George Harms Construction Company, Inc.: NJDOT bid record

George Harms Construction Company, Inc. submitted 16 bids on New Jersey DOT contracts in the data, from 08 NOV 2018 to 12 FEB 2026, and was the low bidder on 2 of them (13%). When it was not low, its total sat a median +24% above the low bid.

Owner
New Jersey DOT
Low bid volume
$94,938,566
Latest bid
12 FEB 2026
Data through
16 APR 2026
16Bids
2Low bids
13Win rate, percent
+24%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
2018100%
2019800%
20233133%
20242150%
2025100%
2026100%
George Harms Construction Company, Inc., NJDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
N18113%
C1500%
S1100%
S4100%
H411100%
George Harms Construction Company, Inc., NJDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Excavation, regulated material202015PCY3219 (59%)$51.50$75.00
Epoxy waterproofing504036PSY2014 (70%)$41.50$72.50
Fuel price adjustment160004MDOL1313 (100%)$17,700$2,700.00
Prime coat401036MGAL1313 (100%)$0.01$0.01
Asphalt price adjustment160007MDOL1111 (100%)$87,400$10,200
3" rigid metallic conduit701021PLF2310 (43%)$53.00$65.00
2" rigid metallic conduit701015PLF1910 (53%)$35.00$50.57
Core samples, hot mix asphalt401108MU139 (69%)$110.00$150.00
Shear connector506012PU98 (89%)$4.00$6.20
3" rigid metallic conduit on structure701022PLF77 (100%)$27.00$36.00
I-9 soil aggregate203009PCY216 (29%)$75.00$85.00
Concrete wing wall504018PCY156 (40%)$1,500.00$2,000.00
George Harms Construction Company, Inc., NJDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

George Harms Construction Company, Inc., NJDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 FEB 202625139C1Route 36, Bridge over Troutman's Creek3 of 9$9,465,104+19%
18 NOV 202525128N1Route 4 Hackensack River Bridge2 of 7$164,879,940+7.0%
06 JUN 202424119N1CR 583 (Princeton Pike), Bridge over Rt 295 & Ramps B & D8 of 9$25,230,293+28%
22 FEB 202418450H4Maintenance Bridge Fender Replacement Contract 2018-11 of 5$18,210,210Low, 1.0% under the second
26 OCT 202323126N1PORTWAY, FISH HOUSE RD PENNSYLVANIA AVE CR 659 IMPROVEMENTS2 of 4$89,851,290+9.0%
24 AUG 202323420S4MTN Veg Saf Management Project, Route 42, 55 and 76 - 20232 of 2$8,364,470+118%
06 JUN 202323111N1RT 1&9T/New Rd, St. Paul's Ave to Van Keuren Ave Contract #21 of 4$76,728,356Low, 2.0% under the second
17 DEC 201919144S1Route I-295/RT 42 Missing Moves from Route I-295 to Route 553 of 4$203,862,131+13%
10 OCT 201919136N1Route 22, Hilldale Place/North Broad Street4 of 6$12,928,541+13%
30 JUL 201919128N1ROUTE 78, BRIDGES OVER ROUTE 202/2069 of 9$40,966,971+47%
20 JUN 201919130C1ROUTE 34, BRIDGE OVER FORMER FREEHOLD AND JAMESBURG RAILROAD7 of 8$13,368,372+39%
06 JUN 201919131C1Route 295 Northbound, Exit Ramp To Route 195 Eastbound8 of 10$5,761,549+73%
21 MAY 201919107C1ALEXANDER RD, BRIDGE OVER D&R CANAL8 of 8$7,639,268+57%
16 MAY 201919116N1Route 1&9/New Road, Contract #12 of 6$80,674,617+16%
17 JAN 201918147C1SIGN STRUCTURE REPLACEMENT CONTRACT 2013-24 of 6$17,731,234+14%
08 NOV 201818142N1Paterson Plank Rd (CR 681), Bridge Over RT 3 at MP 9.124 of 4$12,681,558+45%
George Harms Construction Company, Inc.: latest NJDOT bids in the data

How this record was read

NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

  • Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy