Yardberry Landscape Company: INDOT bid record

Yardberry Landscape Company submitted 61 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 12 FEB 2025, and was the low bidder on 6 of them (10%). When it was not low, its total sat a median +46% above the low bid.

Owner
Indiana DOT
Low bid volume
$4,200,538
Latest bid
12 FEB 2025
Data through
05 NOV 2026
61Bids
6Low bids
10Win rate, percent
+46%Median gap to the low bid when not low, 52 bids

By year

YearBidsLow bidsWin rate
202217212%
20231119%
202426312%
2025700%
Yardberry Landscape Company, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Greenfield1716%
Fort Wayne14321%
Crawfordsville1100%
Seymour900%
Vincennes5120%
LaPorte5120%
Yardberry Landscape Company, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL5656 (100%)$1.00$1.00
Contract liens109-08360DOL5656 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL5555 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL5555 (100%)$1.00$1.00
Stormwater management budget205-12108DOL4848 (100%)$1.00$1.00
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL4848 (100%)$1.00$1.00
Project estimate adjustment109-08463DOL3030 (100%)$1.00$1.00
Pump around205-11626EACH3113 (42%)$8,500.00$14,000
Mulched seeding, type R621-06559SYS2212 (55%)$3.00$3.02
Mobilization and demobilization for seeding621-01004EACH4711 (23%)$700.00$525.00
Truck mounted attenuator801-12042DAY1611 (69%)$350.00$450.00
Quality adjustments, HMA109-08440DOL1010 (100%)$1.00$1.00
Yardberry Landscape Company, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Morphey Construction Inc.3523 of 35
5 Star Company Inc1614 of 16
E & B Paving LLC129 of 12
Milestone Contractors LP128 of 12
Olco Inc1110 of 11
Collom Excavating LLC97 of 9
Crackers Demo LLC97 of 9
Pioneer Associates Inc85 of 8
3D Company Inc86 of 8
Paul H Rohe Company Inc76 of 7
Yardberry Landscape Company, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 FEB 2025R-43335-ASeymourSMALL STRUCTURE REPLACEMENT7 of 8$1,335,254+50%
12 FEB 2025B-43328-ASeymourSCOUR PROTECTION (EROSION)6 of 6$322,362+69%
12 FEB 2025B-44587-AFort WayneDEBRIS REMOVAL FROM CHANNEL3 of 4$210,407+27%
15 JAN 2025R-43146-AFort WayneDRAINAGE DITCH CORRECTION3 of 3$1,542,977+21%
15 JAN 2025R-44758-ALaPorteTREE REMOVAL AND TRIMMING2 of 4$311,130+8.0%
15 JAN 2025B-43226-AVincennesSMALL STRUCTURES AND DRAINS CONSTRUCTION6 of 6$1,857,586+88%
15 JAN 2025B-43497-AGreenfieldSMALL STRUCTURES AND DRAINS CONSTRUCTION6 of 6$519,688+206%
11 DEC 2024B-43557-AGreenfieldSMALL STRUCTURE REPLACEMENT6 of 6$711,750+119%
11 DEC 2024B-44419-ASeymourSCOUR PROTECTION5 of 5$1,588,416+239%
14 NOV 2024R-44767-ALaPorteCULVERT CLEANING4 of 4$441,400+77%
14 NOV 2024B-42342-AGreenfieldSMALL STRUCTURE REPLACEMENT AND PIPE LINING4 of 4$1,027,762+48%
14 NOV 2024B-44095-AFort WayneDEBRIS REMOVAL FROM CHANNEL2 of 2$246,675+49%
09 OCT 2024R-44348-ACrawfordsvilleSMALL STRUCTURE PIPE LINING2 of 3$1,632,909+23%
09 OCT 2024B-43556-AGreenfieldSMALL STRUCTURE REPLACEMENT8 of 8$621,385+47%
09 OCT 2024B-43830-ACrawfordsvilleSCOUR PROTECTION6 of 7$404,654+80%
11 SEP 2024B-43498-AGreenfieldSMALL STRUCTURES AND DRAINS CONSTRUCTION5 of 5$925,340+69%
11 SEP 2024B-44349-ACrawfordsvilleSCOUR PROTECTION6 of 6$489,587+71%
14 AUG 2024B-43539-AGreenfieldSMALL STRUCTURE PIPE LINING AND REPLACEMENT3 of 3$2,035,598+46%
10 JUL 2024R-43288-AFort WayneSMALL STRUCTURE REPLACEMENT AND PIPE LINING2 of 3$1,513,566+18%
10 JUL 2024R-43295-ASeymourSMALL STRUCTURE PAVED INVERT5 of 5$562,203+45%
10 APR 2024R-42736-AVincennesSMALL STRUCTURES AND DRAINS CONSTRUCTION1 of 1$1,554,637Low
13 MAR 2024R-43145-AFort WayneDRAINAGE DITCH CORRECTION1 of 3$1,210,249Low, 1.0% under the second
13 MAR 2024R-43567-ACrawfordsvilleDRAINAGE DITCH CORRECTION2 of 2$763,241+4.0%
13 MAR 2024R-43834-ALaPorteSMALL STRUCTURE MAINTENANCE AND REPAIR3 of 3$259,919+54%
13 MAR 2024R-44950-AFort WayneDEMOLITION, REMOVE BUILDINGS, FOUNDATIONS2 of 3$430,943+18%
Yardberry Landscape Company: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy