TDOT contract CN264019 bid tabulation
The microsurfacing on s.r. 57 from the fayette county line (l.m. 0.00) to saulsbury road (l.m. 6.85), including bridge expansion joint repair and thin epoxy overlay. Let by Tennessee DOT on March 20, 2026, Hardeman County. 2 bids received; low bid $1,077,839 by Asphalt Paving Systems, Inc..
- Owner
- Tennessee DOT
- Letting
- 20 MAR 2026
- Pay items
- 33
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Asphalt Paving Systems, Inc. | $1,077,839 | Low |
| 2 | Pavement Restorations, Inc. | $1,152,230 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Asphalt Paving Systems, Inc. | 2. Pavement Restorations, Inc. |
|---|---|---|---|---|---|
| 1 | Water (203-06) | MG | 14 | $0.01 | $20.00 |
| 2 | Mineral aggregate, type B base, grading (C or D) (303-02) | TON | 1,873 | $68.45 | $58.00 |
| 3 | Bituminous material for tack coat (micro-surfacing) (403-01.01) | TON | 48 | $250.00 | $1,200.00 |
| 4 | Crack sealant (411-04) | LB | 12,233 | $2.00 | $1.75 |
| 5 | Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04) | LM | 14 | $584.16 | $1,070.00 |
| 6 | Emulsified asphalt for micro-surfacing (414-03.01) | TON | 117 | $1,228.34 | $1,400.00 |
| 7 | Aggregate for micro surfacing (414-03.02) | TON | 971 | $180.90 | $210.00 |
| 8 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 25 | $206.00 | $110.00 |
| 9 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 2 | $1,339.00 | $1,210.00 |
| 10 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 23 | $3,450.50 | $3,500.00 |
| 11 | Guardrail removed (706-01) | LF | 1,200 | $1.03 | $3.30 |
| 12 | Rounded end element (706-10.26) | EACH | 2 | $412.00 | $110.00 |
| 13 | Traffic control (712-01) | LS | 1 | $87,398 | $30,000 |
| 14 | Flexible drums (channelizing) (712-04.01) | EACH | 28 | $1.03 | $40.00 |
| 15 | Signs (construction) (712-06) | SF | 1,670 | $6.98 | $6.50 |
| 16 | Sign post delineation enhancement (713-02.21) | LF | 78 | $3.55 | $5.50 |
| 17 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 648 | $12.88 | $15.00 |
| 18 | Removal of signs, posts and footings (713-15) | LS | 1 | $154.50 | $250.00 |
| 19 | Railroad cross-buck sign & support (713-16.05) | EACH | 4 | $412.00 | $375.00 |
| 20 | Railroad advance warning sign and support (713-16.09) | EACH | 3 | $412.00 | $275.00 |
| 21 | Signs (stop sign) (713-16.20) | EACH | 3 | $427.45 | $275.00 |
| 22 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 453 | $49.44 | $50.00 |
| 23 | Removal of snowplowable reflective marker (716-01.30) | EACH | 37 | $27.81 | $30.00 |
| 24 | Plastic pavement marking (stop line) (716-02.05) | LF | 90 | $30.90 | $35.00 |
| 25 | Plastic word pavement marking (RXR) (716-03.02) | EACH | 2 | $1,545.00 | $1,600.00 |
| 26 | Painted pavement marking (6" line) (716-05.20) | LM | 22 | $2,266.00 | $2,300.00 |
| 27 | Removal of pavement marking (stop line) (716-08.05) | LF | 48 | $30.90 | $33.00 |
| 28 | Removal of word pavement marking (RXR) (716-08.11) | EACH | 2 | $1,545.00 | $1,600.00 |
| 29 | Removal of pavement marking (line) (716-08.20) | LM | 9 | $1,611.95 | $1,600.00 |
| 30 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 22 | $8,137.00 | $8,300.00 |
| 31 | Mobilization (717-01) | LS | 1 | $53,760 | $96,000 |
| 32 | Expansion joint repairs (604-10.44) | LF | 77 | $278.10 | $300.00 |
| 33 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 385 | $82.92 | $90.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of March 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.