WisDOT contract 20250909007 bid tabulation

I-94 East West, Early East Leg; 30th Street to 25th Street (IH 094, Milwaukee County I-94 East-West). Let by Wisconsin DOT on September 9, 2025, Milwaukee. 3 bids received; low bid $60,951,508 by Zenith Tech., Inc. - Waukesha.

Owner
Wisconsin DOT
Letting
09 SEP 2025
Pay items
433
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Zenith Tech., Inc. - Waukesha$60,951,508Low
2Kraemer North America, LLC$62,709,872+3.0%
3Lunda Construction Company$69,642,926+14%
WisDOT contract 20250909007: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Zenith Tech., Inc. - Waukesha2. Kraemer North America, LLC3. Lunda Construction Company
1Clearing (201.0105)STA23$1,902.60$1,902.60$1,902.60
2Clearing (201.0120)ID140$25.37$25.37$25.37
3Grubbing (201.0205)STA23$317.10$317.10$317.10
4Grubbing (201.0220)ID140$5.29$5.29$5.29
5Removing structure (structure) 0010. R-40-10 (203.0220)EACH1$150,000$30,000$30,000
6Removing structure (structure) 0033. R-40-33 (203.0220)EACH1$50,000$10,000$10,000
7Removing structure (structure) 0043. B-40-43 (203.0220)EACH1$150,000$500,000$2,000,000
8Removing structure (structure) 0057. B-40-57 (203.0220)EACH1$50,000$10,000$10,000
9Removing structure (structure) 0513. B-40-513 (203.0220)EACH1$1,250,000$764,500$3,000,000
10Removing structure (structure) 1000. cip concrete retaining wall 415EW+60 - 416EW+83 (203.0220)EACH1$50,000$10,000$10,000
11Removing concrete pavement (204.0100)SY19,770$9.50$9.50$9.50
12Removing asphaltic surface (204.0110)SY4,290$4.00$4.00$4.00
13Removing asphaltic surface butt joints (204.0115)SY170$32.00$32.00$32.00
14Removing asphaltic surface milling (204.0120)SY95,720$4.75$4.75$4.75
15Removing curb & gutter (204.0150)LF130$10.00$10.00$10.00
16Removing concrete sidewalk (204.0155)SY1,560$13.00$13.00$13.00
17Removing concrete barrier (204.0157)LF2,170$9.00$9.00$9.00
18Removing guardrail (204.0165)LF1,400$2.60$2.60$2.60
19Removing fence (204.0170)LF2,840$2.50$4.50$4.50
20Removing concrete bases (204.0195)EACH26$360.00$360.00$360.00
21Removing manholes (204.0210)EACH12$1,693.00$997.67$1,693.00
22Removing inlets (204.0220)EACH38$497.00$497.00$497.00
23Removing storm sewer (size) 0001. 12-inch (204.0245)LF1,321$17.00$17.00$17.00
24Removing storm sewer (size) 0002. 15-inch (204.0245)LF1$93.00$93.00$93.00
25Removing storm sewer (size) 0003. 18-inch (204.0245)LF118$30.00$30.00$30.00
26Removing storm sewer (size) 0004. 21-inch (204.0245)LF351$25.00$25.00$25.00
27Removing storm sewer (size) 0005. 24-inch (204.0245)LF428$24.00$24.00$24.00
28Removing storm sewer (size) 0006. 27-inch (204.0245)LF276$27.00$27.00$27.00
29Removing storm sewer (size) 0007. 30-inch (204.0245)LF20$70.00$70.00$70.00
30Abandoning manholes (204.0250)EACH4$2,194.00$2,194.00$2,194.00
31Abandoning wells (204.0265)EACH3$7,500.00$2,500.00$5,000.00
32Abandoning sewer (204.0291.S)CY12$816.00$816.00$816.00
33Removing advance flasher assemblies type 1 (204.9001.S)EACH1$1,122.00$1,122.00$1,122.00
34Removing (item description) 0001. steps railing (204.9060.S)EACH2$1,000.00$1,000.00$1,000.00
35Removing (item description) 0002. removing bollard (204.9060.S)EACH2$500.00$1,000.00$500.00
36Removing (item description) 1002. lighting units (204.9060.S)EACH35$431.80$431.80$431.80
37Removing (item description) 3101. traffic signals W ST paul ave & N 27TH ST (204.9060.S)EACH1$6,426.00$6,426.00$6,426.00
38Removing (item description) 0002. landscape rock (204.9165.S)SF1,360$2.00$2.00$2.00
39Excavation common (205.0100)CY70,498$43.00$49.50$49.50
40Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S)TON1,415$48.00$48.00$48.00
41Excavation for structures bridges (structure) 1083. B-40-1083 (206.1001)EACH1$250,000$250,000$15,000
42Excavation for structures retaining walls (structure) 0761. R-40-761 (206.3001)EACH1$1,000,000$1,000,000$875,000
43Backfill controlled low strength (209.0200.S)CY40$166.04$1,200.00$250.00
44Backfill structure type A (210.1500)TON2,790$34.00$53.70$34.00
45Finishing roadway (project) 0001. 1060-27-74 (213.0100)EACH1$10,000$2,500.00$1,000.00
46Base aggregate dense 1 1/4-inch (305.0120)TON23,680$25.00$25.00$25.00
47Select crushed material (312.0110)TON29,470$25.00$25.00$25.00
48Removing pavement for base patching (390.0100)CY610$1.00$80.00$125.00
49Base patching asphaltic (390.0201)TON100$310.00$310.00$310.00
50Base patching concrete shes (390.0405)CY110$921.64$921.64$921.64
