ODOT contract 260015 bid tabulation
HAM-SR 126-06.86 (FOUR LANE RESURFACING). Let by Ohio DOT on January 15, 2026, HAM. 2 bids received; low bid $4,514,528 by Barrett Paving Materials Inc, +0.3% against the engineer's estimate of $4,499,000.
- Owner
- Ohio DOT
- Letting
- 15 JAN 2026
- Pay items
- 63
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Barrett Paving Materials Inc | $4,514,528 | Low | 0.0% |
| 2 | John R Jurgensen Company | $4,798,851 | +6.0% | +7.0% |
Engineer's estimate: $4,499,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barrett Paving Materials Inc | 2. John R Jurgensen Company |
|---|---|---|---|---|---|
| 1 | Walk removed (202E30000) | SF | 604 | $10.00 | $11.00 |
| 2 | Curb removed (202E32000) | FT | 50 | $20.00 | $25.00 |
| 3 | Guardrail removed (202E38000) | FT | 288 | $4.00 | $4.00 |
| 4 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $125.00 | $125.00 |
| 5 | Anchor assembly removed, type B (202E42050) | EACH | 3 | $150.00 | $150.00 |
| 6 | Bridge terminal assembly removed (202E47000) | EACH | 2 | $200.00 | $200.00 |
| 7 | Reshaping under guardrail (209E15000) | STA | 4 | $125.00 | $125.00 |
| 8 | Guardrail, type MGS with long posts (606E15100) | FT | 325 | $29.00 | $29.00 |
| 9 | Anchor assembly, MGS type B (606E26050) | EACH | 2 | $2,225.00 | $2,225.00 |
| 10 | Anchor assembly, MGS type E (606E26150) | EACH | 1 | $2,375.00 | $2,375.00 |
| 11 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,150.00 | $1,150.00 |
| 12 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 2 | $2,350.00 | $2,350.00 |
| 13 | 4" concrete walk (608E10000) | SF | 221 | $20.00 | $21.00 |
| 14 | Curb ramp (608E52000) | SF | 345 | $55.00 | $21.00 |
| 15 | Compacted aggregate (617E10100) | CY | 532 | $180.00 | $165.67 |
| 16 | Shoulder preparation (617E20000) | SY | 9,576 | $1.00 | $2.24 |
| 17 | Water (617E25000) | MGAL | 11 | $1.00 | $7.59 |
| 18 | Repair seeding and mulching (659E14000) | SY | 8 | $1.00 | $425.00 |
| 19 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 20 | Pavement repair, as per plan (253E01001) | SY | 126 | $200.00 | $25.00 |
| 21 | Pavement repair (253E02000) | CY | 500 | $520.00 | $564.78 |
| 22 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 856 | $2.60 | $8.92 |
| 23 | Pavement planing, asphalt concrete, 1.75" (254E01000) | SY | 232,758 | $2.60 | $2.01 |
| 24 | Patching planed surface (254E01600) | SY | 2,351 | $4.00 | $4.29 |
| 25 | Non-tracking tack coat (407E20000) | GAL | 21,026 | $4.00 | $4.50 |
| 26 | Anti-segregation equipment (442E00100) | CY | 5,557 | $18.00 | $10.00 |
| 27 | Asphalt concrete surface course, 12.5 MM, type A (447), as per plan (442E10301) | CY | 9,734 | $240.00 | $277.14 |
| 28 | Curb, type 6 (609E26000) | FT | 27 | $150.00 | $40.00 |
| 29 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 19.81 | $1,150.00 | $700.00 |
| 30 | Special - intelligent compaction (690E98400) | LS | 1 | $2,500.00 | $28,604 |
| 31 | Special - paver mounted thermal profiling (690E98400) | LS | 1 | $2,500.00 | $14,864 |
| 32 | Longitudinal diamond grooving (889E10000) | SY | 9,871 | $4.40 | $4.53 |
| 33 | RPM (621E00100) | EACH | 823 | $39.00 | $39.00 |
| 34 | Raised pavement marker removed (621E54000) | EACH | 932 | $8.00 | $12.05 |
| 35 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 6 | $10.00 | $10.00 |
| 36 | Stop line (644E00500) | FT | 100 | $7.35 | $7.35 |
| 37 | Crosswalk line, 24" (644E00630) | FT | 652 | $7.35 | $7.35 |
| 38 | Chevron marking (644E00720) | FT | 1,253 | $7.35 | $7.35 |
| 39 | Lane arrow (644E01300) | EACH | 18 | $118.00 | $118.00 |
| 40 | Wrong way arrow (644E01360) | EACH | 7 | $175.00 | $175.00 |
| 41 | Speed measurement marking (644E40000) | EACH | 8 | $300.00 | $673.43 |
| 42 | Edge line, 6", type A4 (645E00118) | MI | 0.42 | $24,000 | $24,000 |
| 43 | Lane line, 6", type A4 (645E00220) | MI | 0.24 | $9,500.00 | $9,500.00 |
| 44 | Dotted line, 6", type A4 (645E01522) | FT | 371 | $6.00 | $6.00 |
| 45 | Wet reflective spray thermoplastic pavement marking, edge line, 6" (807E13010) | MI | 19.81 | $2,900.00 | $2,900.00 |
| 46 | Wet reflective spray thermoplastic pavement marking, lane line, 6" (807E13110) | MI | 8.31 | $1,450.00 | $1,450.00 |
| 47 | Wet reflective spray thermoplastic pavement marking, channelizing line, 12" (807E13310) | FT | 7,601 | $1.65 | $1.65 |
| 48 | Wet reflective spray thermoplastic pavement marking, dotted line, 6" (807E13410) | FT | 6,531 | $1.00 | $1.00 |
| 49 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 29.36 | $1,370.00 | $1,370.00 |
| 50 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 7,601 | $0.40 | $0.40 |
| 51 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 0.73 | $3,000.00 | $3,000.00 |
| 52 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 350 | $90.00 | $132.89 |
| 53 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $995.00 | $995.00 |
| 54 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 8.55 | $450.00 | $450.00 |
| 55 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 20.23 | $665.00 | $665.00 |
| 56 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 7,601 | $0.85 | $0.85 |
| 57 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 6,902 | $1.50 | $1.50 |
| 58 | Work zone stop line, class III, 642 paint (614E26610) | FT | 100 | $8.00 | $8.00 |
| 59 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 24 | $1,195.00 | $1,195.00 |
| 60 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $16,183 | $15,446 |
| 61 | Maintaining traffic (614E11000) | LS | 1 | $422,000 | $324,207 |
| 62 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $7,500.00 | $9,470.84 |
| 63 | Mobilization (624E10000) | LS | 1 | $100,000 | $237,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.