TxDOT contract A00044436 bid tabulation

Bridge Replacement, FM 731 (AT VILLAGE CREEK to .). Let by Texas DOT on March 5, 2025, Johnson, Fort Worth District. 3 bids received; low bid $3,569,154 by Westfield Insurance Company, -0.6% against the engineer's estimate of $3,591,278.

Owner
Texas DOT
Letting
05 MAR 2025
Pay items
85
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Westfield Insurance Company$3,569,154Low-1.0%
2Coppell Construction Co., Inc.$3,741,531+5.0%+4.0%
3Ed Bell Construction Company$4,319,749+21%+20%
TxDOT contract A00044436: bids by rank

Engineer's estimate: $3,591,278.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Westfield Insurance Company2. Coppell Construction Co., Inc.3. Ed Bell Construction Company
1Preparing row (100-7002)STA7.06$14,279$3,620.89$4,000.00$35,000
2Removing concrete (riprap) (104-7006)SY211$50.00$101.90$25.00$42.00
3Remove (12") TRT/untrt base & asphalt pavement (105-7032)SY1,724$60.00$8.22$23.00$7.50
4Excavation (roadway) (110-7001)CY654$37.00$57.53$42.00$55.00
5Embankment (final)(DC)(type C) (132-7006)CY618$25.00$31.30$57.00$55.00
6Backfill (type B) (134-7002)STA6.22$335.00$413.88$4,000.00$1,000.00
7Compost manuf topsoil (4") (161-7002)SY1,942$5.10$19.10$5.00$11.25
8Broadcast seed (permanent_urban_clay) (164-7004)SY3,089$0.70$1.88$0.80$6.00
9Drill seed (temporary_warm) (164-7013)SY1,545$0.30$0.48$1.20$0.75
10Drill seed (temporary_cool) (164-7014)SY1,545$0.30$0.57$1.20$0.75
11Vegetative watering (168-7001)TGL109$116.00$161.25$50.00$3.00
12FL BS (compacted in place)(type A GR 1-2) (4") (247-7021)SY2,036$20.00$21.50$27.00$26.00
13Prime coat (MC-30) (310-7004)GAL611$11.00$21.50$22.00$25.00
14D-GR HMA type-B PG64-22 (341-7001)TON814$237.00$171.19$144.00$160.00
15SP mixes SP-C sac-A PG70-28 (344-7024)TON231$206.00$212.85$222.00$250.00
16Tack coat (344-7077)GAL401$10.00$2.69$8.00$9.00
17Cem stabil BKFL (400-7010)CY164$248.00$214.88$350.00$400.00
18Temporary special shoring (403-7001)SF5,592$51.00$64.50$63.00$75.00
19Drilled shaft (36 in) (416-7006)LF592$383.00$249.40$370.00$350.00
20Class C concrete (abutment)(HPC) (420-7013)CY45.20$1,787.00$1,664.52$1,700.00$2,500.00
21Class C concrete (cap)(HPC) (420-7023)CY41.60$2,024.00$1,612.72$1,500.00$2,000.00
22Class C concrete (column)(HPC) (420-7039)CY31.40$2,013.00$2,046.45$1,600.00$2,250.00
23Reinforced concrete slab (HPC) (422-7002)SF5,500$34.00$34.40$39.00$40.00
24Approach slab (HPC) (422-7014)CY91.90$930.00$967.50$1,050.00$1,250.00
25Retaining wall (MSE) (423-7001)SF3,825$93.00$138.68$106.00$150.00
26Prestressed concrete girder (TX28) (425-7001)LF651.02$242.00$212.04$333.00$450.00
27Riprap (concrete)(5 in) (432-7002)CY75$845.00$752.50$450.00$850.00
28Riprap (mow strip)(5 in) (432-7014)CY53$584.00$467.63$750.00$900.00
29Rail (type T223)(HPC) (450-7009)LF737$119.00$162.63$155.00$150.00
30Sealed expansion joint (4 in) (SEJ - B) (454-7006)LF98.50$200.00$168.78$190.00$150.00
31Gabion mattresses (galvanized)(18 in) (459-7008)SY660$306.00$182.75$235.00$187.00
32Gabions (3' X 3')(galvanized) (459-7010)CY273$315.00$413.88$250.00$425.00
33Gabion (1.5' X 3')(galvanized) (459-7014)CY46$210.00$236.50$455.00$242.00
34Removing structure (bridge 0 - 99 FT length) (496-7009)EACH1$45,000$32,390$230,000$60,000
35Mobilization (500-7001)LS1$320,000$263,847$330,000$376,000
36Barricades, signs and traffic handling (502-7001)MO10$15,000$8,062.50$15,000$15,750
37Portable changeable message sign (503-7002)EACH2$11,482$12,933$15,000$8,500.00
38TMA (stationary) (505-7001)DAY8$240.00$268.75$350.00$315.00
39Rock filter dams (install) (type 2) (506-7002)LF69$35.00$58.97$37.00$55.00
40Rock filter dams (remove) (506-7011)LF69$15.00$24.21$25.00$31.00
41Construction exits (install) (type 2) (506-7021)SY312$36.00$50.51$45.00$80.00
42Construction exits (remove) (506-7024)SY312$16.00$21.27$10.00$40.00
43Temporary sediment control fence (install) (506-7039)LF1,459$4.00$5.97$3.50$3.65
44Temporary sediment control fence (remove) (506-7041)LF1,459$1.40$2.35$1.00$1.25
45Biodegradable erosion control logs (install) (18") (506-7045)LF60$8.00$8.11$7.00$8.00
46Biodegradable erosion control logs (remove) (506-7046)LF60$3.00$3.41$2.00$2.00
47Constructing detours (508-7001)SY198$95.00$182.75$165.00$180.20
48One-way traffic control (port traffic signal) (510-7003)MO10$6,624.00$4,300.00$5,000.00$7,375.33
49Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF1,350$72.00$99.98$86.00$50.00
50Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF480$18.00$22.21$16.00$12.50
51Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049)LF1,350$25.00$21.50$19.00$25.00
52Portable concrete traffic barrier (pinning) (512-7071)EACH32$70.00$50.00$90.00$75.00
53Mill rumble strips (asphalt) (shoulder) (533-7001)LF1,887$0.60$3.15$4.00$2.50
54Mill rumble strips (asphalt) (centerline) (533-7002)LF1,109$0.40$1.13$4.00$3.75
55Metal W-beam guard fence (timber post) (540-7001)LF200$32.00$26.88$25.00$25.00
56Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$2,295.00$2,096.25$1,750.00$3,017.57
57Metal W-beam guard fence adjustment (540-7009)LF25$21.00$12.90$25.00$25.00
58Short radius (28") (540-7013)LF25$454.00$48.38$35.00$50.00
59Driveway terminal anchor section (540-7014)EACH1$522.00$913.75$875.00$1,000.00
60Remove metal beam guard fence (542-7001)LF525$5.00$2.69$2.25$3.00
61Remove downstream anchor terminal (542-7003)EACH4$284.00$268.75$150.00$200.00
62RM metal beam guard fence trans (thrie-beam) (542-7004)EACH4$300.00$268.75$150.00$350.00
63Guardrail end treatment (install) (544-7001)EACH3$3,035.00$3,225.00$3,000.00$3,000.00
64Crash cushion attenuator (move & reset) (545-7002)EACH2$2,647.00$1,612.50$2,500.00$2,000.00
65Crash cushion attenuator (remove) (545-7004)EACH4$1,500.00$967.50$1,000.00$1,000.00
66Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH4$12,462$9,137.50$8,700.00$9,450.00
67Mailbox install-S (TWG-post) type 2 (560-7002)EACH2$311.00$344.00$320.00$295.00
68Mailbox install-D (TWG-post) type 2 (560-7003)EACH1$530.00$419.25$390.00$295.00
69Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH2$814.00$827.75$770.00$610.00
70Remove SM RD SN sup&AM (644-7073)EACH2$200.00$145.13$135.00$150.00
71Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH11$40.00$10.75$25.00$18.00
72Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH12$57.00$25.80$29.00$30.00
73Install object marker assembly (OM-2Z)(WFLX)GND (658-7058)EACH4$100.00$48.38$60.00$60.00
74Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF505$1.40$0.38$0.75$2.00
75Work zone pavement marking removing (W)6"(solid) (662-7068)LF4,020$1.60$1.44$1.00$1.50
76Work zone pavement marking removing (W)24"(solid) (662-7077)LF48$11.00$14.64$10.00$15.75
77Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH144$4.00$1.08$10.00$7.50
78Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF2,963$1.20$1.00$0.50$1.50
79Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF2,160$1.40$0.96$0.50$1.50
80Type I high perf PM (W)6"(solid)(100MIL) (666-7293)LF3,673$1.60$0.85$1.00$2.00
81Type I high perf PM (Y)6"(solid)(100MIL) (666-7305)LF2,870$1.60$0.85$1.00$2.00
82Reflectorized pavement marker type II-A-A (672-7004)EACH37$9.00$11.68$10.00$15.00
83Eliminating existing PM & markers (4") (677-7001)LF6,880$2.20$0.70$0.75$0.70
84Eliminating existing PM & markers (rumble strip) (677-7030)LF2,075$1.70$80.52$0.75$6.00
85Pavement surface preparation for marking (6") (678-7002)LF5,123$0.50$1.14$0.60$0.50
TxDOT contract A00044436: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of March 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way