51Coloring concrete custom (405.0200)CY49$223.96$223.96$223.96
52Concrete pavement gaps (415.0210)EACH4$740.76$740.76$740.76
53Concrete pavement approach slab (415.0410)SY345$159.61$159.61$159.61
54Drilled tie bars (416.0610)EACH420$10.22$10.22$10.22
55Drilled dowel bars (416.0620)EACH550$15.21$15.21$15.21
56Concrete pavement repair shes (416.1715)SY360$326.97$326.97$326.97
57Concrete pavement replacement (416.1720)SY333$173.20$173.20$173.20
58Concrete pavement replacement shes (416.1725)SY10$368.44$368.44$368.44
59Asphaltic mixture for extreme conditions (450.1100.S)TON50$136.00$136.00$136.00
60HMA cold weather paving (450.4000)TON700$1.65$1.65$1.65
61Tack coat (455.0605)GAL15,791$2.30$2.30$2.30
62Incentive density HMA pavement (460.2000)DOL13,030$1.00$1.00$1.00
63HMA pavement 3 MT 58-28 S (460.6223)TON110$125.00$125.00$125.00
64HMA pavement 4 MT 58-28 S (460.6224)TON14,494$89.50$89.50$89.50
65HMA pavement 3 HT 58-28 S (460.7223)TON4,570$96.50$96.50$96.50
66HMA pavement 4 HT 58-28 H (460.7424)TON1,670$135.00$135.00$135.00
67Asphaltic surface (465.0105)TON7$275.00$275.00$275.00
68Asphaltic surface temporary (465.0125)TON720$225.00$225.00$225.00
69Cold patch (495.1000.S)TON100$333.03$600.00$300.00
70Ice hot weather concreting (501.1000.S)LB47,210$1.00$0.01$0.01
71Concrete masonry bridges (502.0100)CY1,382$850.00$1,200.00$1,050.00
72Concrete masonry soldier pile footings 0761. R-40-761 (502.0110.S)CY2,050$200.00$200.00$200.00
73Non-shrink grout (502.0120.S)CF6$1,500.00$500.00$1,000.00
74Expansion device (502.3101)LF200$300.00$400.00$310.00
75Protective surface treatment (502.3200)SY4,019$3.75$1.75$5.00
76Pigmented surface sealer (502.3210)SY338$15.00$30.00$6.00
77Adhesive anchors no. 6 bar (502.4206)EACH160$45.00$45.00$25.00
78Concrete masonry retaining walls (504.0500)CY1,615$1,100.00$1,200.00$1,050.00
79Bar steel reinforcement HS structures (505.0400)LB87,160$1.50$1.55$1.65
80Bar steel reinforcement HS coated structures (505.0600)LB650,100$1.60$1.65$1.86
81Bar couplers no. 10 (505.0910)EACH348$185.00$180.00$200.00
82Structural steel HS (506.0605)LB1,153,680$4.00$4.00$3.60
83Welded stud shear connectors 7/8X6-inch (506.3015)EACH16,746$11.75$6.00$12.82
84Welded stud shear connectors 7/8X7-inch (506.3020)EACH54$12.50$20.00$32.07
85Welded stud shear connectors 7/8X10-inch (506.3035)EACH7,952$15.00$21.00$15.64
86Bearing assemblies fixed (structure) 1083. B-40-1083 (506.5000)EACH22$3,100.00$4,000.00$7,000.00
87Bearing assemblies expansion (structure) 0513. B-40-513_5 (506.6000)EACH9$3,000.00$3,300.00$10,500
88Bearing assemblies expansion (structure) 1083.B-40-1083 (506.6000)EACH21$2,500.00$3,300.00$5,500.00
89Concrete surface repair (509.1500)SF250$200.00$200.00$125.00
90Temporary shoring (structure) 0010. R-40-10 (511.1200)SF4,000$26.34$0.01$30.00
91Temporary shoring (structure) 0761. R-40-761 (511.1200)SF568$100.00$0.01$100.00
92Temporary shoring left in place (structure) 0057. B-40-57 (511.2200)SF1,000$100.00$0.01$90.00
93Temporary shoring left in place (structure) 0761. R-40-761 (511.2200)SF223$125.00$0.01$275.00
94Temporary shoring left in place (location) 0001. IH 94 EB (511.2300)SF3,300$95.00$0.01$50.00
95Temporary shoring left in place (location) 0002. IH 94 WB (511.2300)SF900$95.00$0.01$100.00
96Piling steel sheet permanent delivered (512.0500)SF225$68.50$40.00$100.00
97Piling steel sheet permanent driven (512.0600)SF225$41.00$40.00$10.00
98Railing pipe 0761. R-40-761 (513.2001)LF1,615$205.00$200.00$250.00
99Railing tubular screening (513.4091)LF826$325.00$350.00$260.00
100Floor drains type WF (514.0450)EACH5$5,000.00$5,500.00$6,000.00
101Downspout 8-inch (514.2608)LF270$225.00$200.00$300.00
102Dampproofing (516.0100)SY7,442$15.00$17.11$17.11
103Rubberized membrane waterproofing (516.0500)SY30$50.00$10.00$25.00
104Painting epoxy system (structure) 0513. B-40-513_5 (517.0601)EACH1$55,000$8,000.00$16,000
105Painting epoxy system (structure) 0761. R-40-761 (517.0601)EACH1$50,000$10,000$127,500
106Painting epoxy system (structure) 1083. B-40-1083 (517.0601)EACH1$50,000$58,000$114,950
107Preparation and coating of top flanges (structure) 0513. B-40- 513_5 (517.0901.S)EACH1$5,500.00$5,500.00$8,120.00
108Structure repainting recycled abrasive (structure) 0513. B-40- 513_5 (517.1801.S)EACH1$63,000$63,000$102,375
109Negative pressure containment and collection of waste materials (structure) 0513. B-40-513_5 (517.4501.S)EACH1$47,000$47,000$81,900
