MoDOT contract 250620-C09 bid tabulation
JKU0404 - ROUTE 350 - JACKSON COUNTY. Let by Missouri DOT on June 20, 2025, Jackson, Kansas City. 3 bids received; low bid $4,975,166 by Pyramid Contractors, Inc..
- Owner
- Missouri DOT
- Letting
- 20 JUN 2025
- Pay items
- 157
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pyramid Contractors, Inc. | $4,975,166 | Low |
| 2 | Miles Excavating, Inc. | $5,644,631 | +13% |
| 3 | Amino Bros. Co., Inc. | $6,160,021 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pyramid Contractors, Inc. | 2. Miles Excavating, Inc. | 3. Amino Bros. Co., Inc. |
|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Clearing and grubbing (2013000) | ACRE | 1 | $125,000 | $61,916 | $134,270 |
| 0030 | Removal of improvements (2022010) | LS | 1 | $285,000 | $225,388 | $250,100 |
| 0040 | Unclassified excavation (2035000) | CY | 11,908 | $20.00 | $23.94 | $59.50 |
| 0050 | Compacting embankment (2036000) | CY | 1,048 | $4.75 | $19.03 | $10.00 |
| 0060 | Class 3 excavation (2063000) | CY | 223 | $22.00 | $38.60 | $8.50 |
| 0070 | Class 3 excavation in rock (2063100) | CY | 26 | $145.00 | $176.13 | $128.00 |
| 0080 | Class 4 excavation (2063300) | CY | 13 | $55.00 | $106.86 | $90.00 |
| 0090 | Culvert cleanout (2063500) | EACH | 1 | $4,500.00 | $30,665 | $10,000 |
| 0100 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 1,003 | $13.50 | $18.62 | $30.00 |
| 0110 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 1,386 | $20.00 | $23.40 | $30.00 |
| 0120 | Misc.type 5 aggregate for base (12 in. thick) (3049905) | SY | 5,059 | $25.00 | $32.78 | $50.00 |
| 0130 | Misc.permanent aggregate edge treatment (3049910) | TON | 835 | $42.00 | $54.74 | $60.50 |
| 0140 | Gravel (A) (3101003) | SY | 128 | $13.00 | $46.50 | $46.75 |
| 0150 | Misc.crushed limestone (8 in. thick) (3109905) | SY | 237 | $25.00 | $97.83 | $61.50 |
| 0160 | Bituminous pavement mixture PG64-22, (BP-1) (4011209) | TON | 710.40 | $115.00 | $125.89 | $129.00 |
| 0170 | Bituminous pavement mixture PG64-22 (base) (4013000) | TON | 767.80 | $112.00 | $123.67 | $135.00 |
| 0180 | Asphaltic concrete mixture PG 76-22 (SP125B mix) (4030116) | TON | 809.60 | $148.00 | $162.50 | $179.00 |
| 0190 | Asphaltic concrete mixture PG 64-22 (SP250C mix) (4030306) | TON | 471.30 | $145.00 | $158.37 | $177.00 |
| 0200 | Asphaltic concrete mixture PG 76-22 (SP250B mix) (4030317) | TON | 202.10 | $145.00 | $158.38 | $184.00 |
| 0210 | Tack coat (4071005) | GAL | 1,755 | $3.00 | $3.32 | $4.65 |
| 0220 | Prime-liquid asphalt MC 800 (4081018) | GAL | 448 | $20.00 | $22.11 | $9.30 |
| 0230 | Concrete pavement (12 in. non-reinforced 15 FT. joints) (5021312) | SY | 3,347.10 | $108.40 | $120.28 | $141.00 |
| 0240 | Concrete base ( 10 in. non-reinf) (5024010) | SY | 6.60 | $450.00 | $198.32 | $299.00 |
| 0250 | Wateradjusting air release valve (6039902) | EACH | 1 | $10,000 | $1,491.89 | $1,757.00 |
| 0260 | Wateradjusting hydrant (6039902) | EACH | 2 | $6,100.00 | $7,228.05 | $3,083.00 |
| 0270 | Wateradjusting water valve (6039902) | EACH | 8 | $1,124.00 | $1,491.89 | $734.00 |
| 0280 | Woven wire fence (6072010) | LF | 308 | $66.00 | $30.96 | $44.00 |
| 0290 | 6 in. concrete median strip (6083006) | SY | 168.40 | $97.45 | $161.37 | $142.00 |
| 0300 | Concrete gutter type A (6091041) | LF | 4 | $72.05 | $200.64 | $256.00 |
| 0310 | Concrete gutter type B (6091042) | LF | 280 | $72.70 | $83.30 | $158.00 |
| 0320 | Integral curb (6 in. height and under) type A (6092011) | LF | 38 | $64.15 | $82.02 | $100.00 |
| 0330 | Furnishing type 1 rock ditch liner (6096010A) | CY | 22 | $95.00 | $81.68 | $87.10 |
| 0340 | Furnishing type 4 rock ditch liner (6096040A) | CY | 134 | $80.00 | $106.71 | $87.10 |
| 0350 | Placing type 1 rock ditch liner (6096041) | CY | 22 | $140.00 | $220.83 | $160.00 |
| 0360 | Placing type 4 rock ditch liner (6096044) | CY | 134 | $48.00 | $48.58 | $45.90 |
| 0370 | Bedding material for rock ditch liner (6096050) | CY | 45 | $115.00 | $141.83 | $233.00 |
| 0380 | Misc.curb and gutter type CG-1 (apwa) (6099903) | LF | 642 | $71.05 | $67.93 | $79.00 |
| 0390 | Furnishing type 2 rock blanket (6113020) | CY | 1,378 | $95.00 | $95.38 | $87.10 |
| 0400 | Placing type 2 rock blanket (6113040) | CY | 1,378 | $35.00 | $17.63 | $33.90 |
| 0410 | Impact attenuator 45 MPH (sand barrel array) (6122009) | EACH | 8 | $1,750.00 | $2,211.39 | $2,105.00 |
| 0420 | Replacement sand barrel (6122020) | EACH | 14 | $250.00 | $387.00 | $301.00 |
| 0430 | Impact attenuator (relocation) (6122030) | EACH | 2 | $1,750.00 | $1,658.54 | $2,105.00 |
| 0440 | Curved vane grate and frame (2 FT. X 2 FT. or 600MM X 600MM) (6141120) | EACH | 2 | $1,200.00 | $702.11 | $645.00 |
| 0450 | Construction signs (6161005) | SF | 3,721 | $6.50 | $11.06 | $7.80 |
| 0460 | Channelizer (trim-line) (6161025) | EACH | 195 | $18.00 | $44.23 | $21.65 |
| 0470 | Type 3 moveable barricade (6161030) | EACH | 54 | $145.00 | $276.42 | $174.00 |
| 0480 | Direction indicator barricade (6161033) | EACH | 28 | $75.00 | $182.44 | $90.20 |
| 0490 | Flashing arrow panel (6161040) | EACH | 4 | $3,750.00 | $2,211.39 | $4,510.00 |
| 0500 | Sequential flashing warning light (6161055) | EACH | 28 | $65.00 | $182.44 | $78.20 |
| 0510 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 10 | $5,995.00 | $12,163 | $7,210.00 |
| 0520 | Concrete traffic barrier, type D (6173100) | LF | 280 | $155.00 | $226.95 | $252.00 |
| 0530 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 3,150 | $22.00 | $27.64 | $29.80 |
| 0540 | Relocating temporary traffic barrier (6175010A) | LF | 1,200 | $12.00 | $11.06 | $11.90 |
| 0550 | Mobilization (6181000) | LS | 1 | $400,000 | $354,479 | $230,628 |
| 0560 | Additional mobilization for seeding (6181020) | EACH | 5 | $600.00 | $600.00 | $600.00 |
| 0570 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 144 | $20.00 | $30.96 | $24.05 |
| 0580 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 10 | $195.00 | $304.07 | $235.00 |
| 0590 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 2 | $525.00 | $497.56 | $631.00 |
| 0600 | Temporary removable marking tape 4 in., white (6205301B) | LF | 11,001 | $1.96 | $1.66 | $2.35 |
| 0610 | Temporary removable marking tape 4 in., yellow (6205303B) | LF | 9,775 | $1.96 | $1.66 | $2.35 |
