TxDOT contract A00130008 bid tabulation
Bridge Replacement, IOWA LN (Iowa Lane at Brazos River Auth Canal to .). Let by Texas DOT on October 9, 2025, Brazoria, Houston District. 7 bids received; low bid $1,125,735 by Jfo Services, LLC, -21% against the engineer's estimate of $1,420,927.
- Owner
- Texas DOT
- Letting
- 09 OCT 2025
- Pay items
- 64
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jfo Services, LLC | $1,125,735 | Low | -21% |
| 2 | MC2 Civil, LLC | $1,239,484 | +10% | -13% |
| 3 | STX Civil | $1,248,909 | +11% | -12% |
| 4 | Castillo Aranda LLC | $1,310,251 | +16% | -8.0% |
| 5 | C. E. Barker, LTD. | $1,344,375 | +19% | -5.0% |
| 6 | R Construction Civil, LLC | $1,785,955 | +59% | +26% |
| 7 | Ragle Construction, Inc. | $2,013,511 | +79% | +42% |
Engineer's estimate: $1,420,927.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Jfo Services, LLC | 2. MC2 Civil, LLC | 3. STX Civil | 4. Castillo Aranda LLC | 5. C. E. Barker, LTD. | 6. R Construction Civil, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 6.79 | $6,500.00 | $4,169.21 | $5,300.00 | $5,000.00 | $20,000 | $19,500 | $8,800.00 |
| 2 | Remove (9"-13") TRT/untrt base & asphalt pavement (105-7009) | SY | 1,358 | $69.00 | $18.95 | $10.00 | $10.00 | $10.00 | $13.23 | $29.00 |
| 3 | Excavation (roadway) (110-7001) | CY | 109 | $30.00 | $128.77 | $50.00 | $20.00 | $15.00 | $34.47 | $170.00 |
| 4 | Embankment (final)(OC)(type C) (132-7005) | CY | 1,272 | $40.00 | $33.74 | $50.00 | $50.00 | $20.00 | $47.60 | $100.00 |
| 5 | Block sodding (162-7002) | SY | 554 | $10.00 | $11.00 | $4.00 | $5.00 | $4.00 | $10.50 | $10.00 |
| 6 | Straw or hay mulch (162-7003) | SY | 554 | $0.40 | $2.44 | $15.00 | $19.33 | $0.50 | $3.94 | $6.00 |
| 7 | Broadcast seed (temporary_warm) (164-7005) | SY | 554 | $1.50 | $2.44 | $0.23 | $0.28 | $0.50 | $3.94 | $5.00 |
| 8 | Fertilizer (166-7001) | ACRE | 0.23 | $2,000.00 | $4,889.70 | $750.00 | $975.00 | $1,250.00 | $1,969.50 | $6,200.00 |
| 9 | Vegetative watering (168-7001) | TGL | 8.60 | $150.00 | $625.77 | $25.00 | $50.00 | $80.00 | $137.87 | $450.00 |
| 10 | FL BS (compacted in place)(type A GR 1-2) (8") (247-7067) | SY | 1,924 | $21.00 | $25.88 | $38.00 | $55.00 | $38.00 | $62.04 | $47.00 |
| 11 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 36 | $350.00 | $399.73 | $320.00 | $425.00 | $385.00 | $429.35 | $440.00 |
| 12 | Lime TRT (existing material & new base)(8") (260-7011) | SY | 2,003 | $40.00 | $16.26 | $10.00 | $20.00 | $5.50 | $4.60 | $14.00 |
| 13 | Prime coat (MC-30) (310-7004) | GAL | 468 | $10.00 | $9.78 | $6.00 | $15.00 | $10.00 | $39.39 | $9.00 |
| 14 | D-GR HMA type D sac-B PG70-22 (exempt) (341-7067) | TON | 149 | $350.00 | $336.17 | $250.00 | $350.00 | $280.00 | $282.30 | $400.00 |
| 15 | D-GR HMA type D PG70-22 (exempt) (341-7069) | TON | 151 | $380.00 | $336.17 | $250.00 | $350.00 | $260.00 | $301.99 | $400.00 |
| 16 | Tack coat (341-7082) | GAL | 109 | $10.00 | $14.06 | $14.00 | $25.00 | $10.00 | $39.39 | $6.00 |
| 17 | Struct excavation (400-7001) | CY | 198 | $35.00 | $49.22 | $50.00 | $10.00 | $20.00 | $52.52 | $70.00 |
| 18 | Cem stabil BKFL (400-7010) | CY | 116 | $100.00 | $62.59 | $85.00 | $210.00 | $95.00 | $105.04 | $120.00 |
| 19 | Trench excavation protection (402-7001) | LF | 29 | $16.00 | $5.89 | $50.00 | $45.00 | $1.00 | $72.22 | $2.00 |
| 20 | Class C concrete (rail foundation) (420-7052) | CY | 5 | $1,010.00 | $1,296.67 | $3,000.00 | $2,500.00 | $1,250.00 | $1,011.01 | $410.00 |
| 21 | Riprap (concrete)(5 in) (432-7002) | CY | 69 | $650.00 | $1,039.91 | $1,500.00 | $750.00 | $450.00 | $943.84 | $900.00 |
| 22 | Riprap (mow strip)(4 in) (432-7013) | CY | 23 | $600.00 | $809.94 | $1,200.00 | $800.00 | $400.00 | $976.19 | $750.00 |
| 23 | Rail (type T223) (450-7008) | LF | 148 | $175.00 | $420.39 | $360.00 | $230.00 | $135.00 | $235.71 | $220.00 |
| 24 | Concrete box culvert (10 FT X 8 FT) (462-7036) | LF | 87 | $2,000.00 | $1,591.91 | $3,000.00 | $2,000.00 | $1,950.00 | $1,975.34 | $3,050.00 |
| 25 | RC pipe (CL III)(18 in) (464-7003) | LF | 63 | $110.00 | $93.78 | $160.00 | $110.00 | $155.00 | $131.22 | $610.00 |
| 26 | Wingwall (PW - 1) (HW=11 FT) (466-7181) | EACH | 2 | $100,000 | $65,626 | $60,000 | $80,000 | $125,700 | $60,726 | $125,000 |
| 27 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 2 | $1,500.00 | $2,657.85 | $3,500.00 | $2,000.00 | $3,850.00 | $2,363.40 | $2,100.00 |
| 28 | Removing structure (pipe) (496-7007) | LF | 56 | $45.00 | $56.98 | $70.00 | $10.00 | $20.00 | $75.50 | $100.00 |
| 29 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 1 | $37,200 | $39,729 | $40,000 | $50,000 | $125,000 | $39,718 | $215,000 |
| 30 | Removing structure (ret wall) (496-7019) | LF | 68 | $350.00 | $122.24 | $300.00 | $100.00 | $50.00 | $79.44 | $80.00 |
| 31 | Mobilization (500-7001) | LS | 1 | $128,151 | $108,652 | $120,000 | $113,500 | $125,000 | $118,000 | $65,000 |
| 32 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $16,000 | $2,305.96 | $1,600.00 | $2,500.00 | $2,650.00 | $3,742.05 | $5,300.00 |
| 33 | Portable changeable message sign (503-7001) | DAY | 456 | $142.00 | $53.62 | $56.00 | $45.00 | $105.00 | $131.30 | $100.00 |
| 34 | Rock filter dams (install) (type 1) (506-7001) | LF | 80 | $42.00 | $42.78 | $30.00 | $45.00 | $40.00 | $65.65 | $48.00 |
| 35 | Construction exits (install) (type 1) (506-7020) | SY | 156 | $35.00 | $18.34 | $32.00 | $41.00 | $25.00 | $39.39 | $90.00 |
| 36 | Construction exits (remove) (506-7024) | SY | 156 | $10.00 | $9.78 | $15.00 | $25.00 | $5.00 | $13.13 | $23.00 |
| 37 | Temporary sediment control fence (install) (506-7039) | LF | 1,089 | $3.75 | $3.06 | $4.00 | $4.00 | $4.00 | $6.57 | $4.00 |
| 38 | Temporary sediment control fence (remove) (506-7041) | LF | 1,089 | $1.20 | $0.61 | $1.00 | $2.50 | $1.00 | $2.63 | $1.50 |
| 39 | Concrete curb (dowel) (529-7014) | LF | 133 | $76.50 | $19.09 | $50.00 | $35.00 | $7.00 | $10.18 | $18.00 |
| 40 | Driveways (ACP) (530-7010) | SY | 632 | $65.00 | $93.15 | $25.00 | $100.00 | $45.00 | $65.65 | $91.00 |
| 41 | Metal W-beam guard fence (timber post) (540-7001) | LF | 225 | $30.00 | $34.84 | $30.00 | $31.00 | $30.00 | $32.17 | $90.00 |
| 42 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 1 | $2,500.00 | $2,872.70 | $2,100.00 | $2,580.00 | $2,200.00 | $2,626.00 | $5,600.00 |
| 43 | Short radius (28") (540-7013) | LF | 87.50 | $45.00 | $79.46 | $61.00 | $58.00 | $49.00 | $59.09 | $95.00 |
| 44 | Driveway terminal anchor section (540-7014) | EACH | 7 | $1,100.00 | $2,035.33 | $1,200.00 | $1,950.00 | $1,550.00 | $1,969.50 | $2,400.00 |
| 45 | Downstream anchor terminal section (540-7015) | EACH | 2 | $1,615.00 | $2,017.00 | $1,200.00 | $1,935.00 | $1,650.00 | $1,969.50 | $2,100.00 |
| 46 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,535.00 | $3,850.63 | $3,300.00 | $3,500.00 | $3,100.00 | $3,545.10 | $5,500.00 |
| 47 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 3 | $360.00 | $507.92 | $240.00 | $400.00 | $350.00 | $393.90 | $2,500.00 |
| 48 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 6 | $700.00 | $828.90 | $700.00 | $800.00 | $800.00 | $919.10 | $900.00 |
| 49 | Remove SM RD SN sup&AM (644-7073) | EACH | 3 | $100.00 | $122.24 | $120.00 | $125.00 | $200.00 | $131.30 | $1,000.00 |
| 50 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016) | EACH | 6 | $30.00 | $17.05 | $14.00 | $70.00 | $30.00 | $26.26 | $85.00 |
| 51 | Install object marker assembly (OM-3L)(TWT)GND (658-7066) | EACH | 2 | $250.00 | $588.52 | $490.00 | $100.00 | $300.00 | $328.25 | $680.00 |
| 52 | Install object marker assembly (OM-3R)(TWT)GND (658-7070) | EACH | 2 | $250.00 | $588.52 | $490.00 | $100.00 | $285.00 | $328.25 | $680.00 |
| 53 | Remove delin & object marker assms (658-7078) | EACH | 4 | $25.00 | $122.24 | $25.00 | $25.00 | $30.00 | $32.83 | $2,000.00 |
| 54 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 60 | $8.50 | $12.22 | $10.00 | $12.89 | $10.00 | $19.70 | $10.00 |
| 55 | Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081) | EACH | 2 | $500.00 | $580.65 | $480.00 | $612.06 | $550.00 | $656.50 | $500.00 |
| 56 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 1,336 | $1.00 | $3.36 | $2.80 | $3.54 | $1.00 | $11.82 | $3.00 |
| 57 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 1,336 | $1.00 | $3.36 | $2.80 | $3.54 | $1.00 | $11.82 | $3.00 |
| 58 | Pavement sler 6" (666-7347) | LF | 2,670 | $0.25 | $0.02 | $0.03 | $0.03 | $2.00 | $0.63 | $0.25 |
| 59 | Pavement sler 24" (666-7352) | LF | 60 | $2.00 | $0.10 | $0.10 | $0.10 | $5.00 | $3.94 | $0.25 |
| 60 | Pavement sler (RR crossing) (666-7364) | EACH | 2 | $120.00 | $1.22 | $1.00 | $1.29 | $550.00 | $32.83 | $1.00 |
| 61 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 17 | $8.00 | $12.22 | $10.00 | $12.89 | $350.00 | $11.82 | $12.00 |
| 62 | Pavement surface preparation for marking (6") (678-7002) | LF | 2,672 | $0.25 | $0.06 | $0.05 | $0.06 | $1.00 | $0.12 | $0.10 |
| 63 | Pavement surface preparation for marking (24") (678-7008) | LF | 60 | $2.00 | $0.24 | $0.20 | $0.26 | $2.00 | $0.66 | $0.25 |
| 64 | Pavement surface preparation for marking (RR crossing) (678-7020) | EACH | 2 | $10.00 | $12.23 | $10.00 | $12.89 | $150.00 | $32.83 | $12.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.