110Portable decontamination facility (517.6001.S)EACH1$4,000.00$4,000.00$1.00
111Concrete masonry ancillary structures type NS (531.1100)CY5$1,200.00$1,200.00$1,200.00
112Steel reinforcement HS ancillary structures type NS (531.1140)LB720$4.75$4.75$4.75
113Drilling shaft 24-inch (531.2024)LF40$50.00$50.00$50.00
114Concrete curb & gutter 31-inch (601.0331)LF3,023$26.60$26.60$26.60
115Concrete curb & gutter 18-inch type A (601.0405)LF22$79.86$79.86$79.86
116Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF287$25.94$25.94$25.94
117Concrete curb pedestrian (601.0600)LF56$75.58$75.58$75.58
118Concrete sidewalk 5-inch (602.0410)SF17,550$6.25$6.25$6.25
119Curb ramp detectable warning field natural patina (602.0515)SF170$48.07$48.07$48.07
120Curb ramp detectable warning field radial natural patina (602.0615)SF15$76.89$76.89$76.89
121Concrete driveway 7-inch (602.0815)SY155$72.85$72.85$72.85
122Concrete driveway hes 7-inch (602.0865)SY140$76.34$76.34$76.34
123Concrete steps (602.1500)SF135$84.46$84.46$84.46
124Concrete barrier temporary precast delivered (603.8000)LF9,312.50$17.00$15.00$10.89
125Concrete barrier temporary precast installed (603.8125)LF17,137.50$2.26$5.00$4.80
126Anchoring concrete barrier temporary precast (603.8500)LF2,275$8.25$10.00$20.22
127Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF1,579$151.00$151.00$151.00
128Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF2,107$149.00$149.00$149.00
129Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF152$200.00$200.00$200.00
130Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF1,072$204.00$204.00$204.00
131Storm sewer pipe reinforced concrete class III 30-inch (608.0330)LF1,103$222.00$222.00$222.00
132Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF51$152.00$152.00$152.00
133Storm sewer pipe reinforced concrete class IV 30-inch (608.0430)LF92$224.00$224.00$224.00
134Storm sewer pipe reinforced concrete class IV 42-inch (608.0442)LF13$466.00$466.00$466.00
135Manhole covers type J (611.0530)EACH16$837.00$837.00$837.00
136Inlet covers type C (611.0612)EACH2$1,002.00$1,002.00$1,002.00
137Inlet covers type H (611.0624)EACH3$1,024.00$1,024.00$1,024.00
138Inlet covers type HM (611.0627)EACH5$1,210.00$1,210.00$1,210.00
139Inlet covers type MS (611.0642)EACH4$759.00$759.00$759.00
140Inlet covers type V (611.0654)EACH47$967.00$967.00$967.00
141Inlet covers type VV-B (611.0656)EACH12$2,181.00$2,181.00$2,181.00
142Catch basins 4-FT diameter (611.1004)EACH33$3,622.00$3,622.00$3,622.00
143Catch basins 5-FT diameter (611.1005)EACH2$4,883.00$4,883.00$4,883.00
144Manholes 4-FT diameter (611.2004)EACH21$3,780.00$3,780.00$3,780.00
145Manholes 5-FT diameter (611.2005)EACH20$5,221.00$5,221.00$5,221.00
146Manholes 6-FT diameter (611.2006)EACH3$7,145.00$7,145.00$7,145.00
147Manholes 7-FT diameter (611.2007)EACH1$12,927$12,927$12,927
148Inlets 4-FT diameter (611.3004)EACH23$2,803.00$2,803.00$2,803.00
149Inlets 2X2-FT (611.3220)EACH1$3,387.00$3,387.00$3,387.00
150Inlets 2X2.5-FT (611.3225)EACH37$2,169.00$2,169.00$2,169.00
151Inlets 2X3-FT (611.3230)EACH2$2,593.00$2,593.00$2,593.00
152Inlets median 2 grate (611.3902)EACH2$7,735.00$7,735.00$7,735.00
153Adjusting manhole covers (611.8110)EACH16$482.00$482.00$482.00
154Adjusting inlet covers (611.8115)EACH4$778.00$778.00$778.00
155Cover plates temporary (611.8120.S)EACH12$318.00$318.00$318.00
156Pipe underdrain unperforated 6- inch (612.0206)LF455$19.00$19.00$19.00
157Pipe underdrain unperforated 8- inch (612.0208)LF85$51.00$51.00$51.00
158Pipe underdrain wrapped 6-inch (612.0406)LF185$26.00$26.00$26.00
159Apron endwalls for underdrain reinforced concrete 6-inch (612.0806)EACH4$1,100.00$400.00$250.00
160Crash cushions temporary (614.0905)EACH5$5,176.38$4,425.00$4,425.00
161Fence chain link 6-FT (616.0206)LF1,770$24.50$24.50$24.50
162Gates chain link (width) 0001. 4-FT (616.0329)EACH1$2,500.00$2,500.00$2,500.00
163Gates chain link (width) 0002. 12- FT (616.0329)EACH1$3,500.00$3,500.00$3,500.00
164Fence safety (616.0700.S)LF9$25.00$3.40$50.00
165Mobilization (619.1000)EACH1$8,150,000$6,000,000$6,898,000
166Concrete median sloped nose (620.0300)SF189$12.96$12.96$12.96
167Dust control surface treatment (623.0200)SY27,800$0.01$0.01$0.01
168Water (624.0100)MGAL376$100.00$100.00$100.00
169Topsoil (625.0100)SY8,010$6.00$6.00$6.00
170Salvaged topsoil (625.0500)SY19,930$3.00$3.00$3.00
171Mulching (627.0200)SY22,830$0.28$0.28$0.28
172Erosion bales (628.1104)EACH10$17.50$17.50$17.50
173Silt fence (628.1504)LF3,810$2.25$2.25$2.25
174Silt fence maintenance (628.1520)LF3,810$0.05$0.05$0.05
175Mobilizations erosion control (628.1905)EACH35$200.00$200.00$200.00
176Mobilizations emergency erosion control (628.1910)EACH26$250.00$250.00$250.00
177Erosion mat class I type B (628.2004)SY18,550$1.10$1.10$1.10
178Erosion mat urban class I type A (628.2006)SY1,350$1.80$1.80$1.80
179Soil stabilizer type B (628.6510)ACRE5$800.00$800.00$800.00
180Inlet protection type A (628.7005)EACH130$150.00$150.00$150.00
181Inlet protection type D (628.7020)EACH225$125.00$125.00$125.00
182Temporary ditch checks (628.7504)LF245$8.75$8.75$8.75
183Tracking pads (628.7560)EACH4$5,000.00$5,000.00$5,000.00
184Rock bags (628.7570)EACH125$17.50$17.50$17.50
185Fertilizer type B (629.0210)CWT20$68.00$68.00$68.00
186Seeding mixture no. 20 (630.0120)LB1,930$7.50$7.50$7.50
187Seeding temporary (630.0200)LB1,160$3.50$3.50$3.50
188Seed water (630.0500)MGAL470$25.00$25.00$25.00
189Sod water (631.0300)MGAL16$25.00$25.00$25.00
190Sod lawn (631.1000)SY1,500$10.50$10.50$10.50
191Markers permanent flexible (633.5350)EACH20$75.00$75.00$75.00
192Posts wood 4X6-inch X 20-FT (634.0620)EACH48$150.00$150.00$150.00
193Sign supports structural steel HS (635.0200)LB1,600$5.00$5.00$5.00
194Signs type II reflective H (637.2210)SF522.10$22.00$22.00$22.00
195Signs type II reflective H folding (637.2215)SF20.72$30.00$30.00$30.00
196Signs type II reflective SH (637.2220)SF6.75$22.50$22.50$22.50
197Signs type II reflective F (637.2230)SF531$24.00$24.00$24.00
198Moving signs type I (638.2101)EACH2$600.00$600.00$600.00
199Moving signs type II (638.2102)EACH63$125.00$125.00$125.00
200Removing signs type II (638.2602)EACH80$25.00$25.00$25.00
201Removing small sign supports (638.3000)EACH57$25.00$25.00$25.00
202Removing structural steel sign supports (638.3100)EACH4$400.00$400.00$400.00
203Traffic control drums (643.0300)DAY159,650$0.20$0.20$0.20
204Traffic control barricades type II (643.0410)DAY7,225$0.50$0.50$0.50
205Traffic control barricades type III (643.0420)DAY38,550$0.55$0.55$0.55
206Traffic control warning lights type A (643.0705)DAY77,070$0.11$0.11$0.11
207Traffic control warning lights type C (643.0715)DAY40,790$0.14$0.14$0.14
208Connected arrow board (643.0810.S)DAY2,400$5.95$5.95$5.95
209Traffic control signs (643.0900)DAY249,210$0.15$0.15$0.15
210Traffic control covering signs type I (643.0910)EACH45$225.00$225.00$225.00
211Traffic control covering signs type II (643.0920)EACH325$55.00$55.00$55.00
212Traffic control signs fixed message (643.1000)SF925$15.60$15.60$15.60
213Traffic control signs PCMS (643.1050)DAY2,430$13.25$13.25$13.25
214Connected work zone start and end location markers (643.1220.S)DAY1,435$3.85$3.85$3.85
215Temporary marking line removable tape 4-inch (643.3150)LF3,170$1.45$1.45$1.45
216Temporary marking line epoxy 6- inch (643.3170)LF51,300$0.47$0.47$0.47
217Temporary marking line black epoxy 6-inch (643.3175)LF1,625$0.38$0.38$0.38
218Temporary marking line removable tape 6-inch (643.3180)LF14,915$1.85$1.85$1.85
219Temporary marking line epoxy 10- inch (643.3270)LF2,740$1.62$1.62$1.62
220Temporary marking arrow removable tape (643.3550)EACH3$175.00$175.00$175.00
221Temporary marking raised pavement marker type I (643.3760)EACH265$10.50$10.50$10.50
222Temporary marking removable mask out tape 6-inch (643.3960)LF2,300$2.46$2.46$2.46
223Traffic control interim lane closure (643.4100)EACH528$655.00$655.00$655.00
224Traffic control (643.5000)EACH1$170,000$170,000$170,000
225Temporary pedestrian surface asphalt (644.1410)SF250$9.50$9.50$9.50
226Temporary pedestrian surface plate (644.1430)SF100$16.25$16.25$16.25
227Temporary pedestrian curb ramp (644.1601)DAY25$45.00$45.00$45.00
228Temporary pedestrian detectable warning field (644.1605)SF15$15.00$15.00$15.00
229Temporary pedestrian barricade (644.1810)LF650$7.05$7.05$7.05
230Temporary audible message devices (644.1900.S)DAY3,510$2.75$2.75$2.75
231Geotextile type DF schedule A (645.0111)SY120$10.00$10.00$10.00
232Marking line epoxy 4-inch (646.1020)LF23,887$0.40$0.40$0.40
233Marking line epoxy 6-inch (646.2020)LF92,546$0.55$0.55$0.55
234Marking line epoxy 8-inch (646.3020)LF2,530$1.08$1.08$1.08
235Marking line epoxy 10-inch (646.4020)LF13,923$1.24$1.24$1.24
236Marking line grooved wet ref epoxy 10-inch (646.4040)LF177$3.31$3.31$3.31
237Marking arrow epoxy (646.5020)EACH40$442.89$442.89$442.89
238Marking word epoxy (646.5120)EACH7$448.20$448.20$448.20
239Marking symbol epoxy (646.5220)EACH63$429.97$429.97$429.97
240Marking stop line epoxy 18-inch (646.6120)LF392$18.56$18.56$18.56
241Marking diagonal epoxy 12-inch (646.7120)LF697$18.09$18.09$18.09
242Marking chevron epoxy 24-inch (646.7220)LF287$30.46$30.46$30.46
243Marking crosswalk epoxy transverse line 6-inch (646.7420)LF1,617$17.61$17.61$17.61
244Marking curb epoxy (646.8120)LF20$8.89$8.89$8.89
245Marking island nose epoxy (646.8220)EACH1$333.49$333.49$333.49
246Marking removal line 4-inch (646.9000)LF2,100$0.75$0.75$0.75
247Marking removal line water blasting 4-inch (646.9010)LF2,280$0.95$0.95$0.95
248Marking removal line grooved permanent tape 4-inch (646.9050)LF2,060$2.15$2.15$2.15
249Marking removal line 8-inch (646.9100)LF90$1.55$1.55$1.55
250Marking removal special marking (646.9300)EACH3$78.00$78.00$78.00
251Conduit rigid metallic 2-inch (652.0125)LF102$141.00$141.00$141.00
252Conduit rigid nonmetallic schedule 40 1-inch (652.0210)LF420$7.40$7.40$7.40
253Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF2,450$8.24$8.24$8.24
254Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF4,178$10.09$10.09$10.09
255Conduit rigid nonmetallic schedule 80 3-inch (652.0335)LF206$11.75$11.75$11.75
256Conduit special 3-inch (652.0615)LF39$73.20$73.20$73.20
257Install conduit into existing item (652.0700.S)EACH8$135.00$135.00$135.00
258Pull boxes steel 24X42-inch (653.0140)EACH3$1,292.00$1,292.00$1,292.00
259Junction boxes 18X12X6-inch (653.0222)EACH11$1,790.00$1,790.00$1,790.00
260Removing pull boxes (653.0905)EACH12$220.00$220.00$220.00
261Concrete bases type 2 (654.0102)EACH2$1,291.00$1,291.00$1,291.00
262Concrete bases type 5 (654.0105)EACH18$1,144.00$1,144.00$1,144.00
263Concrete bases type 10-special (654.0120)EACH2$9,857.00$9,857.00$9,857.00
264Cable in duct 4-4 AWG (655.0144)LF782$13.43$13.43$13.43
265Cable type UF 2-12 AWG grounded (655.0305)LF800$1.67$1.67$1.67
266Cable type UF 2-10 AWG grounded (655.0320)LF30$2.15$2.15$2.15
267Electrical wire traffic signals 12 AWG (655.0510)LF407$0.94$0.94$0.94
268Electrical wire lighting 4 AWG (655.0630)LF829$2.68$2.68$2.68
269Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH20$686.00$686.00$686.00
270Underdeck lighting (structure) 0015. B-40-0015 (659.0601)EACH1$9,682.00$9,682.00$9,682.00
271Luminaires underdeck LED C (659.1215)EACH2$696.00$696.00$696.00
272Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH60$12.40$12.40$12.40
273Temporary traffic signals for intersections (location) 3101. W ST paul ave & N 27TH ST left in place (661.0201)EACH1$71,471$71,471$71,471
274Ramp closure gates 32-FT (662.1032.S)EACH1$24,310$24,310$24,310
275Ramp closure gates 37-FT (662.1037.S)EACH1$29,397$29,397$29,397
276Field system integrator (670.0101)EACH1$42,717$42,717$42,717
277ITS documentation (670.0201)EACH1$10,790$10,790$10,790
278Remove cable (674.0300)LF2,090$1.02$1.02$1.02
279Reinstall cable (674.0400)LF60$5.30$5.30$5.30
280Install fiber optic cable outdoor plant 36-CT (678.0036)LF490$2.31$2.31$2.31
281Fiber optic splice (678.0300)EACH112$86.00$86.00$86.00
282Communication system testing (678.0501)EACH1$10,790$10,790$10,790
283Sawing asphalt (690.0150)LF4,210$1.35$1.35$1.50
284Sawing concrete (690.0250)LF6,170$2.30$2.30$2.69
285Incentive strength concrete structures (715.0502)DOL38,578$1.00$1.00$1.00
286Incentive strength concrete barrier (715.0603)DOL169$1.00$1.00$1.00
287Incentive flexural strength concrete pavement (715.0715)DOL2,004$1.00$1.00$1.00
288Railroad flagging reimbursement (801.0117)DOL200,000$1.00$1.00$1.00
289On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS14,000$5.00$5.00$5.00
290On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS45,000$5.00$5.00$5.00
291Special 0001. roadway embankment (SPV.0035)CY84,466$0.01$0.01$0.01
292Special 0004. excavation, hauling, and reuse of low-level petroleum contaminated soil (SPV.0035)CY37,200$12.00$12.00$12.00
293Special 0005. clay cap (SPV.0035)CY4,270$33.00$33.00$33.00
294Special 0006. lightweight foamed concrete fill grade 1 (SPV.0035)CY19,333$98.00$98.00$98.00
295Special 0007. lightweight foamed concrete fill grade 2 (SPV.0035)CY4,546$111.00$111.00$111.00
296Special 4000. HPC masonry structures (SPV.0035)CY1,247$1,200.00$1,400.00$1,050.00
297Special 0001. baseline CPM progress schedule (SPV.0060)EACH1$1.00$1.00$25,000
298Special 0002. monthly CPM progress schedule updates (SPV.0060)EACH23$1.00$1.00$250.00
299Special 0010. remove, salvage and reset boulder (SPV.0060)EACH1$1,500.00$5,000.00$1,000.00
300Special 0108. concrete barrier transition type S1 (SPV.0060)EACH1$31,872$31,872$31,872
301Special 0109. concrete barrier transition type S2 (SPV.0060)EACH1$51,249$51,249$51,249
302Special 0122. sawing concrete barrier (SPV.0060)EACH5$500.00$800.00$740.00
303Special 0123. salvage ramp gate (SPV.0060)EACH2$1,733.00$1,733.00$1,733.00
304Special 0129. survey project (1060- 27-74) (SPV.0060)EACH1$165,000$500,000$223,047
305Special 0150. round aluminum sign post system in soft surface 7- foot (SPV.0060)EACH3$230.00$230.00$230.00
306Special 0151. round aluminum sign post system in soft surface 10-foot (SPV.0060)EACH38$250.00$250.00$250.00
307Special 0152. round aluminum sign post system in soft surface 11-foot (SPV.0060)EACH3$250.00$250.00$250.00
308Special 0158. round aluminum sign post system in concrete surface 7-foot (SPV.0060)EACH1$210.00$210.00$210.00
309Special 0159. round aluminum sign post system in concrete surface 10-foot (SPV.0060)EACH1$225.00$225.00$225.00
310Special 0160. round aluminum sign post system in concrete surface 11-foot (SPV.0060)EACH2$225.00$225.00$225.00
311Special 0170. exposing existing infrastructure paved area (SPV.0060)EACH15$1,916.00$1,916.00$1,916.00
312Special 0171. exposing existing infrastructure unpaved area (SPV.0060)EACH15$1,916.00$1,916.00$1,916.00
313Special 0200. vibration control and monitoring of 122-inch combined sewer (SPV.0060)EACH1$4,000.00$25,583$31,350
314Special 0552. crash cushions temporary low maintenance left in place (SPV.0060)EACH3$36,150$36,150$36,150
315Special 0554. emergency response to traffic incident involving conc barrier temp precast (SPV.0060)EACH5$3,000.00$5,000.00$4,344.15
316Special 0555. emergency response to traffic incident involving crash cushion (SPV.0060)EACH5$315.00$315.00$315.00
317Special 0556. emergency response to pavement repair (SPV.0060)EACH10$5,000.00$2,040.00$5,040.00
318Special 0557. fixed message sign portable support special (SPV.0060)EACH2$1,540.00$1,540.00$1,540.00
319Special 0559. maintain and repair existing crash cushion (SPV.0060)EACH1$5,500.00$5,500.00$5,500.00
320Special 0560. maintain and repair existing sand barrel arrays (SPV.0060)EACH1$5,500.00$5,500.00$5,500.00
321Special 0564. traffic control close- open freeway to freeway system ramp (SPV.0060)EACH136$345.00$345.00$345.00
322Special 0565. traffic control close- open freeway entrance ramp (SPV.0060)EACH184$275.00$275.00$275.00
323Special 0566. traffic control full freeway closure (SPV.0060)EACH46$1,625.00$1,625.00$1,625.00
324Special 0567. traffic control signs left in place (SPV.0060)EACH4$235.00$235.00$235.00
325Special 0569. traffic control warning lights type A left in place (SPV.0060)EACH12$45.00$45.00$45.00
326Special 0570. traffic control barricades type III left in place (SPV.0060)EACH6$445.00$445.00$445.00
327Special 0571. traffic control local road lane closure (SPV.0060)EACH50$350.00$350.00$350.00
328Special 0572. thrie beam connection to concrete barrier temporary precast (SPV.0060)EACH1$1,500.00$5,000.00$5,040.11
329Special 1001. poles wood 60-FT (SPV.0060)EACH4$3,272.00$3,272.00$3,272.00
330Special 1002. wood pole lighting 60-FT (SPV.0060)EACH8$3,615.00$3,615.00$3,615.00
331Special 1004. luminaires utility floodlight (SPV.0060)EACH8$354.00$354.00$354.00
332Special 1005. poles type 30-AL-BD (SPV.0060)EACH8$2,350.40$2,350.40$2,350.40
333Special 1006. poles type 25-AL-BD (SPV.0060)EACH15$2,169.40$2,169.40$2,169.40
334Special 1010. luminaire historic milwaukee lantern LED3 (SPV.0060)EACH17$2,598.00$2,598.00$2,598.00
335Special 1013. inline 5A fast acting fuse with holder (SPV.0060)EACH24$254.00$254.00$254.00
336Special 1014. luminaire arms single member 6-FT. (SPV.0060)EACH6$280.00$280.00$280.00
337Special 1017. luminaire utility 2LED (SPV.0060)EACH3$686.00$686.00$686.00
338Special 1018. luminaire utility 3LED (SPV.0060)EACH3$686.00$686.00$686.00
339Special 1020. pull boxes 17-inch X 30-inch X 24-inch (SPV.0060)EACH18$1,262.00$1,262.00$1,262.00
340Special 1023. submersible multitap 3-port pre-insulated connector (SPV.0060)EACH58$182.00$182.00$182.00
341Special 1024. submersible multitap 4-port pre-insulated connector (SPV.0060)EACH84$197.00$197.00$197.00
342Special 1034. maintenance of lighting system (1060-27-74) (SPV.0060)EACH1$10,190$10,190$10,190
343Special 1044. lighting systems integrator project (1060-27-74) (SPV.0060)EACH1$4,920.00$4,920.00$4,920.00
344Special 1060. lighting equipment painting project 1060-27-74 (SPV.0060)EACH1$12,065$12,065$12,065
345Special 2000. removing electrical service meter breaker pedestal (SPV.0060)EACH1$1,171.00$1,171.00$1,171.00
346Special 2050. enter existing splice enclosure (SPV.0060)EACH1$1,150.00$1,150.00$1,150.00
347Special 2057. salvaged signal assembly advance flashed type 2 (SPV.0060)EACH1$1,733.00$1,733.00$1,733.00
348Special 3101. removing monotube concrete bases (SPV.0060)EACH4$1,728.00$1,728.00$1,728.00
349Special 3143. temporary evp system left in place W ST paul ave & N 27TH ST (SPV.0060)EACH1$8,692.00$8,692.00$8,692.00
350Special 3145. monotube base anchor bolt cover type 10 special (SPV.0060)EACH2$657.00$657.00$657.00
351Special 3146. covering traffic signal heads (SPV.0060)EACH6$321.00$321.00$321.00
352Special 4000. anchor assemblies light poles on structures (SPV.0060)EACH7$1,440.20$716.00$750.00
353Special 4010. bridge jacking B-40- 513_5 (SPV.0060)EACH1$35,000$100,000$50,000
354Special 4100. thermal integrity profile (tip) testing, drilled shaft foundation 34.65-in (SPV.0060)EACH17$5,350.00$5,225.00$3,500.00
355Special 4110. thermal integrity profile (tip) testing, drilled shaft foundation 59.06-in (SPV.0060)EACH10$5,350.00$5,225.00$3,500.00
356Special 4200. crosshole sonic log (CSL) testing, drilled foundation shaft 34.65-inch (SPV.0060)EACH17$4,750.00$4,500.00$4,500.00
357Special 4210. crosshole sonic log (CSL) testing, drilled foundation shaft 59.06-inch (SPV.0060)EACH10$4,750.00$5,000.00$4,500.00
358Special 4400. tieback anchors (SPV.0060)EACH472$6,000.00$6,000.00$6,000.00
359Special 4410. tieback anchors performance tests (SPV.0060)EACH31$1,500.00$1,500.00$1,500.00
360Special 4600. trial drilled foundation shaft 34.65-inch (SPV.0060)EACH1$40,000$55,000$40,000
361Special 4700. underdeck utility structure B-40-1083 (SPV.0060)EACH1$22,940$22,940$45,000
362Special 4800. retaining wall instrumentation R-40-761 (SPV.0060)EACH1$500,000$400,000$1,900,000
363Special 4810. retaining wall instrumentation R-40-767 (SPV.0060)EACH1$350,000$100,000$1,300,000
364Special 4900. embedded galvanic anodes (SPV.0060)EACH136$15.00$70.00$50.00
365Special 5000. installing hydrant (SPV.0060)EACH1$10,333$10,333$10,333
366Special 5001. removing hydrant/major (SPV.0060)EACH1$2,446.00$2,446.00$2,446.00
367Special 5002. installing hydrant - alteration (SPV.0060)EACH1$10,333$10,333$10,333
368Special 5003. adjusting water valve boxes (SPV.0060)EACH24$324.00$324.00$324.00
369Special 5004. connect original service (C.O.S.) (SPV.0060)EACH1$4,906.00$4,906.00$4,906.00
370Special 5200. manholes type tes 4-FT diameter (SPV.0060)EACH3$19,186$19,186$19,186
371Special 5201. manholes type tes doghouse 4-FT diameter (SPV.0060)EACH2$19,186$19,186$19,186
372Special 5202. manholes type tes 5-FT diameter (SPV.0060)EACH1$20,416$20,416$20,416
373Special 5204. removing cuc manholes (SPV.0060)EACH2$2,847.00$2,847.00$2,847.00
374Special 5210. install cement encased conduit into existing manhole (SPV.0060)EACH1$3,042.00$3,042.00$3,042.00
375Special 5212. adjusting tes manhole (SPV.0060)EACH1$1,500.00$2,500.00$1,000.00
376Special 8003. reconnect storm sewer (SPV.0060)EACH47$1,000.00$1,000.00$1,000.00
377Special 8005. sealing storm structure (SPV.0060)EACH14$336.00$336.00$336.00
378Special 8007. cover plates left in place (SPV.0060)EACH20$426.00$426.00$426.00
379Special 8009. manhole cover type MS 58A (SPV.0060)EACH5$1,161.00$1,161.00$1,161.00
380Special 8010. inlet cover type MS 57 (SPV.0060)EACH34$954.00$954.00$954.00
381Special 8100. cover plates left in place in pavement (SPV.0060)EACH12$318.00$318.00$318.00
382Special 0203. pavement cleanup project (1060-27-74) (SPV.0075)HRS1,500$225.00$225.24$170.00
383Special 4000. obstructions, drilled foundation shaft (SPV.0075)HRS40$2,500.00$2,500.00$2,500.00
384Special 4010. obstructions foundation drilling (SPV.0075)HRS120$2,500.00$2,500.00$2,500.00
385Special 4000. structural steel HS soldier piles delivered (SPV.0085)LB1,616,194$1.90$3.90$5.00
386Special 4010. structural steel HS soldier piles installed (SPV.0085)LB1,460,116$1.10$1.00$1.00
387Special 0260. pipe underdrain 6- inch special (SPV.0090)LF8,850$14.44$15.00$13.00
388Special 0263. removing modular block retaining wall (SPV.0090)LF108$29.00$29.00$29.00
389Special 0264. removing railroad tie retaining wall (SPV.0090)LF74$54.00$54.00$54.00
390Special 0272. marking line epoxy block style 12-inch (SPV.0090)LF144$18.09$18.09$18.09
391Special 0274. marking epoxy 6-inch black non grooved (SPV.0090)LF11,734$0.45$0.45$0.45
392Special 0275. marking epoxy 10- inch black non grooved (SPV.0090)LF2,370$1.06$1.06$1.06
393Special 0280. fence safety left in place (SPV.0090)LF1,025$4.50$4.50$4.50
394Special 0285. galvanized pipe railing (SPV.0090)LF30$450.00$400.00$680.95
395Special 0701. anchoring concrete barrier temporary precast left in place (SPV.0090)LF2,550$15.00$20.00$16.31
396Special 0702. concrete barrier temporary precast left in place (SPV.0090)LF5,300$25.00$20.00$40.00
397Special 0703. fence temporary 6- foot (SPV.0090)LF175$50.00$50.00$50.00
398Special 0704. glare screens temporary (SPV.0090)LF1,600$5.15$5.15$5.15
399Special 0705. glare screens temporary left in place (SPV.0090)LF1,652$17.45$17.45$17.45
400Special 1005. liquidtight flexible nonmetallic 1 1/2 inch conduit (SPV.0090)LF5$83.00$83.00$83.00
401Special 1012. electrical cable type 4#2/1#8 XLP (SPV.0090)LF3,872$15.23$15.23$15.23
402Special 1013. cable aerial aluminum 4 AWG quadruplex left in place (SPV.0090)LF1,934$8.14$8.14$8.14
403Special 4100. drilled foundation shaft 34.65-inch (SPV.0090)LF800$465.00$550.00$300.00
404Special 4110. drilled foundation shaft 59.06-inch (SPV.0090)LF415$750.00$750.00$500.00
405Special 4200. foundation drilling (SPV.0090)LF12,350$127.50$100.00$100.00
406Special 4300. remove existing steel piling (SPV.0090)LF40$1,000.00$800.00$2,500.00
407Special 5000. ductile iron (DI) AWWA C-151 class 55 watermain 6-inch (SPV.0090)LF34$703.00$703.00$703.00
408Special 5001. ductile iron (DI) AWWA C-151 class 55 watermain 12-inch (SPV.0090)LF47$1,194.00$1,194.00$1,194.00
409Special 5002. ductile iron hydrant branch 6-inch (SPV.0090)LF13$965.00$965.00$965.00
410Special 5200. 2-duct conduit cement encased 4-inch conduit DB-60 (SPV.0090)LF105$119.20$119.20$119.20
411Special 5201. 4-duct conduit cement encased 4-inch conduit DB-60 (SPV.0090)LF445$147.60$147.60$147.60
412Special 5202. 6-duct conduit cement encased 4-inch conduit DB-60 (SPV.0090)LF133$218.00$218.00$218.00
413Special 5203. 2-duct conduit cement encased 3-inch conduit DB-60 (SPV.0090)LF83$114.40$114.40$114.40
414Special 5210. conduit subduct 1- inch (SPV.0090)LF606$6.89$6.89$6.89
415Special 5215. furnish municipal fiber optic cable 288 count (SPV.0090)LF786$3.84$3.84$3.84
416Special 5216. install fiber optic cable outdoor plant 288-CT (SPV.0090)LF1,465$2.92$2.92$2.92
417Special 5217. removing service cable (SPV.0090)LF706$3.20$3.20$3.20
418Special 8002. drain slotted vane permanent (SPV.0090)LF1,793$229.00$229.00$229.00
419Special 4000. timber lagging (SPV.0110)MBM119$6,475.00$6,000.00$4,500.00
420Special 0301. vibration monitoring (SPV.0135)MON24$3,750.00$4,000.00$3,416.67
421Special 0400. tactile directional indicator (SPV.0165)SF600$54.19$54.19$54.19
422Special 0401. high friction traffic marking green bike lane panel (SPV.0165)SF70$10.65$10.65$10.65
423Special 0410. wall modular block gravity landscape (SPV.0165)SF762$110.00$110.00$110.00
424Special 4000. geocomposite drain board (SPV.0165)SF30,533$7.74$30.00$4.00
425Special 4100. temporary wall wire faced mechanically stabilized earth LFCF R-40-767 (SPV.0165)SF1,895$200.00$200.00$200.00
426Special 4761. wall concrete panel mechanically stabilized earth LFCF R-40-761 (SPV.0165)SF4,726$165.79$170.00$151.00
427Special 4767. wall concrete panel mechanically stabilized earth LFCF R-40-767 (SPV.0165)SF21,190$180.00$180.00$180.00
428Special 0421. HPC pavement 9- inch (SPV.0180)SY6,280$81.71$81.71$81.71
429Special 0443. HMA longitudinal joint repair (SPV.0195)TON50$310.00$310.00$310.00
430Special 0444. HMA transverse joint repair (SPV.0195)TON25$310.00$310.00$310.00
431Special 0446. management of solid waste - ST paul ave / 27TH ST (SPV.0195)TON930$46.00$46.00$46.00
432Special 0447. management of solid waste - greves ST, east of 27TH ST (SPV.0195)TON975$46.00$46.00$46.00
433Special 0448. management of solid waste - greves ST, west of 27TH ST (SPV.0195)TON510$50.00$50.00$50.00
WisDOT contract 20250909007: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of September 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy