ODOT contract 250371 bid tabulation

FRA-US 33-28.61 (INTERSECTION). Let by Ohio DOT on July 31, 2025, FRA. 5 bids received; low bid $255,800 by Shelly & Sands Inc, +1.9% against the engineer's estimate of $251,000.

Owner
Ohio DOT
Letting
31 JUL 2025
Pay items
51
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly & Sands Inc$255,800Low+2.0%
2Shelly Company$255,9640.0%+2.0%
3Axis Civil Construction LLC$274,478+7.0%+9.0%
4Strawser Paving Co Inc$278,564+9.0%+11%
5Complete General Construction Company$283,991+11%+13%
ODOT contract 250371: bids by rank

Engineer's estimate: $251,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly & Sands Inc2. Shelly Company3. Axis Civil Construction LLC4. Strawser Paving Co Inc5. Complete General Construction Company
1Clearing and grubbing (201E11000)LS1$9,283.00$6,500.00$5,000.00$500.00$10,400
2Headwall removed (202E20010)EACH2$775.00$345.00$750.00$800.00$1,400.00
3Pavement removed, as per plan (202E23001)SY740$21.00$26.00$19.50$15.00$16.00
4Pipe removed, 24" and under (202E35100)FT40$34.00$35.00$24.00$40.00$30.00
5Pipe removed, over 24" diameter (202E35200)FT81$34.00$34.35$39.00$20.00$30.00
6Excavation (203E10000)CY440$34.00$53.00$36.00$42.00$60.00
7Embankment (203E20000)CY170$17.00$35.00$36.00$15.00$14.00
8Subgrade compaction (204E10000)SY982$6.00$2.60$4.00$5.00$6.00
9Excavation of subgrade (204E13000)CY110$41.00$41.00$40.00$125.00$37.00
10Proof rolling (204E45000)HR1$250.00$240.00$250.00$160.00$400.00
11Fence, type 47RA (607E15100)FT135$35.00$35.00$35.00$40.00$40.00
12Special - mailbox removed and reset (690E50350)EACH1$250.00$250.00$800.00$500.00$215.00
13Inspection and compaction testing of unbound materials (878E25000)LS1$3,000.00$10,000$4,500.00$5,000.00$3,000.00
14Topsoil (659E00300)CY178$33.00$65.00$49.00$45.00$65.00
15Seeding and mulching (659E10000)SY1,596$3.50$3.29$2.00$2.00$2.00
16Repair seeding and mulching (659E14000)SY80$3.00$3.10$2.00$2.00$2.00
17Inter-seeding (659E15000)SY80$3.00$3.10$2.00$2.00$2.00
18Commercial fertilizer (659E20000)TON0.14$892.00$891.36$1,250.00$1,250.00$1,250.00
19Lime (659E31000)ACRE0.33$155.00$155.48$150.00$150.00$150.00
20Water (659E35000)MGAL9$1.00$1.00$1.00$1.00$1.00
21Erosion control (832E30000)EACH3,200$1.00$1.00$1.00$1.00$1.00
2218" conduit, type D (611E07900)FT55$108.00$75.00$135.00$135.00$140.00
23Full depth pavement sawing (252E01500)FT107$4.00$7.00$7.00$5.00$9.00
24Asphalt concrete base, PG64-22, (449) (301E56000)CY157$200.00$211.00$270.00$260.00$211.00
25Aggregate base (304E20000)CY159$95.00$72.00$119.00$100.00$130.00
26Non-tracking tack coat (407E20000)GAL104$3.50$3.90$7.00$4.00$3.90
27Traffic compacted surface, type C (410E13000)CY10$130.00$140.00$140.00$385.00$100.00
28Stabilized crushed aggregate (411E10000)CY11$160.00$210.00$140.00$300.00$160.00
29Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY39$300.00$291.00$395.00$330.00$291.00
30Asphalt concrete intermediate course, type 1, (449) (441E70200)CY45$275.00$291.00$355.00$310.00$291.00
31Aggregate drains, as per plan (605E31101)FT29$17.00$50.00$40.00$115.00$20.00
32Compacted aggregate (617E10100)CY2$250.00$800.00$300.00$1,450.00$250.00
33Rumble stripes, edge line (asphalt concrete) (618E40800)FT1,070$10.00$3.20$3.20$3.20$3.20
34Maintaining traffic, misc.:maintaining traffic, MI (614E18000)EACH8$465.00$465.00$465.00$465.00$276.00
35Maintaining traffic, misc.:maintaining traffic, MI (614E18000)EACH26$53.00$53.00$53.00$53.00$55.50
36Ground mounted support, no. 2 post (630E02100)FT30$17.00$17.00$15.00$17.00$23.84
37Ground mounted support, no. 3 post (630E03100)FT60$19.00$19.00$30.00$19.00$26.25
38Sign post reflector (630E08600)EACH3$60.00$60.00$55.00$60.00$74.32
39Sign, flat sheet (630E80100)SF64$30.00$30.00$28.00$30.00$28.66
40Removal of ground mounted sign and disposal (630E84900)EACH21$25.00$25.00$35.00$25.00$15.51
41Edge line, 6" (644E00104)MI0.22$5,350.00$5,350.00$5,350.00$5,350.00$5,350.00
42Transverse/diagonal line (644E00700)FT663$6.00$5.80$5.80$5.80$5.80
43Removal of pavement marking (644E30000)FT271$3.50$3.50$3.50$3.50$3.50
44Removal of pavement marking (644E30020)EACH2$110.00$110.00$110.00$110.00$110.00
45Law enforcement officer with patrol car for assistance (614E11110)HR50$113.00$80.00$85.00$85.00$125.00
46Portable changeable message sign, as per plan (614E18601)SNMT12$1,000.00$650.00$750.00$650.00$1,225.00
47Water (616E10000)MGAL1$250.00$5.00$1.00$100.00$175.00
48Premium for contract performance bond and for payment bond (103E05000)LS1$2,500.00$4,000.00$4,500.00$5,000.00$3,835.00
49Maintaining traffic (614E11000)LS1$25,000$22,000$20,000$35,000$35,000
50Construction layout stakes and surveying (623E10000)LS1$7,349.47$4,000.00$9,500.00$10,000$6,000.00
51Mobilization (624E10000)LS1$13,000$11,250$20,000$10,000$14,000
ODOT contract 250371: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of July 31, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy