INDOT contract R-43335-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on February 12, 2025, Brown, Seymour. 8 bids received; low bid $887,425 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 12 FEB 2025
- Pay items
- 64
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $887,425 | Low |
| 2 | Dave Omara Contractor Inc | $1,089,042 | +23% |
| 3 | Olco Inc | $1,094,506 | +23% |
| 4 | Force Construction Co Inc | $1,113,003 | +25% |
| 5 | Milestone Contractors LP | $1,136,000 | +28% |
| 6 | Morphey Construction Inc. | $1,225,082 | +38% |
| 7 | Yardberry Landscape Company | $1,335,254 | +50% |
| 8 | Crider & Crider Inc | $1,511,175 | +70% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Dave Omara Contractor Inc | 3. Olco Inc | 4. Force Construction Co Inc | 5. Milestone Contractors LP | 6. Morphey Construction Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $8,400.00 | $17,500 | $40,350 | $11,280 | $23,000 | $25,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $44,370 | $50,400 | $49,193 | $55,000 | $57,000 | $75,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $10,999 | $12,500 | $48,406 | $5,450.00 | $1,040.00 | $20,000 |
| 0012 | Pavement removal (202-02240) | SYS | 788 | $18.00 | $21.00 | $28.03 | $21.00 | $9.00 | $40.00 |
| 0013 | Pipe, remove (202-96133) | LFT | 185 | $88.00 | $100.00 | $34.61 | $303.00 | $625.00 | $60.00 |
| 0014 | Excavation, common (203-02000) | CYS | 449 | $108.00 | $40.00 | $64.68 | $67.00 | $39.00 | $100.00 |
| 0015 | Borrow (203-02070) | CYS | 7 | $120.00 | $100.00 | $137.83 | $84.00 | $1.00 | $55.00 |
| 0016 | Pump around (205-11626) | EACH | 2 | $6,188.00 | $13,000 | $6,727.78 | $12,160 | $28,800 | $15,000 |
| 0017 | Stormwater management budget (205-12108) | DOL | 7,497 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $4,300.00 | $9,000.00 | $20,005 | $15,760 | $20,000 | $1,500.00 |
| 0019 | Subgrade treatment, type II (207-08264) | SYS | 503 | $25.00 | $21.00 | $29.33 | $14.00 | $22.00 | $45.00 |
| 0020 | Structure backfill, type 5 (211-09268) | CYS | 931 | $150.00 | $175.00 | $224.19 | $172.00 | $200.00 | $160.00 |
| 0021 | Geogrid, type IB (214-11796) | SYS | 503 | $2.50 | $5.00 | $3.75 | $3.40 | $2.70 | $6.00 |
| 0022 | Compacted aggregate, no. 5 (301-12232) | CYS | 52 | $220.00 | $110.00 | $103.58 | $62.00 | $180.00 | $175.00 |
| 0023 | Compacted aggregate, no. 53 (303-01180) | TON | 20 | $300.00 | $90.00 | $79.50 | $70.00 | $119.00 | $110.00 |
| 0024 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 1,257 | $10.00 | $21.00 | $9.31 | $6.80 | $11.00 | $15.00 |
| 0025 | Milling, approach (306-08432) | SYS | 110 | $10.00 | $21.00 | $5.75 | $25.00 | $8.53 | $25.00 |
| 0026 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 142 | $206.00 | $225.00 | $243.46 | $225.00 | $260.50 | $206.00 |
| 0027 | Joint adhesive, surface (401-10258) | LFT | 1,065 | $0.80 | $1.00 | $1.70 | $0.85 | $0.70 | $0.80 |
| 0028 | Liquid asphalt sealant , rpe (401-11785) | LFT | 1,065 | $0.01 | $1.00 | $1.44 | $0.01 | $0.40 | $0.01 |
| 0029 | Asphalt for tack coat (406-05521) | SYS | 1,717 | $0.30 | $1.00 | $0.96 | $0.35 | $0.40 | $0.30 |
| 0030 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 1,065 | $12.50 | $8.00 | $5.83 | $3.50 | $4.90 | $7.00 |
| 0031 | HMA for approaches, type B (610-07487) | TON | 22 | $206.00 | $375.00 | $247.47 | $225.00 | $299.00 | $206.00 |
| 0032 | Mailbox assembly, reset, single (611-08232) | EACH | 5 | $250.00 | $295.00 | $250.00 | $273.00 | $263.00 | $400.00 |
| 0033 | Right-of-way marker (615-06490) | EACH | 8 | $161.00 | $195.00 | $161.00 | $176.00 | $169.00 | $161.00 |
| 0034 | Monument, type B (615-06505) | EACH | 4 | $1,150.00 | $1,200.00 | $1,150.00 | $1,254.00 | $1,211.00 | $1,150.00 |
| 0035 | Riprap, class 1 (616-05688) | TON | 72 | $136.00 | $100.00 | $102.08 | $114.00 | $146.00 | $170.00 |
| 0036 | Riprap, class 2 (616-05689) | TON | 109 | $104.00 | $100.00 | $103.00 | $109.00 | $113.00 | $170.00 |
| 0037 | Riprap, revetment (616-06405) | TON | 32 | $142.50 | $90.00 | $58.21 | $78.00 | $120.00 | $140.00 |
| 0038 | Geotextile for riprap, type 1B (616-12247) | SYS | 290 | $5.25 | $5.00 | $5.28 | $5.00 | $4.00 | $6.00 |
| 0039 | Geotextile for riprap, type 2B (616-12249) | SYS | 391 | $5.00 | $5.00 | $5.35 | $3.80 | $3.50 | $5.00 |
| 0040 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $950.00 | $1,000.00 | $228.22 | $1,036.00 | $1,000.00 | $1,000.00 |
| 0041 | Mulched seeding, type R (621-06559) | SYS | 779 | $2.90 | $3.00 | $3.08 | $3.20 | $3.10 | $15.00 |
| 0042 | Waterproofing membrane type 2 (714-000086) | SFT | 3,595 | $3.50 | $5.00 | $6.37 | $3.60 | $3.00 | $5.00 |
| 0043 | Structure, reinforced concrete, box sections, 6 FT X 5 FT (714-11175) | LFT | 100 | $834.00 | $880.00 | $1,121.93 | $630.00 | $712.00 | $1,450.00 |
| 0044 | Structure, reinforced concrete, box sections, 7 FT X 4 FT (714-11304) | LFT | 85 | $1,042.00 | $930.00 | $1,372.71 | $822.00 | $1,115.00 | $2,000.00 |
| 0045 | HMA for structure installation, type C (715-08306) | TON | 216 | $287.00 | $400.00 | $217.24 | $313.00 | $343.50 | $307.95 |
| 0046 | Road closure sign assembly (801-04308) | EACH | 2 | $199.00 | $235.00 | $150.00 | $290.00 | $158.00 | $150.00 |
| 0047 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 3,868 | $1.86 | $2.00 | $1.90 | $1.80 | $2.00 | $1.90 |
| 0048 | Temporary pavement marking, removable, 24 in. (801-06577) | LFT | 170 | $11.72 | $15.00 | $10.00 | $15.00 | $10.50 | $10.00 |
| 0049 | Construction sign, type A (801-06640) | EACH | 28 | $149.00 | $175.00 | $150.00 | $242.00 | $158.00 | $150.00 |
| 0050 | Construction sign, type B (801-06645) | EACH | 16 | $78.00 | $100.00 | $75.00 | $136.00 | $79.00 | $75.00 |
| 0051 | Maintaining traffic (801-06775) | LS | 1 | $48,496 | $25,500 | $45,313 | $137,000 | $42,034 | $46,684 |
| 0052 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 3 | $6,355.00 | $7,500.00 | $6,355.00 | $6,927.00 | $6,689.00 | $6,355.00 |
| 0053 | Barricade, type III-A (801-07118) | LFT | 22 | $11.00 | $12.00 | $15.00 | $17.00 | $16.00 | $15.00 |
| 0054 | Barricade, type III-B (801-07119) | LFT | 60 | $11.00 | $12.00 | $15.00 | $17.00 | $16.00 | $15.00 |
| 0055 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 265 | $135.00 | $95.00 | $48.14 | $130.00 | $124.00 | $30.00 |
| 0056 | Fixed temporary signal (801-12082) | LS | 1 | $34,640 | $125,000 | $92,800 | $101,160 | $73,000 | $75,000 |
| 0057 | Line, remove (808-06716) | LFT | 1,497 | $0.62 | $1.00 | $0.75 | $0.80 | $0.80 | $0.75 |
| 0058 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 710 | $1.00 | $1.00 | $3.50 | $2.70 | $3.70 | $3.50 |
| 0059 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 6 | $21.61 | $125.00 | $16.04 | $273.00 | $108.00 | $5.00 |
| 0060 | Snowplowable raised pavement marker (808-75998) | EACH | 6 | $125.00 | $350.00 | $200.00 | $103.00 | $211.00 | $200.00 |
| 0061 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 89 | $2.00 | $2.00 | $3.50 | $4.10 | $3.70 | $3.50 |
| 0062 | Field office, type C (628-09403) | MOS | 6 | $2,990.00 | $2,500.00 | $1,175.85 | $4,082.00 | $3,300.00 | $2,500.00 |
| 0063 | Computer system equipment (628-11976) | EACH | 2 | $293.00 | $750.00 | $575.00 | $1,750.00 | $550.00 | $600.00 |
| 0064 | Temporary shoring (702-04325) | LS | 1 | $22,600 | $99,500 | $28,661 | $62,540 | $48,000 | $80,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.