TDOT contract CN261048 bid tabulation
The resurfacing (microsurface or thin mix overlay) on s.r. 304 from near the meigs county line (l.m. 0.00) to near s.r. 58 (l.m. 12.59). Let by Tennessee DOT on May 8, 2026, Roane County. 3 bids received; low bid $2,322,098 by Pavement Restorations, Inc..
- Owner
- Tennessee DOT
- Letting
- 08 MAY 2026
- Pay items
- 31
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pavement Restorations, Inc. | $2,322,098 | Low |
| 2 | Rogers Group, Inc. | $2,619,529 | +13% |
| 3 | Asphalt Paving Systems, Inc. | $2,663,314 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pavement Restorations, Inc. | 2. Rogers Group, Inc. | 3. Asphalt Paving Systems, Inc. |
|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 26 | $1,000.00 | $1,275.00 | $975.00 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 3,332 | $62.85 | $48.50 | $77.30 |
| 3 | Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04) | LM | 26 | $830.00 | $850.00 | $787.50 |
| 4 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 11 | $116.00 | $110.00 | $115.50 |
| 5 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 8 | $1,055.00 | $1,000.00 | $1,050.00 |
| 6 | Guardrail delineation enhancement (BI-directional) (705-04.22) | EACH | 2,240 | $5.60 | $5.25 | $5.51 |
| 7 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 3 | $1,895.00 | $1,800.00 | $1,890.00 |
| 8 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 8 | $3,670.00 | $3,250.00 | $3,412.50 |
| 9 | Guardrail removed (706-01) | LF | 224 | $1.10 | $1.00 | $1.05 |
| 10 | Radius rail (706-06.03) | LF | 39 | $50.00 | $45.00 | $47.25 |
| 11 | Rounded end element (706-10.26) | EACH | 3 | $370.00 | $350.00 | $367.50 |
| 12 | Traffic control (712-01) | LS | 1 | $78,000 | $41,350 | $106,602 |
| 13 | Signs (construction) (712-06) | SF | 1,498 | $8.35 | $7.65 | $8.03 |
| 14 | Signs (OM-3) (713-16.20) | EACH | 17 | $265.00 | $250.00 | $262.50 |
| 15 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 831 | $42.00 | $38.00 | $42.00 |
| 16 | Removal of snowplowable reflective marker (716-01.30) | EACH | 831 | $11.00 | $8.00 | $10.50 |
| 17 | Plastic pavement marking (stop line) (716-02.05) | LF | 1,112 | $11.00 | $10.00 | $10.50 |
| 18 | Painted pavement marking (6" line) (716-05.20) | LM | 41 | $900.00 | $736.00 | $892.50 |
| 19 | Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02) | LM | 51 | $3,800.00 | $3,600.00 | $3,780.00 |
| 20 | Spray thermo PVMT MRKNG (60 mil) (6IN dotted line) (716-13.05) | LF | 215 | $1.05 | $1.00 | $1.05 |
| 21 | Mobilization (717-01) | LS | 1 | $160,000 | $29,449 | $145,875 |
| 22 | Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15) | TON | 2,780 | $125.00 | ||
| 23 | Bituminous material for tack coat (TC) (403-01) | TON | 152 | $950.00 | ||
| 24 | Acs mix(PG64-22) thin lift D asphalt (411-03.12) | TON | 9,266 | $155.00 | ||
| 25 | Cold planing bituminous pavement (415-01.02) | SY | 20,383 | $3.40 | ||
| 26 | Bituminous material for tack coat (micro-surfacing) (403-01.01) | TON | 24 | $1,310.00 | $1,267.00 | |
| 27 | Bituminous material (BSC) (405-01.01) | TON | 238 | $1,190.00 | $1,125.75 | |
| 28 | Mineral aggregate (BSC) (405-01.02) | TON | 2,083 | $54.00 | $80.67 | |
| 29 | Emulsified asphalt for micro-surfacing (414-03.01) | TON | 341 | $1,205.00 | $1,938.77 | |
| 30 | Aggregate for micro surfacing (414-03.02) | TON | 2,837 | $167.00 | $165.83 | |
| 31 | Removal of pavement marking (line) (716-08.20) | LM | 51 | $2,950.00 | $2,940.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of May 8, 2026. Compiled by Mirage Metrics.