George Harms Construction Company, Inc.: NJDOT bid record
George Harms Construction Company, Inc. submitted 16 bids on New Jersey DOT contracts in the data, from 08 NOV 2018 to 12 FEB 2026, and was the low bidder on 2 of them (13%). When it was not low, its total sat a median +24% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $94,938,566
- Latest bid
- 12 FEB 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 1 | 0 | 0% |
| 2019 | 8 | 0 | 0% |
| 2023 | 3 | 1 | 33% |
| 2024 | 2 | 1 | 50% |
| 2025 | 1 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| N1 | 8 | 1 | 13% |
| C1 | 5 | 0 | 0% |
| S1 | 1 | 0 | 0% |
| S4 | 1 | 0 | 0% |
| H4 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Excavation, regulated material | 202015P | CY | 32 | 19 (59%) | $51.50 | $75.00 |
| Epoxy waterproofing | 504036P | SY | 20 | 14 (70%) | $41.50 | $72.50 |
| Fuel price adjustment | 160004M | DOL | 13 | 13 (100%) | $17,700 | $2,700.00 |
| Prime coat | 401036M | GAL | 13 | 13 (100%) | $0.01 | $0.01 |
| Asphalt price adjustment | 160007M | DOL | 11 | 11 (100%) | $87,400 | $10,200 |
| 3" rigid metallic conduit | 701021P | LF | 23 | 10 (43%) | $53.00 | $65.00 |
| 2" rigid metallic conduit | 701015P | LF | 19 | 10 (53%) | $35.00 | $50.57 |
| Core samples, hot mix asphalt | 401108M | U | 13 | 9 (69%) | $110.00 | $150.00 |
| Shear connector | 506012P | U | 9 | 8 (89%) | $4.00 | $6.20 |
| 3" rigid metallic conduit on structure | 701022P | LF | 7 | 7 (100%) | $27.00 | $36.00 |
| I-9 soil aggregate | 203009P | CY | 21 | 6 (29%) | $75.00 | $85.00 |
| Concrete wing wall | 504018P | CY | 15 | 6 (40%) | $1,500.00 | $2,000.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 9 | 5 of 9 |
| Anselmi & Decicco, Inc. | 8 | 6 of 8 |
| Midlantic Construction, LLC | 7 | 4 of 7 |
| South State, Inc. | 6 | 6 of 6 |
| Union Paving & Construction Co., Inc. | 5 | 3 of 5 |
| Crisdel Group, Inc. | 4 | 1 of 4 |
| PKF-Mark III, Inc. | 4 | 1 of 4 |
| D'Annunzio & Sons, Inc. | 3 | 1 of 3 |
| Agate Construction Co., Inc. | 3 | 2 of 3 |
| Earle Asphalt Company | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 FEB 2026 | 25139 | C1 | Route 36, Bridge over Troutman's Creek | 3 of 9 | $9,465,104 | +19% |
| 18 NOV 2025 | 25128 | N1 | Route 4 Hackensack River Bridge | 2 of 7 | $164,879,940 | +7.0% |
| 06 JUN 2024 | 24119 | N1 | CR 583 (Princeton Pike), Bridge over Rt 295 & Ramps B & D | 8 of 9 | $25,230,293 | +28% |
| 22 FEB 2024 | 18450 | H4 | Maintenance Bridge Fender Replacement Contract 2018-1 | 1 of 5 | $18,210,210 | Low, 1.0% under the second |
| 26 OCT 2023 | 23126 | N1 | PORTWAY, FISH HOUSE RD PENNSYLVANIA AVE CR 659 IMPROVEMENTS | 2 of 4 | $89,851,290 | +9.0% |
| 24 AUG 2023 | 23420 | S4 | MTN Veg Saf Management Project, Route 42, 55 and 76 - 2023 | 2 of 2 | $8,364,470 | +118% |
| 06 JUN 2023 | 23111 | N1 | RT 1&9T/New Rd, St. Paul's Ave to Van Keuren Ave Contract #2 | 1 of 4 | $76,728,356 | Low, 2.0% under the second |
| 17 DEC 2019 | 19144 | S1 | Route I-295/RT 42 Missing Moves from Route I-295 to Route 55 | 3 of 4 | $203,862,131 | +13% |
| 10 OCT 2019 | 19136 | N1 | Route 22, Hilldale Place/North Broad Street | 4 of 6 | $12,928,541 | +13% |
| 30 JUL 2019 | 19128 | N1 | ROUTE 78, BRIDGES OVER ROUTE 202/206 | 9 of 9 | $40,966,971 | +47% |
| 20 JUN 2019 | 19130 | C1 | ROUTE 34, BRIDGE OVER FORMER FREEHOLD AND JAMESBURG RAILROAD | 7 of 8 | $13,368,372 | +39% |
| 06 JUN 2019 | 19131 | C1 | Route 295 Northbound, Exit Ramp To Route 195 Eastbound | 8 of 10 | $5,761,549 | +73% |
| 21 MAY 2019 | 19107 | C1 | ALEXANDER RD, BRIDGE OVER D&R CANAL | 8 of 8 | $7,639,268 | +57% |
| 16 MAY 2019 | 19116 | N1 | Route 1&9/New Road, Contract #1 | 2 of 6 | $80,674,617 | +16% |
| 17 JAN 2019 | 18147 | C1 | SIGN STRUCTURE REPLACEMENT CONTRACT 2013-2 | 4 of 6 | $17,731,234 | +14% |
| 08 NOV 2018 | 18142 | N1 | Paterson Plank Rd (CR 681), Bridge Over RT 3 at MP 9.12 | 4 of 4 | $12,681,558 | +45% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.