TxDOT contract A00064472 bid tabulation
Bridge Replacement, DUNCAN PERRY RD (Duncan Perry Rd over Johnson Creek to .). Let by Texas DOT on July 2, 2026, Tarrant, Fort Worth District. 3 bids received; low bid $7,071,178 by Castillo Aranda LLC, +39% against the engineer's estimate of $5,087,705.
- Owner
- Texas DOT
- Letting
- 02 JUL 2026
- Pay items
- 115
- Data through
- 19 NOV 2026
1 of the 3 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Castillo Aranda LLC | $7,071,178 | Low | +39% |
Engineer's estimate: $5,087,705.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Castillo Aranda LLC |
|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 7.70 | $3,000.00 | $92,000 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 483 | $20.00 | $50.00 |
| 3 | Excavation (roadway) (110-7001) | CY | 1,485 | $20.00 | $20.00 |
| 4 | Embankment (final)(DC)(type C2) (132-7010) | CY | 1,423 | $20.00 | $30.00 |
| 5 | Embankment (final)(DC)(type D) (132-7012) | CY | 1,485 | $20.00 | $35.00 |
| 6 | Compost manuf topsoil (4") (161-7002) | SY | 15,556 | $5.00 | $5.00 |
| 7 | Hydro mulch seed (permanent_urban_clay) (164-7020) | SY | 15,556 | $3.00 | $2.00 |
| 8 | Hydro mulch seed (temporary_warm) (164-7021) | SY | 3,889 | $3.00 | $1.00 |
| 9 | Hydro mulch seed (temporary_cool) (164-7022) | SY | 3,889 | $3.00 | $1.00 |
| 10 | Vegetative watering (168-7001) | TGL | 544.50 | $30.00 | $55.00 |
| 11 | Soil ret BLKT(SL_steep_clay_short) (169-7005) | SY | 761 | $4.00 | $5.00 |
| 12 | Soil ret BLKT(SL_steep_clay_long) (169-7006) | SY | 1,186 | $4.00 | $6.50 |
| 13 | FL BS (roadway del)(type A GR 1-2)(final pos) (247-7259) | CY | 428 | $60.00 | $100.00 |
| 14 | Lime (com or QK)(slurry) (260-7005) | TON | 32 | $350.00 | $330.00 |
| 15 | Lime TRT (existing material & new base)(8") (260-7011) | SY | 1,927 | $6.00 | $12.00 |
| 16 | Salvage, haul & stockpile reclaimed asphalt PV (6 to 8") (305-7005) | SY | 1,850 | $7.00 | $12.00 |
| 17 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 353 | $10.00 | $26.00 |
| 18 | D-GR HMA type-B PG64-22 (exempt) (341-7003) | TON | 304 | $180.00 | $175.00 |
| 19 | Tack coat (341-7082) | GAL | 381 | $5.00 | $25.00 |
| 20 | SP mixes SP-C sac-A PG70-28 (344-7024) | TON | 199 | $225.00 | $235.00 |
| 21 | Cem stabil BKFL (400-7010) | CY | 337 | $220.00 | $90.00 |
| 22 | Trench excavation protection (402-7001) | LF | 283 | $11.00 | $1.00 |
| 23 | Temporary special shoring (403-7001) | SF | 318 | $30.00 | |
| 24 | Temporary special shoring (cofferdam) (403-7002) | SF | 1,082 | $50.00 | |
| 25 | Drilled shaft (18 in) (416-7002) | LF | 142 | $150.00 | $270.00 |
| 26 | Drilled shaft (36 in) (416-7006) | LF | 711 | $220.00 | $400.00 |
| 27 | Class C concrete (abutment)(HPC) (420-7013) | CY | 74.40 | $1,100.00 | $1,300.00 |
| 28 | Class C concrete (cap)(HPC) (420-7023) | CY | 52.20 | $1,200.00 | $1,450.00 |
| 29 | Class C concrete (column)(HPC) (420-7039) | CY | 13.50 | $1,500.00 | $1,200.00 |
| 30 | Class C concrete (rail foundation) (420-7052) | CY | 19 | $1,000.00 | $750.00 |
| 31 | Reinforced concrete slab (HPC) (422-7002) | SF | 12,482 | $21.00 | $25.00 |
| 32 | Approach slab (HPC) (422-7014) | CY | 98.20 | $700.00 | $650.00 |
| 33 | Prestressed concrete girder (TX46) (425-7004) | LF | 1,754.64 | $235.00 | $280.00 |
| 34 | Riprap (concrete)(4 in) (432-7001) | CY | 1 | $750.00 | $550.00 |
| 35 | Riprap (mow strip)(5 in) (432-7014) | CY | 20 | $870.00 | $550.00 |
| 36 | Riprap (stone protection)(24 in) (432-7045) | CY | 1,611 | $150.00 | $320.00 |
| 37 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 455 | $60.00 | $30.00 |
| 38 | Rail (type C223)(HPC) (450-7035) | LF | 747.90 | $230.00 | $135.00 |
| 39 | Rail (type PR11) (450-7044) | LF | 592.10 | $155.00 | $155.00 |
| 40 | Sealed expansion joint (4 in) (SEJ - B) (454-7006) | LF | 117 | $155.00 | $150.00 |
| 41 | Concrete box culvert (6 FT X 4 FT) (462-7012) | LF | 116 | $785.00 | |
| 42 | Wingwall (FW - 0) (HW=9 FT) (466-7151) | EACH | 1 | $65,000 | |
| 43 | Wingwall (SW - 0) (HW=6 FT) (466-7205) | EACH | 1 | $55,000 | |
| 44 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 1 | $60,000 | $25,000 |
| 45 | Mobilization (500-7001) | LS | 1 | $400,000 | $700,000 |
| 46 | Barricades, signs and traffic handling (502-7001) | MO | 15 | $10,000 | |
| 47 | Portable changeable message sign (503-7002) | EACH | 3 | $5,000.00 | |
| 48 | TMA (stationary) (505-7001) | DAY | 234 | $250.00 | |
| 49 | TMA (mobile operation) (505-7003) | DAY | 4 | $450.00 | |
| 50 | Rock filter dams (install) (type 1) (506-7001) | LF | 10 | $110.00 | $50.00 |
| 51 | Rock filter dams (remove) (506-7011) | LF | 10 | $15.00 | $5.00 |
| 52 | Construction exits (install) (type 1) (506-7020) | SY | 225 | $30.00 | |
| 53 | Construction exits (remove) (506-7024) | SY | 225 | $10.00 | |
| 54 | Temporary sediment control fence (install) (506-7039) | LF | 2,088 | $5.00 | $4.00 |
| 55 | Temporary sediment control fence (remove) (506-7041) | LF | 2,088 | $1.50 | $1.00 |
| 56 | Constructing detours (508-7001) | SY | 1,862 | $95.00 | |
| 57 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 140 | $65.00 | |
| 58 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 40 | $65.00 | |
| 59 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 140 | $20.00 | |
| 60 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 40 | $20.00 | |
| 61 | Concrete sidewalks (5") (531-7002) | SY | 506 | $100.00 | $75.00 |
| 62 | Metal W-beam guard fence (timber post) (540-7001) | LF | 150 | $25.00 | $30.00 |
| 63 | Metal beam guard fence trans (TL2) (540-7006) | EACH | 4 | $1,300.00 | $1,300.00 |
| 64 | Downstream anchor terminal section (540-7015) | EACH | 2 | $1,375.00 | $1,300.00 |
| 65 | Remove metal beam guard fence (542-7001) | LF | 609 | $2.50 | $10.00 |
| 66 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,300.00 | $3,500.00 |
| 67 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $250.00 | $300.00 |
| 68 | Wire fence (type C) (552-7003) | LF | 351 | $15.00 | |
| 69 | Gate (type 1) (552-7006) | EACH | 1 | $2,500.00 | |
| 70 | Wire fence (remove) (552-7011) | LF | 351 | $1.00 | |
| 71 | Temporary RD IL setup and remove (617-7001) | EACH | 2 | $15,000 | |
| 72 | Temporary RD IL maintain system (617-7002) | MO | 26 | $8,150.00 | |
| 73 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 6 | $825.00 | $750.00 |
| 74 | Relocate SM RD SN sup&AM(sign only) (644-7072) | EACH | 2 | $600.00 | $500.00 |
| 75 | Remove SM RD SN sup&AM (644-7073) | EACH | 1 | $125.00 | $350.00 |
| 76 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 10 | $22.00 | $30.00 |
| 77 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 12 | $27.50 | $30.00 |
| 78 | Install object marker assembly (OM-2Z)(WFLX)SRFLL(BI) (658-7260) | EACH | 2 | $124.00 | $100.00 |
| 79 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 1,415 | $2.00 | |
| 80 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 1,400 | $2.00 | |
| 81 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 298 | $5.00 | |
| 82 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 323 | $5.00 | |
| 83 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 200 | $20.00 | |
| 84 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 200 | $20.00 | |
| 85 | Work zone pavement marking SHT terminal remove (W)(4") (662-7115) | LF | 1,540 | $5.00 | |
| 86 | Work zone pavement marking SHT terminal remove (Y)(4") (662-7116) | LF | 1,540 | $5.00 | |
| 87 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 2,164 | $2.00 | $2.00 |
| 88 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 2,164 | $2.00 | $2.00 |
| 89 | Pavement sler 6" (666-7347) | LF | 4,328 | $0.50 | $1.00 |
| 90 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 27 | $12.00 | $15.00 |
| 91 | Eliminating existing PM & markers (4") (677-7001) | LF | 1,724 | $2.00 | |
| 92 | Eliminating existing PM & markers (plowable RPMS) (677-7031) | EACH | 46 | $6.00 | |
| 93 | Pavement surface preparation for marking (6") (678-7002) | LF | 4,328 | $0.60 | $1.00 |
| 94 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 27 | $2.00 | $1.00 |
| 95 | Tip testing(drilled shaft) (4003-7001) | EACH | 4 | $22,000 | $15,000 |
| 96 | Install FTB (5002-7001) | LF | 44 | $50.00 | $200.00 |
| 97 | Remove FTB (5002-7002) | LF | 44 | $4.00 | $10.00 |
| 98 | 54" FRP gravity sewer pipe, open cut (7093-7001) | LF | 982 | $1,400.00 | |
| 99 | 5' diameter vented drop FRP manhole (7093-7002) | EACH | 1 | $25,400 | |
| 100 | 5' diameter vented FRP manhole (7093-7003) | EACH | 1 | $35,000 | |
| 101 | 5' diameter T-base FRP manhole (7093-7004) | EACH | 1 | $30,000 | |
| 102 | Point of entry connection (7093-7005) | LS | 1 | $25,000 | |
| 103 | Tie-in connections (7093-7006) | LS | 1 | $10,500 | |
| 104 | Decommission manhole (7093-7007) | EACH | 6 | $1,500.00 | |
| 105 | Decommission pipes (7093-7008) | LF | 1,001 | $50.00 | |
| 106 | Dewatring and groundwater control (7093-7009) | LS | 1 | $35,000 | |
| 107 | Temporary cofferdam and flow diversion (7093-7010) | LS | 1 | $3,000.00 | |
| 108 | Trench safety (7093-7011) | LF | 982 | $10.00 | |
| 109 | Storm water pollution prevention plan (7093-7012) | LS | 1 | $50,000 | |
| 110 | Bank stabilization (7093-7013) | CY | 2,543 | $12.00 | |
| 111 | Hydromulch (7093-7014) | ACRE | 1 | $3,000.00 | |
| 112 | Waterline support (7093-7015) | EACH | 2 | $4,500.00 | |
| 113 | Pavement restoration (7093-7016) | LF | 90 | $200.00 | |
| 114 | Temporary bypass pumping (7093-7018) | LS | 0 | $0.00 | |
| 115 | Flow isolation and bypass pumping (7093-7019) | LS | 1 | $65,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.