INDOT contract R-43452-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on April 9, 2025, Montgomery, Crawfordsville. 7 bids received; low bid $2,218,467 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 09 APR 2025
- Pay items
- 80
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $2,218,467 | Low |
| 2 | Force Construction Co Inc | $2,370,018 | +7.0% |
| 3 | William Charles Construction Company | $2,596,000 | +17% |
| 4 | Morphey Construction Inc. | $2,597,000 | +17% |
| 5 | Milestone Contractors LP | $2,652,000 | +20% |
| 6 | His Constructors Inc | $2,812,915 | +27% |
| 7 | Superior Construction Co Inc | $3,063,505 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. Force Construction Co Inc | 3. William Charles Construction Company | 4. Morphey Construction Inc. | 5. Milestone Contractors LP | 6. His Constructors Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $34,600 | $33,920 | $80,000 | $35,900 | $37,000 | $35,404 |
| 0002 | Utility protection (105-12018) | LS | 1 | $7,500.00 | $13,940 | $15,000 | $20,000 | $5,700.00 | $12,582 |
| 0003 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 4 | $1,850.00 | $1,155.00 | $2,500.00 | $300.00 | $2,000.00 | $921.98 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $142,245 | $165,000 | $130,000 | $129,850 | $132,000 | $185,340 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $44,360 | $22,180 | $65,000 | $51,940 | $53,000 | $51,203 |
| 0013 | Paved side ditch, remove (202-02272) | LFT | 111 | $7.00 | $27.00 | $30.00 | $15.00 | $45.00 | $39.34 |
| 0014 | Sidewalk concrete, remove (202-52710) | SYS | 112 | $14.00 | $21.00 | $12.00 | $20.00 | $40.00 | $3.04 |
| 0015 | Guardrail end treatment, remove (202-93741) | EACH | 8 | $200.00 | $208.00 | $200.00 | $200.00 | $200.00 | $216.94 |
| 0016 | Excavation, common (203-02000) | CYS | 665 | $120.00 | $87.00 | $65.00 | $85.00 | $75.00 | $62.57 |
| 0017 | Borrow (203-02070) | CYS | 1,005 | $0.01 | $48.00 | $25.00 | $36.00 | $40.00 | $68.59 |
| 0018 | Pump around (205-11626) | EACH | 5 | $4,300.00 | $10,230 | $25,000 | $6,000.00 | $15,700 | $32,453 |
| 0019 | Stormwater management budget (205-12108) | DOL | 23,910 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0020 | Stormwater management implementation (205-12616) | LS | 1 | $3,200.00 | $12,840 | $18,000 | $2,500.00 | $15,000 | $183,558 |
| 0021 | Subgrade treatment, type IC (207-09935) | SYS | 1,716 | $46.00 | $45.00 | $48.00 | $60.00 | $60.00 | $40.25 |
| 0022 | Structure backfill, type 2 (211-09265) | CYS | 204 | $110.00 | $126.00 | $60.00 | $85.00 | $95.00 | $116.55 |
| 0023 | Structure backfill, type 5 (211-09268) | CYS | 1,396 | $265.00 | $209.00 | $175.00 | $165.00 | $200.00 | $95.36 |
| 0024 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,729 | $8.00 | $5.10 | $5.00 | $4.00 | $2.50 | $7.27 |
| 0025 | Compacted aggregate, no. 8 (301-12233) | CYS | 451 | $100.00 | $103.00 | $100.00 | $150.00 | $130.00 | $42.75 |
| 0026 | Compacted aggregate, no. 53 (303-01180) | TON | 390 | $110.00 | $53.00 | $62.00 | $65.00 | $95.00 | $65.14 |
| 0027 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 2,255 | $19.00 | $11.00 | $10.00 | $10.00 | $12.00 | $16.14 |
| 0028 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 218 | $240.00 | $249.00 | $240.00 | $240.00 | $200.00 | $260.32 |
| 0029 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 85 | $250.00 | $260.00 | $250.00 | $250.00 | $200.00 | $271.17 |
| 0030 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 146 | $210.00 | $218.00 | $210.00 | $210.00 | $225.00 | $227.78 |
| 0031 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 50 | $215.00 | $223.00 | $215.00 | $215.00 | $225.00 | $233.21 |
| 0032 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 539 | $145.00 | $151.00 | $145.00 | $146.00 | $195.00 | $157.28 |
| 0033 | Joint adhesive, surface (401-10258) | LFT | 2,879 | $0.40 | $0.40 | $0.40 | $0.40 | $2.00 | $0.43 |
| 0034 | Joint adhesive, intermediate (401-10259) | LFT | 1,886 | $0.40 | $0.40 | $0.40 | $0.40 | $3.00 | $0.43 |
| 0035 | Asphalt for tack coat (406-05520) | TON | 4 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.85 |
| 0036 | Guardrail, remove (601-02241) | LFT | 1,283 | $4.00 | $4.20 | $4.00 | $4.00 | $4.00 | $7.04 |
| 0037 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 889 | $19.00 | $20.00 | $19.00 | $19.00 | $19.00 | $25.21 |
| 0038 | Guardrail, MGS, long span, type 2 (601-12288) | EACH | 4 | $1,250.00 | $1,299.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,355.85 |
| 0039 | Guardrail end treatment, type OS (601-94689) | EACH | 12 | $2,950.00 | $3,065.00 | $2,950.00 | $2,950.00 | $2,950.00 | $3,999.76 |
| 0040 | Sidewalk, concrete (604-06070) | SYS | 112 | $77.00 | $111.00 | $125.00 | $80.00 | $90.00 | $65.97 |
| 0041 | Milled HMA corrugations, conventional (606-12399) | LFT | 951 | $6.50 | $3.10 | $2.95 | $5.00 | $12.00 | $11.54 |
| 0042 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 939 | $6.50 | $3.10 | $2.95 | $5.00 | $12.50 | $11.54 |
| 0043 | Right-of-way marker (615-06490) | EACH | 37 | $160.00 | $166.00 | $160.00 | $160.00 | $160.00 | $173.55 |
| 0044 | Monument, type B (615-06505) | EACH | 10 | $800.00 | $831.00 | $800.00 | $800.00 | $800.00 | $867.75 |
| 0045 | Riprap, class 1 (616-05688) | TON | 253 | $105.00 | $117.00 | $125.00 | $165.00 | $90.00 | $111.94 |
| 0046 | Riprap, class 2 (616-05689) | TON | 27 | $120.00 | $106.00 | $100.00 | $165.00 | $150.00 | $138.52 |
| 0047 | Riprap, revetment (616-06405) | TON | 521 | $80.00 | $94.00 | $90.00 | $145.00 | $65.00 | $77.95 |
| 0048 | Geotextile for riprap, type 1A (616-12246) | SYS | 1,150 | $1.80 | $4.50 | $3.10 | $2.50 | $1.20 | $9.56 |
| 0049 | Geotextile for riprap, type 2A (616-12248) | SYS | 962 | $2.90 | $5.20 | $3.09 | $2.50 | $1.20 | $16.06 |
| 0050 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $750.00 | $779.00 | $750.00 | $750.00 | $750.00 | $677.93 |
| 0051 | Erosion control blanket (621-02770) | SYS | 2,869 | $1.37 | $1.40 | $1.37 | $5.00 | $1.37 | $2.63 |
| 0052 | Seed mixture, native (621-03909) | LBS | 18 | $45.00 | $47.00 | $45.00 | $45.00 | $45.00 | $92.20 |
| 0053 | Mulched seeding, type R (621-06559) | SYS | 2,984 | $1.13 | $1.20 | $1.13 | $12.00 | $1.13 | $4.81 |
| 0054 | Mulched seeding, type U (621-06560) | SYS | 540 | $1.65 | $1.70 | $1.65 | $12.00 | $1.65 | $4.10 |
| 0055 | Sodding (621-06574) | SYS | 12 | $71.00 | $15.00 | $14.77 | $34.00 | $14.77 | $233.21 |
| 0056 | Sodding, nursery (621-06575) | SYS | 416 | $24.50 | $15.00 | $14.77 | $24.00 | $14.77 | $13.56 |
| 0057 | Fiber mat, coconut (621-07657) | SYS | 167 | $5.17 | $5.40 | $5.17 | $12.00 | $5.17 | $16.81 |
| 0058 | Field office, type C (628-09403) | MOS | 24 | $4,200.00 | $3,117.00 | $3,000.00 | $2,400.00 | $4,500.00 | $2,529.38 |
| 0059 | Computer system equipment (628-11976) | EACH | 1 | $1,100.00 | $831.00 | $1,000.00 | $800.00 | $2,000.00 | $1,382.52 |
| 0060 | Waterproofing membrane type 2 (714-000086) | SFT | 6,364 | $3.50 | $3.70 | $6.00 | $3.00 | $2.75 | $5.36 |
| 0061 | Structure, reinforced concrete, box sections, 17 FT X 6 FT (714-000114) | LFT | 50 | $3,000.00 | $2,658.00 | $3,600.00 | $4,800.00 | $4,500.00 | $6,054.99 |
| 0062 | Structure, reinforced concrete, box sections, 11 FT X 6 FT (714-11078) | LFT | 40 | $2,600.00 | $2,413.00 | $3,400.00 | $4,930.00 | $4,300.00 | $4,266.42 |
| 0063 | Structure, reinforced concrete, box sections, 11 FT X 10 FT (714-12898) | LFT | 38 | $2,850.00 | $2,805.00 | $3,800.00 | $5,370.00 | $4,800.00 | $4,753.61 |
| 0064 | Structure, reinforced concrete, three-sided (723-11236) | LFT | 72 | $2,450.00 | $2,233.00 | $4,800.00 | $5,120.00 | $5,000.00 | $4,012.48 |
| 0065 | Construction sign, type C (801-03290) | EACH | 3 | $200.00 | $208.00 | $200.00 | $200.00 | $200.00 | $216.94 |
| 0066 | Road closure sign assembly (801-04308) | EACH | 37 | $310.00 | $322.00 | $310.00 | $310.00 | $310.00 | $336.25 |
| 0067 | Detour route marker assembly (801-06625) | EACH | 172 | $125.55 | $130.00 | $125.55 | $125.55 | $125.55 | $136.18 |
| 0068 | Construction sign, type A (801-06640) | EACH | 61 | $195.00 | $203.00 | $195.00 | $195.00 | $195.00 | $211.51 |
| 0069 | Construction sign, type B (801-06645) | EACH | 2 | $115.00 | $120.00 | $115.00 | $115.00 | $115.00 | $124.74 |
| 0070 | Maintaining traffic (801-06775) | LS | 1 | $4,000.00 | $280,000 | $139,007 | $33,353 | $19,561 | $4,338.72 |
| 0071 | Barricade, type III-A (801-07118) | LFT | 252 | $15.75 | $16.00 | $15.75 | $15.75 | $15.75 | $17.08 |
| 0072 | Barricade, type III-B (801-07119) | LFT | 608 | $15.75 | $16.00 | $15.75 | $15.75 | $15.75 | $17.08 |
| 0073 | Temporary pedestrian channelizer (801-12862) | LFT | 10 | $64.00 | $203.00 | $55.00 | $100.00 | $84.73 | $50.61 |
| 0074 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 271 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $2.02 |
| 0075 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 2,159 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $0.93 |
| 0076 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 630 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.08 |
| 0077 | Present structure, remove, structure no. CV 047-054-08.40 (202-51330) | LS | 1 | $18,500 | $14,810 | $23,000 | $15,000 | $32,290 | $25,999 |
| 0078 | Present structure, remove, structure no. CV 047-054-16.81 (202-51330) | LS | 1 | $19,500 | $15,900 | $22,000 | $15,000 | $25,935 | $30,506 |
| 0079 | Present structure, remove, structure no. CV 047-054-14.61 (202-51330) | LS | 1 | $32,000 | $20,390 | $35,000 | $15,000 | $30,490 | $34,341 |
| 0080 | Present structure, remove, structure no. CV 234-054-44.10 (202-51330) | LS | 1 | $41,500 | $28,470 | $18,000 | $11,000 | $17,470 | $36,342 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of April 9, 2025. Compiled by Mirage Metrics.