IDOT contract 97892 bid tabulation
Shiloh, section 22-00022-00-PW. Let by Illinois DOT on September 18, 2026, St. Clair, District 08. 3 bids received; low bid $7,655,061 by Plocher Construction Company, Inc..
- Owner
- Illinois DOT
- Letting
- 18 SEP 2026
- Pay items
- 134
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Plocher Construction Company, Inc. | $7,655,061 | Low |
| 2 | Keeley & Sons, Inc. | $7,879,932 | +3.0% |
| 3 | DMS Contracting, Inc. | $8,088,743 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Plocher Construction Company, Inc. | 2. Keeley & Sons, Inc. | 3. DMS Contracting, Inc. |
|---|---|---|---|---|---|---|
| 1 | Bollard removal (X0350810) | EACH | 2 | $500.00 | $516.94 | $702.10 |
| 2 | GPS clock sync unit (X1400437) | EACH | 11 | $1,985.00 | $1,004.70 | $1,039.25 |
| 3 | Potholing (X1700066) | EACH | 30 | $900.00 | $100.00 | $830.13 |
| 4 | Temp pavt removal (X4400110) | SY | 558 | $15.00 | $15.30 | $18.74 |
| 5 | Bar terminators (X5080530) | EACH | 988 | $35.00 | $37.65 | $39.72 |
| 6 | Retaining wall remov (X5220102) | LF | 168 | $40.00 | $40.80 | $83.00 |
| 7 | Drainage scuppr DS-12 (X5230176) | EACH | 6 | $3,000.00 | $3,189.00 | $3,364.65 |
| 8 | Storm sewer removal (X5510100) | LF | 478 | $60.00 | $63.35 | $36.47 |
| 9 | Delineator removal (X6350120) | EACH | 16 | $20.00 | $89.85 | $351.05 |
| 10 | Fence removal (X6640104) | LF | 195 | $10.00 | $11.15 | $28.80 |
| 11 | Traf cont & prot SPL (X7010216) | LS | 1 | $195,000 | $34,298 | $129,510 |
| 12 | RRPM reflector removl (X7830050) | EACH | 61 | $13.00 | $25.45 | $87.78 |
| 13 | Drainage STR removed (Z0018700) | EACH | 5 | $2,600.00 | $687.45 | $1,479.50 |
| 14 | Drill-grout #6 T-bar (Z0018911) | EACH | 507 | $22.00 | $33.90 | $26.30 |
| 15 | Temp pavement (Z0062456) | SY | 558 | $114.00 | $148.24 | $153.33 |
| 16 | Trainees (Z0076600) | HR | 3,500 | $0.80 | $0.80 | $0.80 |
| 17 | Trainees TPG (Z0076604) | HR | 3,500 | $15.00 | $15.00 | $15.00 |
| 18 | Remov wood post (Z0077803) | EACH | 4 | $60.00 | $187.45 | $244.59 |
| 19 | Tree remov 6-15 (20100110) | UNIT | 15 | $530.00 | $81.60 | $120.58 |
| 20 | Tree remov over 15 (20100210) | UNIT | 60 | $290.00 | $81.60 | $140.27 |
| 21 | Tree remov acres (20100500) | ACRE | 1 | $40,000 | $12,240 | $33,666 |
| 22 | Earth excavation (20200100) | CY | 3,350 | $39.00 | $42.84 | $38.67 |
| 23 | Channel excavation (20300100) | CY | 1,990 | $25.00 | $27.35 | $46.88 |
| 24 | Furnished excavation (20400800) | CY | 1,940 | $10.00 | $10.20 | $27.58 |
| 25 | Trench backfill (20800150) | CY | 588 | $60.00 | $67.94 | $64.45 |
| 26 | Seeding CL 2A (25000210) | ACRE | 1.75 | $3,485.00 | $3,570.00 | $7,227.30 |
| 27 | Nitrogen fert nutr (25000400) | LB | 160 | $1.20 | $4.08 | $6.86 |
| 28 | Phosphorus fert nutr (25000500) | LB | 160 | $1.20 | $4.08 | $6.86 |
| 29 | Potassium fert nutr (25000600) | LB | 160 | $1.20 | $4.08 | $6.86 |
| 30 | Mulch method 3 (25100125) | ACRE | 1.75 | $4,614.00 | $3,570.00 | $10,551 |
| 31 | Erosion contr blanket (25100630) | SY | 1,468 | $3.65 | $4.08 | $5.54 |
| 32 | Temp eros contr seed (28000250) | LB | 360 | $14.00 | $5.10 | $6.06 |
| 33 | Temp ditch checks (28000305) | LF | 96 | $7.50 | $35.70 | $30.45 |
| 34 | Perimeter eros bar (28000400) | LF | 1,133 | $2.60 | $4.08 | $9.21 |
| 35 | Inlet & pipe protect (28000500) | EACH | 29 | $200.00 | $427.40 | $349.62 |
| 36 | Stone riprap CL A4 (28100107) | SY | 1,660 | $100.00 | $99.96 | $70.37 |
| 37 | Filter fabric (28200200) | SY | 1,660 | $2.45 | $4.85 | $13.27 |
| 38 | Sub gran mat A (31100100) | TON | 4,839 | $41.00 | $61.85 | $32.72 |
| 39 | Agg surf cse A (40200100) | TON | 19 | $58.00 | $59.70 | $57.77 |
| 40 | Aggregate-temp access (40201000) | TON | 76 | $51.00 | $60.00 | $36.65 |
| 41 | Welded wire reinf (42000060) | SY | 5,832 | $12.75 | $15.45 | $14.32 |
| 42 | PVT con PCC BR app SL (42000080) | SY | 240 | $148.00 | $267.90 | $216.97 |
| 43 | PCC PVT 9 jointed (42000401) | SY | 5,592 | $100.00 | $117.90 | $113.43 |
| 44 | Protective coat (42001300) | SY | 6,806 | $2.75 | $2.05 | $1.59 |
| 45 | PCC driveway pavt 6 (42300200) | SY | 33 | $182.00 | $123.80 | $238.37 |
| 46 | PCC driveway pavt 9 (42300500) | SY | 185 | $141.50 | $131.00 | $191.12 |
| 47 | PC conc sidewalk 4 (42400100) | SF | 2,060 | $7.50 | $13.15 | $12.64 |
| 48 | Detectable warnings (42400800) | SF | 31 | $97.00 | $137.90 | $86.78 |
| 49 | Pavement rem (44000100) | SY | 3,020 | $32.00 | $35.70 | $30.80 |
| 50 | Comb curb gutter rem (44000500) | LF | 706 | $15.00 | $15.30 | $23.02 |
| 51 | Sidewalk rem (44000600) | SF | 163 | $24.00 | $25.50 | $6.39 |
| 52 | Paved SHLD removal (44004250) | SY | 1,424 | $20.00 | $22.75 | $32.41 |
| 53 | Welded wire reinf (44200050) | SY | 75 | $14.00 | $29.00 | $26.38 |
| 54 | CL B patch T4 9 (44200964) | SY | 75 | $200.00 | $322.00 | $490.61 |
| 55 | Dowel bars 1 1/4 (44201298) | EACH | 29 | $25.00 | $28.95 | $47.48 |
| 56 | Saw cuts (44213200) | LF | 194 | $10.00 | $29.48 | $12.66 |
| 57 | Tie bars 3/4 (44213204) | EACH | 31 | $20.00 | $23.10 | $79.13 |
| 58 | Rem exist struct (50100200) | LS | 1 | $225,600 | $87,890 | $252,692 |
| 59 | Pipe culvert remov (50105220) | LF | 138 | $70.00 | $81.60 | $30.17 |
| 60 | Structure excavation (50200100) | CY | 328 | $30.00 | $37.30 | $39.35 |
| 61 | Conc struct (50300225) | CY | 238.40 | $1,000.00 | $1,245.00 | $1,313.57 |
| 62 | Conc sup-STR (50300255) | CY | 483.10 | $1,800.00 | $1,755.85 | $1,852.56 |
| 63 | BR deck grooving (50300260) | SY | 1,895 | $10.00 | $9.59 | $10.12 |
| 64 | Concrete encasement (50300280) | CY | 33 | $2,000.00 | $1,655.00 | $1,746.16 |
| 65 | Protective coat (50300300) | SY | 2,371 | $2.75 | $3.90 | $4.11 |
| 66 | Conc supstr app slab (50301350) | CY | 233.40 | $430.00 | $447.85 | $472.52 |
| 67 | F & E struct steel (50500105) | LS | 1 | $885,000 | $1,310,000 | $1,156,730 |
| 68 | Stud shear connectors (50500505) | EACH | 9,090 | $3.99 | $4.33 | $4.57 |
| 69 | Reinf bars, epoxy CTD (50800205) | LB | 244,890 | $1.70 | $1.90 | $2.00 |
| 70 | Bar splicers (50800515) | EACH | 1,001 | $50.00 | $47.35 | $49.96 |
| 71 | Bicycle railing (50901720) | LF | 229 | $193.00 | $188.70 | $285.40 |
| 72 | Parapet railing (50901750) | LF | 225 | $113.00 | $107.10 | $132.15 |
| 73 | Fur STL pile HP14X89 (51201900) | LF | 4,748 | $124.00 | $144.85 | $152.83 |
| 74 | Driving piles (51202305) | LF | 4,748 | $0.10 | $0.01 | $0.01 |
| 75 | Test pile ST HP14X89 (51203900) | EACH | 2 | $124,500 | $47,890 | $50,528 |
| 76 | Pile shoes (51204650) | EACH | 48 | $210.00 | $195.00 | $205.74 |
| 77 | Name plates (51500100) | EACH | 1 | $1,500.00 | $1,780.00 | $1,878.04 |
| 78 | Anchor bolts 3/4 (52100510) | EACH | 40 | $88.00 | $200.06 | $211.08 |
| 79 | Anchor bolts 1 (52100520) | EACH | 40 | $88.00 | $200.06 | $211.08 |
| 80 | Temp SHT piling (52200010) | SF | 591 | $56.00 | $49.85 | $52.60 |
| 81 | Precast mod ret wall (52200700) | SF | 1,340 | $152.00 | $163.80 | $157.08 |
| 82 | PRC flar end sec 15 (54213660) | EACH | 5 | $2,100.00 | $2,284.80 | $3,392.15 |
| 83 | PRC flar end sec 24 (54213669) | EACH | 1 | $2,850.00 | $3,090.60 | $3,899.23 |
| 84 | Storm sew CL A 1 12 (550A0050) | LF | 65 | $125.00 | $137.70 | $104.00 |
| 85 | Storm sew CL A 1 15 (550A0070) | LF | 743 | $100.00 | $120.36 | $123.09 |
| 86 | Storm sew CL A 2 15 (550A0360) | LF | 554 | $105.00 | $127.50 | $157.69 |
| 87 | Storm sew CL A 2 18 (550A0380) | LF | 90 | $120.00 | $137.70 | $149.06 |
| 88 | Storm sew CL A 2 24 (550A0410) | LF | 230 | $170.00 | $204.00 | $192.87 |
| 89 | Water valves adjust (56109210) | EACH | 2 | $250.00 | $287.00 | $608.52 |
| 90 | Water serv line 1 (56200300) | LF | 100 | $52.00 | $93.45 | $35.13 |
| 91 | Granular backfill STR (58600101) | CY | 226 | $78.00 | $81.35 | $85.83 |
| 92 | Geocomposite wall DR (59100100) | SY | 126 | $25.00 | $27.80 | $29.33 |
| 93 | P undr for struct 4 (60146304) | LF | 214 | $26.00 | $23.00 | $24.27 |
| 94 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $5,500.00 | $6,191.40 | $4,646.70 |
| 95 | Man TA 4 dia T3F&G (60218500) | EACH | 3 | $5,500.00 | $6,191.40 | $4,646.68 |
| 96 | Man TA 4 dia T24F&G (60219540) | EACH | 2 | $5,500.00 | $6,191.40 | $4,692.88 |
| 97 | Man TA 5 dia T24F&G (60222240) | EACH | 1 | $6,200.00 | $7,089.00 | $5,261.32 |
| 98 | Inlets TA T3F&G (60235700) | EACH | 2 | $3,500.00 | $3,855.60 | $3,738.21 |
| 99 | Inlets TA T8G (60236200) | EACH | 2 | $3,500.00 | $3,855.60 | $3,738.21 |
| 100 | Inlets TA T24F&G (60237470) | EACH | 4 | $3,500.00 | $3,855.60 | $3,738.21 |
| 101 | Inlets TB T3F&G (60240220) | EACH | 5 | $4,200.00 | $4,610.40 | $4,215.55 |
| 102 | Inlets TB T24F&G (60240328) | EACH | 10 | $4,200.00 | $4,610.40 | $4,169.34 |
| 103 | Comb CC&G TY B-6.24 (60605000) | LF | 2,207 | $72.00 | $57.90 | $55.76 |
| 104 | SPBGR TY A 6FT posts (63000001) | LF | 337.50 | $30.00 | $30.60 | $33.76 |
| 105 | SPBGR TY A 9FT posts (63000003) | LF | 100 | $39.00 | $39.78 | $42.99 |
| 106 | BCK SD prot of GRDRL (63000035) | LF | 187.50 | $20.00 | $20.40 | $9.50 |
| 107 | Traf bar term T6 (63100085) | EACH | 4 | $4,500.00 | $4,590.00 | $4,193.94 |
| 108 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $3,500.00 | $3,570.00 | $3,640.03 |
| 109 | Guardrail remov (63200310) | LF | 724 | $7.00 | $5.10 | $9.23 |
| 110 | Sight SCRN (CLF) 6 (64000110) | LF | 195 | $125.00 | $91.35 | $92.85 |
| 111 | Mobilization (67100100) | LS | 1 | $530,000 | $479,800 | $428,514 |
| 112 | TR cont surveillance (70103815) | CAL DAY | 255 | $500.00 | $0.10 | $68.25 |
| 113 | Temp PVT MK LTR & sym paint (70300211) | SF | 210 | $2.00 | $2.04 | $2.11 |
| 114 | Temp PVT MK line 4 - paint (70300221) | LF | 26,116 | $0.30 | $0.31 | $0.32 |
| 115 | Temp PVT MK line 12 - paint (70300261) | LF | 540 | $1.00 | $1.02 | $1.06 |
| 116 | Temp PVT MK line 24 - paint (70300281) | LF | 77 | $2.00 | $2.04 | $2.11 |
| 117 | Temp conc barrier (70400100) | LF | 625 | $60.00 | $61.00 | $52.23 |
| 118 | Rel temp conc barrier (70400200) | LF | 525 | $4.00 | $13.00 | $10.55 |
| 119 | Imp attn temp FRN TL3 (70600260) | EACH | 2 | $18,000 | $3,190.00 | $17,435 |
| 120 | Imp attn rel FRN TL3 (70600332) | EACH | 2 | $3,500.00 | $2,115.00 | $2,584.95 |
| 121 | Sign panel T1 (72000100) | SF | 25 | $40.00 | $20.40 | $23.21 |
| 122 | Remov sin pan assy TA (72400100) | EACH | 2 | $100.00 | $211.00 | $939.83 |
| 123 | Remov sin pan assy TB (72400200) | EACH | 2 | $100.00 | $237.00 | $939.83 |
| 124 | Reloc sin pan assy TA (72400500) | EACH | 5 | $100.00 | $76.50 | $1,026.86 |
| 125 | Terminal marker - DA (72501000) | EACH | 4 | $50.00 | $51.00 | $44.31 |
| 126 | Teles STL sin support (72800100) | LF | 125 | $38.00 | $20.66 | $23.48 |
| 127 | Polyurea PM T1 LTR-SY (78008200) | SF | 210 | $65.00 | $66.30 | $68.58 |
| 128 | Polyurea PM T1 LN 4 (78008210) | LF | 7,453 | $4.00 | $4.08 | $4.22 |
| 129 | Polyurea PM T1 LN 12 (78008250) | LF | 540 | $30.00 | $30.60 | $31.65 |
| 130 | Polyurea PM T1 LN 24 (78008270) | LF | 77 | $64.00 | $66.30 | $68.58 |
| 131 | Raised refl pavt MKR (78100100) | EACH | 133 | $135.00 | $68.19 | $77.55 |
| 132 | Grdrail ref type A (78200005) | EACH | 16 | $10.00 | $10.20 | $12.66 |
| 133 | Barr wall ref type B (78200010) | EACH | 8 | $70.00 | $31.20 | $0.01 |
| 134 | PVT MKG rem WTR blast (78300202) | SF | 12,481 | $1.80 | $0.77 | $0.79 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.