TxDOT contract A00063599 bid tabulation
Resurface Roadway, IH 410 (SH 16 to FM 2536). Let by Texas DOT on May 1, 2025, Bexar, San Antonio District. 6 bids received; low bid $9,693,874 by Texas Materials Group, Inc., -21% against the engineer's estimate of $12,327,581.
- Owner
- Texas DOT
- Letting
- 01 MAY 2025
- Pay items
- 99
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Materials Group, Inc. | $9,693,874 | Low | -21% |
| 2 | Clark Construction of Texas, Inc. | $9,773,250 | +1.0% | -21% |
| 3 | Lone Star Paving Company | $9,993,793 | +3.0% | -19% |
| 4 | Allen Keller Company | $10,518,395 | +9.0% | -15% |
| 5 | Dean Word Company, LTD. | $11,594,307 | +20% | -6.0% |
| 6 | Hunter Industries, LTD. | $12,502,486 | +29% | +1.0% |
Engineer's estimate: $12,327,581.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Materials Group, Inc. | 2. Clark Construction of Texas, Inc. | 3. Lone Star Paving Company | 4. Allen Keller Company | 5. Dean Word Company, LTD. | 6. Hunter Industries, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7005) | LF | 300 | $15.00 | $15.00 | $22.00 | $16.00 | $14.45 | $10.72 | $9.90 |
| 2 | Removing concrete (miscellaneous) (104-7046) | SY | 40 | $20.00 | $36.00 | $27.00 | $26.50 | $342.60 | $65.13 | $9.90 |
| 3 | Remove (0"-4") TRT/untrt base & asphalt pavement (105-7001) | SY | 910 | $35.00 | $15.50 | $25.00 | $9.00 | $6.96 | $1.90 | $9.90 |
| 4 | Embankment (final)(OC)(type B) (132-7003) | CY | 157 | $34.42 | $70.00 | $45.00 | $114.00 | $24.48 | $210.73 | $48.40 |
| 5 | Blading (150-7002) | HR | 24 | $150.00 | $137.00 | $450.00 | $530.00 | $367.05 | $249.11 | $99.00 |
| 6 | Compost manuf topsoil (4") (161-7002) | SY | 3,369 | $1.45 | $5.20 | $5.18 | $7.00 | $3.88 | $5.51 | $5.60 |
| 7 | Hydro mulch seed (permanent_rural_sandy) (164-7017) | SY | 3,369 | $0.50 | $0.80 | $0.80 | $0.50 | $0.60 | $0.91 | $0.86 |
| 8 | Vegetative watering (168-7001) | TGL | 52.56 | $22.59 | $60.00 | $275.00 | $260.00 | $341.08 | $86.28 | $36.29 |
| 9 | D-GR HMA type D PG76-22 (level-UP) (341-7059) | TON | 15,535 | $122.19 | $110.00 | $124.74 | $115.00 | $112.07 | $116.34 | $125.40 |
| 10 | Tom-C PG76-22 sac-A (347-7001) | TON | 14,795 | $176.89 | $145.00 | $146.44 | $135.00 | $163.00 | $153.11 | $151.80 |
| 11 | Flexible pavement structure repair(5") (351-7004) | SY | 14,843 | $45.00 | $38.00 | $34.88 | $35.00 | $38.13 | $42.59 | $43.75 |
| 12 | Flexible pavement structure repair(7") (351-7006) | SY | 46,824 | $64.00 | $46.20 | $48.94 | $48.00 | $50.04 | $56.92 | $61.23 |
| 13 | Flex pavement structure repair (7"-9") (351-7030) | SY | 802 | $75.00 | $94.00 | $67.18 | $150.00 | $61.98 | $68.74 | $83.39 |
| 14 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 4,526 | $2.00 | $1.00 | $0.55 | $3.00 | $0.71 | $3.71 | $2.42 |
| 15 | Planing asphalt concrete pavement(0" to 4") (354-7034) | SY | 16,635 | $2.42 | $3.35 | $1.74 | $4.50 | $0.95 | $5.41 | $3.96 |
| 16 | Planing asphalt concrete pavement(2" to 4") (354-7039) | SY | 6,678 | $3.00 | $3.35 | $1.74 | $5.20 | $1.06 | $5.31 | $3.96 |
| 17 | Planing asphalt concrete pavement(0" to 0.5" micro) (354-7044) | SY | 12,858 | $0.25 | $3.00 | $1.19 | $1.70 | $1.02 | $5.01 | $1.32 |
| 18 | Planing asphalt concrete pavement(2") (354-7051) | SY | 233,871 | $1.85 | $1.95 | $1.74 | $2.00 | $0.91 | $2.20 | $2.42 |
| 19 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 16 | $271.97 | $225.00 | $200.00 | $240.00 | $168.45 | $299.91 | $270.03 |
| 20 | Riprap (mow strip)(4 in) (432-7013) | CY | 523.60 | $616.36 | $725.00 | $550.00 | $720.00 | $499.26 | $638.40 | $813.10 |
| 21 | Cleaning existing joints (438-7008) | LF | 1,424 | $24.68 | $10.00 | $5.00 | $5.30 | $3.74 | $10.72 | $5.60 |
| 22 | Header type expansion joint (454-7009) | CF | 237.60 | $670.00 | $532.00 | $615.00 | $650.00 | $460.43 | $569.46 | $689.36 |
| 23 | Joint sealant (454-7010) | LF | 1,460 | $20.50 | $12.50 | $32.00 | $34.00 | $23.95 | $13.43 | $35.87 |
| 24 | Mobilization (500-7001) | LS | 1 | $1,260,000 | $571,400 | $150,000 | $420,000 | $1,000,000 | $915,000 | $712,595 |
| 25 | Barricades, signs and traffic handling (502-7001) | MO | 16 | $7,801.40 | $12,400 | $2,500.00 | $2,000.00 | $12,879 | $22,520 | $46,590 |
| 26 | Portable changeable message sign (503-7001) | DAY | 492 | $90.00 | $75.00 | $100.00 | $90.00 | $101.24 | $91.79 | $91.47 |
| 27 | TMA (stationary) (505-7001) | DAY | 232 | $241.14 | $200.00 | $100.00 | $260.00 | $917.08 | $294.60 | $559.10 |
| 28 | TMA (mobile operation) (505-7003) | DAY | 87 | $419.88 | $200.00 | $100.00 | $260.00 | $787.96 | $913.16 | $807.58 |
| 29 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 10,107 | $5.10 | $3.50 | $3.50 | $4.00 | $2.62 | $3.81 | $3.78 |
| 30 | Biodegradable erosion control logs (remove) (506-7046) | LF | 10,107 | $1.18 | $0.50 | $0.50 | $1.50 | $0.37 | $0.50 | $0.54 |
| 31 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 75,362 | $0.14 | $0.14 | $0.32 | $0.15 | $0.16 | $0.20 | $0.15 |
| 32 | Metal W-beam guard fence (timber post) (540-7001) | LF | 7,287.50 | $24.24 | $25.00 | $28.50 | $27.50 | $18.72 | $26.75 | $30.91 |
| 33 | Metal W-beam guard fence (steel post) (540-7002) | LF | 700 | $32.60 | $27.00 | $40.00 | $105.00 | $20.21 | $28.96 | $118.28 |
| 34 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 8 | $2,321.65 | $3,300.00 | $3,000.00 | $2,340.00 | $1,871.66 | $3,395.62 | $2,615.25 |
| 35 | Downstream anchor terminal section (540-7015) | EACH | 18 | $1,403.80 | $1,200.00 | $1,400.00 | $1,660.00 | $898.40 | $1,285.42 | $1,860.39 |
| 36 | Metal beam guard fence trans (31"-28") (540-7028) | EACH | 9 | $1,000.00 | $900.00 | $950.00 | $1,060.00 | $673.80 | $964.07 | $1,188.75 |
| 37 | Remove metal beam guard fence (542-7001) | LF | 7,900 | $2.67 | $2.00 | $2.00 | $4.00 | $1.50 | $2.10 | $4.46 |
| 38 | Remove terminal anchor section (542-7002) | EACH | 16 | $216.96 | $200.00 | $200.00 | $265.00 | $149.73 | $214.24 | $297.19 |
| 39 | Remove downstream anchor terminal (542-7003) | EACH | 2 | $100.70 | $100.00 | $200.00 | $265.00 | $74.87 | $107.12 | $297.19 |
| 40 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $341.89 | $200.00 | $200.00 | $370.00 | $149.73 | $214.24 | $416.06 |
| 41 | Guardrail end treatment (install) (544-7001) | EACH | 18 | $3,051.91 | $3,000.00 | $3,000.00 | $3,790.00 | $2,246.00 | $3,213.45 | $4,249.78 |
| 42 | Guardrail end treatment (remove) (544-7003) | EACH | 12 | $249.75 | $200.00 | $250.00 | $370.00 | $149.73 | $214.24 | $416.06 |
| 43 | Crash cushion attenuator (remove) (545-7004) | EACH | 3 | $950.00 | $2,700.00 | $1,800.00 | $610.00 | $845.38 | $937.21 | $683.53 |
| 44 | Aluminum signs (type G) (636-7002) | SF | 176 | $30.10 | $28.00 | $8.00 | $30.00 | $20.96 | $30.26 | $40.14 |
| 45 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 10 | $722.04 | $695.00 | $800.00 | $740.00 | $520.32 | $696.22 | $745.55 |
| 46 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 45 | $795.79 | $763.00 | $800.00 | $810.00 | $571.23 | $996.13 | $1,066.71 |
| 47 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 2 | $931.43 | $952.00 | $785.00 | $1,000.00 | $712.73 | $1,178.30 | $1,261.70 |
| 48 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 11 | $901.71 | $987.00 | $985.00 | $1,040.00 | $738.93 | $1,172.89 | $1,255.96 |
| 49 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 3 | $1,192.26 | $1,100.00 | $1,250.00 | $1,160.00 | $823.53 | $1,301.45 | $1,393.60 |
| 50 | Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032) | EACH | 5 | $1,216.83 | $1,210.00 | $1,300.00 | $1,280.00 | $905.89 | $1,430.02 | $1,531.24 |
| 51 | Install small roadside sign support and assembly TYS80(2)SA(P-exal) (644-7049) | EACH | 1 | $1,937.38 | $1,905.00 | $2,000.00 | $2,020.00 | $1,426.21 | $2,249.39 | $2,408.70 |
| 52 | In bridge MNT clearance sign assembly(type S) (644-7062) | EACH | 2 | $3,706.20 | $2,285.00 | $550.00 | $2,400.00 | $1,709.21 | $2,495.79 | $2,672.51 |
| 53 | Remove SM RD SN sup&AM (644-7073) | EACH | 68 | $100.04 | $93.00 | $125.00 | $100.00 | $69.62 | $101.81 | $108.96 |
| 54 | Remove BRDG MNT clearance sign assembly (644-7074) | EACH | 2 | $370.00 | $250.00 | $100.00 | $270.00 | $187.16 | $1,108.66 | $1,187.14 |
| 55 | Install LRSS (struct steel) (647-7001) | LB | 704.20 | $10.21 | $8.50 | $4.00 | $9.00 | $6.36 | $8.52 | $11.88 |
| 56 | Remove lrsa (647-7003) | EACH | 1 | $1,262.03 | $1,200.00 | $250.00 | $1,270.00 | $898.40 | $792.62 | $1,080.13 |
| 57 | Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003) | EACH | 40 | $77.33 | $87.00 | $75.00 | $90.00 | $65.13 | $26.25 | $28.10 |
| 58 | Install delineator assembly (D-SW)SZ 1(WFLX)SRF (658-7006) | EACH | 6 | $120.00 | $97.00 | $75.00 | $103.00 | $72.62 | $56.22 | $60.22 |
| 59 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 53 | $25.17 | $20.00 | $78.00 | $21.00 | $14.98 | $26.25 | $28.10 |
| 60 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 181 | $35.00 | $28.00 | $85.00 | $30.00 | $20.96 | $30.56 | $32.69 |
| 61 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031) | EACH | 53 | $26.22 | $20.00 | $85.00 | $21.00 | $14.98 | $26.25 | $28.10 |
| 62 | Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036) | EACH | 142 | $37.80 | $28.00 | $60.00 | $30.00 | $20.96 | $30.56 | $32.69 |
| 63 | Install delineator assembly (D-SY)SZ 1(BRF)GF2(BI) (658-7037) | EACH | 188 | $30.80 | $30.00 | $75.00 | $32.00 | $22.46 | $31.06 | $33.26 |
| 64 | Install delineator assembly (D-DW)SZ 1(WFLX)GND (658-7045) | EACH | 7 | $59.92 | $87.00 | $75.00 | $92.00 | $65.13 | $74.95 | $80.29 |
| 65 | Install object marker assembly (OM-1)(WFLX)GND (658-7054) | EACH | 5 | $150.00 | $87.00 | $70.00 | $92.00 | $65.13 | $227.06 | $243.16 |
| 66 | Remove delin & object marker assms (658-7078) | EACH | 453 | $25.18 | $7.00 | $75.00 | $7.40 | $5.24 | $19.84 | $21.22 |
| 67 | Install OM LG RD sign (2-OM-type 1)Y (658-7090) | EACH | 2 | $75.00 | $45.00 | $85.00 | $50.00 | $33.69 | $283.88 | $303.95 |
| 68 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 34,886 | $0.41 | $0.40 | $0.45 | $0.30 | $0.30 | $0.30 | $0.44 |
| 69 | Work zone pavement marking non-removing (W)6"(DOT) (662-7006) | LF | 1,589 | $0.74 | $1.00 | $0.45 | $0.40 | $0.75 | $0.40 | $0.59 |
| 70 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 141,113 | $0.60 | $0.30 | $0.45 | $0.30 | $0.23 | $0.30 | $0.38 |
| 71 | Work zone pavement marking non-removing (W)12"(solid) (662-7015) | LF | 67 | $3.18 | $2.50 | $3.00 | $1.60 | $1.87 | $1.60 | $2.21 |
| 72 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 620 | $3.87 | $4.00 | $6.00 | $3.20 | $3.00 | $3.21 | $4.42 |
| 73 | Work zone pavement marking non-removing (W)(entr gore) (662-7020) | EACH | 26 | $324.00 | $300.00 | $300.00 | $320.00 | $224.60 | $321.36 | $442.21 |
| 74 | Work zone pavement marking non-removing (W)(exit gore) (662-7021) | EACH | 24 | $324.00 | $300.00 | $600.00 | $320.00 | $224.60 | $321.36 | $442.21 |
| 75 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 147,069 | $0.60 | $0.30 | $0.45 | $0.30 | $0.23 | $0.30 | $0.38 |
| 76 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 29,324 | $1.82 | $1.60 | $1.00 | $1.00 | $2.13 | $3.61 | $1.78 |
| 77 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 1,589 | $2.65 | $1.50 | $0.95 | $1.60 | $1.12 | $1.60 | $2.21 |
| 78 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 300 | $1.19 | $1.50 | $0.95 | $1.00 | $1.12 | $1.10 | $1.47 |
| 79 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 67 | $5.37 | $2.50 | $4.00 | $3.20 | $1.87 | $3.21 | $4.42 |
| 80 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 733 | $7.97 | $8.50 | $8.00 | $6.40 | $6.36 | $6.41 | $8.84 |
| 81 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 3 | $118.56 | $125.00 | $200.00 | $160.00 | $93.59 | $160.73 | $221.10 |
| 82 | Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069) | EACH | 13 | $1,102.70 | $700.00 | $450.00 | $635.00 | $524.07 | $642.71 | $884.41 |
| 83 | Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072) | EACH | 12 | $1,881.25 | $700.00 | $900.00 | $635.00 | $524.07 | $642.71 | $884.41 |
| 84 | Pavement sler 6" (666-7347) | LF | 140,244 | $0.25 | $0.25 | $0.25 | $0.30 | $0.18 | $0.30 | $0.38 |
| 85 | Pavement sler 12" (666-7350) | LF | 67 | $1.61 | $1.50 | $2.00 | $2.10 | $1.12 | $2.10 | $2.95 |
| 86 | Pavement sler 24" (666-7352) | LF | 620 | $2.13 | $3.50 | $4.00 | $4.20 | $2.62 | $4.31 | $5.90 |
| 87 | Pavement sler (entr gore) (666-7361) | EACH | 13 | $182.70 | $250.00 | $200.00 | $320.00 | $187.17 | $321.36 | $442.21 |
| 88 | Pavement sler (exit gore) (666-7362) | EACH | 12 | $537.50 | $250.00 | $400.00 | $320.00 | $187.16 | $321.36 | $442.21 |
| 89 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 16,501 | $0.67 | $0.75 | $0.75 | $0.70 | $0.56 | $0.70 | $0.96 |
| 90 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 65,878 | $0.63 | $0.75 | $0.75 | $0.65 | $0.56 | $0.70 | $0.90 |
| 91 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 67,335 | $0.64 | $0.75 | $0.75 | $0.65 | $0.56 | $0.70 | $0.90 |
| 92 | Prefabricated PM type C (W)(number) (668-7102) | EACH | 6 | $258.97 | $250.00 | $75.00 | $320.00 | $187.17 | $321.36 | $442.21 |
| 93 | Reflectorized pavement marker type I-A (672-7001) | EACH | 2,786 | $4.21 | $4.75 | $5.00 | $5.30 | $3.55 | $5.31 | $7.37 |
| 94 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,584 | $5.05 | $4.75 | $5.00 | $5.30 | $3.55 | $5.31 | $7.37 |
| 95 | Debris removal (spot debris) (735-7072) | MI | 0.68 | $7,016.13 | $43,300 | $56,500 | $60,000 | $42,300 | $65,259 | $63,331 |
| 96 | Underseal course (3006-7001) | GAL | 51,439 | $4.06 | $1.00 | $4.60 | $4.00 | $3.94 | $4.81 | $4.18 |
| 97 | Bonding course (3007-7001) | GAL | 51,439 | $4.03 | $0.10 | $3.70 | $4.00 | $3.94 | $1.70 | $3.30 |
| 98 | Long channel mount curb sys (install) (6039-7001) | LF | 334 | $51.50 | $65.00 | $42.00 | $64.00 | $48.66 | $84.57 | $71.32 |
| 99 | Long channel mount curb sys (remove) (6039-7003) | LF | 334 | $3.93 | $10.00 | $2.50 | $10.60 | $7.49 | $19.84 | $11.89 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 1, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way