WisDOT contract 20250909007 bid tabulation
I-94 East West, Early East Leg; 30th Street to 25th Street (IH 094, Milwaukee County I-94 East-West). Let by Wisconsin DOT on September 9, 2025, Milwaukee. 3 bids received; low bid $60,951,508 by Zenith Tech., Inc. - Waukesha.
- Owner
- Wisconsin DOT
- Letting
- 09 SEP 2025
- Pay items
- 433
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zenith Tech., Inc. - Waukesha | $60,951,508 | Low |
| 2 | Kraemer North America, LLC | $62,709,872 | +3.0% |
| 3 | Lunda Construction Company | $69,642,926 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zenith Tech., Inc. - Waukesha | 2. Kraemer North America, LLC | 3. Lunda Construction Company |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 23 | $1,902.60 | $1,902.60 | $1,902.60 |
| 2 | Clearing (201.0120) | ID | 140 | $25.37 | $25.37 | $25.37 |
| 3 | Grubbing (201.0205) | STA | 23 | $317.10 | $317.10 | $317.10 |
| 4 | Grubbing (201.0220) | ID | 140 | $5.29 | $5.29 | $5.29 |
| 5 | Removing structure (structure) 0010. R-40-10 (203.0220) | EACH | 1 | $150,000 | $30,000 | $30,000 |
| 6 | Removing structure (structure) 0033. R-40-33 (203.0220) | EACH | 1 | $50,000 | $10,000 | $10,000 |
| 7 | Removing structure (structure) 0043. B-40-43 (203.0220) | EACH | 1 | $150,000 | $500,000 | $2,000,000 |
| 8 | Removing structure (structure) 0057. B-40-57 (203.0220) | EACH | 1 | $50,000 | $10,000 | $10,000 |
| 9 | Removing structure (structure) 0513. B-40-513 (203.0220) | EACH | 1 | $1,250,000 | $764,500 | $3,000,000 |
| 10 | Removing structure (structure) 1000. cip concrete retaining wall 415EW+60 - 416EW+83 (203.0220) | EACH | 1 | $50,000 | $10,000 | $10,000 |
| 11 | Removing concrete pavement (204.0100) | SY | 19,770 | $9.50 | $9.50 | $9.50 |
| 12 | Removing asphaltic surface (204.0110) | SY | 4,290 | $4.00 | $4.00 | $4.00 |
| 13 | Removing asphaltic surface butt joints (204.0115) | SY | 170 | $32.00 | $32.00 | $32.00 |
| 14 | Removing asphaltic surface milling (204.0120) | SY | 95,720 | $4.75 | $4.75 | $4.75 |
| 15 | Removing curb & gutter (204.0150) | LF | 130 | $10.00 | $10.00 | $10.00 |
| 16 | Removing concrete sidewalk (204.0155) | SY | 1,560 | $13.00 | $13.00 | $13.00 |
| 17 | Removing concrete barrier (204.0157) | LF | 2,170 | $9.00 | $9.00 | $9.00 |
| 18 | Removing guardrail (204.0165) | LF | 1,400 | $2.60 | $2.60 | $2.60 |
| 19 | Removing fence (204.0170) | LF | 2,840 | $2.50 | $4.50 | $4.50 |
| 20 | Removing concrete bases (204.0195) | EACH | 26 | $360.00 | $360.00 | $360.00 |
| 21 | Removing manholes (204.0210) | EACH | 12 | $1,693.00 | $997.67 | $1,693.00 |
| 22 | Removing inlets (204.0220) | EACH | 38 | $497.00 | $497.00 | $497.00 |
| 23 | Removing storm sewer (size) 0001. 12-inch (204.0245) | LF | 1,321 | $17.00 | $17.00 | $17.00 |
| 24 | Removing storm sewer (size) 0002. 15-inch (204.0245) | LF | 1 | $93.00 | $93.00 | $93.00 |
| 25 | Removing storm sewer (size) 0003. 18-inch (204.0245) | LF | 118 | $30.00 | $30.00 | $30.00 |
| 26 | Removing storm sewer (size) 0004. 21-inch (204.0245) | LF | 351 | $25.00 | $25.00 | $25.00 |
| 27 | Removing storm sewer (size) 0005. 24-inch (204.0245) | LF | 428 | $24.00 | $24.00 | $24.00 |
| 28 | Removing storm sewer (size) 0006. 27-inch (204.0245) | LF | 276 | $27.00 | $27.00 | $27.00 |
| 29 | Removing storm sewer (size) 0007. 30-inch (204.0245) | LF | 20 | $70.00 | $70.00 | $70.00 |
| 30 | Abandoning manholes (204.0250) | EACH | 4 | $2,194.00 | $2,194.00 | $2,194.00 |
| 31 | Abandoning wells (204.0265) | EACH | 3 | $7,500.00 | $2,500.00 | $5,000.00 |
| 32 | Abandoning sewer (204.0291.S) | CY | 12 | $816.00 | $816.00 | $816.00 |
| 33 | Removing advance flasher assemblies type 1 (204.9001.S) | EACH | 1 | $1,122.00 | $1,122.00 | $1,122.00 |
| 34 | Removing (item description) 0001. steps railing (204.9060.S) | EACH | 2 | $1,000.00 | $1,000.00 | $1,000.00 |
| 35 | Removing (item description) 0002. removing bollard (204.9060.S) | EACH | 2 | $500.00 | $1,000.00 | $500.00 |
| 36 | Removing (item description) 1002. lighting units (204.9060.S) | EACH | 35 | $431.80 | $431.80 | $431.80 |
| 37 | Removing (item description) 3101. traffic signals W ST paul ave & N 27TH ST (204.9060.S) | EACH | 1 | $6,426.00 | $6,426.00 | $6,426.00 |
| 38 | Removing (item description) 0002. landscape rock (204.9165.S) | SF | 1,360 | $2.00 | $2.00 | $2.00 |
| 39 | Excavation common (205.0100) | CY | 70,498 | $43.00 | $49.50 | $49.50 |
| 40 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 1,415 | $48.00 | $48.00 | $48.00 |
| 41 | Excavation for structures bridges (structure) 1083. B-40-1083 (206.1001) | EACH | 1 | $250,000 | $250,000 | $15,000 |
| 42 | Excavation for structures retaining walls (structure) 0761. R-40-761 (206.3001) | EACH | 1 | $1,000,000 | $1,000,000 | $875,000 |
| 43 | Backfill controlled low strength (209.0200.S) | CY | 40 | $166.04 | $1,200.00 | $250.00 |
| 44 | Backfill structure type A (210.1500) | TON | 2,790 | $34.00 | $53.70 | $34.00 |
| 45 | Finishing roadway (project) 0001. 1060-27-74 (213.0100) | EACH | 1 | $10,000 | $2,500.00 | $1,000.00 |
| 46 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 23,680 | $25.00 | $25.00 | $25.00 |
| 47 | Select crushed material (312.0110) | TON | 29,470 | $25.00 | $25.00 | $25.00 |
| 48 | Removing pavement for base patching (390.0100) | CY | 610 | $1.00 | $80.00 | $125.00 |
| 49 | Base patching asphaltic (390.0201) | TON | 100 | $310.00 | $310.00 | $310.00 |
| 50 | Base patching concrete shes (390.0405) | CY | 110 | $921.64 | $921.64 | $921.64 |
| 51 | Coloring concrete custom (405.0200) | CY | 49 | $223.96 | $223.96 | $223.96 |
| 52 | Concrete pavement gaps (415.0210) | EACH | 4 | $740.76 | $740.76 | $740.76 |
| 53 | Concrete pavement approach slab (415.0410) | SY | 345 | $159.61 | $159.61 | $159.61 |
| 54 | Drilled tie bars (416.0610) | EACH | 420 | $10.22 | $10.22 | $10.22 |
| 55 | Drilled dowel bars (416.0620) | EACH | 550 | $15.21 | $15.21 | $15.21 |
| 56 | Concrete pavement repair shes (416.1715) | SY | 360 | $326.97 | $326.97 | $326.97 |
| 57 | Concrete pavement replacement (416.1720) | SY | 333 | $173.20 | $173.20 | $173.20 |
| 58 | Concrete pavement replacement shes (416.1725) | SY | 10 | $368.44 | $368.44 | $368.44 |
| 59 | Asphaltic mixture for extreme conditions (450.1100.S) | TON | 50 | $136.00 | $136.00 | $136.00 |
| 60 | HMA cold weather paving (450.4000) | TON | 700 | $1.65 | $1.65 | $1.65 |
| 61 | Tack coat (455.0605) | GAL | 15,791 | $2.30 | $2.30 | $2.30 |
| 62 | Incentive density HMA pavement (460.2000) | DOL | 13,030 | $1.00 | $1.00 | $1.00 |
| 63 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 110 | $125.00 | $125.00 | $125.00 |
| 64 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 14,494 | $89.50 | $89.50 | $89.50 |
| 65 | HMA pavement 3 HT 58-28 S (460.7223) | TON | 4,570 | $96.50 | $96.50 | $96.50 |
| 66 | HMA pavement 4 HT 58-28 H (460.7424) | TON | 1,670 | $135.00 | $135.00 | $135.00 |
| 67 | Asphaltic surface (465.0105) | TON | 7 | $275.00 | $275.00 | $275.00 |
| 68 | Asphaltic surface temporary (465.0125) | TON | 720 | $225.00 | $225.00 | $225.00 |
| 69 | Cold patch (495.1000.S) | TON | 100 | $333.03 | $600.00 | $300.00 |
| 70 | Ice hot weather concreting (501.1000.S) | LB | 47,210 | $1.00 | $0.01 | $0.01 |
| 71 | Concrete masonry bridges (502.0100) | CY | 1,382 | $850.00 | $1,200.00 | $1,050.00 |
| 72 | Concrete masonry soldier pile footings 0761. R-40-761 (502.0110.S) | CY | 2,050 | $200.00 | $200.00 | $200.00 |
| 73 | Non-shrink grout (502.0120.S) | CF | 6 | $1,500.00 | $500.00 | $1,000.00 |
| 74 | Expansion device (502.3101) | LF | 200 | $300.00 | $400.00 | $310.00 |
| 75 | Protective surface treatment (502.3200) | SY | 4,019 | $3.75 | $1.75 | $5.00 |
| 76 | Pigmented surface sealer (502.3210) | SY | 338 | $15.00 | $30.00 | $6.00 |
| 77 | Adhesive anchors no. 6 bar (502.4206) | EACH | 160 | $45.00 | $45.00 | $25.00 |
| 78 | Concrete masonry retaining walls (504.0500) | CY | 1,615 | $1,100.00 | $1,200.00 | $1,050.00 |
| 79 | Bar steel reinforcement HS structures (505.0400) | LB | 87,160 | $1.50 | $1.55 | $1.65 |
| 80 | Bar steel reinforcement HS coated structures (505.0600) | LB | 650,100 | $1.60 | $1.65 | $1.86 |
| 81 | Bar couplers no. 10 (505.0910) | EACH | 348 | $185.00 | $180.00 | $200.00 |
| 82 | Structural steel HS (506.0605) | LB | 1,153,680 | $4.00 | $4.00 | $3.60 |
| 83 | Welded stud shear connectors 7/8X6-inch (506.3015) | EACH | 16,746 | $11.75 | $6.00 | $12.82 |
| 84 | Welded stud shear connectors 7/8X7-inch (506.3020) | EACH | 54 | $12.50 | $20.00 | $32.07 |
| 85 | Welded stud shear connectors 7/8X10-inch (506.3035) | EACH | 7,952 | $15.00 | $21.00 | $15.64 |
| 86 | Bearing assemblies fixed (structure) 1083. B-40-1083 (506.5000) | EACH | 22 | $3,100.00 | $4,000.00 | $7,000.00 |
| 87 | Bearing assemblies expansion (structure) 0513. B-40-513_5 (506.6000) | EACH | 9 | $3,000.00 | $3,300.00 | $10,500 |
| 88 | Bearing assemblies expansion (structure) 1083.B-40-1083 (506.6000) | EACH | 21 | $2,500.00 | $3,300.00 | $5,500.00 |
| 89 | Concrete surface repair (509.1500) | SF | 250 | $200.00 | $200.00 | $125.00 |
| 90 | Temporary shoring (structure) 0010. R-40-10 (511.1200) | SF | 4,000 | $26.34 | $0.01 | $30.00 |
| 91 | Temporary shoring (structure) 0761. R-40-761 (511.1200) | SF | 568 | $100.00 | $0.01 | $100.00 |
| 92 | Temporary shoring left in place (structure) 0057. B-40-57 (511.2200) | SF | 1,000 | $100.00 | $0.01 | $90.00 |
| 93 | Temporary shoring left in place (structure) 0761. R-40-761 (511.2200) | SF | 223 | $125.00 | $0.01 | $275.00 |
| 94 | Temporary shoring left in place (location) 0001. IH 94 EB (511.2300) | SF | 3,300 | $95.00 | $0.01 | $50.00 |
| 95 | Temporary shoring left in place (location) 0002. IH 94 WB (511.2300) | SF | 900 | $95.00 | $0.01 | $100.00 |
| 96 | Piling steel sheet permanent delivered (512.0500) | SF | 225 | $68.50 | $40.00 | $100.00 |
| 97 | Piling steel sheet permanent driven (512.0600) | SF | 225 | $41.00 | $40.00 | $10.00 |
| 98 | Railing pipe 0761. R-40-761 (513.2001) | LF | 1,615 | $205.00 | $200.00 | $250.00 |
| 99 | Railing tubular screening (513.4091) | LF | 826 | $325.00 | $350.00 | $260.00 |
| 100 | Floor drains type WF (514.0450) | EACH | 5 | $5,000.00 | $5,500.00 | $6,000.00 |
| 101 | Downspout 8-inch (514.2608) | LF | 270 | $225.00 | $200.00 | $300.00 |
| 102 | Dampproofing (516.0100) | SY | 7,442 | $15.00 | $17.11 | $17.11 |
| 103 | Rubberized membrane waterproofing (516.0500) | SY | 30 | $50.00 | $10.00 | $25.00 |
| 104 | Painting epoxy system (structure) 0513. B-40-513_5 (517.0601) | EACH | 1 | $55,000 | $8,000.00 | $16,000 |
| 105 | Painting epoxy system (structure) 0761. R-40-761 (517.0601) | EACH | 1 | $50,000 | $10,000 | $127,500 |
| 106 | Painting epoxy system (structure) 1083. B-40-1083 (517.0601) | EACH | 1 | $50,000 | $58,000 | $114,950 |
| 107 | Preparation and coating of top flanges (structure) 0513. B-40- 513_5 (517.0901.S) | EACH | 1 | $5,500.00 | $5,500.00 | $8,120.00 |
| 108 | Structure repainting recycled abrasive (structure) 0513. B-40- 513_5 (517.1801.S) | EACH | 1 | $63,000 | $63,000 | $102,375 |
| 109 | Negative pressure containment and collection of waste materials (structure) 0513. B-40-513_5 (517.4501.S) | EACH | 1 | $47,000 | $47,000 | $81,900 |
| 110 | Portable decontamination facility (517.6001.S) | EACH | 1 | $4,000.00 | $4,000.00 | $1.00 |
| 111 | Concrete masonry ancillary structures type NS (531.1100) | CY | 5 | $1,200.00 | $1,200.00 | $1,200.00 |
| 112 | Steel reinforcement HS ancillary structures type NS (531.1140) | LB | 720 | $4.75 | $4.75 | $4.75 |
| 113 | Drilling shaft 24-inch (531.2024) | LF | 40 | $50.00 | $50.00 | $50.00 |
| 114 | Concrete curb & gutter 31-inch (601.0331) | LF | 3,023 | $26.60 | $26.60 | $26.60 |
| 115 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 22 | $79.86 | $79.86 | $79.86 |
| 116 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 287 | $25.94 | $25.94 | $25.94 |
| 117 | Concrete curb pedestrian (601.0600) | LF | 56 | $75.58 | $75.58 | $75.58 |
| 118 | Concrete sidewalk 5-inch (602.0410) | SF | 17,550 | $6.25 | $6.25 | $6.25 |
| 119 | Curb ramp detectable warning field natural patina (602.0515) | SF | 170 | $48.07 | $48.07 | $48.07 |
| 120 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 15 | $76.89 | $76.89 | $76.89 |
| 121 | Concrete driveway 7-inch (602.0815) | SY | 155 | $72.85 | $72.85 | $72.85 |
| 122 | Concrete driveway hes 7-inch (602.0865) | SY | 140 | $76.34 | $76.34 | $76.34 |
| 123 | Concrete steps (602.1500) | SF | 135 | $84.46 | $84.46 | $84.46 |
| 124 | Concrete barrier temporary precast delivered (603.8000) | LF | 9,312.50 | $17.00 | $15.00 | $10.89 |
| 125 | Concrete barrier temporary precast installed (603.8125) | LF | 17,137.50 | $2.26 | $5.00 | $4.80 |
| 126 | Anchoring concrete barrier temporary precast (603.8500) | LF | 2,275 | $8.25 | $10.00 | $20.22 |
| 127 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 1,579 | $151.00 | $151.00 | $151.00 |
| 128 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 2,107 | $149.00 | $149.00 | $149.00 |
| 129 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 152 | $200.00 | $200.00 | $200.00 |
| 130 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 1,072 | $204.00 | $204.00 | $204.00 |
| 131 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 1,103 | $222.00 | $222.00 | $222.00 |
| 132 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 51 | $152.00 | $152.00 | $152.00 |
| 133 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 92 | $224.00 | $224.00 | $224.00 |
| 134 | Storm sewer pipe reinforced concrete class IV 42-inch (608.0442) | LF | 13 | $466.00 | $466.00 | $466.00 |
| 135 | Manhole covers type J (611.0530) | EACH | 16 | $837.00 | $837.00 | $837.00 |
| 136 | Inlet covers type C (611.0612) | EACH | 2 | $1,002.00 | $1,002.00 | $1,002.00 |
| 137 | Inlet covers type H (611.0624) | EACH | 3 | $1,024.00 | $1,024.00 | $1,024.00 |
| 138 | Inlet covers type HM (611.0627) | EACH | 5 | $1,210.00 | $1,210.00 | $1,210.00 |
| 139 | Inlet covers type MS (611.0642) | EACH | 4 | $759.00 | $759.00 | $759.00 |
| 140 | Inlet covers type V (611.0654) | EACH | 47 | $967.00 | $967.00 | $967.00 |
| 141 | Inlet covers type VV-B (611.0656) | EACH | 12 | $2,181.00 | $2,181.00 | $2,181.00 |
| 142 | Catch basins 4-FT diameter (611.1004) | EACH | 33 | $3,622.00 | $3,622.00 | $3,622.00 |
| 143 | Catch basins 5-FT diameter (611.1005) | EACH | 2 | $4,883.00 | $4,883.00 | $4,883.00 |
| 144 | Manholes 4-FT diameter (611.2004) | EACH | 21 | $3,780.00 | $3,780.00 | $3,780.00 |
| 145 | Manholes 5-FT diameter (611.2005) | EACH | 20 | $5,221.00 | $5,221.00 | $5,221.00 |
| 146 | Manholes 6-FT diameter (611.2006) | EACH | 3 | $7,145.00 | $7,145.00 | $7,145.00 |
| 147 | Manholes 7-FT diameter (611.2007) | EACH | 1 | $12,927 | $12,927 | $12,927 |
| 148 | Inlets 4-FT diameter (611.3004) | EACH | 23 | $2,803.00 | $2,803.00 | $2,803.00 |
| 149 | Inlets 2X2-FT (611.3220) | EACH | 1 | $3,387.00 | $3,387.00 | $3,387.00 |
| 150 | Inlets 2X2.5-FT (611.3225) | EACH | 37 | $2,169.00 | $2,169.00 | $2,169.00 |
| 151 | Inlets 2X3-FT (611.3230) | EACH | 2 | $2,593.00 | $2,593.00 | $2,593.00 |
| 152 | Inlets median 2 grate (611.3902) | EACH | 2 | $7,735.00 | $7,735.00 | $7,735.00 |
| 153 | Adjusting manhole covers (611.8110) | EACH | 16 | $482.00 | $482.00 | $482.00 |
| 154 | Adjusting inlet covers (611.8115) | EACH | 4 | $778.00 | $778.00 | $778.00 |
| 155 | Cover plates temporary (611.8120.S) | EACH | 12 | $318.00 | $318.00 | $318.00 |
| 156 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 455 | $19.00 | $19.00 | $19.00 |
| 157 | Pipe underdrain unperforated 8- inch (612.0208) | LF | 85 | $51.00 | $51.00 | $51.00 |
| 158 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 185 | $26.00 | $26.00 | $26.00 |
| 159 | Apron endwalls for underdrain reinforced concrete 6-inch (612.0806) | EACH | 4 | $1,100.00 | $400.00 | $250.00 |
| 160 | Crash cushions temporary (614.0905) | EACH | 5 | $5,176.38 | $4,425.00 | $4,425.00 |
| 161 | Fence chain link 6-FT (616.0206) | LF | 1,770 | $24.50 | $24.50 | $24.50 |
| 162 | Gates chain link (width) 0001. 4-FT (616.0329) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 |
| 163 | Gates chain link (width) 0002. 12- FT (616.0329) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 164 | Fence safety (616.0700.S) | LF | 9 | $25.00 | $3.40 | $50.00 |
| 165 | Mobilization (619.1000) | EACH | 1 | $8,150,000 | $6,000,000 | $6,898,000 |
| 166 | Concrete median sloped nose (620.0300) | SF | 189 | $12.96 | $12.96 | $12.96 |
| 167 | Dust control surface treatment (623.0200) | SY | 27,800 | $0.01 | $0.01 | $0.01 |
| 168 | Water (624.0100) | MGAL | 376 | $100.00 | $100.00 | $100.00 |
| 169 | Topsoil (625.0100) | SY | 8,010 | $6.00 | $6.00 | $6.00 |
| 170 | Salvaged topsoil (625.0500) | SY | 19,930 | $3.00 | $3.00 | $3.00 |
| 171 | Mulching (627.0200) | SY | 22,830 | $0.28 | $0.28 | $0.28 |
| 172 | Erosion bales (628.1104) | EACH | 10 | $17.50 | $17.50 | $17.50 |
| 173 | Silt fence (628.1504) | LF | 3,810 | $2.25 | $2.25 | $2.25 |
| 174 | Silt fence maintenance (628.1520) | LF | 3,810 | $0.05 | $0.05 | $0.05 |
| 175 | Mobilizations erosion control (628.1905) | EACH | 35 | $200.00 | $200.00 | $200.00 |
| 176 | Mobilizations emergency erosion control (628.1910) | EACH | 26 | $250.00 | $250.00 | $250.00 |
| 177 | Erosion mat class I type B (628.2004) | SY | 18,550 | $1.10 | $1.10 | $1.10 |
| 178 | Erosion mat urban class I type A (628.2006) | SY | 1,350 | $1.80 | $1.80 | $1.80 |
| 179 | Soil stabilizer type B (628.6510) | ACRE | 5 | $800.00 | $800.00 | $800.00 |
| 180 | Inlet protection type A (628.7005) | EACH | 130 | $150.00 | $150.00 | $150.00 |
| 181 | Inlet protection type D (628.7020) | EACH | 225 | $125.00 | $125.00 | $125.00 |
| 182 | Temporary ditch checks (628.7504) | LF | 245 | $8.75 | $8.75 | $8.75 |
| 183 | Tracking pads (628.7560) | EACH | 4 | $5,000.00 | $5,000.00 | $5,000.00 |
| 184 | Rock bags (628.7570) | EACH | 125 | $17.50 | $17.50 | $17.50 |
| 185 | Fertilizer type B (629.0210) | CWT | 20 | $68.00 | $68.00 | $68.00 |
| 186 | Seeding mixture no. 20 (630.0120) | LB | 1,930 | $7.50 | $7.50 | $7.50 |
| 187 | Seeding temporary (630.0200) | LB | 1,160 | $3.50 | $3.50 | $3.50 |
| 188 | Seed water (630.0500) | MGAL | 470 | $25.00 | $25.00 | $25.00 |
| 189 | Sod water (631.0300) | MGAL | 16 | $25.00 | $25.00 | $25.00 |
| 190 | Sod lawn (631.1000) | SY | 1,500 | $10.50 | $10.50 | $10.50 |
| 191 | Markers permanent flexible (633.5350) | EACH | 20 | $75.00 | $75.00 | $75.00 |
| 192 | Posts wood 4X6-inch X 20-FT (634.0620) | EACH | 48 | $150.00 | $150.00 | $150.00 |
| 193 | Sign supports structural steel HS (635.0200) | LB | 1,600 | $5.00 | $5.00 | $5.00 |
| 194 | Signs type II reflective H (637.2210) | SF | 522.10 | $22.00 | $22.00 | $22.00 |
| 195 | Signs type II reflective H folding (637.2215) | SF | 20.72 | $30.00 | $30.00 | $30.00 |
| 196 | Signs type II reflective SH (637.2220) | SF | 6.75 | $22.50 | $22.50 | $22.50 |
| 197 | Signs type II reflective F (637.2230) | SF | 531 | $24.00 | $24.00 | $24.00 |
| 198 | Moving signs type I (638.2101) | EACH | 2 | $600.00 | $600.00 | $600.00 |
| 199 | Moving signs type II (638.2102) | EACH | 63 | $125.00 | $125.00 | $125.00 |
| 200 | Removing signs type II (638.2602) | EACH | 80 | $25.00 | $25.00 | $25.00 |
| 201 | Removing small sign supports (638.3000) | EACH | 57 | $25.00 | $25.00 | $25.00 |
| 202 | Removing structural steel sign supports (638.3100) | EACH | 4 | $400.00 | $400.00 | $400.00 |
| 203 | Traffic control drums (643.0300) | DAY | 159,650 | $0.20 | $0.20 | $0.20 |
| 204 | Traffic control barricades type II (643.0410) | DAY | 7,225 | $0.50 | $0.50 | $0.50 |
| 205 | Traffic control barricades type III (643.0420) | DAY | 38,550 | $0.55 | $0.55 | $0.55 |
| 206 | Traffic control warning lights type A (643.0705) | DAY | 77,070 | $0.11 | $0.11 | $0.11 |
| 207 | Traffic control warning lights type C (643.0715) | DAY | 40,790 | $0.14 | $0.14 | $0.14 |
| 208 | Connected arrow board (643.0810.S) | DAY | 2,400 | $5.95 | $5.95 | $5.95 |
| 209 | Traffic control signs (643.0900) | DAY | 249,210 | $0.15 | $0.15 | $0.15 |
| 210 | Traffic control covering signs type I (643.0910) | EACH | 45 | $225.00 | $225.00 | $225.00 |
| 211 | Traffic control covering signs type II (643.0920) | EACH | 325 | $55.00 | $55.00 | $55.00 |
| 212 | Traffic control signs fixed message (643.1000) | SF | 925 | $15.60 | $15.60 | $15.60 |
| 213 | Traffic control signs PCMS (643.1050) | DAY | 2,430 | $13.25 | $13.25 | $13.25 |
| 214 | Connected work zone start and end location markers (643.1220.S) | DAY | 1,435 | $3.85 | $3.85 | $3.85 |
| 215 | Temporary marking line removable tape 4-inch (643.3150) | LF | 3,170 | $1.45 | $1.45 | $1.45 |
| 216 | Temporary marking line epoxy 6- inch (643.3170) | LF | 51,300 | $0.47 | $0.47 | $0.47 |
| 217 | Temporary marking line black epoxy 6-inch (643.3175) | LF | 1,625 | $0.38 | $0.38 | $0.38 |
| 218 | Temporary marking line removable tape 6-inch (643.3180) | LF | 14,915 | $1.85 | $1.85 | $1.85 |
| 219 | Temporary marking line epoxy 10- inch (643.3270) | LF | 2,740 | $1.62 | $1.62 | $1.62 |
| 220 | Temporary marking arrow removable tape (643.3550) | EACH | 3 | $175.00 | $175.00 | $175.00 |
| 221 | Temporary marking raised pavement marker type I (643.3760) | EACH | 265 | $10.50 | $10.50 | $10.50 |
| 222 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 2,300 | $2.46 | $2.46 | $2.46 |
| 223 | Traffic control interim lane closure (643.4100) | EACH | 528 | $655.00 | $655.00 | $655.00 |
| 224 | Traffic control (643.5000) | EACH | 1 | $170,000 | $170,000 | $170,000 |
| 225 | Temporary pedestrian surface asphalt (644.1410) | SF | 250 | $9.50 | $9.50 | $9.50 |
| 226 | Temporary pedestrian surface plate (644.1430) | SF | 100 | $16.25 | $16.25 | $16.25 |
| 227 | Temporary pedestrian curb ramp (644.1601) | DAY | 25 | $45.00 | $45.00 | $45.00 |
| 228 | Temporary pedestrian detectable warning field (644.1605) | SF | 15 | $15.00 | $15.00 | $15.00 |
| 229 | Temporary pedestrian barricade (644.1810) | LF | 650 | $7.05 | $7.05 | $7.05 |
| 230 | Temporary audible message devices (644.1900.S) | DAY | 3,510 | $2.75 | $2.75 | $2.75 |
| 231 | Geotextile type DF schedule A (645.0111) | SY | 120 | $10.00 | $10.00 | $10.00 |
| 232 | Marking line epoxy 4-inch (646.1020) | LF | 23,887 | $0.40 | $0.40 | $0.40 |
| 233 | Marking line epoxy 6-inch (646.2020) | LF | 92,546 | $0.55 | $0.55 | $0.55 |
| 234 | Marking line epoxy 8-inch (646.3020) | LF | 2,530 | $1.08 | $1.08 | $1.08 |
| 235 | Marking line epoxy 10-inch (646.4020) | LF | 13,923 | $1.24 | $1.24 | $1.24 |
| 236 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 177 | $3.31 | $3.31 | $3.31 |
| 237 | Marking arrow epoxy (646.5020) | EACH | 40 | $442.89 | $442.89 | $442.89 |
| 238 | Marking word epoxy (646.5120) | EACH | 7 | $448.20 | $448.20 | $448.20 |
| 239 | Marking symbol epoxy (646.5220) | EACH | 63 | $429.97 | $429.97 | $429.97 |
| 240 | Marking stop line epoxy 18-inch (646.6120) | LF | 392 | $18.56 | $18.56 | $18.56 |
| 241 | Marking diagonal epoxy 12-inch (646.7120) | LF | 697 | $18.09 | $18.09 | $18.09 |
| 242 | Marking chevron epoxy 24-inch (646.7220) | LF | 287 | $30.46 | $30.46 | $30.46 |
| 243 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,617 | $17.61 | $17.61 | $17.61 |
| 244 | Marking curb epoxy (646.8120) | LF | 20 | $8.89 | $8.89 | $8.89 |
| 245 | Marking island nose epoxy (646.8220) | EACH | 1 | $333.49 | $333.49 | $333.49 |
| 246 | Marking removal line 4-inch (646.9000) | LF | 2,100 | $0.75 | $0.75 | $0.75 |
| 247 | Marking removal line water blasting 4-inch (646.9010) | LF | 2,280 | $0.95 | $0.95 | $0.95 |
| 248 | Marking removal line grooved permanent tape 4-inch (646.9050) | LF | 2,060 | $2.15 | $2.15 | $2.15 |
| 249 | Marking removal line 8-inch (646.9100) | LF | 90 | $1.55 | $1.55 | $1.55 |
| 250 | Marking removal special marking (646.9300) | EACH | 3 | $78.00 | $78.00 | $78.00 |
| 251 | Conduit rigid metallic 2-inch (652.0125) | LF | 102 | $141.00 | $141.00 | $141.00 |
| 252 | Conduit rigid nonmetallic schedule 40 1-inch (652.0210) | LF | 420 | $7.40 | $7.40 | $7.40 |
| 253 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 2,450 | $8.24 | $8.24 | $8.24 |
| 254 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 4,178 | $10.09 | $10.09 | $10.09 |
| 255 | Conduit rigid nonmetallic schedule 80 3-inch (652.0335) | LF | 206 | $11.75 | $11.75 | $11.75 |
| 256 | Conduit special 3-inch (652.0615) | LF | 39 | $73.20 | $73.20 | $73.20 |
| 257 | Install conduit into existing item (652.0700.S) | EACH | 8 | $135.00 | $135.00 | $135.00 |
| 258 | Pull boxes steel 24X42-inch (653.0140) | EACH | 3 | $1,292.00 | $1,292.00 | $1,292.00 |
| 259 | Junction boxes 18X12X6-inch (653.0222) | EACH | 11 | $1,790.00 | $1,790.00 | $1,790.00 |
| 260 | Removing pull boxes (653.0905) | EACH | 12 | $220.00 | $220.00 | $220.00 |
| 261 | Concrete bases type 2 (654.0102) | EACH | 2 | $1,291.00 | $1,291.00 | $1,291.00 |
| 262 | Concrete bases type 5 (654.0105) | EACH | 18 | $1,144.00 | $1,144.00 | $1,144.00 |
| 263 | Concrete bases type 10-special (654.0120) | EACH | 2 | $9,857.00 | $9,857.00 | $9,857.00 |
| 264 | Cable in duct 4-4 AWG (655.0144) | LF | 782 | $13.43 | $13.43 | $13.43 |
| 265 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 800 | $1.67 | $1.67 | $1.67 |
| 266 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 30 | $2.15 | $2.15 | $2.15 |
| 267 | Electrical wire traffic signals 12 AWG (655.0510) | LF | 407 | $0.94 | $0.94 | $0.94 |
| 268 | Electrical wire lighting 4 AWG (655.0630) | LF | 829 | $2.68 | $2.68 | $2.68 |
| 269 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 20 | $686.00 | $686.00 | $686.00 |
| 270 | Underdeck lighting (structure) 0015. B-40-0015 (659.0601) | EACH | 1 | $9,682.00 | $9,682.00 | $9,682.00 |
| 271 | Luminaires underdeck LED C (659.1215) | EACH | 2 | $696.00 | $696.00 | $696.00 |
| 272 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 60 | $12.40 | $12.40 | $12.40 |
| 273 | Temporary traffic signals for intersections (location) 3101. W ST paul ave & N 27TH ST left in place (661.0201) | EACH | 1 | $71,471 | $71,471 | $71,471 |
| 274 | Ramp closure gates 32-FT (662.1032.S) | EACH | 1 | $24,310 | $24,310 | $24,310 |
| 275 | Ramp closure gates 37-FT (662.1037.S) | EACH | 1 | $29,397 | $29,397 | $29,397 |
| 276 | Field system integrator (670.0101) | EACH | 1 | $42,717 | $42,717 | $42,717 |
| 277 | ITS documentation (670.0201) | EACH | 1 | $10,790 | $10,790 | $10,790 |
| 278 | Remove cable (674.0300) | LF | 2,090 | $1.02 | $1.02 | $1.02 |
| 279 | Reinstall cable (674.0400) | LF | 60 | $5.30 | $5.30 | $5.30 |
| 280 | Install fiber optic cable outdoor plant 36-CT (678.0036) | LF | 490 | $2.31 | $2.31 | $2.31 |
| 281 | Fiber optic splice (678.0300) | EACH | 112 | $86.00 | $86.00 | $86.00 |
| 282 | Communication system testing (678.0501) | EACH | 1 | $10,790 | $10,790 | $10,790 |
| 283 | Sawing asphalt (690.0150) | LF | 4,210 | $1.35 | $1.35 | $1.50 |
| 284 | Sawing concrete (690.0250) | LF | 6,170 | $2.30 | $2.30 | $2.69 |
| 285 | Incentive strength concrete structures (715.0502) | DOL | 38,578 | $1.00 | $1.00 | $1.00 |
| 286 | Incentive strength concrete barrier (715.0603) | DOL | 169 | $1.00 | $1.00 | $1.00 |
| 287 | Incentive flexural strength concrete pavement (715.0715) | DOL | 2,004 | $1.00 | $1.00 | $1.00 |
| 288 | Railroad flagging reimbursement (801.0117) | DOL | 200,000 | $1.00 | $1.00 | $1.00 |
| 289 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 14,000 | $5.00 | $5.00 | $5.00 |
| 290 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 45,000 | $5.00 | $5.00 | $5.00 |
| 291 | Special 0001. roadway embankment (SPV.0035) | CY | 84,466 | $0.01 | $0.01 | $0.01 |
| 292 | Special 0004. excavation, hauling, and reuse of low-level petroleum contaminated soil (SPV.0035) | CY | 37,200 | $12.00 | $12.00 | $12.00 |
| 293 | Special 0005. clay cap (SPV.0035) | CY | 4,270 | $33.00 | $33.00 | $33.00 |
| 294 | Special 0006. lightweight foamed concrete fill grade 1 (SPV.0035) | CY | 19,333 | $98.00 | $98.00 | $98.00 |
| 295 | Special 0007. lightweight foamed concrete fill grade 2 (SPV.0035) | CY | 4,546 | $111.00 | $111.00 | $111.00 |
| 296 | Special 4000. HPC masonry structures (SPV.0035) | CY | 1,247 | $1,200.00 | $1,400.00 | $1,050.00 |
| 297 | Special 0001. baseline CPM progress schedule (SPV.0060) | EACH | 1 | $1.00 | $1.00 | $25,000 |
| 298 | Special 0002. monthly CPM progress schedule updates (SPV.0060) | EACH | 23 | $1.00 | $1.00 | $250.00 |
| 299 | Special 0010. remove, salvage and reset boulder (SPV.0060) | EACH | 1 | $1,500.00 | $5,000.00 | $1,000.00 |
| 300 | Special 0108. concrete barrier transition type S1 (SPV.0060) | EACH | 1 | $31,872 | $31,872 | $31,872 |
| 301 | Special 0109. concrete barrier transition type S2 (SPV.0060) | EACH | 1 | $51,249 | $51,249 | $51,249 |
| 302 | Special 0122. sawing concrete barrier (SPV.0060) | EACH | 5 | $500.00 | $800.00 | $740.00 |
| 303 | Special 0123. salvage ramp gate (SPV.0060) | EACH | 2 | $1,733.00 | $1,733.00 | $1,733.00 |
| 304 | Special 0129. survey project (1060- 27-74) (SPV.0060) | EACH | 1 | $165,000 | $500,000 | $223,047 |
| 305 | Special 0150. round aluminum sign post system in soft surface 7- foot (SPV.0060) | EACH | 3 | $230.00 | $230.00 | $230.00 |
| 306 | Special 0151. round aluminum sign post system in soft surface 10-foot (SPV.0060) | EACH | 38 | $250.00 | $250.00 | $250.00 |
| 307 | Special 0152. round aluminum sign post system in soft surface 11-foot (SPV.0060) | EACH | 3 | $250.00 | $250.00 | $250.00 |
| 308 | Special 0158. round aluminum sign post system in concrete surface 7-foot (SPV.0060) | EACH | 1 | $210.00 | $210.00 | $210.00 |
| 309 | Special 0159. round aluminum sign post system in concrete surface 10-foot (SPV.0060) | EACH | 1 | $225.00 | $225.00 | $225.00 |
| 310 | Special 0160. round aluminum sign post system in concrete surface 11-foot (SPV.0060) | EACH | 2 | $225.00 | $225.00 | $225.00 |
| 311 | Special 0170. exposing existing infrastructure paved area (SPV.0060) | EACH | 15 | $1,916.00 | $1,916.00 | $1,916.00 |
| 312 | Special 0171. exposing existing infrastructure unpaved area (SPV.0060) | EACH | 15 | $1,916.00 | $1,916.00 | $1,916.00 |
| 313 | Special 0200. vibration control and monitoring of 122-inch combined sewer (SPV.0060) | EACH | 1 | $4,000.00 | $25,583 | $31,350 |
| 314 | Special 0552. crash cushions temporary low maintenance left in place (SPV.0060) | EACH | 3 | $36,150 | $36,150 | $36,150 |
| 315 | Special 0554. emergency response to traffic incident involving conc barrier temp precast (SPV.0060) | EACH | 5 | $3,000.00 | $5,000.00 | $4,344.15 |
| 316 | Special 0555. emergency response to traffic incident involving crash cushion (SPV.0060) | EACH | 5 | $315.00 | $315.00 | $315.00 |
| 317 | Special 0556. emergency response to pavement repair (SPV.0060) | EACH | 10 | $5,000.00 | $2,040.00 | $5,040.00 |
| 318 | Special 0557. fixed message sign portable support special (SPV.0060) | EACH | 2 | $1,540.00 | $1,540.00 | $1,540.00 |
| 319 | Special 0559. maintain and repair existing crash cushion (SPV.0060) | EACH | 1 | $5,500.00 | $5,500.00 | $5,500.00 |
| 320 | Special 0560. maintain and repair existing sand barrel arrays (SPV.0060) | EACH | 1 | $5,500.00 | $5,500.00 | $5,500.00 |
| 321 | Special 0564. traffic control close- open freeway to freeway system ramp (SPV.0060) | EACH | 136 | $345.00 | $345.00 | $345.00 |
| 322 | Special 0565. traffic control close- open freeway entrance ramp (SPV.0060) | EACH | 184 | $275.00 | $275.00 | $275.00 |
| 323 | Special 0566. traffic control full freeway closure (SPV.0060) | EACH | 46 | $1,625.00 | $1,625.00 | $1,625.00 |
| 324 | Special 0567. traffic control signs left in place (SPV.0060) | EACH | 4 | $235.00 | $235.00 | $235.00 |
| 325 | Special 0569. traffic control warning lights type A left in place (SPV.0060) | EACH | 12 | $45.00 | $45.00 | $45.00 |
| 326 | Special 0570. traffic control barricades type III left in place (SPV.0060) | EACH | 6 | $445.00 | $445.00 | $445.00 |
| 327 | Special 0571. traffic control local road lane closure (SPV.0060) | EACH | 50 | $350.00 | $350.00 | $350.00 |
| 328 | Special 0572. thrie beam connection to concrete barrier temporary precast (SPV.0060) | EACH | 1 | $1,500.00 | $5,000.00 | $5,040.11 |
| 329 | Special 1001. poles wood 60-FT (SPV.0060) | EACH | 4 | $3,272.00 | $3,272.00 | $3,272.00 |
| 330 | Special 1002. wood pole lighting 60-FT (SPV.0060) | EACH | 8 | $3,615.00 | $3,615.00 | $3,615.00 |
| 331 | Special 1004. luminaires utility floodlight (SPV.0060) | EACH | 8 | $354.00 | $354.00 | $354.00 |
| 332 | Special 1005. poles type 30-AL-BD (SPV.0060) | EACH | 8 | $2,350.40 | $2,350.40 | $2,350.40 |
| 333 | Special 1006. poles type 25-AL-BD (SPV.0060) | EACH | 15 | $2,169.40 | $2,169.40 | $2,169.40 |
| 334 | Special 1010. luminaire historic milwaukee lantern LED3 (SPV.0060) | EACH | 17 | $2,598.00 | $2,598.00 | $2,598.00 |
| 335 | Special 1013. inline 5A fast acting fuse with holder (SPV.0060) | EACH | 24 | $254.00 | $254.00 | $254.00 |
| 336 | Special 1014. luminaire arms single member 6-FT. (SPV.0060) | EACH | 6 | $280.00 | $280.00 | $280.00 |
| 337 | Special 1017. luminaire utility 2LED (SPV.0060) | EACH | 3 | $686.00 | $686.00 | $686.00 |
| 338 | Special 1018. luminaire utility 3LED (SPV.0060) | EACH | 3 | $686.00 | $686.00 | $686.00 |
| 339 | Special 1020. pull boxes 17-inch X 30-inch X 24-inch (SPV.0060) | EACH | 18 | $1,262.00 | $1,262.00 | $1,262.00 |
| 340 | Special 1023. submersible multitap 3-port pre-insulated connector (SPV.0060) | EACH | 58 | $182.00 | $182.00 | $182.00 |
| 341 | Special 1024. submersible multitap 4-port pre-insulated connector (SPV.0060) | EACH | 84 | $197.00 | $197.00 | $197.00 |
| 342 | Special 1034. maintenance of lighting system (1060-27-74) (SPV.0060) | EACH | 1 | $10,190 | $10,190 | $10,190 |
| 343 | Special 1044. lighting systems integrator project (1060-27-74) (SPV.0060) | EACH | 1 | $4,920.00 | $4,920.00 | $4,920.00 |
| 344 | Special 1060. lighting equipment painting project 1060-27-74 (SPV.0060) | EACH | 1 | $12,065 | $12,065 | $12,065 |
| 345 | Special 2000. removing electrical service meter breaker pedestal (SPV.0060) | EACH | 1 | $1,171.00 | $1,171.00 | $1,171.00 |
| 346 | Special 2050. enter existing splice enclosure (SPV.0060) | EACH | 1 | $1,150.00 | $1,150.00 | $1,150.00 |
| 347 | Special 2057. salvaged signal assembly advance flashed type 2 (SPV.0060) | EACH | 1 | $1,733.00 | $1,733.00 | $1,733.00 |
| 348 | Special 3101. removing monotube concrete bases (SPV.0060) | EACH | 4 | $1,728.00 | $1,728.00 | $1,728.00 |
| 349 | Special 3143. temporary evp system left in place W ST paul ave & N 27TH ST (SPV.0060) | EACH | 1 | $8,692.00 | $8,692.00 | $8,692.00 |
| 350 | Special 3145. monotube base anchor bolt cover type 10 special (SPV.0060) | EACH | 2 | $657.00 | $657.00 | $657.00 |
| 351 | Special 3146. covering traffic signal heads (SPV.0060) | EACH | 6 | $321.00 | $321.00 | $321.00 |
| 352 | Special 4000. anchor assemblies light poles on structures (SPV.0060) | EACH | 7 | $1,440.20 | $716.00 | $750.00 |
| 353 | Special 4010. bridge jacking B-40- 513_5 (SPV.0060) | EACH | 1 | $35,000 | $100,000 | $50,000 |
| 354 | Special 4100. thermal integrity profile (tip) testing, drilled shaft foundation 34.65-in (SPV.0060) | EACH | 17 | $5,350.00 | $5,225.00 | $3,500.00 |
| 355 | Special 4110. thermal integrity profile (tip) testing, drilled shaft foundation 59.06-in (SPV.0060) | EACH | 10 | $5,350.00 | $5,225.00 | $3,500.00 |
| 356 | Special 4200. crosshole sonic log (CSL) testing, drilled foundation shaft 34.65-inch (SPV.0060) | EACH | 17 | $4,750.00 | $4,500.00 | $4,500.00 |
| 357 | Special 4210. crosshole sonic log (CSL) testing, drilled foundation shaft 59.06-inch (SPV.0060) | EACH | 10 | $4,750.00 | $5,000.00 | $4,500.00 |
| 358 | Special 4400. tieback anchors (SPV.0060) | EACH | 472 | $6,000.00 | $6,000.00 | $6,000.00 |
| 359 | Special 4410. tieback anchors performance tests (SPV.0060) | EACH | 31 | $1,500.00 | $1,500.00 | $1,500.00 |
| 360 | Special 4600. trial drilled foundation shaft 34.65-inch (SPV.0060) | EACH | 1 | $40,000 | $55,000 | $40,000 |
| 361 | Special 4700. underdeck utility structure B-40-1083 (SPV.0060) | EACH | 1 | $22,940 | $22,940 | $45,000 |
| 362 | Special 4800. retaining wall instrumentation R-40-761 (SPV.0060) | EACH | 1 | $500,000 | $400,000 | $1,900,000 |
| 363 | Special 4810. retaining wall instrumentation R-40-767 (SPV.0060) | EACH | 1 | $350,000 | $100,000 | $1,300,000 |
| 364 | Special 4900. embedded galvanic anodes (SPV.0060) | EACH | 136 | $15.00 | $70.00 | $50.00 |
| 365 | Special 5000. installing hydrant (SPV.0060) | EACH | 1 | $10,333 | $10,333 | $10,333 |
| 366 | Special 5001. removing hydrant/major (SPV.0060) | EACH | 1 | $2,446.00 | $2,446.00 | $2,446.00 |
| 367 | Special 5002. installing hydrant - alteration (SPV.0060) | EACH | 1 | $10,333 | $10,333 | $10,333 |
| 368 | Special 5003. adjusting water valve boxes (SPV.0060) | EACH | 24 | $324.00 | $324.00 | $324.00 |
| 369 | Special 5004. connect original service (C.O.S.) (SPV.0060) | EACH | 1 | $4,906.00 | $4,906.00 | $4,906.00 |
| 370 | Special 5200. manholes type tes 4-FT diameter (SPV.0060) | EACH | 3 | $19,186 | $19,186 | $19,186 |
| 371 | Special 5201. manholes type tes doghouse 4-FT diameter (SPV.0060) | EACH | 2 | $19,186 | $19,186 | $19,186 |
| 372 | Special 5202. manholes type tes 5-FT diameter (SPV.0060) | EACH | 1 | $20,416 | $20,416 | $20,416 |
| 373 | Special 5204. removing cuc manholes (SPV.0060) | EACH | 2 | $2,847.00 | $2,847.00 | $2,847.00 |
| 374 | Special 5210. install cement encased conduit into existing manhole (SPV.0060) | EACH | 1 | $3,042.00 | $3,042.00 | $3,042.00 |
| 375 | Special 5212. adjusting tes manhole (SPV.0060) | EACH | 1 | $1,500.00 | $2,500.00 | $1,000.00 |
| 376 | Special 8003. reconnect storm sewer (SPV.0060) | EACH | 47 | $1,000.00 | $1,000.00 | $1,000.00 |
| 377 | Special 8005. sealing storm structure (SPV.0060) | EACH | 14 | $336.00 | $336.00 | $336.00 |
| 378 | Special 8007. cover plates left in place (SPV.0060) | EACH | 20 | $426.00 | $426.00 | $426.00 |
| 379 | Special 8009. manhole cover type MS 58A (SPV.0060) | EACH | 5 | $1,161.00 | $1,161.00 | $1,161.00 |
| 380 | Special 8010. inlet cover type MS 57 (SPV.0060) | EACH | 34 | $954.00 | $954.00 | $954.00 |
| 381 | Special 8100. cover plates left in place in pavement (SPV.0060) | EACH | 12 | $318.00 | $318.00 | $318.00 |
| 382 | Special 0203. pavement cleanup project (1060-27-74) (SPV.0075) | HRS | 1,500 | $225.00 | $225.24 | $170.00 |
| 383 | Special 4000. obstructions, drilled foundation shaft (SPV.0075) | HRS | 40 | $2,500.00 | $2,500.00 | $2,500.00 |
| 384 | Special 4010. obstructions foundation drilling (SPV.0075) | HRS | 120 | $2,500.00 | $2,500.00 | $2,500.00 |
| 385 | Special 4000. structural steel HS soldier piles delivered (SPV.0085) | LB | 1,616,194 | $1.90 | $3.90 | $5.00 |
| 386 | Special 4010. structural steel HS soldier piles installed (SPV.0085) | LB | 1,460,116 | $1.10 | $1.00 | $1.00 |
| 387 | Special 0260. pipe underdrain 6- inch special (SPV.0090) | LF | 8,850 | $14.44 | $15.00 | $13.00 |
| 388 | Special 0263. removing modular block retaining wall (SPV.0090) | LF | 108 | $29.00 | $29.00 | $29.00 |
| 389 | Special 0264. removing railroad tie retaining wall (SPV.0090) | LF | 74 | $54.00 | $54.00 | $54.00 |
| 390 | Special 0272. marking line epoxy block style 12-inch (SPV.0090) | LF | 144 | $18.09 | $18.09 | $18.09 |
| 391 | Special 0274. marking epoxy 6-inch black non grooved (SPV.0090) | LF | 11,734 | $0.45 | $0.45 | $0.45 |
| 392 | Special 0275. marking epoxy 10- inch black non grooved (SPV.0090) | LF | 2,370 | $1.06 | $1.06 | $1.06 |
| 393 | Special 0280. fence safety left in place (SPV.0090) | LF | 1,025 | $4.50 | $4.50 | $4.50 |
| 394 | Special 0285. galvanized pipe railing (SPV.0090) | LF | 30 | $450.00 | $400.00 | $680.95 |
| 395 | Special 0701. anchoring concrete barrier temporary precast left in place (SPV.0090) | LF | 2,550 | $15.00 | $20.00 | $16.31 |
| 396 | Special 0702. concrete barrier temporary precast left in place (SPV.0090) | LF | 5,300 | $25.00 | $20.00 | $40.00 |
| 397 | Special 0703. fence temporary 6- foot (SPV.0090) | LF | 175 | $50.00 | $50.00 | $50.00 |
| 398 | Special 0704. glare screens temporary (SPV.0090) | LF | 1,600 | $5.15 | $5.15 | $5.15 |
| 399 | Special 0705. glare screens temporary left in place (SPV.0090) | LF | 1,652 | $17.45 | $17.45 | $17.45 |
| 400 | Special 1005. liquidtight flexible nonmetallic 1 1/2 inch conduit (SPV.0090) | LF | 5 | $83.00 | $83.00 | $83.00 |
| 401 | Special 1012. electrical cable type 4#2/1#8 XLP (SPV.0090) | LF | 3,872 | $15.23 | $15.23 | $15.23 |
| 402 | Special 1013. cable aerial aluminum 4 AWG quadruplex left in place (SPV.0090) | LF | 1,934 | $8.14 | $8.14 | $8.14 |
| 403 | Special 4100. drilled foundation shaft 34.65-inch (SPV.0090) | LF | 800 | $465.00 | $550.00 | $300.00 |
| 404 | Special 4110. drilled foundation shaft 59.06-inch (SPV.0090) | LF | 415 | $750.00 | $750.00 | $500.00 |
| 405 | Special 4200. foundation drilling (SPV.0090) | LF | 12,350 | $127.50 | $100.00 | $100.00 |
| 406 | Special 4300. remove existing steel piling (SPV.0090) | LF | 40 | $1,000.00 | $800.00 | $2,500.00 |
| 407 | Special 5000. ductile iron (DI) AWWA C-151 class 55 watermain 6-inch (SPV.0090) | LF | 34 | $703.00 | $703.00 | $703.00 |
| 408 | Special 5001. ductile iron (DI) AWWA C-151 class 55 watermain 12-inch (SPV.0090) | LF | 47 | $1,194.00 | $1,194.00 | $1,194.00 |
| 409 | Special 5002. ductile iron hydrant branch 6-inch (SPV.0090) | LF | 13 | $965.00 | $965.00 | $965.00 |
| 410 | Special 5200. 2-duct conduit cement encased 4-inch conduit DB-60 (SPV.0090) | LF | 105 | $119.20 | $119.20 | $119.20 |
| 411 | Special 5201. 4-duct conduit cement encased 4-inch conduit DB-60 (SPV.0090) | LF | 445 | $147.60 | $147.60 | $147.60 |
| 412 | Special 5202. 6-duct conduit cement encased 4-inch conduit DB-60 (SPV.0090) | LF | 133 | $218.00 | $218.00 | $218.00 |
| 413 | Special 5203. 2-duct conduit cement encased 3-inch conduit DB-60 (SPV.0090) | LF | 83 | $114.40 | $114.40 | $114.40 |
| 414 | Special 5210. conduit subduct 1- inch (SPV.0090) | LF | 606 | $6.89 | $6.89 | $6.89 |
| 415 | Special 5215. furnish municipal fiber optic cable 288 count (SPV.0090) | LF | 786 | $3.84 | $3.84 | $3.84 |
| 416 | Special 5216. install fiber optic cable outdoor plant 288-CT (SPV.0090) | LF | 1,465 | $2.92 | $2.92 | $2.92 |
| 417 | Special 5217. removing service cable (SPV.0090) | LF | 706 | $3.20 | $3.20 | $3.20 |
| 418 | Special 8002. drain slotted vane permanent (SPV.0090) | LF | 1,793 | $229.00 | $229.00 | $229.00 |
| 419 | Special 4000. timber lagging (SPV.0110) | MBM | 119 | $6,475.00 | $6,000.00 | $4,500.00 |
| 420 | Special 0301. vibration monitoring (SPV.0135) | MON | 24 | $3,750.00 | $4,000.00 | $3,416.67 |
| 421 | Special 0400. tactile directional indicator (SPV.0165) | SF | 600 | $54.19 | $54.19 | $54.19 |
| 422 | Special 0401. high friction traffic marking green bike lane panel (SPV.0165) | SF | 70 | $10.65 | $10.65 | $10.65 |
| 423 | Special 0410. wall modular block gravity landscape (SPV.0165) | SF | 762 | $110.00 | $110.00 | $110.00 |
| 424 | Special 4000. geocomposite drain board (SPV.0165) | SF | 30,533 | $7.74 | $30.00 | $4.00 |
| 425 | Special 4100. temporary wall wire faced mechanically stabilized earth LFCF R-40-767 (SPV.0165) | SF | 1,895 | $200.00 | $200.00 | $200.00 |
| 426 | Special 4761. wall concrete panel mechanically stabilized earth LFCF R-40-761 (SPV.0165) | SF | 4,726 | $165.79 | $170.00 | $151.00 |
| 427 | Special 4767. wall concrete panel mechanically stabilized earth LFCF R-40-767 (SPV.0165) | SF | 21,190 | $180.00 | $180.00 | $180.00 |
| 428 | Special 0421. HPC pavement 9- inch (SPV.0180) | SY | 6,280 | $81.71 | $81.71 | $81.71 |
| 429 | Special 0443. HMA longitudinal joint repair (SPV.0195) | TON | 50 | $310.00 | $310.00 | $310.00 |
| 430 | Special 0444. HMA transverse joint repair (SPV.0195) | TON | 25 | $310.00 | $310.00 | $310.00 |
| 431 | Special 0446. management of solid waste - ST paul ave / 27TH ST (SPV.0195) | TON | 930 | $46.00 | $46.00 | $46.00 |
| 432 | Special 0447. management of solid waste - greves ST, east of 27TH ST (SPV.0195) | TON | 975 | $46.00 | $46.00 | $46.00 |
| 433 | Special 0448. management of solid waste - greves ST, west of 27TH ST (SPV.0195) | TON | 510 | $50.00 | $50.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.