TDOT contract CNZ014 bid tabulation

The resurfacing on s.r. 344 from s.r. 113 (l.m. 0.00) to u.s. 11w (s.r. 1) (l.m. 4.81). Let by Tennessee DOT on February 7, 2025, Hawkins County. 3 bids received; low bid $705,639 by Duracap Asphalt Paving Co., Inc..

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
16
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Duracap Asphalt Paving Co., Inc.$705,639Low
2APAC-Atlantic, Inc.$788,337+12%
3Summers-Taylor, Inc.$809,283+15%
TDOT contract CNZ014: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Duracap Asphalt Paving Co., Inc.2. APAC-Atlantic, Inc.3. Summers-Taylor, Inc.
1Brooming & degrassing shoulders (208-01.05)LM10$1,035.00$700.00$1,600.00
2Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15)TON581$145.70$180.50$183.00
3Bituminous material for tack coat (TC) (403-01)TON46$1,175.00$800.00$1,000.00
4Acs mix(PG64-22) thin lift D asphalt (411-03.12)TON2,904$131.20$153.00$159.00
5Cold planing bituminous pavement (415-01.02)SY75$141.33$86.00$125.00
6Traffic control (712-01)LS1$27,800$32,000$16,200
7Signs (construction) (712-06)SF765$9.30$15.00$11.01
8Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH317$40.00$42.00$48.50
9Removal of snowplowable reflective marker (716-01.30)EACH317$9.00$11.50$11.00
10Plastic pavement marking(channelization striping) (716-02.04)SY75$23.00$28.00$28.00
11Plastic pavement marking (stop line) (716-02.05)LF150$13.00$13.00$15.50
12Plastic word pavement marking (school) (716-03.04)EACH4$250.00$425.00$289.00
13Plastic pavement marking (transverse shoulder) (716-04.04)LF160$5.50$4.50$6.40
14Painted pavement marking (6" line) (716-05.20)LM8$1,300.00$1,250.00$1,300.00
15Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02)LM20$3,700.00$3,900.00$3,730.00
16Mobilization (717-01)LS1$24,580$34,000$34,760
TDOT contract CNZ014: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy