IDOT contract 61K84 bid tabulation

Channahon, section 15-00024-02-BT. Let by Illinois DOT on January 17, 2025, Will, District 01. 2 bids received; low bid $2,494,970 by D. Construction, Inc..

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
124
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1D. Construction, Inc.$2,494,970Low
2Herlihy Mid-Continent Company$3,343,667+34%
IDOT contract 61K84: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. D. Construction, Inc.2. Herlihy Mid-Continent Company
1T-acerx frem AB 2-1/2 (A2000120)EACH8$630.30$573.00
2T-plat X acr MC 2.5 (A2005960)EACH7$654.50$595.00
3T-quercus rubra 2-1/2 (A2007120)EACH7$687.50$625.00
4T-tilia amer RD 2-1/2 (A2007920)EACH5$646.80$588.00
5T-tilia tomen 2-1/2 (A2008320)EACH6$646.80$588.00
6T-zelkova ser 2-1/2 (A3005210)EACH5$696.30$633.00
7LT WT cell conc fill (X0325318)CY516$200.00$164.00
8Relocate EX mailbox (X0327301)EACH5$250.00$350.00
9Anti-graffiti coating (X0327999)SF3,869$4.00$6.93
10Fold down bollards (X0350805)EACH2$2,327.50$2,116.00
11Stump removal (X2010404)EACH1$100.00$100.00
12Temp access- priv ent (X4021000)EACH9$500.00$1,500.00
13Temp access winterize (X4024100)SY448$0.01$40.00
14Cofferdam typ 1 IS WW (X5021512)EACH1$15,000$50,000
15Perm ST SHT pile SPL (X5220005)SF14,777$66.00$59.50
16Memb WTRPRF sys B STR (X5810103)SY11$200.00$160.00
17Fence removal (X6640104)LF46$12.50$10.80
18Fence rem & reinstall (X6640108)LF45$94.75$86.13
19Remove row markers (X6660410)EACH2$100.00$500.00
20HMA driveway pavt 6 (Z0004522)SY473$37.00$80.00
21Construction layout (Z0013798)LS1$31,500$625,269
22Dust control watering (Z0019600)UNIT20$0.01$0.01
23Property markers (Z0025505)EACH2$1,000.00$500.00
24Temp info signing (Z0030850)SF52$30.00$30.00
25Rock fill (Z0054400)CY7$100.00$100.00
26SS 1 wat MN 12 (Z0056648)LF99$105.60$97.80
27SS 2 wat MN 12 (Z0056668)LF326$105.60$97.80
28Trainees (Z0076600)HR500$0.80$0.80
29Trainees TPG (Z0076604)HR500$15.00$15.00
30Tree remov 6-15 (20100110)UNIT20$38.50$35.00
31Tree remov over 15 (20100210)UNIT15$49.50$45.00
32Temporary fence (20101000)LF65$3.00$3.00
33Tree root pruning (20101200)EACH2$165.00$75.00
34Tree prun 1-10 (20101300)EACH1$165.00$50.00
35Tree prun over 10 (20101350)EACH1$275.00$60.00
36Earth excavation (20200100)CY1,465$25.00$50.00
37Channel excavation (20300100)CY15$30.00$69.00
38Trench backfill (20800150)CY715$87.89$85.95
39Geotech fab F/GR stab (21001000)SY13$15.00$50.00
40Topsoil F & P 4 (21101615)SY3,448$6.60$6.00
41Seeding CL 2A (25000210)ACRE0.75$4,499.00$4,499.00
42Seeding CL 4 (25000310)ACRE0.03$3,364.00$3,364.00
43Seeding CL 5B (25000324)ACRE0.03$32,646$3,264.00
44Nitrogen fert nutr (25000400)LB65$3.00$3.00
45Phosphorus fert nutr (25000500)LB65$3.00$3.00
46Potassium fert nutr (25000600)LB65$3.00$3.00
47Erosion contr blanket (25100630)SY3,372$1.20$1.20
48Supple watering (25200200)UNIT10$50.00$50.00
49Temp eros contr seed (28000250)LB71$4.00$4.00
50Temp ditch checks (28000305)LF220$5.60$5.60
51Perimeter eros bar (28000400)LF1,762$2.50$2.50
52Inlet filters (28000510)EACH7$176.00$125.00
53Temp eros contr blank (28001100)SY3,372$1.10$1.10
54Stone riprap CL A4 (28100107)SY44$125.00$121.00
55Filter fabric (28200200)SY44$7.00$6.35
56Agg subgrade improve (30300001)CY100$50.00$85.00
57Agg subgrade impr 12 (30300112)SY198$22.00$40.00
58Agg base cse B 6 (35101800)SY1,683$14.00$18.00
59Bit matls PR CT (40600275)LB4,422$0.01$0.01
60HMA SC IL-9.5 D N50 (40604060)TON206$125.00$170.00
61PCC driveway pavt 8 (42300400)SY59$120.00$161.50
62PC conc sidewalk 5 (42400200)SF111$25.00$20.85
63Detectable warnings (42400800)SF27$40.00$41.50
64Pavement rem (44000100)SY134$15.00$38.00
65HMA surf rem 2 (44000157)SY152$15.00$18.00
66Drive pavement rem (44000200)SY408$10.00$32.00
67Comb curb gutter rem (44000500)LF162$10.00$30.00
68Sidewalk rem (44000600)SF70$10.00$10.00
69Paved SHLD removal (44004250)SY10$50.00$125.00
70CL C patch T1 7 (44201313)SY54$175.00$21.50
71CL D patch T1 2 (44201670)SY9$150.00$250.00
72Aggregate SHLDS B 6 (48101500)SY247$15.00$28.00
73Conc headwall removal (50104400)EACH6$682.00$670.00
74Pipe culvert remov (50105220)LF234$21.45$21.70
75Structure excavation (50200100)CY170$30.00$65.00
76Rem/disp uns matl-STR (50200450)CY7$100.00$60.00
77Conc struct (50300225)CY181$1,550.00$2,500.00
78Form liner tex surf (50300285)SF2,175$25.00$35.00
79F & E struct steel (50500405)LB2,240$9.00$8.00
80Stud shear connectors (50500505)EACH858$6.00$16.00
81Reinf bars, epoxy CTD (50800205)LB18,730$3.00$1.75
82Bicycle railing (50901720)LF483$149.45$135.68
83Conc box cul (54003000)CY11$2,800.00$3,000.00
84PRC flar end sec 12 (54213657)EACH1$1,138.50$1,085.00
85PRC flar end sec 18 (54213663)EACH1$1,248.50$1,185.00
86Storm sew CL A 1 12 (550A0050)LF439$56.65$55.15
87Storm sew CL A 1 18 (550A0090)LF30$79.20$75.35
88Storm sew CL A 2 12 (550A0340)LF783$56.65$55.15
89Storm sewer rem 12 (55100500)LF40$13.75$12.50
90Storm sewer rem 24 (55101200)LF5$18.70$17.00
91Adj water main 6 (56106300)LF20$413.60$376.00
92Adj water main 16 (56106700)LF35$665.50$626.00
93Adj water serv lines (56300300)LF300$65.18$63.00
94Fire hydnts to BE rem (56400500)EACH2$110.00$100.00
95Fire hyd W/aux V & VB (56400820)EACH2$9,504.00$8,825.00
96Concrete sealer (58700300)SF3,869$2.00$2.33
97Geocomposite wall DR (59100100)SY157$30.00$45.00
98Conc HDWL for P drain (60100060)EACH1$345.95$314.50
99Pipe drains 6 (60100915)LF194$31.90$29.00
100Pipe underdr T 2 6 (60108206)LF118$31.90$29.00
101CB TA 4 dia T1F OL (60200105)EACH1$3,850.00$3,680.00
102CB TA 5 dia T1F OL (60203805)EACH2$6,600.00$6,300.00
103CB TC T8G (60207605)EACH1$1,457.50$1,400.00
104Man TA 4 dia T1F OL (60218300)EACH7$3,190.00$3,050.00
105Man TA 4 dia T1F CL (60218400)EACH6$3,190.00$3,050.00
106Man TA 5 dia T1F OL (60221000)EACH1$3,756.50$3,415.00
107Inlets TA T1F OL (60234200)EACH1$1,452.00$1,363.00
108Inlets TA T1F CL (60235300)EACH1$1,452.00$1,363.00
109Inlets TA T8G (60236200)EACH1$1,452.00$1,363.00
110Inlets TA T11V F&G (60236825)EACH5$1,903.00$1,819.00
111Inlets TB T11V F&G (60240312)EACH1$2,860.00$2,870.00
112Conc curb TB (60600605)LF69$40.00$51.50
113Comb CC&G TB6.12 (60603800)LF711$40.00$45.50
114Mobilization (67100100)LS1$146,450$201,000
115TR cont & prot 701501 (70102620)LS1$20,000$500.00
116TR cont & prot 701801 (70102640)LS1$1.00$2,500.00
117Sign panel T1 (72000100)SF14$33.00$30.00
118Remov sin pan assy TA (72400100)EACH3$82.50$200.00
119Remov sign panel T1 (72400310)SF66$16.50$15.00
120Teles STL sin support (72800100)LF44$16.50$20.00
121THPL PVT MK line 4 (78000200)LF686$4.40$4.50
122THPL PVT MK line 6 (78000400)LF47$5.50$6.75
123THPL PVT MK line 24 (78000650)LF87$11.00$13.00
124PVT MKG rem WTR blast (78300202)SF144$23.10$20.00
IDOT contract 61K84: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy