TxDOT contract A00176137 bid tabulation
Rehabilitate Existing Roadway, FM 3163 (IH35 to FM 2164). Let by Texas DOT on September 5, 2025, Denton, Dallas District. 7 bids received; low bid $4,145,279 by Jagoe-Public Company, +2.7% against the engineer's estimate of $4,037,878.
- Owner
- Texas DOT
- Letting
- 05 SEP 2025
- Pay items
- 84
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jagoe-Public Company | $4,145,279 | Low | +3.0% |
| 2 | Quality Excavation, LLC | $4,286,399 | +3.0% | +6.0% |
| 3 | Eurovia Atlantic Coast LLC | $4,325,987 | +4.0% | +7.0% |
| 4 | Austin Bridge & Road Services, LP | $4,606,755 | +11% | +14% |
| 5 | Grey Sky Construction LLC | $5,549,019 | +34% | +37% |
| 6 | Overland Corporation | $6,794,935 | +64% | +68% |
| 7 | Peachtree Construction, LTD. | $7,028,624 | +70% | +74% |
Engineer's estimate: $4,037,878.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Jagoe-Public Company | 2. Quality Excavation, LLC | 3. Eurovia Atlantic Coast LLC | 4. Austin Bridge & Road Services, LP | 5. Grey Sky Construction LLC | 6. Overland Corporation |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 131.32 | $420.00 | $500.00 | $900.00 | $254.00 | $3,508.03 | $3,000.00 | $2,400.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 145 | $10.00 | $19.00 | $11.00 | $36.00 | $38.73 | $50.00 | $25.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 750 | $13.00 | $19.00 | $19.00 | $18.00 | $12.29 | $50.00 | $35.00 |
| 4 | Remove (0"-6") TRT/untrt base & asphalt pavement (105-7046) | SY | 2,702 | $9.50 | $11.00 | $7.55 | $10.00 | $13.96 | $20.00 | $9.40 |
| 5 | Remove (2"-8") TRT/untrt base & asphalt pavement (105-7053) | SY | 2,931 | $9.00 | $15.00 | $9.71 | $18.00 | $14.00 | $30.00 | $9.30 |
| 6 | Excavation (roadway) (110-7001) | CY | 3,371 | $16.00 | $20.00 | $6.50 | $27.00 | $20.00 | $20.00 | $45.00 |
| 7 | Embankment (final)(DC)(type C) (132-7006) | CY | 4,943 | $23.00 | $20.00 | $15.50 | $53.00 | $17.56 | $50.00 | $67.00 |
| 8 | Backfill (type A or B) (134-7004) | STA | 131.32 | $320.00 | $240.00 | $420.00 | $375.00 | $53.71 | $250.00 | $500.00 |
| 9 | Compost manuf topsoil (4") (161-7002) | SY | 198,887 | $1.00 | $0.30 | $0.99 | $0.92 | $0.10 | $3.00 | $1.10 |
| 10 | Block sodding (162-7002) | SY | 8,492 | $4.30 | $6.00 | $0.50 | $4.66 | $4.80 | $6.00 | $4.00 |
| 11 | Drill seed (permanent_rural_clay) (164-7010) | SY | 126,930 | $0.20 | $0.05 | $0.13 | $0.12 | $0.12 | $0.50 | $0.20 |
| 12 | Drill seed (temporary_warm_cool) (164-7015) | SY | 63,465 | $0.20 | $0.04 | $0.12 | $0.11 | $0.11 | $0.50 | $0.16 |
| 13 | Vegetative watering (168-7001) | TGL | 29,586 | $4.00 | $0.50 | $2.95 | $0.25 | $0.10 | $1.00 | $44.00 |
| 14 | SP mixes SP-B PG64-22 (344-7001) | TON | 5,789 | $100.00 | $90.00 | $116.00 | $107.00 | $127.00 | $122.00 | $161.00 |
| 15 | SP mixes SP-C PG64-22 (344-7009) | TON | 4,903 | $105.00 | $100.00 | $120.00 | $110.00 | $140.00 | $135.00 | $135.00 |
| 16 | Tack coat (344-7077) | GAL | 5,031 | $3.00 | $1.00 | $3.24 | $3.00 | $6.68 | $5.00 | $3.75 |
| 17 | Flexible pavement structure repair(12") (351-7011) | SY | 1,000 | $65.00 | $90.00 | $140.00 | $102.00 | $108.44 | $120.00 | $170.00 |
| 18 | Plane & text asphalt concrete pavement(1") (354-7017) | SY | 1,600 | $3.50 | $4.00 | $3.50 | $6.00 | $4.05 | $10.00 | $13.00 |
| 19 | Cut & restoring pavement (400-7006) | SY | 368 | $240.00 | $100.00 | $165.00 | $160.00 | $100.00 | $150.00 | $215.00 |
| 20 | Flowable backfill (401-7001) | CY | 4 | $400.00 | $1,500.00 | $500.00 | $450.00 | $1,098.25 | $350.00 | $350.00 |
| 21 | Trench excavation protection (402-7001) | LF | 441 | $6.00 | $1.00 | $2.36 | $1.00 | $2.00 | $10.00 | $7.50 |
| 22 | Temporary special shoring (403-7001) | SF | 1,340 | $30.00 | $1.00 | $54.00 | $35.00 | $100.00 | $55.00 | $22.00 |
| 23 | Concrete structure repair(rapid deck rep(full DPT)) (429-7006) | SF | 150 | $80.00 | $330.00 | $411.88 | $223.00 | $223.00 | $500.00 | $381.00 |
| 24 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 31 | $250.00 | $400.00 | $144.86 | $269.00 | $269.00 | $500.00 | $134.00 |
| 25 | Riprap (mow strip)(4 in) (432-7013) | CY | 160 | $550.00 | $1,100.00 | $630.00 | $705.00 | $556.77 | $500.00 | $700.00 |
| 26 | Riprap (stone common)(grout)(18 in) (432-7039) | CY | 109 | $350.00 | $380.00 | $265.00 | $350.00 | $247.43 | $185.00 | $425.05 |
| 27 | Riprap (stone protection)(12 in) (432-7041) | CY | 170 | $200.00 | $280.00 | $170.00 | $252.00 | $152.32 | $150.00 | $241.11 |
| 28 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 60 | $40.00 | $80.00 | $98.38 | $42.00 | $42.00 | $100.00 | $91.00 |
| 29 | Spot clean & paint existing structure(special protection sys) (446-7019) | LS | 1 | $10,000 | $68,000 | $8,578.00 | $55,000 | $55,000 | $75,000 | $7,900.00 |
| 30 | Concrete box culvert (10 FT X 6 FT)(extend) (462-7089) | LF | 66 | $1,600.00 | $2,000.00 | $1,000.00 | $1,710.00 | $1,150.00 | $1,500.00 | $1,075.00 |
| 31 | RC pipe (CL III)(18 in) (464-7003) | LF | 650 | $100.00 | $70.00 | $90.00 | $65.00 | $55.00 | $85.00 | $75.00 |
| 32 | RC pipe (CL III)(24 in) (464-7005) | LF | 885 | $105.00 | $100.00 | $101.00 | $80.00 | $65.00 | $105.00 | $89.00 |
| 33 | RC pipe (CL III)(36 in) (464-7009) | LF | 107 | $166.00 | $200.00 | $205.00 | $150.00 | $165.00 | $150.00 | $155.00 |
| 34 | RC pipe (CL III)(48 in) (464-7011) | LF | 51 | $270.00 | $310.00 | $375.00 | $260.00 | $200.00 | $250.00 | $255.00 |
| 35 | RC pipe (CL III)(54 in) (464-7012) | LF | 152 | $280.00 | $800.00 | $525.00 | $420.00 | $265.00 | $350.00 | $350.00 |
| 36 | Headwall (CH - FW - 0) (diameter= 48 in) (466-7011) | EACH | 2 | $19,000 | $13,000 | $8,300.00 | $12,000 | $12,238 | $8,500.00 | $17,350 |
| 37 | Headwall (CH - FW - 30) (diameter= 54 in) (466-7042) | EACH | 2 | $21,000 | $22,000 | $15,000 | $14,000 | $13,938 | $12,500 | $19,600 |
| 38 | Wingwall (PW - 2) (HW=8 FT) (466-7192) | EACH | 2 | $36,000 | $30,000 | $31,000 | $44,000 | $37,708 | $25,000 | $28,750 |
| 39 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 42 | $1,600.00 | $1,800.00 | $1,600.00 | $1,230.00 | $900.00 | $1,350.00 | $1,650.00 |
| 40 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 10 | $1,500.00 | $2,000.00 | $1,550.00 | $1,300.00 | $1,000.00 | $2,200.00 | $2,030.00 |
| 41 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 26 | $1,400.00 | $2,200.00 | $2,150.00 | $1,590.00 | $1,450.00 | $2,200.00 | $2,150.00 |
| 42 | Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366) | EACH | 4 | $4,200.00 | $4,300.00 | $5,900.00 | $3,130.00 | $4,750.00 | $3,500.00 | $5,000.00 |
| 43 | Clean existing culverts (480-7001) | EACH | 1 | $3,000.00 | $7,000.00 | $5,250.00 | $4,000.00 | $2,750.00 | $5,000.00 | $5,500.00 |
| 44 | Removing structure (inlet) (496-7002) | EACH | 1 | $1,700.00 | $700.00 | $1,350.00 | $500.00 | $600.00 | $2,500.00 | $1,100.00 |
| 45 | Removing structure (set) (496-7004) | EACH | 63 | $350.00 | $170.00 | $400.00 | $200.00 | $325.00 | $500.00 | $550.00 |
| 46 | Removing structure (wingwall) (496-7005) | EACH | 16 | $1,300.00 | $1,200.00 | $900.00 | $1,000.00 | $875.00 | $2,500.00 | $1,750.00 |
| 47 | Removing structure (pipe) (496-7007) | LF | 1,538 | $25.00 | $7.00 | $16.00 | $10.00 | $10.00 | $50.00 | $20.00 |
| 48 | Mobilization (500-7001) | LS | 1 | $383,168 | $461,000 | $420,000 | $415,000 | $506,743 | $400,000 | $592,700 |
| 49 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $12,000 | $30,000 | $7,800.00 | $25,000 | $31,200 | $15,000 | $12,500 |
| 50 | Portable changeable message sign (503-7002) | EACH | 2 | $13,000 | $30,000 | $19,500 | $18,000 | $400.00 | $20,000 | $10,800 |
| 51 | TMA (stationary) (505-7001) | DAY | 127 | $200.00 | $240.00 | $198.19 | $300.00 | $2.00 | $250.00 | $220.00 |
| 52 | TMA (mobile operation) (505-7002) | HR | 160 | $38.00 | $25.00 | $105.00 | $85.00 | $3.00 | $55.00 | $115.00 |
| 53 | Rock filter dams (install) (type 2) (506-7002) | LF | 1,100 | $42.00 | $48.00 | $37.48 | $34.67 | $35.71 | $30.00 | $39.00 |
| 54 | Rock filter dams (install) (type 3) (506-7003) | LF | 350 | $80.00 | $90.00 | $82.74 | $76.54 | $78.84 | $50.00 | $72.00 |
| 55 | Rock filter dams (remove) (506-7011) | LF | 1,450 | $16.00 | $14.00 | $15.68 | $14.50 | $14.94 | $20.00 | $11.00 |
| 56 | Construction exits (install) (type 1) (506-7020) | SY | 156 | $32.00 | $10.00 | $38.07 | $35.22 | $36.28 | $40.00 | $35.00 |
| 57 | Construction exits (remove) (506-7024) | SY | 156 | $11.50 | $5.00 | $10.92 | $10.10 | $10.40 | $20.00 | $11.00 |
| 58 | Temporary sediment control fence (install) (506-7039) | LF | 14,620 | $4.00 | $4.75 | $3.36 | $3.11 | $3.20 | $4.00 | $3.90 |
| 59 | Temporary sediment control fence (remove) (506-7041) | LF | 14,620 | $1.00 | $0.60 | $0.89 | $0.82 | $0.84 | $2.00 | $0.50 |
| 60 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 2,340 | $6.00 | $7.00 | $7.23 | $6.69 | $6.89 | $12.00 | $5.75 |
| 61 | Biodegradable erosion control logs (remove) (506-7046) | LF | 2,340 | $1.20 | $1.25 | $1.43 | $1.32 | $1.36 | $6.00 | $1.00 |
| 62 | Driveways (concrete) (hes) (530-7007) | SY | 730 | $130.00 | $100.00 | $94.00 | $139.50 | $142.69 | $100.00 | $105.00 |
| 63 | Driveways (ACP) (530-7010) | SY | 2,810 | $60.00 | $49.00 | $86.00 | $53.00 | $59.40 | $45.00 | $100.00 |
| 64 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 24,411 | $0.15 | $0.15 | $0.19 | $0.38 | $0.18 | $0.50 | $0.18 |
| 65 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 11,881 | $0.20 | $0.15 | $0.19 | $0.39 | $0.18 | $0.50 | $0.18 |
| 66 | Metal W-beam guard fence (steel post) (540-7002) | LF | 600 | $32.00 | $40.00 | $34.05 | $31.50 | $29.00 | $30.00 | $31.50 |
| 67 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,500.00 | $3,900.00 | $3,189.12 | $2,950.00 | $2,925.00 | $3,250.00 | $2,950.00 |
| 68 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 13 | $240.00 | $360.00 | $237.83 | $220.00 | $265.00 | $850.00 | $295.00 |
| 69 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 1 | $270.00 | $460.00 | $259.45 | $240.00 | $275.00 | $850.00 | $375.00 |
| 70 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 4 | $700.00 | $1,000.00 | $594.58 | $550.00 | $900.00 | $850.00 | $795.00 |
| 71 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 9 | $690.00 | $800.00 | $778.36 | $720.00 | $350.00 | $1,150.00 | $645.00 |
| 72 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 1 | $800.00 | $900.00 | $864.84 | $800.00 | $785.00 | $1,150.00 | $725.00 |
| 73 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 2 | $880.00 | $800.00 | $810.79 | $750.00 | $600.00 | $1,150.00 | $610.00 |
| 74 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001) | EACH | 8 | $30.00 | $31.00 | $32.43 | $25.00 | $30.00 | $100.00 | $25.00 |
| 75 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 32 | $60.00 | $70.00 | $64.86 | $60.00 | $55.00 | $100.00 | $55.00 |
| 76 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 2,630 | $2.00 | $2.50 | $3.00 | $1.55 | $0.50 | $6.00 | $1.00 |
| 77 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 75 | $9.00 | $9.00 | $10.27 | $7.00 | $13.39 | $20.00 | $13.00 |
| 78 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 26,009 | $0.70 | $0.80 | $0.63 | $0.64 | $0.59 | $0.75 | $0.57 |
| 79 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 2,620 | $0.60 | $0.80 | $0.74 | $0.64 | $0.61 | $0.75 | $0.59 |
| 80 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 13,249 | $1.50 | $0.80 | $0.63 | $0.64 | $0.61 | $0.75 | $0.59 |
| 81 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 290 | $5.50 | $6.00 | $4.27 | $5.00 | $4.12 | $6.00 | $4.00 |
| 82 | Longt crack cleaning and sealing (CRCP) (713-7005) | LF | 20 | $42.00 | $50.00 | $108.11 | $33.00 | $33.00 | $200.00 | $100.00 |
| 83 | Full - width mowing (730-7019) | CYC | 2 | $500.00 | $2,500.00 | $4,864.75 | $3,700.00 | $5,000.00 | $1,000.00 | $5,000.00 |
| 84 | CNC crack repair (discrete)(inject) (780-7002) | LF | 30 | $95.00 | $37.00 | $32.43 | $90.00 | $90.00 | $100.00 | $155.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.