| 0620 | Temporary removable marking tape, 24 in., white (6205309) | LF | 95 | $11.50 | $12.16 | $13.85 |
| 0630 | Temporary non-removable marking tape left/right arrow (6205440A) | EACH | 4 | $95.00 | $116.10 | $114.00 |
| 0640 | 6 in. white high build waterborne pavement marking paint, type L beads (6205902A) | LF | 913 | $0.27 | $1.16 | $0.30 |
| 0650 | 4 in. white standard waterborne pavement marking paint, type P beads (6206000C) | LF | 4,965 | $0.14 | $0.28 | $0.15 |
| 0660 | 4 in. yellow standard waterborne pavement marking paint, type P beads (6206001C) | LF | 4,801 | $0.14 | $0.28 | $0.15 |
| 0670 | Pavement marking removal (6207001) | LF | 34,610 | $0.54 | $0.44 | $0.65 |
| 0680 | Pavement marking removal (symbols) (6207002) | EACH | 4 | $85.00 | $116.10 | $102.00 |
| 0690 | 4 in temporary pavement marking paint (6208076) | LF | 12,499 | $0.14 | $0.18 | $0.15 |
| 0700 | Misc.12 in. yellow high build waterborne pavement marking paint (6209903) | LF | 258 | $0.45 | $19.90 | $0.55 |
| 0710 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 7,838 | $6.00 | $6.53 | $5.40 |
| 0720 | Permanent erosion control geotextile (6240103A) | SY | 184 | $6.00 | $5.83 | $11.75 |
| 0730 | Separation geotextile (6240104A) | SY | 2,066 | $4.00 | $3.79 | $7.25 |
| 0740 | Contractor furnished surveying and staking (6274000) | LS | 1 | $35,000 | $26,537 | $35,143 |
| 0750 | Misc.single cell 8 FT. X 8 FT. RCB (7039903) | LF | 35.80 | $1,990.00 | $2,756.87 | $2,625.00 |
| 0760 | 12 in. pipe group A (7261012) | LF | 142 | $90.00 | $120.99 | $84.10 |
| 0770 | 15 in. pipe group A (7261015) | LF | 14 | $185.00 | $223.74 | $134.00 |
| 0780 | 18 in. pipe group A (7261018) | LF | 74 | $150.00 | $189.05 | $102.00 |
| 0790 | Misc.23 in. X 14 in. class IV reinforced concrete elliptical pipe (7269903) | LF | 277 | $190.00 | $188.14 | $138.00 |
| 0800 | Precast concrete drop inlet 2 FT X 2 FT (7311022) | FT | 7 | $875.00 | $4,169.08 | $1,256.00 |
| 0810 | Misc.area inlet (special 4 FT. X 4 FT.) (7319902) | EACH | 1 | $7,500.00 | $8,089.88 | $6,926.00 |
| 0820 | Misc.junction box (special 14 FT. X 12 FT.) (7319902) | EACH | 1 | $55,000 | $117,667 | $54,617 |
| 0830 | Misc.kcmo curb inlet type 2 (8 FT. X 3 FT.) (7319902) | EACH | 2 | $7,500.00 | $7,340.76 | $7,052.00 |
| 0840 | 18 in. or allowed substitute group A flared end section (7320618A) | EACH | 1 | $1,500.00 | $1,801.75 | $1,452.00 |
| 0850 | Beveled pipe end treatment for 15 in. or allowed substitute pipe (7322015A) | EACH | 1 | $1,500.00 | $2,818.46 | $1,336.00 |
| 0860 | Misc.23 in. X 14 in. elliptical reinforced precast flared end section (7329902) | EACH | 9 | $1,550.00 | $2,133.36 | $1,568.00 |
| 0870 | Mulching (8025006) | ACRE | 2.40 | $1,500.00 | $3,206.51 | $1,787.00 |
| 0880 | Turf type tall fescue sodding (8031000A) | SY | 621 | $15.00 | $12.16 | $17.85 |
| 0890 | Seeding - cool season grasses (8051000A) | ACRE | 1.90 | $2,000.00 | $3,593.51 | $2,383.00 |
| 0900 | Sediment trap excavation (8061003) | CY | 10 | $25.00 | $45.35 | $133.00 |
| 0910 | Sediment trap rock (8061004) | CY | 10 | $150.00 | $143.66 | $632.00 |
| 0920 | Rock ditch check (8061005) | LF | 278 | $25.00 | $97.57 | $150.00 |
| 0930 | Alternate ditch check (8061006) | LF | 601 | $8.00 | $20.45 | $9.55 |
| 0940 | Curb inlet check (8061007A) | EACH | 2 | $100.00 | $88.45 | $119.00 |
| 0950 | Sediment removal (8061016) | CY | 63 | $35.00 | $71.99 | $169.00 |
| 0960 | Temporary seeding (8061017) | ACRE | 0.50 | $500.00 | $2,930.09 | $596.00 |
| 0970 | Silt fence (8061019) | LF | 1,425 | $2.00 | $2.05 | $2.40 |
| 0980 | Type 1 turf reinforcement mat (8064128) | SY | 218 | $6.50 | $9.18 | $7.75 |
| 0990 | Type 3 turf reinforcement mat (8064130) | SY | 405 | $6.50 | $26.87 | $7.75 |
| 1000 | Type 2C erosion control blanket (8064137) | SY | 7,011 | $2.00 | $2.10 | $2.40 |
| 1010 | MGS guardrail (6061060) | LF | 25 | $27.00 | $33.17 | $35.75 |
| 1020 | MGS bridge approach transition section (extended curb) (6061068) | EACH | 1 | $3,493.00 | $4,201.64 | $4,527.00 |
| 1030 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 1 | $3,381.00 | $4,146.35 | $4,467.00 |
| 1040 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 2 | $3,042.00 | $3,869.93 | $4,170.00 |
| 1050 | Misc.30 FT. concrete foundation, kcmo (9019902) | EACH | 4 | $3,200.00 | $3,416.60 | $3,709.00 |
| 1060 | Misc.6 in. anti-theft cable retainer, kcmo (9019902) | EACH | 4 | $300.00 | $272.00 | $295.00 |
| 1070 | Misc.cobra-head luminaire (240V) type C LED EQ, kcmo (9019902) | EACH | 4 | $1,125.00 | $1,222.90 | $1,328.00 |
| 1080 | Misc.1C no. 8 AWG bare copper ground wire, kcmo (9019903) | LF | 633 | $2.00 | $2.21 | $2.40 |
| 1090 | Misc.2 #4 RHH/RHW/use CU, kcmo (9019903) | LF | 633 | $6.00 | $6.63 | $7.20 |
| 1100 | Misc.2 in. schedule 40 PVC conduit, kcmo (9019903) | LF | 601 | $22.00 | $24.32 | $26.40 |
| 1110 | Bracket arm, 12 FT. or 3.6 M (9011112) | EACH | 4 | $1,100.00 | $1,173.14 | $1,274.00 |
| 1120 | Bracket arm, 15 FT. or 4.6 M (9011115) | EACH | 1 | $1,200.00 | $1,317.99 | $1,431.00 |
| 1130 | Luminaire, LED-A (9011311) | EACH | 5 | $850.00 | $939.84 | $1,020.00 |
| 1140 | Signal head, type 3S (9020213) | EACH | 4 | $1,100.00 | $1,188.62 | $1,290.00 |
| 1150 | Signal head, type 3B (9020513) | EACH | 9 | $1,200.00 | $1,321.30 | $1,434.00 |
| 1160 | Signal head, type 4B (9020514) | EACH | 2 | $1,500.00 | $1,630.90 | $1,770.00 |
| 1170 | SH-flat sheet - signal sign (9020833) | SF | 56 | $85.00 | $93.98 | $102.00 |
| 1180 | Signal sign, mounting hardware (9020834) | EACH | 6 | $150.00 | $143.74 | $156.00 |
| 1190 | Post, type C, 30 FT. arm or 9.1 M arm (9023230) | EACH | 1 | $15,000 | $14,141 | $15,351 |
| 1200 | Post, type C, 50 FT. arm or 15.2 M arm (9023250) | EACH | 2 | $25,000 | $22,710 | $24,653 |
| 1210 | Post, type C, 55 FT. arm (9023255) | EACH | 1 | $30,000 | $27,893 | $30,280 |
| 1220 | Video detection system (9024975) | EACH | 1 | $60,000 | $30,683 | $33,308 |
| 1230 | Conduit, 2 in., trench with tracer wire (9025200) | LF | 103 | $30.00 | $31.73 | $34.45 |
| 1240 | Conduit, 3 in., trench with tracer wire (9025300) | LF | 230 | $30.00 | $32.29 | $35.05 |
| 1250 | Conduit, 2 in., pushed with tracer wire (9027200) | LF | 337 | $40.00 | $39.80 | $43.20 |
| 1260 | Conduit, 4 in., pushed with tracer wire (9027400) | LF | 337 | $40.00 | $44.23 | $48.00 |
| 1270 | Cable, 10 AWG 1 conductor, pole and bracket (9028100) | LF | 720 | $2.00 | $2.21 | $2.40 |
| 1280 | Cable, 3 AWG 1 conductor, power (9028203) | LF | 160 | $7.00 | $7.74 | $8.40 |
| 1290 | Cable, 4 AWG 1 conductor, power (9028204) | LF | 2,010 | $3.00 | $3.32 | $3.60 |
| 1300 | Cable, 16 AWG 7 conductor (9028311) | LF | 2,550 | $2.50 | $2.76 | $3.00 |
| 1310 | Pull box, preformed class 2 (9028811) | EACH | 2 | $3,000.00 | $3,003.06 | $3,260.00 |
| 1320 | Pull box, preformed class 3 (9028812) | EACH | 2 | $4,500.00 | $4,757.80 | $5,165.00 |
| 1330 | Base, concrete (9029100) | CY | 12.82 | $3,000.00 | $2,864.86 | $3,110.00 |
| 1340 | Misc.remove and relocate ogl equipment (9029901) | LS | 1 | $1,650.00 | $1,824.39 | $1,980.00 |
| 1350 | Misc.traffic signal controller assembly, NEMA (9029902) | EACH | 1 | $35,000 | $34,366 | $37,307 |
| 1360 | Misc.catv cable (ogl) (9029903) | LF | 190 | $4.00 | $3.76 | $4.10 |
| 1370 | Misc.CCTV ethernet cable (9029903) | LF | 210 | $4.00 | $3.81 | $4.15 |
| 1380 | Structural steel posts (9031210) | LB | 130 | $8.50 | $11.06 | $11.90 |
| 1390 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 80 | $16.00 | $27.64 | $29.80 |
| 1400 | Driven post anchor for 2.5 in. PSST - 7 GA. (9031281A) | EACH | 5 | $177.00 | $276.42 | $298.00 |
| 1410 | Class 1 excavation (2061000) | CY | 240 | $60.00 | $131.57 | $286.00 |
| 1420 | Removal of bridges (2160500) | LS | 1 | $225,000 | $82,000 | $324,542 |
| 1430 | (48 in.) decorative pedestrian fence(structures) (6073001) | LF | 372 | $176.00 | $248.78 | $268.00 |
| 1440 | Galvanized structural steel piles (14 in) (7021214) | LF | 1,506 | $105.00 | $214.43 | $169.00 |
| 1450 | Pre-bore for piling (7026000) | LF | 316 | $90.00 | $93.98 | $88.55 |
| 1460 | Pile point reinforcement (7027000) | EACH | 35 | $155.00 | $149.27 | $199.00 |
| 1470 | Class B concrete (substructure) (7032003) | CY | 163.60 | $1,200.00 | $2,644.56 | $1,444.00 |
| 1480 | Slab on concrete adjacent beam (7034226) | SY | 247 | $750.00 | $455.78 | $632.00 |
| 1490 | Misc.barrier curb (24 in. X 12 in.) (7039903) | LF | 372 | $180.00 | $244.72 | $131.00 |
| 1500 | 42 in., prestressed concrete adjacent box beam (7056058) | LF | 241 | $825.00 | $829.66 | $979.00 |
| 1510 | Misc.54 in. prestressed concrete adjacent box beam (7059903) | LF | 233 | $990.00 | $955.80 | $1,158.00 |
| 1520 | Reinforcing steel (bridges) (7061060) | LB | 12,090 | $1.75 | $3.58 | $0.90 |
| 1530 | Reinforcing steel (epoxy coated) (7101000) | LB | 20,610 | $2.00 | $2.58 | $1.85 |
| 1540 | Protective coating - concrete bents and piers (epoxy) (7110200) | LS | 1 | $12,000 | $11,057 | $29,514 |
| 1550 | Vertical drain at end bents (7151001) | EACH | 2 | $2,500.00 | $4,925.92 | $4,736.00 |
| 1560 | Laminated neoprene bearing pad (7161002) | EACH | 18 | $375.00 | $900.20 | $305.00 |
| 1570 | Preformed compression seal (7171002) | LF | 58 | $115.00 | $638.90 | $135.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of June 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.