covers (611.8110)EACH12$665.00$616.59
155Adjusting inlet covers (611.8115)EACH20$665.00$730.12
156Cover plates temporary (611.8120.S)EACH29$157.00$350.00
157Salvaged inlet covers (611.9710)EACH10$532.00$1,496.71
158Drain slotted vane (611.9900.S)EACH4$3,930.00$11,654
159Pipe underdrain 6-inch (612.0106)LF35,608$7.70$8.00
160Steel plate beam guard class A (614.0305)LF25$50.00$35.00
161Steel plate beam guard short radius (614.0345)LF26$50.00$35.00
162Steel plate beam guard short radius terminal (614.0390)EACH1$2,500.00$2,400.00
163Guardrail mow strip asphalt (614.0396)SY291$45.00$77.25
164Salvaged guardrail end treatments (614.0925)EACH1$500.00$340.00
165MGS guardrail 3 (614.2300)LF550$30.00$29.90
166MGS guardrail terminal eat (614.2610)EACH4$4,800.00$3,400.00
167MGS guardrail terminal type 2 (614.2620)EACH4$3,600.00$3,500.00
168Maintenance and repair of haul roads (project) 001. 2773-10-70 (618.0100)EACH1$1.00$1,000.00
169Maintenance and repair of haul roads (project) 002. 2773-10-72 (618.0100)EACH1$1.00$1,000.00
170Mobilization (619.1000)EACH1$825,000$917,671
171Concrete corrugated median (620.0100)SF2,263$20.00$9.12
172Concrete median sloped nose (620.0300)SF1,873$15.00$13.13
173Water (624.0100)MGAL2,902$1.00$10.00
174Topsoil (625.0100)SY52,300$3.00$2.18
175Salvaged topsoil (625.0500)SY13,173$3.00$2.18
176Mulching (627.0200)SY16,010$0.50$0.28
177Silt fence (628.1504)LF7,552$2.20$1.55
178Silt fence maintenance (628.1520)LF7,552$0.01$0.04
179Silt fence heavy duty (628.1530.S)LF2,275$11.00$11.90
180Silt fence heavy duty maintenance (628.1535.S)LF2,275$0.01$0.10
181Mobilizations erosion control (628.1905)EACH5$500.00$150.00
182Mobilizations emergency erosion control (628.1910)EACH5$200.00$100.00
183Erosion mat class I type A (628.2002)SY55,721$1.10$1.06
184Erosion mat class I type B (628.2004)SY8,319$1.25$1.11
185Erosion mat urban class I type A (628.2006)SY1,435$2.50$1.39
186Soil stabilizer type B (628.6510)ACRE14$250.00$575.00
187Inlet protection type A (628.7005)EACH368$10.00$68.00
188Inlet protection type B (628.7010)EACH7$105.00$40.00
189Inlet protection type C (628.7015)EACH615$105.00$25.00
190Inlet protection type D (628.7020)EACH24$200.00$70.00
191Temporary ditch checks (628.7504)LF173$15.00$7.50
192Culvert pipe checks (628.7555)EACH200$18.00$18.00
193Tracking pads (628.7560)EACH4$500.00$3,225.00
194Rock bags (628.7570)EACH172$18.00$9.10
195Fertilizer type B (629.0210)CWT46.20$180.00$76.10
196Seeding mixture no. 30 (630.0130)LB1,060$14.00$8.22
197Seeding mixture no. 40 (630.0140)LB86$14.00$9.25
198Seeding mixture no. 70 (630.0170)LB35$150.00$97.00
199Seeding temporary (630.0200)LB505$4.00$3.20
200Seed water (630.0500)MGAL1,467$0.01$5.00
201Delineators flexible (633.0200)EACH13$75.00$68.50
202Markers culvert end (633.5200)EACH1$100.00$65.50
203Posts wood 4X6-inch X 18-FT (634.0618)EACH262$125.00$77.00
204Signs type I reflective SH (637.1220)SF78.50$40.00$33.50
205Signs type II reflective H (637.2210)SF1,905.65$25.00$18.90
206Signs type II reflective H folding (637.2215)SF298.40$38.00$23.90
207Signs type II reflective F (637.2230)SF407.25$26.00$20.50
208Moving signs type II (638.2102)EACH72$125.00$75.00
209Removing signs type II (638.2602)EACH193$50.00$15.00
210Removing small sign supports (638.3000)EACH219$50.00$17.00
211Traffic control drums (643.0300)DAY471,211$0.12$0.08
212Traffic control barricades type III (643.0420)DAY59,985$0.45$0.45
213Traffic control flexible tubular marker posts (643.0500)EACH1,055$35.00$28.00
214Traffic control flexible tubular marker bases (643.0600)EACH1,055$11.50$5.00
215Traffic control warning lights type A (643.0705)DAY61,171$0.25$0.05
216Traffic control warning lights type C (643.0715)DAY39,111$0.10$0.05
217Traffic control arrow boards (643.0800)DAY1,441$7.25$8.00
218Traffic control signs (643.0900)DAY213,998$0.15$0.25
219Traffic control covering signs type II (643.0920)EACH2$95.00$35.00
220Traffic control signs fixed message (643.1000)SF342.50$23.50$13.25
221Traffic control signs PCMS (643.1050)DAY112$35.00$20.00
222Temporary marking line paint 6- inch (643.3165)LF53,731$0.18$0.40
223Temporary marking line epoxy 6- inch (643.3170)LF109,074$0.30$0.50
224Temporary marking line removable tape 6-inch (643.3180)LF120,978$1.60$1.25
225Temporary marking line paint 10- inch (643.3265)LF6,704$0.30$0.92
226Temporary marking line epoxy 10- inch (643.3270)LF6,530$1.00$1.15
227Temporary marking line removable tape 10-inch (643.3280)LF9,858$3.00$2.00
228Temporary marking crosswalk paint 6-inch (643.3305)LF633$2.00$0.65
229Temporary marking crosswalk epoxy 6-inch (643.3320)LF950$8.00$1.50
230Temporary marking crosswalk removable tape 6-inch (643.3350)LF3,621$2.05$1.35
231Temporary marking stop line paint 18-inch (643.3805)LF416$4.25$3.00
232Temporary marking stop line epoxy 18-inch (643.3820)LF1,050$10.00$4.00
233Temporary marking stop line removable tape 18-inch (643.3850)LF1,178$6.00$3.92
234Traffic control (643.5000)EACH1$115,000$168,373
235Temporary pedestrian surface asphalt (644.1410)SF294$17.00$17.00
236Temporary pedestrian surface plate (644.1430)SF3,392$8.00$4.00
237Temporary pedestrian curb ramp (644.1601)DAY748$5.15$4.00
238Temporary pedestrian detectable warning field (644.1605)SF288$8.25$4.00
239Temporary pedestrian barricade (644.1810)LF3,080$5.00$6.00
240Geotextile type DF schedule A (645.0111)SY19,783$0.67$2.23
241Geotextile type HR (645.0120)SY582$3.40$5.10
242Geogrid type SR (645.0220)SY146,200$1.00$0.70
243Marking line epoxy 4-inch (646.1020)LF3,697$0.32$0.99
244Marking line grooved wet ref epoxy 4-inch (646.1040)LF185$2.00$1.20
245Marking line grooved wet ref contrast epoxy 4-inch (646.1545)LF425$3.00$3.50
246Marking line grooved black epoxy 6-inch (646.2025)LF11,647$1.50$1.10
247Marking line grooved wet ref epoxy 6-inch (646.2040)LF74,917$1.08$1.37
248Marking line epoxy 8-inch (646.3020)LF88$2.00$1.98
249Marking line grooved wet ref epoxy 8-inch (646.3040)LF100$3.00$2.00
250Marking line grooved wet ref contrast epoxy 8-inch (646.3545)LF667$2.00$6.85
251Marking line grooved wet ref epoxy 10-inch (646.4040)LF13,716$1.90$3.00
252Marking arrow epoxy (646.5020)EACH91$215.00$225.00
253Marking word epoxy (646.5120)EACH25$250.00$250.00
254Marking outfall epoxy (646.5520)EACH13$34.20$68.00
255Marking stop line epoxy 18-inch (646.6120)LF1,033$10.00$13.15
256Marking yield line epoxy 18-inch (646.6220)EACH172$26.67$65.00
257Cold weather marking epoxy 6-inch (646.6466)LF71,189$0.35$0.60
258Cold weather marking epoxy 10- inch (646.6470)LF7,384$0.85$1.10
259Marking diagonal epoxy 12-inch (646.7120)LF1,169$10.89$9.50
260Marking crosswalk epoxy transverse line 6-inch (646.7420)LF4,453$10.00$10.00
261Marking crosswalk epoxy block style 24-inch (646.7520)LF178$18.00$17.00
262Marking corrugated median epoxy (646.8020)SF913$6.52$9.00
263Marking curb epoxy (646.8120)LF1,100$5.36$8.25
264Marking island nose epoxy (646.8220)EACH48$200.00$275.00
265Marking removal line 4-inch (646.9000)LF1,165$0.20$0.50
266Marking removal line 6-inch (646.9002)LF26,291$0.20$0.65
267Marking removal line water blasting 4-inch (646.9010)LF1,772$0.30$1.00
268Marking removal line water blasting 6-inch (646.9012)LF16,590$0.30$1.00
269Marking removal line 8-inch (646.9100)LF398$0.35$1.20
270Marking removal line 10-inch (646.9102)LF2,979$0.40$1.25
271Marking removal line water blasting 8-inch (646.9110)LF285$0.75$2.00
272Marking removal line water blasting 10-inch (646.9112)LF1,358$0.85$2.00
273Marking removal line wide (646.9200)LF779$2.50$3.00
274Marking removal line water blasting wide (646.9210)LF377$5.75$4.00
275Marking removal special marking water blasting (646.9310)EACH2$220.00$250.00
276Construction staking storm sewer (650.4000)EACH448$74.00$74.00
277Construction staking subgrade (650.4500)LF25,116$0.01$1.50
278Construction staking base (650.5000)LF26,687$1.75$1.75
279Construction staking curb gutter and curb & gutter (650.5500)LF51,802$0.95$0.95
280Construction staking concrete pavement (650.7000)LF665$3.40$3.40
281Construction staking electrical installations (project) 001. 2773-10- 70 (650.8501)EACH1$8,350.00$8,350.00
282Construction staking curb ramps (650.9000)EACH82$152.00$152.00
283Construction staking sidewalk (project) 001. 2773-10-70 (650.9500)EACH1$10,900$10,900
284Construction staking sidewalk (project) 002. 2773-10-72 (650.9500)EACH1$3,800.00$3,800.00
285Construction staking supplemental control (project) 001. 2773-10-70 (650.9911)EACH1$3,600.00$3,600.00
286Construction staking supplemental control (project) 002. 2773-10-72 (650.9911)EACH1$220.00$220.00
287Construction staking slope stakes (650.9920)LF27,019$0.76$0.76
288Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF8,896$10.84$10.84
289Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF7,337$13.59$13.59
290Conduit loop detector (652.0800)LF12,388$10.82$10.82
291Pull boxes steel 24X36-inch (653.0135)EACH46$1,448.44$1,448.44
292Pull boxes steel 24X42-inch (653.0140)EACH68$1,520.78$1,520.78
293Adjusting pull boxes (653.0900)EACH28$655.14$655.14
294Removing pull boxes (653.0905)EACH96$127.74$127.74
295Concrete bases type 1 (654.0101)EACH30$973.20$973.20
296Concrete bases type 2 (654.0102)EACH4$1,269.70$1,269.70
297Concrete bases type 5 (654.0105)EACH9$1,129.64$1,129.64
298Concrete bases type 10 (654.0110)EACH4$6,394.93$6,394.93
299Concrete bases type 13 (654.0113)EACH2$10,854$10,854
300Concrete bases type 10-special (654.0120)EACH6$7,964.20$7,964.20
301Concrete control cabinet bases type 9 special (654.0217)EACH1$2,218.79$2,218.79
302Cable traffic signal 5-14 AWG (655.0230)LF4,855$1.79$1.79
303Cable traffic signal 7-14 AWG (655.0240)LF11,008$2.21$2.21
304Cable traffic signal 12-14 AWG (655.0260)LF4,078$3.70$3.70
305Cable traffic signal 15-14 AWG (655.0270)LF2,355$4.51$4.51
306Cable traffic signal 21-14 AWG (655.0290)LF3,158$5.64$5.64
307Cable type UF 2-10 AWG grounded (655.0320)LF7,333$1.86$1.86
308Electrical wire traffic signals 10 AWG (655.0515)LF17,501$1.74$1.74
309Electrical wire lighting 12 AWG (655.0610)LF5,516$0.94$0.94
310Loop detector lead in cable (655.0700)LF51,172$1.25$1.25
311Loop detector wire (655.0800)LF49,196$0.94$0.94
312Traffic signal evp detector cable (655.0900)LF8,435$1.24$1.24
313Electrical service meter breaker pedestal (location) 100. ush 18/STH 59/164 & pearl ST (656.0201)EACH1$1,530.98$1,530.98
314Pedestal bases (657.0100)EACH34$372.63$372.63
315Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH13$659.92$659.92
316Poles type 3 (657.0310)EACH4$3,735.44$3,735.44
317Poles type 5-aluminum (657.0322)EACH9$2,057.36$2,057.36
318Traffic signal standards aluminum 3.5-FT (657.0405)EACH4$464.87$464.87
319Traffic signal standards aluminum 13-FT (657.0420)EACH11$878.48$878.48
320Traffic signal standards aluminum 15-FT (657.0425)EACH5$918.20$918.20
321Traffic signal standards aluminum 10-FT (657.0430)EACH14$824.72$824.72
322Luminaire arms single member 4- inch clamp 6-FT (657.0609)EACH6$339.98$339.98
323Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610)EACH9$334.14$334.14
324Traffic signal face 3S 12-inch (658.0173)EACH59$934.14$934.14
325Traffic signal face 4S 12-inch (658.0174)EACH17$1,254.33$1,254.33
326Pedestrian signal face 16-inch (658.0416)EACH35$564.27$564.00
327Signal mounting hardware (location) 100. ush 18/STH 59/164 & sunset DR (658.5070)EACH1$4,786.19$4,786.19
328Signal mounting hardware (location) 101. ush 18/STH 59/164 & CTH Y (658.5070)EACH1$1,971.10$1,971.10
329Signal mounting hardware (location) 102. ush 18/STH 59/164 & CTH D (658.5070)EACH1$3,289.24$3,289.24
330Signal mounting hardware (location) 103. ush 18/STH 59/164 & pearl ST (658.5070)EACH1$4,993.03$4,993.03
331Signal mounting hardware (location) 104. ush 18/STH 59/164 & arcadian ave (658.5070)EACH1$4,316.43$4,316.43
332Signal mounting hardware (location) 105. ush 18/STH 59 & oakdale DR (658.5070)EACH1$894.83$894.83
333Luminaires utility LED C (659.1125)EACH25$589.91$589.91
334Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH89$12.91$12.91
335Temporary traffic signals for intersections (location) 100. ush 18/STH 59/164 & arcadian ave (661.0201)EACH1$88,573$88,573
336Temporary traffic signals for intersections (location) 101. ush 18/STH 59/164 & pearl ST (661.0201)EACH1$75,387$75,387
337Temporary traffic signals for intersections (location) 102. ush 18/STH 59/164 & CTH D (661.0201)EACH1$73,532$73,532
338Temporary traffic signals for intersections (location) 103. ush 18/STH 59/164 & CTH Y (661.0201)EACH1$86,389$86,389
339Temporary traffic signals for intersections (location) 104. ush 18/STH 59/164 & sunset DR (661.0201)EACH1$72,968$72,968
340Generators (661.0300)DAY5$96.67$96.67
341Field system integrator (670.0101)EACH1$25,075$25,075
342ITS documentation (670.0201)EACH1$5,793.66$5,793.66
343Communication vault type 1 (673.0105)EACH1$3,798.32$3,798.32
344Remove cable (674.0300)LF3,615$1.30$1.30
345Reinstall cable (674.0400)LF124$5.71$5.71
346Install camera assembly (677.0200)EACH5$7,555.00$7,555.00
347Install fiber optic cable outdoor plant 6-CT (678.0006)LF3,777$1.65$1.65
348Fiber optic splice enclosure (678.0200)EACH5$2,036.68$2,036.68
349Fiber optic splice (678.0300)EACH32$185.68$185.68
350Communication system testing (678.0501)EACH1$5,793.66$5,793.66
351Install ethernet switches (678.0600)EACH2$1,310.99$1,310.99
352Sawing asphalt (690.0150)LF3,705$1.15$1.15
353Sawing concrete (690.0250)LF22,988$2.20$2.20
354Incentive compressive strength concrete pavement (715.0720)DOL500$1.00$1.00
355Incentive iri ride (740.0440)DOL26,000$1.00$1.00
356On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS6,300$5.00$5.00
357On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS10,000$5.00$5.00
358Special 001. backfill slurry (SPV.0035)CY1,783$93.00$152.66
359Special 001. section corner monuments (SPV.0060)EACH1$3,000.00$1,250.00
360Special 002. storm sewer locate (SPV.0060)EACH1$1,350.00$1,500.00
361Special 003. temporary pipe connection 12-inch (SPV.0060)EACH7$500.00$1,590.50
362Special 004. temporary pipe connection 15-inch (SPV.0060)EACH2$500.00$1,814.03
363Special 005. temporary pipe connection 18-inch (SPV.0060)EACH3$500.00$2,063.21
364Special 006. temporary pipe connection 24-inch (SPV.0060)EACH4$500.00$2,361.01
365Special 007. temporary pipe connection 30-inch (SPV.0060)EACH1$500.00$2,646.65
366Special 008. temporary pipe connection 36-inch (SPV.0060)EACH1$500.00$3,100.80
367Special 009. field facilities office space (SPV.0060)EACH1$70,000$88,192
368Special 010. adjusting manhole frames and covers (SPV.0060)EACH15$1,200.00$712.44
369Special 011. catch basins 8-FT diameter (SPV.0060)EACH5$8,920.00$12,403
370Special 100. install poles type 9 - over height (SPV.0060)EACH1$1,347.79$1,347.79
371Special 101. install poles type 10 (SPV.0060)EACH3$1,532.27$1,532.27
372Special 102. install poles type 9 special (SPV.0060)EACH1$1,347.79$1,347.79
373Special 103. install poles type 9 special - over height (SPV.0060)EACH2$1,347.79$1,347.79
374Special 104. install poles type 10 special (SPV.0060)EACH2$1,532.27$1,532.27
375Special 105. install poles type 10 special - over height (SPV.0060)EACH1$1,532.27$1,532.27
376Special 106. install poles type 12 - over height (SPV.0060)EACH2$1,532.27$1,532.27
377Special 107. install poles type 13 - over height (SPV.0060)EACH3$1,532.27$1,532.27
378Special 108. install monotube arms 15-FT (SPV.0060)EACH2$1,589.53$1,589.53
379Special 109. install monotube arms 25-FT (SPV.0060)EACH1$1,589.53$1,589.53
380Special 110. install monotube arms 30-FT (SPV.0060)EACH1$1,958.50$1,958.50
381Special 111. install monotube arms 35-FT type 9/10 special pole (SPV.0060)EACH2$2,327.47$2,327.47
382Special 112. install monotube arms 40-FT type 9/10 special pole (SPV.0060)EACH3$2,327.47$2,327.47
383Special 113. install monotube arms 45-FT type 9/10 special pole (SPV.0060)EACH1$2,327.47$2,327.47
384Special 114. install monotube arms 45-FT type 12/13 pole (SPV.0060)EACH1$2,327.47$2,327.47
385Special 115. install monotube arms 55-FT (SPV.0060)EACH4$2,820.32$2,820.32
386Special 116. install luminaire arms steel 15-FT (SPV.0060)EACH10$161.74$161.74
387Special 117. transport & install SF traffic signal cabinet ush 18/STH 59/164 & pearl ST (SPV.0060)EACH1$9,665.22$9,665.22
388Special 118. transport & install SF traffic signal cabinet ush 18/STH 59/164 & sunset DR (SPV.0060)EACH1$11,317$11,317
389Special 119. transport traffic signal & inter LGT matl ush 18/STH 59/164 & arcadian ave (SPV.0060)EACH1$4,268.50$4,268.50
390Special 120. transport traffic signal & inter LGT matl ush 18/STH 59/164 & pearl ST (SPV.0060)EACH1$737.94$737.94
391Special 121. transport traffic signal & inter LGT matl ush 18/STH 59/164 & CTH D (SPV.0060)EACH1$9,093.57$9,093.57
392Special 122. transport traffic signal & inter LGT matl ush 18/STH 59/164 & CTH Y (SPV.0060)EACH1$10,289$10,289
393Special 123. transport traffic signal & inter LGT matl ush 18/STH 59/164 & sunset DR (SPV.0060)EACH1$737.94$737.94
394Special 124. transport & install SF evp detector heads ush 18/STH 59/164 & arcadian ave (SPV.0060)EACH1$2,264.37$2,264.37
395Special 125. transport & install SF evp detector heads ush 18/STH 59/164 & pearl ST (SPV.0060)EACH1$2,264.37$2,264.37
396Special 126. transport & install SF evp detector heads ush 18/STH 59/164 & CTH D (SPV.0060)EACH1$2,264.37$2,264.37
397Special 127. transport & install SF evp detector heads ush 18/STH 59/164 & CTH Y (SPV.0060)EACH1$2,264.37$2,264.37
398Special 128. transport & install SF evp detector heads ush 18/STH 59/164 & sunset DR (SPV.0060)EACH1$2,264.37$2,264.37
399Special 129. transport & install SF evp detector heads ush 18/STH 59/164 & oakdale DR (SPV.0060)EACH1$2,264.37$2,264.37
400Special 130. transport & install SF video detection sys ush 18/STH 59/164 & arcadian (SPV.0060)EACH1$6,507.54$6,507.54
401Special 131. transport & install SF video detection sys ush 18/STH 59/164 & pearl ST (SPV.0060)EACH1$3,740.26$3,740.26
402Special 132. transport & install SF video detection sys ush 18/STH 59/164 & CTH D (SPV.0060)EACH1$3,740.26$3,740.26
403Special 133. transport & install SF video detection sys ush 18/STH 59/164 & sunset DR (SPV.0060)EACH1$3,740.26$3,740.26
404Special 134. transport & install SF radar detection sys ush 18/STH 59/164 & CTH Y (SPV.0060)EACH1$3,740.26$3,740.26
405Special 135. temporary infrared evp system ush 18/STH 59/164 & arcadian ave (SPV.0060)EACH1$3,586.60$3,586.60
406Special 136. temporary infrared evp system ush 18/STH 59/164 & pearl ST (SPV.0060)EACH1$3,586.60$3,586.60
407Special 137. temporary infrared evp system ush 18/STH 59/164 & CTH D (SPV.0060)EACH1$3,586.60$3,586.60
408Special 138. temporary infrared evp system ush 18/STH 59/164 & CTH Y (SPV.0060)EACH1$3,586.60$3,586.60
409Special 139. temporary infrared evp system ush 18/STH 59/164 & sunset DR (SPV.0060)EACH1$3,586.60$3,586.60
410Special 140. transport & install SF audible ped sig sys ush 18/STH 59/164 & arcadian ave (SPV.0060)EACH1$1,844.86$1,844.86
411Special 141. transport & install SF audible ped sig sys ush 18/STH 59/164 & pearl ST (SPV.0060)EACH1$2,951.77$2,951.77
412Special 142. transport & install SF audible ped sig sys ush 18/STH 59/164 & CTH D (SPV.0060)EACH1$2,951.77$2,951.77
413Special 143. transport & install SF audible ped sig sys ush 18/STH 59/164 & CTH Y (SPV.0060)EACH1$4,058.68$4,058.68
414Special 144. transport & install SF audible ped sig sys ush 18/STH 59/164 & sunset DR (SPV.0060)EACH1$3,689.71$3,689.71
415Special 145. transport & install SF audible ped sig sys ush 18/STH 59/164 & oakdale DR (SPV.0060)EACH1$1,475.89$1,475.89
416Special 146. temporary accessible pedestrian signal system ush 18/STH 59/164 & CTH Y (SPV.0060)EACH1$12,635$12,635
417Special 147. temporary accessible pedestrian signal system ush 18/STH59/164 & sunset DR (SPV.0060)EACH1$5,872.38$5,872.38
418Special 148. removing concrete traffic signal bases type 13 (SPV.0060)EACH2$2,554.19$2,554.19
419Special 001. concrete curb & gutter 66-inch type D (SPV.0090)LF1,765$32.50$36.50
420Special 002. concrete curb & gutter 6-inch sloped 68-inch type J (SPV.0090)LF18,872$32.50$34.77
421Special 003. SS pipe reinforced concrete horizontal elliptical class HE-IV 38X60-inch (SPV.0090)LF1,558$353.00$372.86
422Special 004. SS pipe reinforced concrete horizontal elliptical class HE-IV 43X68-inch (SPV.0090)LF319$432.00$423.99
423Special 100. fiber optic warning tape (SPV.0090)LF2,942$0.56$0.56
424Special 101. foundation drilling 36- inch diameter (SPV.0090)LF15$1,481.04$1,481.04
425Special 001. excavation of phragmites contaminated soil (SPV.0180)SY271$64.50$12.80
426Special 002. herbicide application (SPV.0180)SY271$30.00$2.00
WisDOT contract 20250408030: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy