| 1 | Walk removed (202E30000) | SF | 388 | $12.00 | $12.00 |
| 2 | Traffic island removed (202E30800) | SY | 15 | $110.00 | $121.00 |
| 3 | Curb removed (202E32000) | FT | 161 | $17.00 | $20.00 |
| 4 | Curb and gutter removed (202E32500) | FT | 3,085 | $17.00 | $20.00 |
| 5 | Guardrail removed (202E38000) | FT | 1,162.50 | $2.00 | $2.00 |
| 6 | Anchor assembly removed, type A, as per plan (202E42001) | EACH | 2 | $320.00 | $320.00 |
| 7 | Anchor assembly removed, type E (202E42010) | EACH | 1 | $145.00 | $145.00 |
| 8 | Anchor assembly removed, type T (202E42040) | EACH | 5 | $80.00 | $80.00 |
| 9 | Bridge terminal assembly removed (202E47000) | EACH | 2 | $65.00 | $65.00 |
| 10 | Excavation (203E10000) | CY | 4 | $300.00 | $210.00 |
| 11 | Guardrail, type 5 (606E13000) | FT | 25 | $19.80 | $19.80 |
| 12 | Guardrail, type MGS with long posts (606E15100) | FT | 1,050 | $21.20 | $21.20 |
| 13 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 4 | $2,550.00 | $2,550.00 |
| 14 | Anchor assembly, type T (606E26500) | EACH | 1 | $1,140.00 | $1,140.00 |
| 15 | Anchor assembly, MGS type T (606E26550) | EACH | 5 | $1,360.00 | $1,360.00 |
| 16 | Bridge terminal assembly, type 4, as per plan (606E35141) | EACH | 2 | $1,420.00 | $1,420.00 |
| 17 | 4" concrete walk (608E10000) | SF | 141 | $20.00 | $20.00 |
| 18 | Curb ramp (608E52000) | SF | 417 | $20.00 | $31.00 |
| 19 | Detectable warning (608E53020) | SF | 30 | $60.00 | $50.00 |
| 20 | Monument assembly adjusted to grade (623E39500) | EACH | 3 | $981.89 | $800.00 |
| 21 | Topsoil (659E00300) | CY | 5 | $200.00 | $300.00 |
| 22 | Seeding and mulching (659E10000) | SY | 40 | $70.60 | $24.00 |
| 23 | Commercial fertilizer (659E20000) | TON | 0.01 | $10.00 | $965.00 |
| 24 | Lime (659E31000) | ACRE | 0.01 | $10.00 | $120.00 |
| 25 | Water (659E35000) | MGAL | 1 | $10.00 | $1.00 |
| 26 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 27 | Catch basin adjusted to grade (611E98630) | EACH | 19 | $1,191.18 | $1,200.00 |
| 28 | Manhole adjusted to grade (611E99654) | EACH | 32 | $1,191.18 | $1,200.00 |
| 29 | Pavement repair (253E02000) | CY | 1,120 | $463.80 | $500.00 |
| 30 | Pavement repair, as per plan (253E02001) | CY | 11 | $300.00 | $484.00 |
| 31 | Pavement planing, asphalt concrete, 1.75" (254E01000) | SY | 134,424 | $2.20 | $3.25 |
| 32 | Patching planed surface (254E01600) | SY | 1,350 | $4.46 | $5.00 |
| 33 | Non-tracking tack coat (407E20000) | GAL | 12,099 | $5.00 | $4.00 |
| 34 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 144 | $30.00 | $55.00 |
| 35 | Anti-segregation equipment (442E00100) | CY | 4,138 | $7.50 | $20.00 |
| 36 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 6,535 | $257.65 | $260.00 |
| 37 | Combination curb and gutter, type 2 (609E12000) | FT | 32 | $45.00 | $55.00 |
| 38 | Combination curb and gutter, type 2, as per plan (609E12001) | FT | 3,000 | $60.00 | $55.00 |
| 39 | Combination curb and gutter, type 3 (609E18000) | FT | 34 | $45.00 | $55.00 |
| 40 | Curb, type 6 (609E26000) | FT | 88 | $35.00 | $40.00 |
| 41 | Curb, type 6, as per plan (609E26001) | FT | 40 | $35.00 | $45.00 |
| 42 | 6" concrete traffic island (609E54000) | SY | 15 | $180.00 | $168.00 |
| 43 | Compacted aggregate (617E10100) | CY | 119 | $230.27 | $275.00 |
| 44 | Shoulder preparation (617E20000) | SY | 2,147 | $3.42 | $1.50 |
| 45 | Water (617E25000) | MGAL | 2 | $7.75 | $63.31 |
| 46 | Valve box adjusted to grade (638E10800) | EACH | 6 | $696.05 | $700.00 |
| 47 | Removal of existing pavement marking (512E74500) | FT | 128 | $10.00 | $10.00 |
| 48 | RPM (621E00100) | EACH | 1,155 | $30.90 | $42.00 |
| 49 | Raised pavement marker removed (621E54000) | EACH | 1,155 | $15.29 | $8.00 |
| 50 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 17 | $15.00 | $15.00 |
| 51 | Removal of ground mounted sign and disposal (630E84900) | EACH | 1 | $75.00 | $20.00 |
| 52 | Removal of pole mounted sign and disposal (630E87500) | EACH | 3 | $95.00 | $25.00 |
| 53 | Stop line (644E00500) | FT | 1,066 | $7.00 | $7.00 |
| 54 | Crosswalk line, 24" (644E00630) | FT | 1,107 | $7.00 | $7.00 |
| 55 | Transverse/diagonal line (644E00700) | FT | 2,228 | $6.00 | $6.00 |
| 56 | Chevron marking (644E00720) | FT | 565 | $6.00 | $6.00 |
| 57 | Island marking (644E00900) | SF | 406 | $3.50 | $3.50 |
| 58 | Railroad symbol marking (644E01000) | EACH | 4 | $650.00 | $650.00 |
| 59 | Lane arrow (644E01300) | EACH | 100 | $90.00 | $90.00 |
| 60 | Two way left turn arrow (644E01370) | EACH | 9 | $190.00 | $190.00 |
| 61 | Dotted line, 6" (644E01510) | FT | 116 | $3.00 | $3.00 |
| 62 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 3.81 | $7,405.00 | $7,405.00 |
| 63 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 5.66 | $3,905.00 | $3,905.00 |
| 64 | Wet reflective thermoplastic pavement marking, center line (807E14200) | MI | 4.12 | $11,209 | $11,209 |
| 65 | Wet reflective thermoplastic pavement marking, channelizing line, 12" (807E14310) | FT | 10,096 | $2.65 | $2.65 |
| 66 | Grooving for 4" recessed pavement marking, (asphalt) (850E10000) | MI | 8.24 | $1,453.00 | $1,453.00 |
| 67 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 9.48 | $1,943.00 | $1,943.00 |
| 68 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 10,096 | $0.97 | $0.97 |
| 69 | Railroad flagging services (900E00100) | EACH | 1 | $10,000 | $10,000 |
| 70 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 150 | $135.63 | $90.00 |
| 71 | Portable changeable message sign, as per plan (614E18601) | SNMT | 8 | $995.00 | $995.00 |
| 72 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 5.66 | $841.00 | $841.00 |
| 73 | Work zone center line, class III, 642 paint (614E21550) | MI | 4.12 | $3,400.00 | $3,400.00 |
| 74 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 3.81 | $1,700.00 | $1,700.00 |
| 75 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 10,096 | $0.60 | $0.60 |
| 76 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 116 | $1.50 | $1.50 |
| 77 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 2,228 | $1.00 | $1.00 |
| 78 | Work zone stop line, class III, 642 paint (614E26610) | FT | 1,066 | $3.00 | $3.00 |
| 79 | Work zone crosswalk line, class III, 24", 642 paint (614E27260) | FT | 1,107 | $2.00 | $2.00 |
| 80 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 118 | $25.00 | $25.00 |
| 81 | Work zone railroad symbol marking, class III, 642 paint (614E32210) | EACH | 4 | $225.00 | $225.00 |
| 82 | Work zone island marking, class III, 642 paint (614E32800) | SF | 406 | $1.50 | $1.50 |
| 83 | Deep beam bridge retrofit railing (517E75600) | FT | 200 | $112.00 | $112.00 |
| 84 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $5,000.00 | $5,000.00 |
| 85 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $15,236 | $9,655.06 |
| 86 | Maintaining traffic (614E11000) | LS | 1 | $70,821 | $310,000 |
| 87 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $5,280.78 | $10,000 |
| 88 | Mobilization (624E10000) | LS | 1 | $180,000 | $100,000 |