TDOT contract CNZ171 bid tabulation

The resurfacing on u.s. 321 (s.r. 35) from near ricker avenue (l.m. 11.50) to u.s. 11e (s.r. 34) (l.m. 14.62). Let by Tennessee DOT on June 27, 2025, Greene County. 1 bid received; low bid $1,756,542 by Summers-Taylor, Inc..

Owner
Tennessee DOT
Letting
27 JUN 2025
Pay items
25
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Summers-Taylor, Inc.$1,756,542Low
TDOT contract CNZ171: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Summers-Taylor, Inc.
1Brooming & degrassing shoulders (208-01.05)LM5$2,840.00
2Bituminous material for tack coat (TC) (403-01)TON28$1,200.00
3Acs mix(PG70-22) grading D (411-02.10)TON4,185$171.00
4Cold planing bituminous pavement (415-01.01)TON4,145$49.00
5Traffic control (712-01)LS1$140,000
6Flexible drums (channelizing) (712-04.01)EACH67$35.50
7Warning lights (type A) (712-05.01)EACH34$28.50
8Signs (construction) (712-06)SF1,197$11.50
9Arrow board (type C) (712-08.03)EACH2$1,930.00
10Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH257$45.50
11Plastic pavement marking(channelization striping) (716-02.04)SY189$33.00
12Plastic pavement marking (stop line) (716-02.05)LF1,200$11.50
13Plastic pavement marking (turn lane arrow) (716-02.06)EACH34$179.00
14Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF1,032$26.50
15Plastic word pavement marking (only) (716-03.01)EACH1$269.00
16Plastic word pavement marking (RXR) (716-03.02)EACH4$628.00
17Plastic word pavement marking (stop ahead) (716-03.03)EACH2$419.00
18Plastic pavement marking (straight-turn arrow) (716-04.01)EACH2$209.00
19Plastic pavement marking (handicap symbol) (716-04.10)EACH13$299.00
20Plastic pavement marking (yield line) (716-04.12)SF400$18.00
21Painted pavement marking (6" line) (716-05.20)LM16$1,500.00
22Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02)LM16$3,890.00
23Mobilization (717-01)LS1$175,000
24Saw slot (730-14.02)LF23,000$8.00
25Loop wire (730-14.03)LF46,000$2.25
TDOT contract CNZ171: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy