C & R Construction and Consulting LLC: INDOT bid record

C & R Construction and Consulting LLC submitted 11 bids on Indiana DOT contracts in the data, from 09 MAR 2022 to 10 SEP 2025, and was the low bidder on 3 of them (27%). When it was not low, its total sat a median +36% above the low bid.

Owner
Indiana DOT
Low bid volume
$8,254,863
Latest bid
10 SEP 2025
Data through
05 NOV 2026
11Bids
3Low bids
27Win rate, percent
+36%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
20224125%
20233267%
2025400%
C & R Construction and Consulting LLC, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Vincennes6117%
Seymour5240%
C & R Construction and Consulting LLC, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL1010 (100%)$1.00$1.00
Contract liens109-08360DOL1010 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL1010 (100%)$1.00$1.00
Quality adjustments, HMA109-08440DOL1010 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL99 (100%)$1.00$1.00
Snowplowable raised pavement marker808-75998EACH107 (70%)$100.00$89.00
Payment adjustment PG asphalt binder109-09489DOL66 (100%)$1.00$1.00
Asphalt for tack coat406-05520TON75 (71%)$650.00$650.00
Stormwater management budget205-12108DOL55 (100%)$1.00$1.00
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL55 (100%)$1.00$1.00
Quality adjustments, pavement traffic markings109-09377DOL55 (100%)$1.00$1.00
Computer system equipment628-11976EACH104 (40%)$500.00$802.75
C & R Construction and Consulting LLC, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

C & R Construction and Consulting LLC, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
10 SEP 2025R-43985-AVincennesSLIDE CORRECTION8 of 10$1,048,497+32%
14 MAY 2025R-46174-AVincennesSPOT PAVING2 of 2$128,777+109%
07 MAY 2025R-43252-AVincennesASPHALT RESURFACE3 of 3$3,930,684+54%
12 FEB 2025R-43234-AVincennesSMALL STRUCTURE REPLACEMENT7 of 8$749,019+39%
09 AUG 2023R-42742-BVincennesASPHALT RESURFACE AND BRIDGE THIN DECK OVERLAY1 of 3$3,723,791Low, 0.0% under the second
12 APR 2023R-44766-AVincennesASPHALT RESURFACE5 of 5$754,040+33%
19 JAN 2023B-41421-ASeymourBRIDGE AND SMALL STRUCTURE REPLACEMENT, MAINT AND REPAIR1 of 3$2,476,953Low, 21% under the second
13 OCT 2022B-42872-ASeymourBRIDGE DECK OVERLAY5 of 5$1,407,324+18%
14 SEP 2022R-41422-ASeymourSMALL STRUCTURE PIPE LINING, SMALL STRUCTURE REPLACEMENT2 of 3$1,239,199+26%
10 AUG 2022R-42890-ASeymourASPHALT RESURFACE1 of 3$2,054,119Low, 15% under the second
09 MAR 2022R-42151-ASeymourASPHALT RESURFACE3 of 3$12,667,961+92%
C & R Construction and Consulting LLC: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy