ODOT contract 250137 bid tabulation
WAS-SR 60-15.79 (SLIDE REPAIR). Let by Ohio DOT on February 27, 2025, WAS. 3 bids received; low bid $817,880 by Alan Stone Co Inc, -4.6% against the engineer's estimate of $857,000.
- Owner
- Ohio DOT
- Letting
- 27 FEB 2025
- Pay items
- 53
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Alan Stone Co Inc | $817,880 | Low | -5.0% |
| 2 | Shelly & Sands Inc | $824,629 | +1.0% | -4.0% |
| 3 | Ohio-West Virginia Excavating Co | $943,171 | +15% | +10% |
Engineer's estimate: $857,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alan Stone Co Inc | 2. Shelly & Sands Inc | 3. Ohio-West Virginia Excavating Co |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $3,500.00 | $4,500.00 | $15,800 |
| 2 | Headwall removed (202E20010) | EACH | 4 | $180.00 | $150.00 | $585.00 |
| 3 | Pavement removed (202E23000) | SY | 320 | $20.00 | $20.00 | $28.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 48 | $35.00 | $8.00 | $49.00 |
| 5 | Pipe removed, over 24" diameter (202E35200) | FT | 25 | $45.00 | $8.00 | $94.00 |
| 6 | Guardrail removed (202E38000) | FT | 275 | $5.00 | $2.20 | $6.00 |
| 7 | Special - fill and plug existing conduit (202E70000) | FT | 40 | $100.00 | $95.00 | $61.00 |
| 8 | Excavation (203E10000) | CY | 123 | $50.00 | $14.00 | $49.00 |
| 9 | Embankment (203E20000) | CY | 130 | $20.00 | $32.00 | $57.00 |
| 10 | Subgrade compaction (204E10000) | SY | 413 | $7.00 | $6.50 | $3.00 |
| 11 | Guardrail, type MGS with long posts (606E15100) | FT | 275 | $35.00 | $31.60 | $30.00 |
| 12 | Right-of-way monument, type B (623E40520) | EACH | 1 | $800.00 | $325.00 | $500.00 |
| 13 | Seeding and mulching (659E10000) | SY | 656 | $2.50 | $5.00 | $6.00 |
| 14 | Commercial fertilizer (659E20000) | TON | 0.06 | $600.00 | $1,250.00 | $1,400.00 |
| 15 | Lime (659E31000) | ACRE | 0.14 | $800.00 | $150.00 | $200.00 |
| 16 | Water (659E35000) | MGAL | 3.60 | $100.00 | $1.00 | $1.00 |
| 17 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 |
| 18 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $500.00 | $1,000.00 | $8,700.00 |
| 19 | 6" perforated corrugated plastic pipe (518E40000) | FT | 224 | $10.00 | $7.00 | $8.00 |
| 20 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 12 | $40.00 | $25.00 | $4.00 |
| 21 | Rock channel protection, type C with filter (601E32200) | CY | 19 | $140.00 | $165.00 | $180.00 |
| 22 | Concrete masonry (602E20000) | CY | 1.02 | $2,300.00 | $2,200.00 | $3,100.00 |
| 23 | Aggregate drains (605E31100) | FT | 44 | $20.00 | $13.00 | $34.00 |
| 24 | 18" conduit, type A (611E07200) | FT | 51 | $170.00 | $180.00 | $139.00 |
| 25 | 36" conduit, type A (611E16200) | FT | 52 | $260.00 | $280.00 | $291.00 |
| 26 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $500.00 | $250.00 | $800.00 |
| 27 | Low strength mortar backfill (613E41200) | CY | 42 | $130.00 | $120.00 | $224.00 |
| 28 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 77 | $300.00 | $338.00 | $384.00 |
| 29 | Aggregate base (304E20000) | CY | 146 | $95.00 | $95.00 | $144.00 |
| 30 | Non-tracking tack coat (407E20000) | GAL | 126 | $4.50 | $4.00 | $4.00 |
| 31 | Prime coat (408E10000) | GAL | 25 | $25.00 | $15.00 | $33.00 |
| 32 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 110 | $370.00 | $376.00 | $427.00 |
| 33 | Compacted aggregate (617E10100) | CY | 3 | $200.00 | $350.00 | $625.00 |
| 34 | Edge line, 6", type 1 (642E00104) | MI | 0.22 | $3,800.00 | $3,650.00 | $4,000.00 |
| 35 | Center line, type 1 (642E00300) | MI | 0.11 | $7,300.00 | $7,250.00 | $8,000.00 |
| 36 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 4 | $3,000.00 | $2,780.00 | $2,400.00 |
| 37 | Work zone lighting system (614E12740) | EACH | 1 | $3,500.00 | $15,000 | $8,300.00 |
| 38 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 20 | $40.00 | $8.00 | $43.00 |
| 39 | Object marker, two way (614E13360) | EACH | 20 | $45.00 | $12.00 | $45.00 |
| 40 | Work zone edge line, class I, 6" (614E22010) | MI | 0.40 | $4,500.00 | $4,250.00 | $12,000 |
| 41 | Work zone stop line, class I (614E26000) | FT | 24 | $15.00 | $14.00 | $15.00 |
| 42 | Portable barrier, unanchored (622E41100) | FT | 960 | $20.00 | $24.00 | $21.00 |
| 43 | Steel piles, misc.:, W24X207 (507E00400) | FT | 1,666 | $170.00 | $181.00 | $190.00 |
| 44 | Class QC1 concrete, footing, as per plan (511E46511) | CY | 17 | $580.00 | $450.00 | $448.00 |
| 45 | Porous backfill with geotextile fabric (518E21200) | CY | 150 | $190.00 | $120.00 | $126.00 |
| 46 | Drilled shafts, 36" diameter, above bedrock, as per plan (524E94703) | FT | 1,403 | $95.00 | $79.00 | $96.00 |
| 47 | Drilled shafts, 36" diameter, into bedrock, as per plan (524E94705) | FT | 600 | $100.00 | $90.00 | $116.00 |
| 48 | Drilled shafts, misc.: extension (524E95000) | FT | 2 | $350.00 | $150.00 | $104.00 |
| 49 | Special - retaining wall, precast concrete lagging (530E51010) | SF | 1,716 | $24.00 | $32.00 | $31.00 |
| 50 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,200.00 | $5,503.20 | $15,000 |
| 51 | Maintaining traffic (614E11000) | LS | 1 | $27,000 | $21,000 | $38,700 |
| 52 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 | $6,500.00 | $800.00 |
| 53 | Mobilization (624E10000) | LS | 1 | $16,000 | $29,700 | $23,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.